INTRASTACK STEEL FRAME

15
INTRASTACK STEEL FRAME CREATING CERTAINTY AT THE CORE OF ANY STEEL FRAME PROJECT.

Transcript of INTRASTACK STEEL FRAME

Page 1: INTRASTACK STEEL FRAME

INTRASTACK STEEL FRAMECREATING CERTAINTY AT THE CORE OF ANY STEEL FRAME PROJECT.

Page 2: INTRASTACK STEEL FRAME

HOW DOES IT WORK?

Light gauge steel construction can deliver fast, adaptable and cost-effective buildings at multiple storey heights. The INTRASTACK offer is designed to further enhance these strengths through the application of off-site manufacturing principles. By implementing INTRASTACK, the need for teams to deliver on-site construction is dramatically reduced, alongside improvements in quality, greater speed of installation and lower risk.

The solution includes pre-assembled structural components for walls, floors and roofs, available in open and closed panel options. Our manufacturing process is designed to be system agnostic, enabling us to work with your chosen design and steel supplier. We pre-stage your delivery working with your chosen installation service to make sure your panels are delivered and erected in sequence, ready for the follow on trades.

INTRASTACK’s compelling new panelised light gauge steel frame solution has been developed to support the delivery of multi-occupancy residential projects. The benefits of implementing the INTRASTACK system for your project include:

• Accurate panel construction means less work on site

• Factory driven quality means fewer snags and rework

• Fast and clean construction improves speed of delivery

• Flexibility of procurement and installation does not restrict your supply chain

• A cost efficient and durable off-site solution that is simple to implement

• Construction details that are designed to work with Saint-Gobain products, if required.

The following pages show sample wall construction solutions that have been fire tested with Saint-Gobain products.

FOR MORE DETAILS VISIT WWW.INTRASTACK.CO.UK

Page 3: INTRASTACK STEEL FRAME

INTRASTACK STEEL FRAME

As standard, Intrastack steel frame panels are provided without insulation. External facing panels are supplied with a British Gysum Glassroc X cladding. Frame panels can be supplied using bolted or tek screw fixings, dependent on your project’s design requirements.

Page 4: INTRASTACK STEEL FRAME

INDICATIVE WALL CONSTRUCTION

The following are indicative tested wall constructions, shown for illustration only at concept stage. Test data is available for review, upon request. These designs are not to be considered specification advice, nor should they replace project specific design undertaken by qualified specialists.

FOR DETAILED INFORMATION REGARDING THE PERFORMANCE OF THE MATERIALS MENTIONED, PLEASE VISIT WWW.BRITISH-GYPSUM.COM/LITERATURE/WHITE-BOOK.

Page 5: INTRASTACK STEEL FRAME

60MIN NON LOAD BEARING SOUNDBLOC

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Non-Loadbearing Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 15mm British Gypsum 12.5mm Glasroc X Sheathing Board4

Tested build up did not include breather membraneor vapour control layers, client to assess.

FIRE TEST RESULT:

• 60 minutes• Tested In Accordance with BS EN 1364-1:2015• Direction of fire in to out (internal lining through to

façade)

APPLICATION RESTRICTIONS:

• Maximum panel height 2.7 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1364-1:2015

Disclaimer: 1, 2, 3, 4: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 6: INTRASTACK STEEL FRAME

120MIN NON LOAD BEARING ISOVER POLTERM MAX PLUS

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm Glasroc X Sheathing Board4

• 200mm Isover Polterm Max Plus5

Tested build up did not include breather membraneor vapour control layers, client to assess.

FIRE TEST RESULT:

• 120 minutes• Tested In Accordance with BS EN 1364-1:2015• Direction of fire in to out (internal lining through to

façade)

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1364-1:2015

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 7: INTRASTACK STEEL FRAME

60MIN INTERNAL LOADED PARTITION GYPROC SOUNDBLOC

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 2 layers 15mm Gyproc SoundBloc1

FIRE TEST RESULT:

• 60 minutes• Tested In Accordance with BS EN 1365-1:2012• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 8: INTRASTACK STEEL FRAME

60MIN INTERNAL LOADED PARTITION GYPFRAME RB1 RESILIENT BAR

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• British Gypsum Gypframe RB1 Resilient Bar2

• 100mm Structural Steel Stud3

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone4

• British Gypsum Gypframe RB1 Resilient Bar2

• 2 layers 15mm Gyproc SoundBloc1

FIRE TEST RESULT:

• 60 minutes• Tested In Accordance with BS EN 1365-1:2012• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 9: INTRASTACK STEEL FRAME

60MIN INTERNAL LOADED WALL GYPROC HABITO

WALL BUILD UP:

• 2 layers British Gypsum Gyproc plasterboard• Layer 1 12.5mm British Gypsum Gyproc Habito• Layer 2 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 2 layers British Gypsum Gyproc plasterboard• Layer 1 12.5mm British Gypsum Gyproc Habito• Layer 2 15mm British Gypsum Gyproc SoundBloc1

Tested build up did not include breather membraneor vapour control layers, client to assess.

FIRE TEST RESULT:

• 60 minutes• Tested In Accordance with BS EN 1365-1:2012• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 10: INTRASTACK STEEL FRAME

90MIN EXTERNAL LOADED WALL 100MM POLTERM MAX PLUS

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm British Gypsum Glasroc X Sheathing Board4

• 100mm Isover Polterm Max Plus5

Tested build up did not include breather membraneor vapour control layers, client to assess.

FIRE TEST RESULT:

• 90 minutes• Tested In Accordance with BS EN 1365-1:2012• Direction of fire out to in (Glasroc X through to

internal lining)• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 11: INTRASTACK STEEL FRAME

90MIN EXTERNAL LOADED WALL FIRELINE & GYPROC HABITO

WALL BUILD UP:

• 2 layers Gyproc Plasterboard• Layer 1 12.5mm British Gypsum Gyproc Habito• Layer 2 15mm British Gypsum Gyproc FireLine1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm British Gypsum Glasoc X4

• 200mm Isover Poltherm Max Plus5

Tested build up did not include breather membrane or vapour control layers, client to assess.

FIRE TEST RESULT:

• 90 minutes• Tested In Accordance with BS EN 1365-1:2012• Direction of fire in to out (internal lining through to

façade)• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 12: INTRASTACK STEEL FRAME

120MIN EXTERNAL LOADED WALL 120 MINUTES

WALL BUILD UP:

• 3 layers 15mm British Gypsum Gyproc FireLine1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm British Gypsum Glasroc X Sheathing Board4

• 200mm Isover Polterm Max Plus5

Tested build up did not include breather membraneor vapour control layers, client to assess

FIRE TEST RESULT:

• 120 minutes• Tested In Accordance with BS EN 1365-1:2012• Direction of fire in to out (internal lining through to

façade)• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 13: INTRASTACK STEEL FRAME

90MIN EXTERNAL LOADED WALL 90 MINUTES

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc FireLine1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm British Gypsum Glasroc X Sheathing Board4

• 200mm Isover Polterm Max Plus5

Tested build up did not include breather membraneor vapour control layers, client to assess

FIRE TEST RESULT:

• 90 minutes• Tested In Accordance with BS EN 1365-1:2012• Direction of fire in to out (internal lining through to

façade)• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 14: INTRASTACK STEEL FRAME

60MIN EXTERNAL LOADED WALL 60 MINUTES

WALL BUILD UP:

• 2 layers 15mm British Gypsum Gyproc SoundBloc1

• 100mm Structural Steel Stud2

• 100mm Isover Acoustic Partition Roll (APR 1200) in stud zone3

• 1 layer 12.5mm British Gypsum Glasroc X Sheathing Board4

• 200mm Isover Polterm Max Plus5

Tested build up did not include breather membraneor vapour control layers, client to assess

FIRE TEST RESULT:

• 60 minutes• Tested In Accordance with BS EN 1365-1:2012• Direction of fire in to out (internal lining through to

façade)• Tested load 60kN

APPLICATION RESTRICTIONS:

• Maximum panel height 3 meters• Minimum stud depth 100mm• Maximum stud centres 600mm• Minimum stud metal gauge 1.2mm

TESTED IN ACCORDANCE WITH BS EN 1365-1:2012

Disclaimer: 1, 2, 3, 4, 5: Restrictions apply for material specification and fixing details for the testing to be relevant. These will be accounted for within the INTRASTACK design platform.

Page 15: INTRASTACK STEEL FRAME

INTRASTACK.CO.UK

[email protected]

1 Herald Way, Binley Industrial Estate, Coventry CV3 2ZG