14
CE470 Lab 1 Intro to AISC Case Study Building Lab 1 – Snow, wind, gravity loads Lab procedure

Transcript of Intro to AISC Case Study Building Lab 1 Snow, wind ...jliu/courses/CE470/PPT_PDF/CE470... · Intro...

CE470 Lab 1

Intro to AISC Case Study Building

Lab 1 – Snow, wind, gravity loads

Lab procedure

AISC Case Study Building

AISC Case Study Building

Joists

Girders

Primary Drain

38

10

5

3.7

10

3.7

38

10

5

3.7

38 38

10

5

3.7

10

5

3.7

38

10

5

10

3.7

10

3.7

10

3.7

10

53 57

ASCE 7-10 p. 401

Error! These values are NOT in psf!

Lab procedure

Work in teams of 3 or 4

Submit 1 lab assignment per team

Write all team members’ names on the 1st page

Add cover sheet if you prefer

Include any supplemental sheets if needed

Calculations directly on sheets provided OK

Be neat!

Finish in the lab period

You may leave when your group has submitted your lab assignment

Please return ASCE 7-10 & Vulcraft packets