Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

8

Click here to load reader

description

Ingrid-Maria Gregor, Introduction Cafe Katelbach Große Brunnenstr Hamburg-Altona

Transcript of Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Page 1: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

IntroductionIntroduction

JRA1 Meeting, Hamburg January 30JRA1 Meeting, Hamburg January 30thth 2008 2008

Ingrid-Maria GregorIngrid-Maria GregorDESYDESY

Page 2: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

Scope of MeetingScope of Meeting

TodayToday review new results since Annual Meeting in Paris (October 2007)review new results since Annual Meeting in Paris (October 2007) Concentrate on “what to do next” and how to get this doneConcentrate on “what to do next” and how to get this done Look closely at milestones and what is expected Look closely at milestones and what is expected

TomorrowTomorrow Detailed discussions about DAQ software and analysis issuesDetailed discussions about DAQ software and analysis issues Too detailed discussions today could be postponed to tomorrow to Too detailed discussions today could be postponed to tomorrow to

concentrate on “planning” concentrate on “planning”

Tonight: dinner in Altona: leaving at 19:30 from gate -> busTonight: dinner in Altona: leaving at 19:30 from gate -> bus

Page 3: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

Cafe Katelbach Cafe Katelbach Große Brunnenstr. 60Große Brunnenstr. 60

22763 Hamburg-Altona22763 Hamburg-Altona

Page 4: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

Short look back on 2007Short look back on 2007

Reports of JRA1!!Reports of JRA1!! EUDET-Report-2007-01EUDET-Report-2007-01

A.F.Zarnecki, P.Niezurawski A.F.Zarnecki, P.Niezurawski EUDET Telescope Geometry and Resolution StudiesEUDET Telescope Geometry and Resolution Studies

EUDET-Report-2007-05EUDET-Report-2007-05 I.M.Gregor I.M.Gregor A Pixel Telescope for Detector R&DEUDET-Report-2007-06 First Test Beam A Pixel Telescope for Detector R&DEUDET-Report-2007-06 First Test Beam

Results from the EUDET Pixel TelescopeResults from the EUDET Pixel Telescope EUDET-Report-2007-07EUDET-Report-2007-07

D.Haas D.Haas A pixelated Telescope for the E.U Detector R&DA pixelated Telescope for the E.U Detector R&D

EUDET-Report-2007-08 EUDET-Report-2007-08 D.Haas D.Haas The DAQ for the EUDET pixel telescopeThe DAQ for the EUDET pixel telescope

EUDET-Report-2007-09 EUDET-Report-2007-09 D.Haas D.Haas Summary of the data acquisition session for ILC detectors,Summary of the data acquisition session for ILC detectors,

Page 5: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

18 reports ! 18 reports ! EUDET-Number TitleEUDET-Memo-2006-07 JRA1 - Data Acquisition SystemEUDET-Memo-2006-11 Status of JRA1EUDET-Memo-2007-02 Description of the JRA1 Trigger Logic Unit (TLU)EUDET-Memo-2007-06 Simulation study for the EUDET pixel beam telescope using ILC

softwareEUDET-Memo-2007-10 Summary of JRA1 Review Meeting on 28 March at DPNCEUDET-Memo-2007-11 Test Beams at DESYEUDET-Memo-2007-16 Milestone Report: Analogue Telescope integrated in BeamEUDET-Memo-2007-19 JRA1 - Status of the Demonstrator TelescopeEUDET-Memo-2007-20 EUTelescope: trackingsoftware,EUDET-Memo-2007-21 Next Steps towards the Final Telescope,EUDET-Memo-2007-22 EUDET pixel telescope data taking manualEUDET-Memo-2007-25 The JRA1 data acquisition systemEUDET-Memo-2007-36 The EUDET Data Reduction Board (EUDRB)EUDET-Memo-2007-40 The DEPFET sensor as the first device

under test using the EUDET JRA1 telescopeEUDET-Memo-2007-43 ISIS plansEUDET-Memo-2007-45 Status of pixel sensors for the demonstrator phase of EUDET

beam telescopeEudet-Memo-2007-51 First Version of the PCMAG Field MapEudet-Memo-2007-55 JRA-1 Milestone: SDC Prototype 2 ready

+ 2 through Transnational Access+ 2 through Transnational Access

Page 6: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

Status Annual ReportStatus Annual Report

Annual Report 2007 to be submitted Feb. 15Annual Report 2007 to be submitted Feb. 15thth

JRA1: all talks leaders send me input well in timeJRA1: all talks leaders send me input well in timeThank you very muchThank you very much

I had to remove some scientific details and abreviate the textI had to remove some scientific details and abreviate the text

Scientific part preliminary version in BrusselsScientific part preliminary version in Brussels

Page 7: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

Planning …Planning …

Page 8: Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.

Ingr

id-M

aria

Gre

gor,

Intro

duct

ion

and planning …and planning …

TESTBEAMS AT CERNTESTBEAMS AT CERN PS: 1 week starting July 23PS: 1 week starting July 23rdrd

SPS: 2 weeks starting August 6SPS: 2 weeks starting August 6thth