1 Introduction of the N700-I Bullet Train Introduction of the N700-I Bullet Train The World’s Safest and Most Efficient High Speed Rail System Tsutomu Morimura January 13, 2012 Tsutomu Morimura Central Japan Railway Company

Transcript of Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet...

Page 1: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

1

Introduction of the N700-I Bullet TrainIntroduction of the N700-I Bullet TrainThe World’s Safest and Most Efficient High Speed Rail System

Tsutomu MorimuraJanuary 13, 2012

Tsutomu MorimuraCentral Japan Railway Company

Page 2: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

Contents of Presentation2

- Overview of Central Japan Railway (“JRC”) and the Tokaido Shinkansenthe Tokaido Shinkansen

- Safety & PunctualityD di d Li i h N L l C iDedicated Line with No Level CrossingsAutomatic Train Control (ATC)Shinkansen General Control Centre

- Introduction of the “N700-I Bullet”t oduct o o t e 00 u et- What is the “N700-I Bullet”?

Rolling Stock Specifications- Rolling Stock SpecificationsLow Energy ConsumptionM T tMass TransportOptimum Seat Capacity

Page 3: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

Operating Distance (Shinkansen) : 552 6km

JRC and the Shinkansen Network 3

Operating Distance (Shinkansen) : 552.6km

Shin-Aomori

OsakaNagoya TokyoOsaka y

Tokaido Shinkansen’sOperating Area*Sources

Population: Population-Residential Register (Data: End of March 2010)GDP: Annual Report on Prefectural Accounts (Data: FY2009.3), Economic and Social Research Institute, Cabinet Office

Page 4: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

Safety and Punctuality 4

- Safety

ZERO accident record, unbroken

- Safety

since 1964 (over 47 years)= ZERO passenger injuries or fatalities

from train accidents

Punctuality- Punctuality

Annual average delay per train is0.6 minutes *1 *20.6 minutes = Less than One minute

minutes / train

*1 : Including delays due to uncontrollable causes, such as natural disasters*2 : Standard for train delays; JR Central : “delay” = >1 minute, Europe : “delay” = >15 minutes

Page 5: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

5Safety and Punctuality

Dedicated Line with No Level CrossingsDedicated Line with No Level Crossings

A dedicated, closed passenger rail system with- complete separation of passenger and freight traffic - full grade separations

zero possibility of catastrophic collision with goods trains or motor vehicles

Shinkansen tracks

Highway

Page 6: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

Safety and Punctuality 6

Automatic Train Control (ATC)- Eliminates possibility of collision with train running ahead- 100% safety record in Japan for over 47 years

Automatic Train Control (ATC)

y p y

Calculated brake pattern Comparison of Brake pattern and Speed

Brake Command

Brake pattern is calculated by on-board ATC system

GroundFacility

ATC Signal (Information on the train running ahead)

Page 7: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

Safety and Punctuality 7

Shinkansen General Control CentreShinkansen General Control Centre

Monitors operational condition of trains and facilities

(Computer-aided Traffic Control)- Monitors operational condition of trains and facilities- Manages train operations comprehensively- 100% safety record in Japan for over 47 years100% safety record in Japan for over 47 years

6:00 7:00 8:00 9:00Tokyo

Nagoya

Shin-

Shinkansen General Control Centre (Tokyo)Schedule Diagram

Osaka

Page 8: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

8The “N700-I Bullet”

“N700 I (I :International) Bullet”N700-I (I :International) Bullet- Cruising Speed 330 km/h -

Page 9: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

9The “N700-I Bullet”

Hardware Software

Totally Integrated System

- Rolling stockGround facilities and tracks Safety promotion structure

Hardware Software

- Ground facilities and tracks- Signal system “ATC”

(onboard and ground facilities)

- Safety promotion structure- Employee education and aptitude- Maintenance

- Disaster prevention facilities- Protective facilities

- Operation management

Page 10: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

10What is the “N700-I Bullet”?- A total “High-Speed Rail System”A total High Speed Rail System- Comprises the N700-I rolling stock, a derived model of the

N700 optimized for overseas operations and the entiretyp p yof the Tokaido Shinkansen system

- The system has provided safe and stable operations inJapan for over 47 years.

FastFast

Safe

Green

Comfortable

Proven

Page 11: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

11Specifications of Rolling Stock【Specifications】 N700-I (eight-car configuration, or reference design)【Specifications】 N700 I (eight car configuration, or reference design)

8 car trainset (each car individuallyBasic formation 8-car trainset (each car individually motorized,100% regenerative brake)

Seating Capacity 636Maximum Cruising Speed 330 km/hTrain Set Length 204.7mTrain Set Weight (Full passenger capacity) 365 t

Page 12: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

12

N700-I has a large cross section, enabling maximization of seating

Mass Transport

European high-speed railways N700-I

capacity/train. This gives N700-I superiority in rolling stock cost/seat.

p g p y(Small capacity)(Large capacity)

3,360 mm 2,904 mm (TGV-POS)

1,435 mm 1,435 mm

Page 13: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

13Optimum Seat CapacityThe N700-I basic configuration is scalable for a 6 to 16 carsThe N700 I basic configuration is scalable for a 6 to 16 cars configuration, enabling highly tailored corridor-specific transportation construction.

Series N700 ②① ③ ④ ⑤ ⑥ ⑦ ⑧ ⑮ ⑯⑭⑬⑫⑪⑩⑨

: Passenger car: Powered axle【Basic configuration】

②① ③ ④ ⑤ ⑥ ⑦ ⑧Model N700-Ⅰ (eight-car configuration)

②① ③ ④ X・・・・・・・・

- Configuration length can be freely changed. Distributed traction system means configuration does not impact train performance.

Moreover configuration can be extended in response to- Moreover, configuration can be extended in response to increasing demand.

Page 14: Introduction of the N700Introduction of the N700-I … of the N700Introduction of the N700-I Bullet TrainI Bullet Train The World’s Safest and Most Efficient High Speed Rail System

14Conclusions

The “N700-I Bullet” is a proven technology p gybased on the “Total System Approach”that builds on 47 years of experience andthat builds on 47 years of experience and refinement.

• Safety and Punctuality• High-speed, Efficient Transportation• Low Energy Consumption• Low Energy Consumption• Low Carbon Emissions