INTRODUCTION TO
SCAFFOLDING INSPECTION
FOR HSE STAFF
Mark Stephens FIIRSM FInstLM FISQEMA
![Page 2: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/2.jpg)
Disclaimer
• This training presentation does not qualify you to become
a Scaffold Inspector
• This presentation is purely for awareness training only
![Page 3: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/3.jpg)
Definition
• Scaffold:
• 1. a temporary or movable platform or structure for holding workers and materials working high above the floor or ground during the erection, repair, decoration or demolition of a structure.
• 2. an elevated platform or structure on which criminals are killed by being hanged or beheaded
![Page 4: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/4.jpg)
Definition
• Falsework:
• consists of temporary structures used in construction to support spanning or arched structures in order to hold the component in place until its construction is sufficiently advanced to support itself.
• Falsework also includes temporary support structures for formwork used to mold concrete to form a desired shape, and shoring which is temporary structural reinforcement used during repairs.
![Page 5: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/5.jpg)
Definition
• Formwork: • is the term given to either
temporary or permanent
molds into which concrete or
similar materials are poured.
![Page 6: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/6.jpg)
Rule #1 - don’t mix the three
![Page 7: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/7.jpg)
Statistics
On average, 78 fatalities a year in
USA (2000 – 2010)
In a Bureau of Labor and Statistics (BLS)
study, 72% of workers injured in scaffold
accidents attributed the accident either to
the planking or support giving way, or to
the employee slipping or being struck by
a falling object.
![Page 8: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/8.jpg)
70%
12%
18%
Facts – Scaffolding fatality study
Falls
Collapse
Electro-cution
![Page 9: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/9.jpg)
Typical Middle East Scenario
• Project Manager:
“You’re the HSE Manager – it’s your job to sign-off the scaffolding”
![Page 10: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/10.jpg)
Only a (scaffold) competent person can erect, modify, move, maintain, inspect or dismantle scaffolding, or if being trained, is being supervised by a (scaffold) competent person.
Competency
![Page 11: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/11.jpg)
Inspection: Structural Engineer Scaffold Inspector (3 day) Scaffold Supervisor (3 day)(6 months experience at level 3)
Erection, modification, moving, maintaining, or dismantling : Level 3 (5 day) (6 months experience at level 2)
Level 2 (5 day) (6 months experience at level 1)
Level 1 (5 day)
Trainee laborer/apprentice (1 day)
Overseas Competent Persons (Scaffolds)
![Page 12: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/12.jpg)
All scaffolds over 10m long, over 8m in height, hung, cantilever or suspended scaffolds must be designed by a qualified, professional structural engineer. All calculations and the design drawing(s) must be included in an Appendix of the Health & Safety Construction Plan, that can be extracted and used as a Scaffolding Plan. Once erected, designed scaffolds must be approved and signed off by the structural engineer as being built to the design.
Overseas Competent Persons (Scaffolds)
![Page 13: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/13.jpg)
Occupational Health Standards
All workers during the orientation/ induction process shall be required
to complete a health assessment questionnaire, which shall be kept
on file within the site first aid facility.
Questions within the health assessment questionnaire shall be based
on typical construction work activities that will encountered on the
project , examples are, but not limited to:
Are you taking any medication which may affect your capacity to
do your job safely?
Do you suffer from vertigo?
Overseas Competent Persons (Scaffolds)
![Page 14: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/14.jpg)
Types - System
Prefabricated and all components are predesigned to fit in specific places. Fast but lacking in flexibility.
![Page 15: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/15.jpg)
Types – Open Tube & Coupler/Clamp
• Allows for greater flexibility of design, but compared to a system scaffold, it is a bit slower to erect and requires competency
![Page 16: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/16.jpg)
Types – Timber / Bamboo
![Page 17: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/17.jpg)
Typical Middle East Scenario
• Project Manager:
“You’re the HSE Manager – it’s your job to sign-off the scaffolding”
![Page 18: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/18.jpg)
Where do I start?
![Page 19: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/19.jpg)
Scaffolding Hazards
Where do I start?
Falls from Height
Incomplete working platforms
Incomplete cover of openings (floor & wall)
Insufficient sized working platform
Use of equipment to gain extra height
Incomplete/Insufficient access
Poor Housekeeping (Slips & trips)
Failure to wear PPE (PFAS) where required
Falling Objects
![Page 20: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/20.jpg)
Scaffolding Hazards
Where do I start? Structural Collapse
Incorrect set-up
Anchorages
Poor quality materials
Unstable footings
4:1 ratio
Movement
Gravity
Overloading
Weather
Damaged material
Electrocution
Overhead Power Lines
Temporary Electrical equipment (poor grounding/earthing)
Lightning
![Page 21: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/21.jpg)
Risk Profile
Where do I start?
What’s going to hit the headlines?
![Page 22: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/22.jpg)
Rule #2 – Stop it falling over
![Page 23: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/23.jpg)
Gravity
![Page 24: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/24.jpg)
Structural Collapse
All scaffolds must be prevented
from collapsing or tipping by
secure attachment to the
bearing surface or to another
structure by the means of the
following methods:
![Page 25: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/25.jpg)
Structural Collapse
Reveal Tie
![Page 26: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/26.jpg)
Structural Collapse
Box Tie
![Page 27: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/27.jpg)
Structural Collapse
Through Tie (2-way tie)
![Page 28: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/28.jpg)
Structural Collapse
Lip Tie
![Page 29: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/29.jpg)
Structural Collapse
Cast-in
![Page 30: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/30.jpg)
Structural Collapse
Drilled-in
![Page 31: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/31.jpg)
Structural Collapse
Tie Safety Criteria
Lowest level of ties at the lift
closest to the height of 4 times the
minimum base dimension (4:1
ratio).
Highest level of ties as close to the
top of the scaffold as possible.
Spaced vertically every 8 meters (4
lifts) or less.
Installed at both ends of the
scaffold and at horizontal intervals
no more than 9 meters measured
from one end toward the other.
![Page 32: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/32.jpg)
Structural Collapse
Rakers
![Page 33: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/33.jpg)
Structural Collapse
Outriggers
![Page 34: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/34.jpg)
Structural Collapse
Cross Tube Anchor
![Page 35: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/35.jpg)
Structural Collapse
Driven Tube & Wire Anchor
![Page 36: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/36.jpg)
Gravity
![Page 37: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/37.jpg)
Gravity
![Page 38: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/38.jpg)
Structural Collapse
Bracing
BEARER (TRANSOM)POST (STANDARD)
TRANSVERSE (SECTIONAL) "ZIG-ZAG" BRACING
TUBE & COUPLER SCAFFOLD
4th LIFT
3rd LIFT
2nd LIFT
1st LIFT
Base Lift35o-55o
(TYP.)
MAX. 3OPEN BAYS
![Page 39: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/39.jpg)
Structural Collapse
Bracing
RUNNER (LEDGER)
POST (STANDARD)
LONGITUDINAL (FAÇADE) "ZIG-ZAG" BRACING
TUBE & COUPLER SCAFFOLD
3rd LIFT
2nd LIFT
1st LIFT
Base Lift35o-55o
(TYP.)
BRACING REPEATED EVERY
5th POST (STANDARD)
![Page 40: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/40.jpg)
Structural Collapse
Footings
![Page 41: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/41.jpg)
Structural Collapse
Footings
![Page 42: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/42.jpg)
Structural Collapse
Footings
![Page 43: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/43.jpg)
Structural Collapse
Weather
"Sheeted Scaffolds" or scaffolds that have nets or tarpaulins attached to them must
have specific calculations and design conducted by a structural engineer to address
the issue of "wind-sail" on the complete structure.
![Page 44: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/44.jpg)
Structural Collapse
Weather
In windy conditions, manufacturer's instructions must be adhered to; usually at
17mph all work should cease on mobile towers.
![Page 45: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/45.jpg)
Structural Collapse
Overloading
Each scaffold and scaffold component must support without failure its own
weight and at least four times the maximum intended load applied or transmitted
to it.
![Page 46: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/46.jpg)
Structural Collapse
Correct Connections
Couplers should be free from worn threads or damaged bolts and excess oil
which reduces friction grip.
![Page 47: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/47.jpg)
Structural Collapse
Correct Connections
![Page 48: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/48.jpg)
Structural Collapse
Serviceable material
Tubes should not be split, cracked, rusty, bent or distorted, and ends should be
cut square and clean.
![Page 49: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/49.jpg)
Structural Collapse
Serviceable material
Scaffold boards must be a minimum of 1,500 lb-f/in2 construction grade
lumber, fitted with end hoop irons for protection.
![Page 50: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/50.jpg)
Structural Collapse
Movement
No attempt should be made to
move tall, fully-erected towers. The
tower must be reduced to a safe
height appropriate to the ground
conditions. Normally as guidance,
the height should not exceed 2 1/2
times the minimum base
dimension.
.
No persons or materials must be
on the tower during movement.
![Page 51: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/51.jpg)
Rule #3 – stop someone from falling off
![Page 52: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/52.jpg)
Falls from Height
Incomplete Working Platform
![Page 53: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/53.jpg)
Falls from Height
Working Platform Overhangs
![Page 54: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/54.jpg)
Falls from Height
Working area size
![Page 55: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/55.jpg)
Falls from Height
Gaining extra height
![Page 56: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/56.jpg)
Falls from Height
Housekeeping
![Page 57: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/57.jpg)
Rule #4 – stop someone from falling through
![Page 58: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/58.jpg)
Falls from Height
Floor Openings
![Page 59: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/59.jpg)
Falls from Height
Gaps between Scaffold & Structure
![Page 60: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/60.jpg)
Falls from Height
Gaps between Working Platform boards
![Page 61: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/61.jpg)
Falls from Height
Rebar Caps
![Page 62: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/62.jpg)
Access
Ladders
![Page 63: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/63.jpg)
Access
Ramps
![Page 64: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/64.jpg)
Rule #5 – stop tools & materials falling off
![Page 65: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/65.jpg)
Falling Objects
Fans
![Page 66: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/66.jpg)
Falling Objects
Sheeting
![Page 67: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/67.jpg)
Falling Objects
Netting
![Page 68: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/68.jpg)
Falling Objects
Waste Chutes
![Page 69: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/69.jpg)
Scaffolding Contractors
Handover Certificates
![Page 70: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/70.jpg)
Electrical Safety
Overhead Power Lines
![Page 71: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/71.jpg)
Electrical Safety
Temporary Electrical Safety
![Page 72: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/72.jpg)
Inspections
Visible Records
![Page 73: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/73.jpg)
Summary
Rules
1. Never mix scaffolding/formwork/falsework 2. Stop the scaffolding falling over 3. Stop someone falling off 4. Stop someone falling through 5. Stop tools & materials falling off
![Page 74: INTRODUCTION TO SCAFFOLDING INSPECTION FOR HSE STAFF](https://reader034.fdocuments.net/reader034/viewer/2022051102/586a31bf1a28ab3d018bf04e/html5/thumbnails/74.jpg)
INTRODUCTION TO
SCAFFOLDING INSPECTION
Any Questions ?