Introduction to Risk Assessment
Safety of Machinery Series
AIHS Webinar
S. Ivkovic, A. Hallinan
Pilz Australia
20th October 2020
![Page 2: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/2.jpg)
What is Risk Assessment?
A risk assessment involves considering what could happen if someone is exposed to a hazard
(consequence) and the likelihood of it happening.
A risk assessment can help you determine:
How severe a risk is;
Whether existing control measures are effective;
What action you should take to control the risk; and
How urgently the action needs to be taken.
![Page 3: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/3.jpg)
Why conduct a Risk Assessment?
WHS Regulation #34 - Duty to identify hazards
A duty holder, in managing risks to health and safety, must identify reasonably foreseeable hazards that
could give rise to risks to health and safety.
WHS Regulation #35 – Managing risks to health and safety
A duty holder, in managing risks to health and safety, must:
a) eliminate risks to health and safety so far as is reasonably practicable; and
b) if it is not reasonably practicable to eliminate risks to health and safety—minimise those risks so far
as is reasonably practicable.
Victorian and Western Australian legislation also mentions these points in the relevant Acts and
Regulations.
![Page 4: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/4.jpg)
Information on Risk Assessment
AS/NZS 4024.1-2014 Safety of machinery series contains 25 Parts that are European (EN) and
Internationally-based (ISO) safety and design Standards with some modifications to meet Australia's
tough safety practices and regulations.
The series provides designers, manufacturers, suppliers, employers and users of machinery with
guidelines to help reduce the risks of working with, or near, machinery.
This webinar will cover information you can find in the following standards:
AS/NZS 4024 Part 1201: General principles for design—Risk assessment and risk reduction
AS/NZS 4024 Part 1303: Risk assessment—Practical guidance and examples of methods
![Page 5: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/5.jpg)
Risk Assessment Process as Defined in AS/NZS 4024.1201
![Page 6: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/6.jpg)
Limits of the Machinery
Intended to provide a clear description of the mechanical and
physical properties, functional capabilities of the machinery, its
intended use and reasonably foreseeable misuse, and the type of
environment in which it is likely to be used and maintained.
Typical information gathered includes:
Make/Model/Serial No. details
Intended use of machine
Energy sources
Description of control system
Modes of operation
Raw materials
Required skills of operators
Housekeeping and Maintenance
![Page 7: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/7.jpg)
Hazard Identification
Inspect each item of plant in your workplace and observe how it is used.
Talk to your workers and their health and safety representatives to find out
what their experience is with the plant they operate, inspect or maintain.
All hazards associated with the machine should be considered even if
there are suitable risk controls in place.
You should consider whether:
The plant could cause injury due to entanglement, falling, crushing,
trapping, cutting, puncturing, shearing, abrasion or tearing
The plant could create hazardous conditions due to harmful emissions,
fluids or gas under pressure, electricity, noise, radiation, friction,
vibration, fire, explosion, moisture, dust, ice, hot or cold parts, and
The plant could cause injury due to poor ergonomic design - for
example, if operator controls are difficult to reach or require high force to
operate
![Page 8: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/8.jpg)
Risk Estimation
There are many methods used to estimate Risk Levels. It does not
matter what method you use so long as it gives consideration to
the severity of injury and likelihood of occurrence and gives you the
ability to prioritise the risks that you have.
Remember risk estimation is subjective, not a precise science.
Some of the more commonly used risk estimation methods are:
Risk Matrix
Risk Graph
Hazard Rating Number
Risk Score Calculator
You can find details on some of these methods and examples in
AS/NZS 4024.1303
![Page 9: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/9.jpg)
Risk Estimation
![Page 10: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/10.jpg)
Hazard Rating Number (HRN)
Numerical values are assigned to the following factors in order to evaluate the risk related with a
hazard:
The Likelihood of Occurrence (LO)
The Frequency of Exposure (FE)
The Degree of Possible Harm (DPH)
The Number of Persons at risk (NP)
The Hazard Rating Number has then been calculated from the following formula:
![Page 11: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/11.jpg)
Hazard Rating Number (HRN)
Likelihood of Occurrence (LO)
0.033 Almost impossible
1 Highly Unlikely
1.5 Unlikely
2 Possible
5 Even Chance
8 Probable
10 Likely
15 Certain
Degree of Possible Harm (DPH)
0.1 Scratch / Bruise
0.5 Laceration / cut / mild ill health effect
1 Fracture: minor bone – fingers/ toes
2 Fracture- major bone – hand/ arm/ leg
4 Loss of 1 or 2 fingers/ toes
8 Leg / hand amputation, partial loss of hearing or eye
10 Amputation of 2 legs/hands, total loss of hearing/sight
xx in both ears/eyes
12 Critical or permanent illness
15 Fatality
Number of Persons at risk (NP)
1 1- 2 persons
2 3-7 persons
4 8-15 persons
8 16-50 persons
12 More than 50 persons
Frequency of Exposure (FE)
0.5 Annually
1 Monthly
1.5 Weekly
2.5 Daily
4 Hourly
5 Constantly
![Page 12: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/12.jpg)
Risk Evaluation
When evaluating risk you need to consider whether you have
achieved your risk reduction objectives.
The hazard has been eliminated or the risk reduced as far as
reasonably practicable
The safeguarding selected is of a type which, by experience, is
safe for the intended use
The type of safeguarding selected is appropriate for the
application in terms of
probability of defeat or circumvention;
severity of harm; and
hindrance to the execution of the required task
The operating procedures for the use of the machinery are
consistent with the ability of personnel who use the machinery
![Page 13: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/13.jpg)
Acceptable Risk?
If an acceptable level is not achieved then Risk Reduction
Measures must be implemented.
![Page 14: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/14.jpg)
Example – Semi Automatic Rotary Table Wrapper Machine
![Page 15: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/15.jpg)
Example – Semi Automatic Rotary Table Wrapper Machine
This machine facilitates the semi-automatic wrapping of goods placed on a timber pallet. The loaded
pallet is placed on the rotary turn-table
A film spool dispenses plastic film which is routed through rollers on an automatic film shears which
will cut the film at the end of the wrapping process
The film spool will be hoisted while the turntable is in motion to wrap in a vertical direction
The rotation of turn-table will alternate between clockwise and counter clockwise for each wrapping
cycle
Wrapping cycle speeds, number of wrapping layers and rotational torque are fully adjustable via a
HMI screen on the control panel
The machine is stopped, started and reset via push buttons on the control panel, or via a wireless
controller
The operator loaded pallets 3 times an hour
The film spool is replaced daily
Maintenance is performed monthly
![Page 16: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/16.jpg)
Example – Semi Automatic Rotary Table Wrapper Machine
![Page 17: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/17.jpg)
Machine in Operation
![Page 18: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/18.jpg)
Semi Automatic Rotary Table Wrapper Machine
![Page 19: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/19.jpg)
Machine Component Parts
![Page 20: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/20.jpg)
Machine Component Parts
![Page 21: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/21.jpg)
Machine Component Parts
![Page 22: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/22.jpg)
Machine Component Parts
![Page 23: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/23.jpg)
Machine Loading/Unloading
![Page 24: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/24.jpg)
Risk Assessment Process
![Page 25: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/25.jpg)
Step 1 – Identify Limits of the Machine
![Page 26: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/26.jpg)
Step 1 – Identify Limits of the Machine
![Page 27: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/27.jpg)
Risk
Evaluation
Risk
Reduction
Required
Ref No. Lifecycle Task LO FE DPH NP HRNNegligible -
UnacceptableYes/No
0
Operation
Maintenance
Set-up
Changing
SpoolY/N
1
Operation
Maintenance
Set-up
Electrical
MaintenanceY/N
Operation
Maintenance
Set-up
Y/N
Accident Scenario Risk Estimation
Hazard Identification
Machine Inspector Date
Hazard Zone Identified Hazard
Working Zone
Operator Station
Possible crushing hazard between the film
spool holder and metal floor plate
Exposed electrical parts present a possible
electrocution hazard
Step 2 – Identify Hazards
![Page 28: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/28.jpg)
Step 3 – Estimate the Risk
![Page 29: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/29.jpg)
Step 4 – Evaluate the Risk
![Page 30: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/30.jpg)
Step 5 – Acceptable Risk
![Page 31: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/31.jpg)
Step 6 – Risk Reduction
Hierarchy of Control Measures needs to be employed when
considering means of reducing risk:
1. Elimination
2. Substitution
3. Isolation
4. Engineering Controls
5. Administrative Controls
6. Personal Protective Equipment
![Page 32: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/32.jpg)
Machine Specific Standards
AS/NZS 4024 Part 3 standards give risk reduction solutions for
specific machines types
The wrapping machine is included in:
AS 4024.3406:2018 Safety of packaging machines – Pallet
wrapping machines
Machinery Safety Lifecycle
![Page 33: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/33.jpg)
Example – Semi Automatic Rotary Table Wrapper Machine
![Page 34: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/34.jpg)
More information
Pilz training courses https://www.pilz.com/en-AU/trainings
MachineSAFE Introduction – 1 day course covers legislation, standards, guarding and introduction to
Risk Assessment
MachineSAFE Comprehensive – 2 day course covers introduction plus more in depth in RA, LoTo,
electrical safety and safety control systems
Risk Assessment Workshop – 1 day course focusing on Risk Assessment with practical examples
Certified Machinery Safety Expert CMSE® - 4 day course certified by TÜV Nord
Pilz can perform a Risk Assessment as one of the many services we offer
Pilz Safety Compendium is aimed at all those in mechanical and plant
engineering who deal with the issue of functional safety and its associated aspects.
![Page 35: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/35.jpg)
External Reference Documents
AIHS BoK Chapter 28: Mechanical Plant
AS/NZS 4024.1:2019
WHS Model Code of Practice: Managing risks of plant in the workplace
Victorian Compliance code: Plant
WA Code of practice – Safeguarding of machinery and plant
![Page 36: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/36.jpg)
Webinar – Updates to AS/NZS 4024.2019
Name: What is new in AS/NZS 4024
Duration: 1.5 hours webinar, 0.5 hours Q&A
Date: November 12, 2020
Time: 10:00 AM to 12:00 PM (AEST)
Cost: $237.00
To register please send an email to: [email protected] or visit www.pilz.com.au
![Page 37: Introduction to Risk Assessment - aihs.org.au](https://reader034.fdocuments.net/reader034/viewer/2022050717/6251c9641cd9022620044ce3/html5/thumbnails/37.jpg)
CM
SE
®,
Ind
ura
NE
Tp
®,
PA
S4
00
0®,
PA
Sca
l®,
PA
Sco
nfig
®,
Pilz
®, P
IT®,
PL
ID®,
PM
Cpri
mo
®,
PM
Cpro
teg
o®,
PM
Cte
nd
o®,
PM
D®,
PM
I®,
PN
OZ
®, P
rim
o®,
PS
EN
®,
PS
S®,
PV
IS®,
Safe
tyB
US
p®, S
afe
tyE
YE
®,
Safe
tyN
ET
p®, T
HE
SP
IRIT
OF
SA
FE
TY
®
are
reg
iste
red
an
dp
rote
cte
dtr
ad
em
ark
so
fP
ilz G
mb
H &
Co
. K
G in
so
me
co
un
trie
s. W
ew
ou
ldp
oin
to
ut th
atp
rod
uct
fea
ture
sm
ay
va
ryfr
om
the
de
tails
sta
ted
in th
isd
ocu
me
nt,
de
pe
nd
ing
on
th
esta
tus
at
the
tim
e o
fp
ub
lica
tio
na
nd
the
sco
pe
ofth
ee
qu
ipm
en
t. W
ea
cce
pt
no
resp
on
sib
ility
for
the
va
lid
ity, a
ccu
racy
an
de
ntire
tyo
fth
ete
xta
nd
gra
ph
ics
pre
se
nte
din
th
isin
form
atio
n. P
lea
se
co
nta
cto
ur
Te
ch
nic
al S
up
po
rt ifyo
uh
ave
an
yq
ue
stio
ns.
www.pilz.com.au
Pilz Australia1/12-14 Miles StreetMulgrave, 3170, Victoria Tel: 1300 723 334Tel: +61 3 9560 [email protected]
Pilz Australia and New Zealand
https://www.linkedin.com/company/3603698/