Intro casos exito salon renovacion 2012
-
Upload
instituto-tides -
Category
Technology
-
view
341 -
download
0
Transcript of Intro casos exito salon renovacion 2012
![Page 1: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/1.jpg)
Casos de éxito
![Page 2: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/2.jpg)
CASOS DE ÉXITO
![Page 3: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/3.jpg)
Ejemplos en zona de San Agustín, Playa del Inglés, Campo
Internacional de Golf, Puerto Rico.
MUNICIPIOS
SAN BARTOLOMÉ
DE TIRAJANA Y
MOGÁN
![Page 4: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/4.jpg)
Paralelamente a la renovación física, se focalizan en la renovación
de los modelos de gestión.
![Page 5: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/5.jpg)
- Proceso desde 2009-2012
- Crisis económica
- Mayor competencia y nivel de
exigencia de los clientes
- Escasos y poco preparados RRHH
- % ISCE
- % ISCI
- 533 empleados involucrados
- 50%Fondos propios y 50%crédito
tripartita
- Resultados: incremento de
rentabilidad del 12 al 19%
- Mejores ISCE e ISCI
![Page 6: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/6.jpg)
HD Parque CristóbalAntes de renovación Después de renovación
![Page 7: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/7.jpg)
Mirar hacia adelante
Innovación
Diseño
Calidad
Sostenibilidad
![Page 8: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/8.jpg)
HD Parque Cristóbal
- Oferta extra-hotelera
obsoleta
- Cambio de categoría de 2 a
3*
- Estudio de tendencias/
estilos de vida
- Posicionamiento
- Diferenciación
- Incremento de resultados
![Page 9: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/9.jpg)
División del producto
HD PCGC HD PCTF HD PUEBLO MARINERO
HD BEACH RESORT
ANTES DESPUES ANTES DESPUES ANTES DESPUES ANTES DESPUES
CATEGORIA 2LL *** 2LL *** **** 2LL ****
CONCEPTO GRAL FAMILIA+ SPLASH
GRAL FAMILIA+ SPLASH
APTOS SOLO ADULTOS
APTO HOTEL ACTIVO+SPA
SEGMENTO 12 FLY TUI 12 FLY TUI NEW 12 FLY
INVERSION 14 millRenovacion3 mill Zona Splash+RestTematico0,4 millhabitaciones
10.2 millRenovacion
14mill
FINANCIACION ICO ICO 11 millINCENTIVOS
REG 1mill
HABITACIONES 2 TIPOS 4 TIPOS 2 TIPOS
4 TIPOS 2 TIPOS 4 TIPOS 2 TIPOS 7 TIPOS
REGIMEN MP TI MP TI MP MP TEMATICO
TI TI DE TODOS LOS SERVICIOS
CALIDAD Y SOSTENIBILIDAD
Q CALIDAD+ 14001
Q CALIDAD
+14001
+14001 +14001
INC GOP
![Page 10: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/10.jpg)
Renovación Cordial Canarias
![Page 11: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/11.jpg)
- Inversión en Green Golf, Sandy
Golf y Biarritz
- Crédito hipotecario
- Contratos de gestión para
evitar la atomización en la
dirección
- Incremento EBITDAR
- Mejora en el posicionamiento
de marcas
![Page 12: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/12.jpg)
Renovación 2006
![Page 13: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/13.jpg)
Después
![Page 14: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/14.jpg)
El profesor Dr. José Arias, profesor de organización del departamento de
Economía y Dirección de empresa, se plantea como objetivo reducir en un
20% el coste final sobre el presupuesto inicial, así como reducir los plazos a
un máximo de 3 meses de ejecución.
![Page 15: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/15.jpg)
120 unidades alojativas en régimen de TIME
SHARE (Tiempo compartido).
TOTAL 5.559 semanas
![Page 16: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/16.jpg)
PLAZOS
• Originalmente dos
años.
• 1ª Fase de Mayo
a Octubre 2012
• 2ª Fase de mayo
a Octubre 2013
• Ejecutado en dos meses y medio de 1 de Mayo a 15 Julio 2012
![Page 17: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/17.jpg)
1. Organización y reparto del
trabajo con 5
constructoras a la vez.
Estudio previo con 5
meses de antelación.
2. Estudio detallado de los
riesgos de la ruptura de
ejecución y de la compra
anticipada.
3. Acceso a nuevos
segmentos medio-alto
4. Incremento del precio de
venta en el 61,2%.
![Page 18: Intro casos exito salon renovacion 2012](https://reader033.fdocuments.net/reader033/viewer/2022052911/559dfae11a28ab64468b47b2/html5/thumbnails/18.jpg)