INTRODUCTION THE AREA TODAY THE PLAN IMPLEMENTATION CONTEXT FOR CHANGE 31 3.3 Mobility 3.3.1 Existing Street Network The primary City streets within the study area are Scott Street, Parkdale Avenue and Holland Avenue. Both Scott Street and Parkdale Avenue are classified as arterial roads in the City’s Official Plan. Holland Avenue is classified as a major collector. All other study area streets are classified as local streets. With regard to right-of-way widths, the Official Plan protection policy for Scott Street, Parkdale Avenue and Holland Avenue is 26.0 metres (m) . With regard to the number of lanes, Scott Street is generally three lanes wide west of Holland Avenue, five lanes wide from Holland Avenue to Parkdale Avenue and four lanes wide from Parkdale Avenue to Bayview Road. Parkdale Avenue is generally comprised with two lanes for traffic with left-turn lanes at signalized intersections with on-street parking permitted at certain times adjacent to the west curb. Holland Avenue is generally two lanes for traffic with left-turn lanes at signalized intersections and parking permitted on both sides at certain times. Current peak hour traffic volumes on the major streets in the study area vary. As a general summary, peak hour volumes on Scott Street range from 400 vehicles per hour (vph) to 850 vph per direction depending on the location. On Parkdale Avenue they range from 350 vph to 650 vph per direction, and on Holland Avenue they range from 300 vph to 700 vph per direction. As a long established area in the inner city, there are limited opportunities to alter the street network by creating new streets or widening existing ones. With the City’s focus on encouraging alternatives to driving, and the shift to prioritizing pedestrians, cyclists and public transit near LRT stations, the challenge is to improve facilities for pedestrians and cyclists within existing right-of-ways and enhance the network of pathways. Scott Street is the primary east-west road in the study area for all modes of transportation and is an important transportation corridor in the City for all modes of transportation. It links the Westboro area and beyond with Albert and Slater Streets in the downtown core. In addition to accommodating the above-noted traffic volumes, it also accommodates cyclists and pedestrians via a combination of sidewalks, bike lanes (not continuous), a multi-use pathway and crosswalks at signalized intersections. Given the traffic volumes, the high turn movements at the major signalized intersections and the sub- standard pedestrian and cycling facilities, Scott Street “feels” like vehicle traffic has priority over pedestrians and cyclists. One of the challenges of this study is to develop a new conceptual Scott Street cross-section within the available right-of-way that improves the pedestrian and cycling environment while maintaining the necessary vehicle capacity. 3.3.2 Existing Intersection Operation Many of the study area intersections are currently operating at an acceptable level of service during weekday peak hours; however, a few key intersections are not. Those intersections currently operating at congested conditions or experiencing significant delay in one or more movements include Island Park/Sir John A. Macdonald, Island Park/Scott, Parkdale/Scott, Parkdale/Wellington and Scott/Ross. Based on field observations of peak period traffic flow, Parkdale Avenue appears to be the most traffic-sensitive of the study area roads. Based on six peak hour observations, lengthy queues were observed on (or approaching) Parkdale Avenue at (or through) the signalized Scott/Parkdale and Parkdale/Wellington intersections. These observations are also consistent with the comments of area residents, who also report that Parkdale Avenue is frequently congested outside the peak hours.

Transcript of INTRODUCTION 3.3 Mobility

Page 1: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

31

3.3 Mobility

3.3.1 Existing Street NetworkThe primary City streets within the study area are Scott Street, Parkdale Avenue and Holland Avenue. Both Scott Street and Parkdale Avenue are classified as arterial roads in the City’s Official Plan. Holland Avenue is classified as a major collector. All other study area streets are classified as local streets.

With regard to right-of-way widths, the Official Plan protectionpolicy for Scott Street, Parkdale Avenue and Holland Avenue is26.0 metres (m) .

With regard to the number of lanes, Scott Street is generally three lanes wide west of Holland Avenue, five lanes wide from Holland Avenue to Parkdale Avenue and four lanes wide from Parkdale Avenue to Bayview Road. Parkdale Avenue is generally comprised with two lanes for traffic with left-turn lanes at signalized intersections with on-street parking permitted at certain times adjacent to the west curb. Holland Avenue is generally two lanes for traffic with left-turn lanes at signalized intersections and parking permitted on both sides at certain times.

Current peak hour traffic volumes on the major streets in the study area vary. As a general summary, peak hour volumes on Scott Street range from 400 vehicles per hour (vph) to 850 vph per direction depending on the location. On Parkdale Avenue they range from 350 vph to 650 vph per direction, and on Holland Avenue they range from 300 vph to 700 vph per direction.

As a long established area in the inner city, there are limited opportunities to alter the street network by creating new streets or widening existing ones. With the City’s focus on encouraging alternatives to driving, and the shift to prioritizing pedestrians, cyclists and public transit near LRT stations, the challenge is to improve facilities for pedestrians and cyclists within existing right-of-ways and enhance the network of pathways.

Scott Street is the primary east-west road in the study area for all modes of transportation and is an important transportation corridor in the City for all modes of transportation. It links the Westboro area and beyond with Albert and Slater Streets in the downtown core. In addition to accommodating the above-noted traffic volumes, it also accommodates cyclists and pedestrians via a combination of sidewalks, bike lanes (not continuous), a multi-use pathway and crosswalks at signalized intersections. Given the traffic volumes, the high turn movements at the major signalized intersections and the sub-standard pedestrian and cycling facilities, Scott Street “feels” like vehicle traffic has priority over pedestrians and cyclists. One of the challenges of this study is to develop a new conceptual Scott Street cross-section within the available right-of-way that improves the pedestrian and cycling environment while maintaining the necessary vehicle capacity.

3.3.2 Existing Intersection OperationMany of the study area intersections are currently operating at an acceptable level of service during weekday peak hours; however, a few key intersections are not. Those intersections currently operating at congested conditions or experiencing significant delay in one or more movements include Island Park/Sir John A. Macdonald, Island Park/Scott, Parkdale/Scott, Parkdale/Wellington and Scott/Ross.

Based on field observations of peak period traffic flow, Parkdale Avenue appears to be the most traffic-sensitive of the study area roads. Based on six peak hour observations, lengthy queues were observed on (or approaching) Parkdale Avenue at (or through) the signalized Scott/Parkdale and Parkdale/Wellington intersections. These observations are also consistent with the comments of area residents, who also report that Parkdale Avenue is frequently congested outside the peak hours.

Page 2: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

32

West of Holland Ave.3 Lanes - 2 Bike Lane

East of Parkdale Ave.4 Lanes

Holand Ave-Parkdale Ave5 lanes

Scott

Burnside

Ladouceur

Bullman

Bullman

Parc

Laroche Park

Remic

Rapids Park

Sorrel

Sir Jo

hn A. M

acdonald

Eglantine

Sunnymede

Premier

Yarrow

Tunney’s PasturePré Tunney

Bayview

Garland

Hilda

Goldenrod

Sir Frederick BantingNorthw

esternCowley

Spencer

Armstrong

Wellington

Parkdale

Pinehurst

Hinchey

Carruthers

Stirling

Parkdale

Forward

Hinchey

Carruthers

Stonehurst

Pinhey

Merton

Holland

Hamilton

Huron

CarolineSmirleGrangeRossGilchristW

esternCarleton

Colombine

TUNNEY`S PASTURE

BAYVIEW

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

EXISTING STREET NETWORK

Based on these six independent observations, the amount of traffic congestion on Parkdale Avenue can fluctuate significantly day-by-day. There are days where Parkdale Avenue experiences very little queuing and operates very well (within the study area) and there are days where it experiences heavy queues for hours. It was also observed that traffic congestion on Parkdale Avenue can rapidly transition (within the study area) from no queues, to significant queues and back to no queues, in a span of 30 minutes.

The amount of traffic congestion on Parkdale Avenue (within the study area) is dependent on how the Parkdale/Highway 417 interchange and the Sir John A. Macdonald Parkway are operating, if the Parkdale Market is open, and how busy Wellington Street West is. Often when Highway 417 is heavily congested, drivers will exit at Parkdale Avenue, travel north to the Sir John A. Macdonald Parkway as an alternate east/west route, and similarly in the reverse direction, if the Sir John A. Macdonald Parkway is heavily congested.

Page 3: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

33

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

TUNNEY`S PASTURE

BAYVIEW

Scott

Burnside

Ladouceur

Bullman

Bullman

Parc

Laroche Park

Remic

Rapids Park

Lyndale

Sorrel

Sir Jo

hn A. M

acdonald

Eglantine

Sunnymede

Premier

Yarrow

Tunney’s PasturePré Tunney

Bayview

Garland

Hilda

Goldenrod

Sir Frederick BantingNorthw

esternCowley

Spencer

Armstrong

Wellington

Parkdale

Pinehurst

Hinchey

Carruthers

Stirling

Parkdale

Forward

Hinchey

Carruthers

Stonehurst

Pinhey

Merton

Holland

Hamilton

Huron

CarolineSmirleGrangeRossGilchristW

esternCarleton

Colombine

EXISTING MULTI-USE PATHWAYS

3.3.3 Existing Multi-Use PathwaysThe pedestrian network in the study area is comprised of a combination of sidewalks and multi-use pathways. The major roads of Parkdale Avenue, Holland Avenue and Wellington Street West each have sidewalks on both sides. Scott Street has a sidewalk on its south side and a multi-use pathway on its north side. The Sir John A Macdonald Parkway has no sidewalks, but there is a multi-use pathway that parallels it along the Ottawa River. All other streets within the study area are local streets which typically have sidewalks on both sides, however, there is the occasional street that only has a sidewalk on one side. This is common in Mechanicsville, where the narrow right-of-ways of most streets do not allow for sidewalks on both sides. The study area’s existing pedestrian network and the location of signalized intersections is depicted in Figure 3.

With regard to the pedestrian crossing opportunities along ScottStreet, the spacing of signalized intersection is not consistent over its length, thus crossing the corridor comfortably at some locations can be problematic. As growth occurs in Tunney’s Pasture, additional signalized intersections will be required, providing more protected crossings for pedestrians. At some locations, and particularly at the Holland Avenue and Parkdale Avenue entrances to Tunney’s Pasture, even though pedestrians have sufficient green time to cross, they can feel threatened by the high volume of turning traffic at these intersections as they share the same “green time” with pedestrians.

Page 4: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

34

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

TUNNEY`S PASTURE

BAYVIEW

Scott

Burnside

Ladouceur

Bullman

Bullman

Parc

Laroche Park

Remic

Rapids Park

Lyndale

Sorrel

Sir Jo

hn A. M

acdonald

Eglantine

Sunnymede

Premier

Yarrow

Tunney’s PasturePré Tunney

Bayview

Garland

Hilda

Goldenrod

Sir Frederick BantingNorthw

esternCowley

Spencer

Armstrong

Wellington

Parkdale

Pinehurst

Hinchey

Carruthers

Stirling

Parkdale

Forward

Hinchey

Carruthers

Stonehurst

Pinhey

Merton

Holland

Hamilton

Huron

CarolineSmirleGrangeRossGilchristW

esternCarleton

Colombine

EXISTING CYCLING NETWORK

3.3.4 Existing Cycling NetworkThe bicycling network in the study area is comprised of acombination of multi-use pathways, delineated on-road cycling lanes and shared use lanes. These are depicted on Figure 4 along with the study area’s signalized intersections. The City is not currently planning any significant changes to the network within the study area. Nevertheless, there are opportunities to introduce more dedicated cycling facilities along Scott Street when the LRT is constructed and on future public streets within Tunney’s Pasture. As further development in Tunney’s Pasture occurs, there will also be opportunities to extend the multi-use path network along key streets, such as Parkdale Avenue and Sir Frederick Banting Driveway.

Page 5: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

35

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorGrande collectrice

CollectorRoute collectrice

Potential Collector onTunney`s Pasture(Conceptual)Route collectrice possible (conceptuelle)

Potential Federally Owned RoadRoute locale possible

Potential Local Street onTunney`s Pasture(Conceptual)au pré Tunney (conceptuelle)

Future Local StreetRue locale future

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Signalized IntersectionCarrefour avec feux de circulation

Proposed Number of Car LanesNombre de voies pour les voitures proposées

LRT StationStation du TLR

Bayview Station CDPDu Secteur do la station Bayview

Provincial HighwayAutoroute provinciale

Federally Owned RoadRoute fédérale

ArterialArtère

Major CollectorImportante route collectrice

CollectorRoute collectrice

Right-of-Way Protection Priority(26m)Protection de l’emprise (26 m)

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

CDP Study Area

CDP Area BoundaryLimite du PCC

CDP Focus AreaSecteur d’intérêt du PCC

General Urban AreaZone urbaine générale

Central AreaZone centrale

Mixed Use Centre Centre d’utilisations polyvalentes

Major Open SpaceEspaces verts d’importance

Urban Natural FeaturesCaractéristiques naturelles de zone urbaine

Traditional Main StreetRue principale traditionnelle

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Pedestrian Pathway Sentier piétonnier futur

Future PathwaySentier futur

Enhanced Community PathwaySentier communautaire amélioré

Existing PathwaySentier existant

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du TLR future

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Proposed Multi-use PathwaySentier polyvalent proposé

Future Cycle Track (O�-Road)Voie cyclable future (hors rue)

Future Bike Lane (On-Road)Voie cyclable future (sur rue)

Future Shared Use Lane (Signed Route)Future voie partagée (tracé balisé)

Enhanced Cross WalkPassage pour piétons amélioré

Signalized IntersectionCarrefour avec feux de circulation

Future LRT StationStation du Transitway

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing PathwaySentier existant

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

BRT StationStation de transport en commun rapide par autobus (TCRA)

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�leUtilisation résidentielle à pro�l élevé

Residential-Medium Pro�leUtilisation résidentielle à pro�l moyen

Residential-Low Pro�leUtilisation résidentielle à pro�l bas

CommercialCommerciale

O�ceBureau

InstitutionalInstitutionnelle

IndustrialIndustrielle

UtilityServices publics

Open Space and ParksEspace ouvert et parcs

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT StationStation de transport en commun rapide par autobus (TCRA)/station du TLR plani�é

BRT Line/ Planned LRT LineLigne de transport en commun rapide par autobus/ ligne de TLR prévue

Existing Bus Route Circuit d’autobus existant

Existing O-train/Planned LRT LineTracé actuel de l’O-Train/ligne du TLR prévue

Planned LRT Station PlazaPlace de la station du TLR prévue

Bayview Station CDPDu Secteur do la station Bayview

Existing Multi-use PathwaySentier polyvalent existant

Existing O�-Street Multi-use PathwaySentier polyvalent hors rue existant

Existing Bike Lane (On-Road)Voie cyclable actuelle (sur rue)

Existing Shared Use LaneVoie partagée actuelle

Existing Signalized IntersectionCarrefour avec feux de circulation actuel

Transitway StationStation du Transitway

ApprovedApprouvées

Under ReviewEn examen

Under Construction/Recently CompletedEn construction/Achevé récemment

CDP AreasSecteurs des PCC

Scott St. CDP Study AreaSecteur à l’étude du PCC de la rue Scott

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

T

1

2

3

4

5

6

Mixed-Use CentreCentre d’utilisations polyvalentes

Secondary MainstreetRue principale résidentielle

Low-Rise Residential Secteur résidentiel de faible hauteur

Low-Rise Residential (Max 6 Storeys)Secteur résidentiel de faible hauteur (6 étages)

Apartment NeighbourhoodQuartier d’immeubles de logements

Local CommercialLocal commercial

Public/Institutional AreaSecteur public/institutionnel

Open SpaceEspace ouvert

Mid Block Connection Lien à mi pâté

Mid Block Connection-ConceptualLien à mi pâté-Conceptuel

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Capital FunctionFunction de la Capital

NCC Open SpaceEspace vert de la CCN

Subject to NCC Urban Land MasterplanSous reserve de l'achèvement du Plan directeur des terrains urbains de la capitale

UtilityServices publics

Potential Community Centre/ FacilityCentre/installations communautaires potentiels

LRT StationStation du TLR

Neighbourhood LineLigne de quartier

CDP Study AreaSecteur d’étude du PCC

**

600 m

600 m

TUNNEY`S PASTURE STATIONPRÉ TUNNEY

BAYVIEW STATION

Scott

Burnside

Ladouceur

Bullman

Bullman

Parc

Laroche Park

Remic

Rapids Park

Lyndale

Sorrel

Sir Jo

hn A. M

acdonald

Eglantine

Sunnymede

Premier

Yarrow

Tunney’s PasturePré Tunney

Bayview

Garland

Hilda

Goldenrod

Sir Frederick BantingNorthw

esternCowley

Spencer

Armstrong

Wellington

Parkdale

Pinehurst

Hinchey

Carruthers

Stirling

Parkdale

Forward

Hinchey

Carruthers

Stonehurst

Pinhey

Merton

Holland

Hamilton

Huron

CarolineSmirleGrangeRossGilchristW

esternCarleton

Colombine

EXISTING/PLANNED TRANSIT NETWORK

3.3.5 Existing Transit ServiceTransit service to the study area is provided by a combination of on-road local bus routes, and express bus service on the Transitway. Relevant Transitway stations are located in the middle of the study area adjacent to the north side of Scott Street (Tunney’s Station) at Holland Avenue and at the O-Train intersection at the east end of the study area (Bayview Station). The existing transit network is depicted on Figure 5.

3.3.6 Planned Light Rail TransitVery important to the transit service discussion is the City’s planned LRT project that extends from the Tunney’s Station, under downtown and east to Blair Station. The construction of the Confederation Line is now underway, with the existing Transitway being converted to Light Rail Transit, and a new LRT tunnel being provided through downtown. The Tunney’s Pasture station will be reconstructed to an LRT station along with a bus interface for Transitway buses to/from the west. The Confederation LRT line is planned to be operational in 2018. It is noteworthy that in the City’s recently released Transportation Master Plan Update, the extension of the LRT line west and south to Baseline Station and Bayshore Shopping Centre is planned for 2023.

Page 6: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

36

3.3.7 Summary of MobilityOpportunitiesBased on the foregoing overview of the existing conditions, the following is a listing of considerations for the Scott Street CDP to enhance the pedestrian and bicycle environment within the study area while continuing to accommodate vehicular travel:

• encourage more mixed-use development as this will reduce the length and number of vehicle trips;

• provide enhanced connections to transit stations for pedestrians and cyclists with improved and new pathways and improved/additional pedestrian crossings of Scott Street;

• enhance connectivity through Tunney’s Pasture with new pathways and dedicated cycling facilities on key streets; and

• ensure major new office and residential development implement transportation demand management (TDM) strategies.

3.4 Utilities

The following section is based on the Scott Street District Community Design Plan Municipal Infrastructure Report.

3.4.1 Water Distribution SystemThe Lemieux Island Water Purification Plant (WPP) is located immediately north of the Scott Street CDP area. This plant supplies water to approximately 60% of the serviced part of the City, including all of the CDP area. The CDP area is located in the 1W pressure zone. The 1950 mm dia. high pressure transmission main (HPTM) conveys water to 1W pressure zone from the Lemieux WPP, running west to east, along Bayview & Wellington streets. There is a 1067 mm dia. watermain along Scott Street that connects to the 1950 mm HPTM at Bayview intersection. This main interconnects the water supply from the Lemieux WPP to the Britannia WPP. All streets in the CDP area have local watermains ranging from 125 mm to 305 mm. The watermains are relatively new as they were replaced during street rehabilitation projects between 1992 and 2004.

It is expected that proposed intensification should be accommodated by the existing water distribution network, particularly considering the fact that the sizing of local watermains is driven by fire-fighting requirements; however the approval of each new development will require confirmation that adequate local fire supply exists.

3.4.2 Wastewater Collection SystemThe municipal wastewater collection system within the Scott Street CDP area was originally a combined system and has been separated in the last 20 years with the exception of a few combined pipes on Scott Street at Bayview Road, on Hilda Street and on Manchester Street. The City of Ottawa plans to replace these combined pipes as part planned road rehabilitation projects in the next ten-year planning horizon. Even though most of the storm and sanitary system had been fully separated within the CDP area, it still functions mostly as a partially separated system which conveys municipal wastewater and foundation drainage to the sanitary system. There are two major wastewater trunk sewers located in the CDP area: the West Nepean Collector (WNC) and the Cave Creek Collector (CCC). Future increases in sanitary flow contributions from new development to WNC and CCC are expected to be small in relation to the peak wet weather flows in these collectors. Any increase in sanitary contributions are expected to be compensated by the future infrastructure renewal and extraneous flow removal projects planned for the entire WNC and CCC drainage areas. In addition any new development or re-development in the CDP area will need to have the foundation drains connected to the storm sewer either by gravity or via a sump pump.

The local sanitary sewers in the CDP area comprises of pipes varying in size from 250 mm to 375 mm which outlet to the WNC along Scott Street. A small north-east section drains north along

Page 7: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

37

Stonehurst Street and outlets to the CCC via the Bayview Street Sewer. The south-east section of CDP area also drains to CCC. Similar to the watermains, the local sanitary sewers are relatively new as they were replaced during street rehabilitation projects between 1992 and 2004 and are expected to accommodate wastewater intensification flows.

3.4.3 Stormwater Collection SystemThere are three main storm trunk systems that run through the CDP area. The West Transitway twin box stormwater sewer outlet, which was constructed in 1983, discharges immediately to the west of Lemieux Island. It connects to the 2100 mm twin box sewer at the Transitway just to the west of Merton. The twin box sewer along the Transitway was designed specifically to manage the drainage from the West Transitway. This sewer also provides an outlet for the 1800 mm. Pinhey Street Storm as well as number of local stormwater pipes along the way.

The Merton Stormwater Trunk Sewer (MTS) enters the study area as 1800 mm pipe upstream of the Merton and Scott Street combined sewer overflows and provides outlet for the 1050 mm storm pipe located along Scott Street. A 750 mm West Transitway connection at Merton Street also contributes flow from the east to the MTS. The 2100 mm MTS splits into twin 1800 mm pipes south of Burnside Street before discharging into the Ottawa River immediately east of the access bridge to Lemieux Island.

The Parkdale Stormwater Trunk is more localized as it drains the north-west corner of the area and outlets into Ottawa River north of Forward Street.

Local storm water pipes range from 375 mm to the 750 mm and are also relatively new as they were replaced during street rehabilitation projects between 1992 and 2004.

The key to managing impacts of intensification on the storm collection system in the area will be on-site stormwater management. In general, redevelopment in the CDP area will be required to maintain a property-level storm discharge at or less than pre-development level and will be subject to current stormwater controls measures.

Page 8: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

38

3.5 The Public Realm

The public realm of a community includes its streets, parks and other publicly-accessible open spaces as well as institutions, such as schools, community centres and places of worship. The public realm is where people gather to play, exercise, shop, learn, celebrate, worship or simply interact with neighbours. Theattractiveness, livability and prosperity of a community depend on the quality of its public realm. Streets, parks and other gathering places are the connective tissue of a community, and therefore how they are designed and how they function are important considerations of a community design plan.

Parks and Open Spaces

The network of green spaces in the study area is dominated by Laroche Park and the open spaces that surround many of the buildings in Tunney’s Pasture. This suggests that the workers and residents north of Scott Street, who also enjoy proximity to the Ottawa River open space system, are well served by outdoor space for passive and active recreation. On the other hand, North Hintonburg contains only a few small parks and Wellington Village has none. In this context, Laroche Park becomes a neighbourhood park for more than one neighbourhood; in fact, its baseball diamonds attract users from across the city. The NCC lands along the river provide passive recreation; however there are limited access points to these lands.

Outside of Tunney’s Pasture, there are no potential redevelopment sites in the study area that are large enough to

accommodate a new park, although some sites may afford the opportunity for a small, publicly-accessible open space. In light of this, there are four key opportunities to pursue to ensure existing and future residents in the area, as well as employees, have good access to parkland and park amenities:

• Build new parks in conjunction with residential development in Tunney’s Pasture, including a significant neighbourhood park in the west half and smaller neighbourhood parks in the east half. The design and programming of the parks should consider the needs of the larger community.

• Enhance the facilities of Laroche Park. Given the important role of the park and how heavily it is used, some of its facilities need to be upgraded, including the ice rink and playground. The field house should be replaced with a larger building designed as a small community centre. The removal of one of the baseball diamonds would provide more green space for flexible use, and a fenced dog park should be considered. These ideas have been generated by the Mechanicsville community and should be the starting point for its redesign.

• Use a portion of the NCC lands north of Burnside Avenue to effectively extend Laroche Park and improve connections to the river. In keeping with the character of the Sir John A. Macdonald Parkway, the park extension could comprise mostly landscaped green space and pathways with benches.

• Improve pedestrian and bicycle connections to the NCC’s riverfront lands. Two ways to accomplish this would be to

build multi-use pathways on the east side of Sir Frederick Banting Driveways, when it is extended to the parkway, and on the west side of Parkdale Avenue. Providing more openings in the fence around the NCC lands north of Burnside Avenue until they are developed, or removing the fence altogether, would also improve public access to green space.

Schools and Community CentresThe cluster of community facilities on the south side of Wellington Street West, between Parkdale and Carruthers Avenues, is a regular destination for many in the community, especially children and seniors. It is not expected that population growth outside of Tunney’s Pasture will generate demand for additional schools or other major public indoor community facilities. A small community centre to replace the field house in Laroche Park should take some pressure off the Hintonburg Community Centre to provide the full range of recreational programming needed in the area. Even once this new facility is built, however, it will be important to maintain safe and comfortable walking routes to the schools in Hintonburg, for example, by improving the pedestrian crossing at Scott Street and Carruthers Avenue.

As mentioned in Section 3.1.4, future residential development in Tunney’s Pasture will generate a need for community facilities that might exceed the capacity of existing facilities in the

Page 9: INTRODUCTION 3.3 Mobility

INTRO

DU

CTIO

NTH

E AREA

TOD

AYTH

E PLAN

IMPLEM

ENTATIO

NCO

NTEXT FO

R CHA

NG

E

39

Residential First Density ZoneZone résidentielle densité 1

Residential Second Density ZoneZone résidentielle de densité 2

Residential Third Density ZoneZone résidentielle de densité 3

Residential Fourth Density ZoneZone résidentielle de densité 4

Residential Fifth Density ZoneZone résidentielle de densité 5

Local Commercial ZoneZone de commerces locaux

Traditional Mainstreet ZoneZone de rue principale traditionelle

Mixed Use Centre ZoneZone de centres polyvalents

General Mixed Use ZoneZone polyvalente générale

Environmental Protection ZoneZone de protection de l’environnement

Community Leisure Facility ZoneZone d’installation de loisirs communautaire

Parks and Open Space ZoneZone de parc et d’espace vert

Light Industrial ZoneZone d’industrie légère

General Industrial ZoneZone d’industrie générale

Minor Institutional ZoneZone de petites institutions

Major Institutional ZoneZone de grandes institutions

Pending Zoning Amendment

R1

R2

R3

R4

R5

LC

TM

MC

GM

EP

L1

O1

IL

IG

I1

12

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Potential Federally Owned Road

Potential Local Street onTunney`s Pasture(Conceptual)

Future Local Street

Right-of-Way Protection Priority(26m)

Signalized Intersection

Proposed Number of Car Lanes

LRT Station

Bayview Station CDP

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Right-of-Way Protection Priority(26m)

Existing Signalized Intersection

Transitway StationCDP Study Area

CDP Area Boundary

CDP Focus Area

General Urban Area

Central Area

Mixed Use Centre

Major Open Space

Urban Natural Features

Traditional Main Street

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway

Future Pathway

Enhanced Community Pathway

Existing Pathway

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway andCycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Community Pathway

View Corridor to the River

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Cycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Pathway

Existing Signalized Intersection

BRT Station

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�le

Residential-Medium Pro�le

Residential-Low Pro�le

Commercial

O�ce

Institutional

Industrial

Utility

Open Space and Parks

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT Station

BRT Line/ Planned LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

Planned LRT Station Plaza

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Bike Lane (On-Road)

Existing Shared Use Lane

Existing Signalized Intersection

Transitway Station

Approved Building

Potential Future Building

Existing/Proposed Open Space

Property Line

Approved

Under Review

Under Construction/Recently Completed

CDP Areas

Scott St. CDP Study Area

Mixed-Use Centre

Secondary Mainstreet

Low-Rise Residential

Apartment Neighbourhood

Traditional Mainstreet

Local Commercial

Public/Institutional Area

Open Space

Tunney`s Pasture Open Space

Utility

Potential Community Centre/ Facility

LRT Station

Neighbourhood Line

CDP Study Area

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

Scott Street

Parkdale-Holland Node

Tunney`s Pasture

Mechanicsville

North Hintonburg Edge

Espace ouvert pré Tunney

Supporting De Soutien

PrimaryPrimaires

Contributing De Contribution

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Public Building/Community FacilitiesInstallations de bâtiment public/com-munautaire

Places of WorshipLieux de culte

W

T

1

2

3

4

5

6

Residential First Density ZoneZone résidentielle densité 1

Residential Second Density ZoneZone résidentielle de densité 2

Residential Third Density ZoneZone résidentielle de densité 3

Residential Fourth Density ZoneZone résidentielle de densité 4

Residential Fifth Density ZoneZone résidentielle de densité 5

Local Commercial ZoneZone de commerces locaux

Traditional Mainstreet ZoneZone de rue principale traditionelle

Mixed Use Centre ZoneZone de centres polyvalents

General Mixed Use ZoneZone polyvalente générale

Environmental Protection ZoneZone de protection de l’environnement

Community Leisure Facility ZoneZone d’installation de loisirs communautaire

Parks and Open Space ZoneZone de parc et d’espace vert

Light Industrial ZoneZone d’industrie légère

General Industrial ZoneZone d’industrie générale

Minor Institutional ZoneZone de petites institutions

Major Institutional ZoneZone de grandes institutions

Pending Zoning Amendment

R1

R2

R3

R4

R5

LC

TM

MC

GM

EP

L1

O1

IL

IG

I1

12

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Potential Federally Owned Road

Potential Local Street onTunney`s Pasture(Conceptual)

Future Local Street

Right-of-Way Protection Priority(26m)

Signalized Intersection

Proposed Number of Car Lanes

LRT Station

Bayview Station CDP

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Right-of-Way Protection Priority(26m)

Existing Signalized Intersection

Transitway StationCDP Study Area

CDP Area Boundary

CDP Focus Area

General Urban Area

Central Area

Mixed Use Centre

Major Open Space

Urban Natural Features

Traditional Main Street

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway

Future Pathway

Enhanced Community Pathway

Existing Pathway

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway andCycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Community Pathway

View Corridor to the River

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Cycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Pathway

Existing Signalized Intersection

BRT Station

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�le

Residential-Medium Pro�le

Residential-Low Pro�le

Commercial

O�ce

Institutional

Industrial

Utility

Open Space and Parks

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT Station

BRT Line/ Planned LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

Planned LRT Station Plaza

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Bike Lane (On-Road)

Existing Shared Use Lane

Existing Signalized Intersection

Transitway Station

Approved Building

Potential Future Building

Existing/Proposed Open Space

Property Line

Approved

Under Review

Under Construction/Recently Completed

CDP Areas

Scott St. CDP Study Area

Mixed-Use Centre

Secondary Mainstreet

Low-Rise Residential

Apartment Neighbourhood

Traditional Mainstreet

Local Commercial

Public/Institutional Area

Open Space

Tunney`s Pasture Open Space

Utility

Potential Community Centre/ Facility

LRT Station

Neighbourhood Line

CDP Study Area

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

Scott Street

Parkdale-Holland Node

Tunney`s Pasture

Mechanicsville

North Hintonburg Edge

Espace ouvert pré Tunney

Supporting De Soutien

PrimaryPrimaires

Contributing De Contribution

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Public Building/Community FacilitiesInstallations de bâtiment public/com-munautaire

Places of WorshipLieux de culte

W

T

1

2

3

4

5

6

Residential First Density ZoneZone résidentielle densité 1

Residential Second Density ZoneZone résidentielle de densité 2

Residential Third Density ZoneZone résidentielle de densité 3

Residential Fourth Density ZoneZone résidentielle de densité 4

Residential Fifth Density ZoneZone résidentielle de densité 5

Local Commercial ZoneZone de commerces locaux

Traditional Mainstreet ZoneZone de rue principale traditionelle

Mixed Use Centre ZoneZone de centres polyvalents

General Mixed Use ZoneZone polyvalente générale

Environmental Protection ZoneZone de protection de l’environnement

Community Leisure Facility ZoneZone d’installation de loisirs communautaire

Parks and Open Space ZoneZone de parc et d’espace vert

Light Industrial ZoneZone d’industrie légère

General Industrial ZoneZone d’industrie générale

Minor Institutional ZoneZone de petites institutions

Major Institutional ZoneZone de grandes institutions

Pending Zoning Amendment

R1

R2

R3

R4

R5

LC

TM

MC

GM

EP

L1

O1

IL

IG

I1

12

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Potential Federally Owned Road

Potential Local Street onTunney`s Pasture(Conceptual)

Future Local Street

Right-of-Way Protection Priority(26m)

Signalized Intersection

Proposed Number of Car Lanes

LRT Station

Bayview Station CDP

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Right-of-Way Protection Priority(26m)

Existing Signalized Intersection

Transitway StationCDP Study Area

CDP Area Boundary

CDP Focus Area

General Urban Area

Central Area

Mixed Use Centre

Major Open Space

Urban Natural Features

Traditional Main Street

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway

Future Pathway

Enhanced Community Pathway

Existing Pathway

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway andCycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Community Pathway

View Corridor to the River

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Cycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Pathway

Existing Signalized Intersection

BRT Station

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�le

Residential-Medium Pro�le

Residential-Low Pro�le

Commercial

O�ce

Institutional

Industrial

Utility

Open Space and Parks

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT Station

BRT Line/ Planned LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

Planned LRT Station Plaza

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Bike Lane (On-Road)

Existing Shared Use Lane

Existing Signalized Intersection

Transitway Station

Approved Building

Potential Future Building

Existing/Proposed Open Space

Property Line

Approved

Under Review

Under Construction/Recently Completed

CDP Areas

Scott St. CDP Study Area

Mixed-Use Centre

Secondary Mainstreet

Low-Rise Residential

Apartment Neighbourhood

Traditional Mainstreet

Local Commercial

Public/Institutional Area

Open Space

Tunney`s Pasture Open Space

Utility

Potential Community Centre/ Facility

LRT Station

Neighbourhood Line

CDP Study Area

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

Scott Street

Parkdale-Holland Node

Tunney`s Pasture

Mechanicsville

North Hintonburg Edge

Espace ouvert pré Tunney

Supporting De Soutien

PrimaryPrimaires

Contributing De Contribution

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Public Building/Community FacilitiesInstallations de bâtiment public/com-munautaire

Places of WorshipLieux de culte

W

T

1

2

3

4

5

6

Residential First Density ZoneZone résidentielle densité 1

Residential Second Density ZoneZone résidentielle de densité 2

Residential Third Density ZoneZone résidentielle de densité 3

Residential Fourth Density ZoneZone résidentielle de densité 4

Residential Fifth Density ZoneZone résidentielle de densité 5

Local Commercial ZoneZone de commerces locaux

Traditional Mainstreet ZoneZone de rue principale traditionelle

Mixed Use Centre ZoneZone de centres polyvalents

General Mixed Use ZoneZone polyvalente générale

Environmental Protection ZoneZone de protection de l’environnement

Community Leisure Facility ZoneZone d’installation de loisirs communautaire

Parks and Open Space ZoneZone de parc et d’espace vert

Light Industrial ZoneZone d’industrie légère

General Industrial ZoneZone d’industrie générale

Minor Institutional ZoneZone de petites institutions

Major Institutional ZoneZone de grandes institutions

Pending Zoning Amendment

R1

R2

R3

R4

R5

LC

TM

MC

GM

EP

L1

O1

IL

IG

I1

12

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Potential Federally Owned Road

Potential Local Street onTunney`s Pasture(Conceptual)

Future Local Street

Right-of-Way Protection Priority(26m)

Signalized Intersection

Proposed Number of Car Lanes

LRT Station

Bayview Station CDP

Provincial HighwayRoute provinciale

Federally Owned RoadChemins de propriété féderal

ArterialArtère

Major CollectorGrande collectrice

CollectorCollectrice

Right-of-Way Protection Priority(26m)

Existing Signalized Intersection

Transitway StationCDP Study Area

CDP Area Boundary

CDP Focus Area

General Urban Area

Central Area

Mixed Use Centre

Major Open Space

Urban Natural Features

Traditional Main Street

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway

Future Pathway

Enhanced Community Pathway

Existing Pathway

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Pedestrian Pathway andCycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Community Pathway

View Corridor to the River

Existing Multi-use Pathway

Proposed Multi-use Pathway

Future Cycle Track (O�-Road)

Future Bike Lane (On-Road)

Future Shared Use Lane (Signed Route)

Enhanced Cross Walk

Signalized Intersection

Future LRT Station

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Pathway

Existing Signalized Intersection

BRT Station

LRT Station

LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

LRT Station Plaza

LRT Station

BRT

Planned LRT Line

Bus Route (Based on Existing)

Existing O-train/Planned LRT Line

Interim Transfer Bus Station

Interim Bus Parking

BRT Station

BRT

Existing Bus Route

Existing O-train/Planned LRT Line

Residential-High Pro�le

Residential-Medium Pro�le

Residential-Low Pro�le

Commercial

O�ce

Institutional

Industrial

Utility

Open Space and Parks

Low-Pro�le Residential BuildingMedium-Pro�le Residential BuildingHigh-Pro�le Residential BuildingResidential Mixed-Use BuildingO�ce BuildingRetail Space BuildingPublic/Institutional Building

Low-Rise Neighbourhood

Tunneys Pasture Mixed-Use CentreSubject to Tunneys Pasture Master Plan

Holland-Parkdale NodeMixed-Use Centre

Secondary Mainstreet

Active Frontage

NCC

Existing/Proposed Open Space

Existing/Proposed Plaza

Community Centre/Facility

LRT Station

CDP Study Area

BRT Station/Planned LRT Station

BRT Line/ Planned LRT Line

Existing Bus Route

Existing O-train/Planned LRT Line

Planned LRT Station Plaza

Bayview Station CDP

Existing Multi-use Pathway

Existing O�-Street Multi-use Pathway

Existing Bike Lane (On-Road)

Existing Shared Use Lane

Existing Signalized Intersection

Transitway Station

Approved Building

Potential Future Building

Existing/Proposed Open Space

Property Line

Approved

Under Review

Under Construction/Recently Completed

CDP Areas

Scott St. CDP Study Area

Mixed-Use Centre

Secondary Mainstreet

Low-Rise Residential

Apartment Neighbourhood

Traditional Mainstreet

Local Commercial

Public/Institutional Area

Open Space

Tunney`s Pasture Open Space

Utility

Potential Community Centre/ Facility

LRT Station

Neighbourhood Line

CDP Study Area

Height Limits Subject toTunney`s Pasture Master Plan

Low Pro�leUp to 11mUp to 14.5 m (4 Storeys ) Up to 14.5 m (4 Storeys ) *Except Where Angular Premits Greater Height-See Guidelines Section 4.2.2(C)

Medium Pro�leUp to 19 m (6 Storeys)

High Pro�le Up to 76m (25 Storeys)Up to 55m (18 Storeys)Up to 37m (12 Storeys)

Maximum Height Subjuct to Angular Plane and CDP Tall-Building Guidelines

Height Limits Varies as Per Existing Zoning

General Location for Tall Building*Subject to CDP Tall-Building Guidelines

Neighbourhood Line

LRT Station

CDP Study Area

Transit Plaza

Parkdale Greenway

Sir Frederick Banting Greenway

Columbine Cycling Route

Transitway Greenway

Neighbourhood Park and Community Centre

Scott Street

Parkdale-Holland Node

Tunney`s Pasture

Mechanicsville

North Hintonburg Edge

Espace ouvert pré Tunney

Supporting De Soutien

PrimaryPrimaires

Contributing De Contribution

Tunney`s Pasture Open SpaceEspace ouvert pré Tunney

Public Building/Community FacilitiesInstallations de bâtiment public/com-munautaire

Places of WorshipLieux de culte

W

T

1

2

3

4

5

6

W

W

WW

W

Scott

Burnside

Ladouceur

Bullman

Bullman

Parc

Laroche Park

Remic

Rapids Park

Lyndale

Colombine

Sorrel

Sir Jo

hn A. M

acdonald

Eglantine

Sunnymede

Premier

Yarrow

Tunney’s PasturePré Tunney

Bayview

Garland

Hilda

Goldenrod

Sir Frederick BantingNorthw

esternCowley

Spencer

Armstrong

Wellington

Parkdale

Pinehurst

Hinchey

Carruthers

Stirling

Parkdale

Forward

Hinchey

Carruthers

Stonehurst

Pinhey

Merton

Holland

Hamilton

Huron

CarolineSmirleGrangeRossGilchristW

esternCarleton

EXISTING OPEN SPACE NETWORK

area. The opportunity exists in the west half of the site to plan a community centre and potentially an elementary school adjacent to a neighbourhood park.

Scott Street

Most of the local neighbourhood streets in the study area have attractive streetscapes that encourage walking, in contrast to the area’s major roads. In Mechanicsville, Burnside Avenue is one important street that can be made more pedestrian and bicycle friendly. Along major streets, like Parkdale Avenue, new development will create opportunities to incrementally improve adjacent streetscapes and make them more inviting to pedestrians with tree planting and other landscaping in the private realm. As noted in Section 3.3.1, however, the constraints of existing right-of-ways pose a challenge to making significant streetscape improvements in the area. The notable exception is on Scott Street.

As discussed in Section 3.3.1, the width of Scott Street, including the greenway on the north side, creates the opportunity to rebalance the street to make it more attractive for walking and cycling while maintaining the current roadway capacity. This will not only enhance the transportation role of the street; by significantly improving the landscaping on both sides with moretrees and adding pedestrian amenities in the greenway, Scott Street can also become a place that feels and functions like a linear park.