Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine...
Transcript of Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine...
![Page 1: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/1.jpg)
October 15th, 2010 Wind Turbine Division
Samsung Heavy Industries
Introduction to Samsung Wind Turbine Business
![Page 2: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/2.jpg)
Contents 1. The potential for Wind Turbine Business
2. Visions and Targets
3. Onshore WTG Development
Features of 2.5MW WTG
Lubbock Wind Ranch Project
4. Offshore WTG Development
SHI’s Turn-key solution
Voice of Customer
5. Development schedule
![Page 3: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/3.jpg)
Samsung Wind Turbine Business
Shipbuilding & Fixed / Floating
Offshore Structure
Civil Engineering &
Plant Engineering
Digital Business Automation / Navigation /
Power Control System
Research Institute Noise & Vibration Analysis
• Drive train designs • Cold climate packages • Offshore turbine designs • Samsung Wind turbine Quality Standard (SWQS)
• Balance of plants • Wind turbine controller • SCADA • Power quality control
• Blade designs • Structure optimization • Noise & vibration reduction
The Potential for Wind Turbine Business
Integrated Technology &
Experience
![Page 4: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/4.jpg)
Vision and Target
2015 Global Top 10
M/S 10%
Expansion to global market
• Europe market entry: 2013
Manufacturing Capacity
: 400 units/year
2020 Global Top 3
M/S 15%
World Top 3 Manufacturer
Manufacturing Capacity
: 1000 units/year
![Page 5: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/5.jpg)
Global Business Network Plan
Sales Branch: Houston (2009)
U.S.A. Europe China
Logistics, A/S Centre (2013)
Assembly Factory (2013)
Logistics, A/S Centre (2013)
Assembly/Component Factory (2013)
Korea
Sales Branch: Portland (2011)
Blade/Tower Factory (2011)
Engineering Centre (2011)
Component Factory (2011)
Japan
Engineering Centre (2012)
Sales Branch (2012)
Sales Branch (2012)
Gearbox Factory (2012)
Logistics, A/S Centre (2010)
Assembly Factory (2010)
![Page 6: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/6.jpg)
Construction of Assembly Factory
- Completion date : July 2010 (26,710m² / Geoje-Si, Korea)
- Production capacity : 2.5MW WTG 200 units/year
![Page 7: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/7.jpg)
Onshore WTG Development
![Page 8: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/8.jpg)
Onshore 25s/25x Technical Specifications (1/2)
IEC class IIA IEC class IIIA
25 m/s (55.9 mph) 21 m/s (47.0 mph)
operating temperature : -30 survival temperature : -40 [
![Page 9: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/9.jpg)
Onshore 25s/25x Technical Specifications (2/2)
![Page 10: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/10.jpg)
Engineered for Reliability
![Page 11: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/11.jpg)
Individual Pitch Control (IPC) Significantly reduced fatigue loads compared to collective pitch control system
Power Quality
Ensuring excellent voltage and frequency stability
Optimized for Performance
![Page 12: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/12.jpg)
Built for Maintainability
Automatic Lubrication System
Maintenance time/frequency reduced by simply replacing grease oil container
Enhanced durability of bearings and gears
Electric Pitch/Yaw Drive System Reduced maintenance cost by eliminating
the need of regular inspections
Condition Monitoring System Monitoring of vital drive-train
components in 13 locations
Alert the operator of abnormal operating conditions
![Page 13: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/13.jpg)
7.5MW Lubbock Wind Ranch Project
Terms of a Contract Contract Date : July 24, 2009
Sale of Wind Turbines : 3 X 2.5MW Wind Turbines + Tower + SCADA
Project Schedule - Prototype : Oct. 2009 Electrical Eng. Design completed Nov. 2009 Civil Eng. Design completed Jan. 2010 WTG Erection completed Apr. 2010 Commissioning completed Sep. 2010 Power and load measurements completed Oct. 2010 Deliver to Cielo - WTG #2, 3 : May. 2011 Final Completion
![Page 14: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/14.jpg)
Transportation & Installation of Prototype Lubbock Wind Ranch Project
![Page 15: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/15.jpg)
Load Measurement for GL Certification Lubbock Wind Ranch Project
Objectives
To verify the structural design of the wind turbine system
GL Cert. Requirement according to IEC61400-13
Measuring Point
Blade Root
Main Shaft
Tower Top
Tower Bottom
Main Frame (additional)
Main Bearing Housing (additional)
![Page 16: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/16.jpg)
Load Measurement for GL Certification Lubbock Wind Ranch Project Measurement Result
Measurement result match with simulation result that ensure the design and the safety
![Page 17: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/17.jpg)
Offshore WTG Development
![Page 18: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/18.jpg)
Turn-Key Solution for Offshore Power Station
World #1 Offshore WTG Provider
Turn-Key Solution Provider
![Page 19: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/19.jpg)
Low O&M cost
High reliability
Low nacelle weight
High energy capture Low cost of energy
Grid compatibility
Wind farm management
Easy installation
Turnkey solution
* Preliminary specification *
Target Market: European offshore
Voice of Customer
Contents Specification
Class IEC Class I
Capacity 6MW~ 7MW
Drive Train 2-Stage geared / Direct-drive
Generator Type PMG, Medium Voltage
Design Life 25 years
Voltage & Frequency Control Available
Foundation Monopile / Tripod / Jacket
![Page 20: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/20.jpg)
Schedule for WT Development
25s
(Class IIa)
25x
(Class IIIa)
25xc
(Class IIIa+CCP)
Offshore
’10 ’11 ’12 ’13
’11. 12
’12. 6
’10. 9
’13. 4
’10.11 ’11. 6 ’12. 3
’10.11
’13. 8 ’14. 4
’14
Design process
Onshore prototype
Onshore test & cert.
Offshore prototype
Offshore test & cert.
’12. 8
![Page 21: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/21.jpg)
Windpower 2010 Exhibition in Dallas
![Page 22: Introduction to Samsung Wind Turbine Business · Contents 1. The potential for Wind Turbine Business 2. Visions and Targets 3. Onshore WTG Development Features of 2.5MW WTG Lubbock](https://reader030.fdocuments.net/reader030/viewer/2022040305/5ea7e3ef90cc1c0a1c3f0a6e/html5/thumbnails/22.jpg)
Thank you!