CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority
Page �I-5 So., Orange County Line to Rte. 605
Interstate 5 Carpool lane from orange County lIne to Interstate 605
Description of corriDor
The I-5 corridor is one of the most congested freeways in the Los Angeles basin, providing a direct connection between Southern California’s two largest counties, Orange and Los Angeles. A drop from 10 lanes in Orange County to six lanes in Los Angeles County causes significant congestion and travel delays northbound. The insufficient number of lanes and growing demand clog this freeway segment in each direction.
project Description
This 6.7 mile project involves widening and construction of one High Occupancy Vehicle (HOV) lane and one general-purpose lane in each direction between the Orange County Line and Rte. 605. Eighteen struc-tures (12 bridges and overcrossings and six undercrossings) will be upgraded with relocation/reconstruction of the Carmenita Ave. Interchange and major construction on the Valley View Ave. and Rosecrans Ave. Interchanges. The 50-year-old freeway segment also will be upgraded to conform to current highway design standards that include median shoulders and CHP enforcement areas.
project cost
CMIA Request: $387,000,000
Non-CMIA Funding: $768,000,000
Total Cost: $1,155,000,000 (Carmenita Interchange is separately funded)
project sponsors/partners
The project is being jointly developed by the Federal Highway Administration (FHWA), Caltrans, Los Angeles County Metropolitan Transportation Authority (Metro) and Orange County Transportation Authority (OCTA), in cooperation with the I-5 Consortium Cities Joint Powers Authority (I-5 JPA). OCTA is financing and constructing the Interstate 5 segment from State Route 91 to the OCL.
project Benefits
The I-5 South project will have the following benefits:
Mobility
Elimination of the northbound bottleneck resulting from the lane drop at the Orange/L.A County line.
Provide additional capacity to handle the current and forecasted demand.
•
•
Benefits SummaryB/C Ratio 1.2Vehicle Hours of Delay Saved: 11,937,000Delay Savings: $63.2 millionCurrent ADT: 178,000ADT Forecast w/o Project: 230,000ADT Forecast w/ Project: 320,000Safety Benefit: $6.1 millionAdditional Jobs Created: 11,900 jobs
CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority
Page �I-5 So., Orange County Line to Rte. 605
Improve freeway Level of Service during AM and PM peak hours.
Increase throughput to accommodate current and future demand.
Improve design speed from 50 to 65 MPH.
connectivity
Improve performance of major intersections and interchanges in the I-5 Corridor.
Improve access/connectivity with regional transit and HOV facilities. Lines 275, 460 and NW3 cross the Carmenita Interchange and Line 460 (Disneyland Express) continues along I-5 to the Orange County Line, with approximately 4,500 transit boardings for the total line. Metrolink ridership on the Orange County Line is 6,600 daily boardings.
Reconstruct roadway, over and undercrossings with new signalization and ramp metering to improve freeway and arterial operation.
Freeway segment directly connects two of the state’s largest metropolitan areas, Los Angeles and Orange Counties.
Major activity centers: Disneyland, Edison (Anaheim) Stadium, Knott’s Berry Farm, Arrowhead Pond (Arena), Biola University, Commerce Casino, Citadel/Stonewood/Santa Fe Springs Shopping Centers and numerous industrial employers/manufacturers.
safety
Improve travel time and reduce congestion-related accidents.
Upgrade I-5 corridor to meet current Caltrans and FHWA design standards.
Provide inside and outside shoulders with CHP enforcement areas.
air Quality and Greenhouse Gas emissions
The I-5 South HOV Project is included in Metro’s 25-Year Long-Range Transportation Plan. The plan models the collective benefits of the county’s multi-modal transportation system investments to determine the overall air quality improvements and emissions reductions.
The I-5 South HOV Project combined with Metro’s multi-modal investments will result in air quality and greenhouse gas emissions reductions of approximately 50% by the year 2025. This is significant as Los Ange-les has one of the worst air quality rankings in the nation and, as the most populous county in the nation, is a significant greenhouse gas emitter. The I-5 South HOV Project will be leveraged with other multi-modal investments including transit-oriented mixed-use development in this highly congested corridor to ensure that Los Angeles achieves a more sustainable transportation system.
Multi-modal corridor improvements investments:
Interchange, intersection, arterial and goods movement-related improvement projects including:
Carmenita Ave. IC - $251 million (funded separately)
Valley View Ave. IC - $53 million.
Valley View Ave. Grade Separation - $47 million
Improvements to 43 truck-impacted intersections.
•
•
•
•
•
•
•
•
•
•
•
•
—
—
—
—
CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority
Page �I-5 So., Orange County Line to Rte. 605
Arterial signal, bus speed improvement and TOS improvements exceeding $27 million.
Design and implementation of regional traffic signal system on major arterials.
Construction of bus facilities, multi-modal centers, new and existing bus service expansion and transit security upgrades.
Expansion of commuter rail services and facilities including triple track construction and new grade crossings.
Funding for Metrolink operation and facility upgrades for service paralleling the I-5 Corridor.
Programs, policies and initiatives that promote the use of public transit and other non-motorized options.
Gap closure/expansion of regional bicycle facilities and pedestrian ways.
Implementation and expansion of the Freeway Service Patrol.
Mitigating the project risks
Accelerating construction of Carmenita Ave. IC to limit escalation of ROW and materials costs.
Evaluating other project acceleration opportunities to limit cost increases and delay to schedule.
Economic Development Benefits
Construction of the I-5 project from the Orange County Line to I-605 will bring substantial economic benefits to Los Angeles County and the state. The reduction in congestion-related costs will facilitate making the region more competitive relative to the rest of the country and the world. Economic projections made using the REMI model indicate this project will provide the following regional benefits in the year 2030:
The creation of an additional 11,900 jobs;
An increase of $2.4 billion (2007 dollars) in Gross Regional Product;
An increase of $1.1 billion (2007 dollars) in real, disposable personal income;
A $440 million (2007 dollars) boost in regional exports.
corridor Management approach
Caltrans and Metro are in the process of developing a corridor management plan (CMP) on all corridors for which improvements are submitted for funding from the Corridor Mobility Improvement Account Program (CMIA) to ensure a coordinated, multi-modal, congestion management approach.
Caltrans District 7 is committed to prepare CMPs using a multi-disciplinary and multi-function approach, including but not limited to, representatives from district traffic operations, planning and maintenance. Participation of other functions such as design, program-project management and environmental is recom-mended based on the corridor. Regional agencies, congestion management agencies and modal operators will be involved through all stages of plan development. This effort will be coordinated with Metro’s ITS program (see CMP description and ITS project description for more details).
•
—
•
•
—
•
•
•
•
•
•
•
•
•
I-5 NB
I-5 SB
MF
SB
HO
V S
BH
OV
NB
MF
NB
HO
V
HO
V
LAOC
LAOC
I-5 NB
I-5 SBH
OV
H
OV
LAOC
LAOC
LAKE
WOO
D
WHITTIER
VALLEY
ENCE
ALONDRA
DEL AMO
ARTESIA
FIRESTONE
WHITTIER
CH
BELL
FLOW
ER
CARSON
CARM
ENITA
SOUTH
BEVERLY
ROSECRANS
605
60
5
710
91
105
5
90
710
10
405
72
42
19
LONGBEACH
SIGNAL HILL
LAKEWOOD
HAWAIIANGARDENS
LAKEWOOD
ARTESIA CERRITOS
BELLFLOWER
PARAMOUNTCOMPTON
NORWALK
LYNWOOD
SOUTHGATE
CUDAHY
DOWNEY
SANTA FESPRINGS
LA HABRAHEIGHTS
BELL
WHITTIER
VERNON
CITY OFCOMMERCE
PICORIVERA
WHITTIER
MONTEBELLO
MONTEREYPARK
EL MONTE
LosAngelesCo.
LA 5PM 0.1
LA 5PM 6.8
Los Angeles
Orange
Ventrua
PacificOcean
San Bern
0 1 2 3 4 Miles5Miles
Corridor Mobility Improvement Account Program
January 9, 2007
I-5 Carpool and Mixed Flow Lanesfrom Orange County Line to I-605
5
1
4
2
3
BEFORE
AFTER
Existing HOV Lanes
Corridor Management Plan
I-5 Carpool and Mixed Flow LanesProject Limits
Freeway and Major Arterials
SCAG SmartGrowth Areas
Proposed Interchange Improvements
Proposed HOV/Mixed Flow Lanes
Metro Green Line
Metrolink Station
Metro Green Line Station
Metrolink Commuter Rail
MTA Bus Lines\Muni Lines
Metro Rapid (Bus Rapid Transit)
ITS Features
CCTV - Closed Circuit TV
CMS - Changeable Message Sign
HAR - Highway Advisory Radio
METER - Ramp Meter
Regional Employment / Activity Centers
RWIS - Roadside Weather Information SystemTMS - Transportation Management Systems
N
Metrolink Orange County Line
ITS
To DowntownLos Angeles
To Irvine/
SanDiego/Mexico
El Monte Busway Station
Montebello Commerce
Lakewood Norwalk Santa Fe Springs
Rosecrans
Carmenita
Valley View
PROJECT #1: I-5, OC LINE TO I-605
Project Description- Construct (1) HOV and (1) Mixed Flow Lanes in Each Direction- Reconstruct Carmenita Avenue interchange- Construct Interchange at Valley View Avenue- ITS Elements (Various Locations)
Project CostCMIA Request: $387,000,000Non-CMIA Match: $768,000,000Total Cost: $1,155,000,000 (Carmenita Interchg separately funded)
Benefits Summary- B/C Ratio 1.2- Vehicle Hours of Delay Saved: 11,937,000- Delay Savings: $63.2 million- Current ADT: 178,000- ADT Forecast w/o Project: 230,000- ADT Forecast w/ Project: 320,000- Safety Benefit: $6.1 million- Additional Jobs Created 11,900 jobs
Cal StateUniversity
CommerceLA
Manufacturing/Industrial Center
Cudahy
StonewoodCenter
Cerritos College
LakewoodCenter Mall
Long BeachAirport
Knott’s BerryFarm
Disneyland
Metro Green Line
Metrolink Riverside Line
CORRIDOR MOBILITY IMPROVEMENT ACCOUNT PROGRAMBENEFIT/COST ANALYSIS: PROJECT INPUT SHEET
Region/District: 7 County: Los Angeles Route: Rte 5 (south) EA: 2159AO
Describe Project: Interstate 5 from Orange County Line to Interstate 605 Post mile: 0.0/6.5 PPNO: 2808
PROJECT DATA HIGHWAY ACCIDENT DATA
Type of Project Enter "X" Actual 3-Year Accident Data for FacilityHwy Capacity Expansion (Lane Addition) 2 Count (No.)Operational Improvement Fatal Accidents 6Transp MGMT System (TMS) Injury Accidents 582Other (describe: HOV Lanes ) 1 Property Damage Only (PDO) Accidents 1893
Project Location Statewide Average for Highway Classification(1 = So. Cal., 2 = No. Cal., or 3 = rural) 1 w/o Project w/ Project
Accident Rate (per mil. veh-miles) 1.37 1.21Length of Construction Period 6 years % Fatal Accidents 0.80% 0.5%
% Injury Accidents 43.0% 30.6%Duration of Peak Period (AM+PM) 7 hours
HIGHWAY DESIGN AND TRAFFIC DATA TOTAL PROJECT COSTS (in escalated dollars)Highway Design From Project Nomination Fact Sheet:
w/o Project w/ Project HOVNumber of General Traffic Lanes 6 10 Restriction Fiscal Year:Number of HOV Lanes 0 2 2 Prior $ 234,417,000Highway Free-Flow Speed (in mph) 65 65 (2 or 3 ) 2007-2008 $Project Length (in miles) 7 7 2008-2009 $ 613,393,000
2009-2010 $ 19,245,0002010-2011 $ 174,908,000
Average Daily Traffic w/o Project w/ Project 2011-2012 $Current 178,000 2012-2013 $ 113,322,000Forecast (20 years after construction) 230,000 320,000
Average Hourly HOV Traffic (if HOV lanes) 4,040 4,040Percent Trucks (include RVs, if applicable) 9% 9Truck Speed (if passing lane project)
COMMENTS:
Prepared by: Phone No: E-Mail:
CONTACT: Mahmoud Mahdavi 916-653-9525 [email protected] FAX: 916-653-1447
Transportation Economics, DOTP, Caltrans1/16/2007
California Transportation Commission CMIA Guidelines
Fax Number
Project Delivery Milestones (month/year):
Project Study Report (PSR) complete Jan/2001
Notice of Preparation Document Type: EIR/EIS Jan/2001
Begin Circulation of Draft Environmental Document Oct/2006
Final Approval of Environmental Document May/2007
Completion of plans, specifications, and estimates Jan/2012
Right-of-way certfication Jun/2012
Ready for advertisement Dec/2012
Construction contract award Dec/2012
Construction contract acceptance Nov/2016
NOTE:
Contact Person Jon Grace/Emad Gorgy
MTA: (213) 922-3022 / CT Dist 7 (213) 897-0684Phone Number MTA: (213) 922-4848 / CT Dist 7: (213) 897-6746
Additional funding is expected to be funded with Prop 1B CMIA category
Location - Project Limits - Description and Scope of Work (Provide a project location map on a separate sheet and attach to this form)
Project Information:
Email Address [email protected]/[email protected]
Implementing Agency (by component)
PA&ED: PS&E:
A copy of the CTC CMIA Guidelines and a template of the Project Fact Sheet are available at: http://www.dot.ca.gov/hq/transprog/ and at: http://www.catc.ca.gov/
CALTRANS
CALTRANS
CALTRANS
CALTRANS
The CTC Corridor Mobility Improvement Account (CMIA) Program Guidelines should have been read and understood prior to preparation of the CMIA Fact Sheet.
Elimination of northbound bottleneck as a result of the lane drop between the Orange County and L.A County line. Improve major intersections and interchanges performance, in the I-5 Corridor. Provide additional capacity to handle the forecasted demands. Upgrade I-5 corridor to meet current Caltrans and FHWA design standards. Improve access to regional transit and HOV facilities. Improve freeway Level Of Service during AM and PM peak hours, Reduce travel time delays and congestion related accidents.
Project Title Interstate 5 Carpool Lane from Orange County Line to Interstate 605
Expected Source(s) of Additional Funding Necessary to Complete Project - as Identified Under ‘Additional Need’
Los Angeles County - Orange County Line to Route 5/Route 605 Junction - Widen Interstate 5 with HOV and Mixed flow lanes in various cities from .02 mile south oArtesia Avenue to .02 mile north of Florence Avenue Overcrossing.
Description of Major Project Benefits
34,38,39
Assembly:
LOS ANGELES 7 2808
56,58,60
* NOTE: PPNO & EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO. Route/Corridor & Post Mile Back/Ahead used for State Highway System.0.1 6.8
Legislative Districts
EA *
CON:
Senate: 27,30 Congressional:
R/W:
Region/MPO/ TIP ID*County Post Mile Ahead *
5
Route / Corridor * Post Mile Back *
2159A0
CaltransDistrict PPNO *
Fact Sheet Date: 01/09/07Nominating Agency: MTA / Caltrans District 7
CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNT
Project Nomination Fact Sheet Interstate 5 Carpool Lane from Orange County Line to Interstate 605
1
CMIA Guidelines
Date: 9-Jan-07County CT District
LOS ANGELES 7Project Title:
* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO
Proposed Total Project Cost ProjectComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 7,523 7,523PS&E 24,965 24,965R/W SUP (CT) * 5,681 5,681CON SUP (CT) * 34,500 34,500R/W 176,509 194,111 19,245 117,208 507,073CON 19,739 384,782 57,700 113,322 575,543TOTAL 234,417 0 613,393 19,245 174,908 0 113,322 1,155,285
Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 TotalE&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 194,111 194,111CON 192,889 192,889TOTAL 0 0 387,000 0 0 0 0 387,000* NOTE: R/W SUP and CON SUP to be used only for projects implemented by Caltrans
Existing RTIP Funds (RTIP Program Code: ** 20.XX.075.600)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 1,068 1,068PS&E 0R/W SUP (CT) * 408 408CON SUP (CT) * 34,500 34,500R/W 0CON 191,893 191,893TOTAL 1,476 0 226,393 0 0 0 0 227,869
Proposed RTIP Funds (RTIP Program Code: ** 20.XX.075.600)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 1,068 1,068PS&E 0R/W SUP (CT) * 408 408CON SUP (CT) * 34,500 34,500R/W 0CON 191,893 191,893TOTAL 1,476 0 226,393 0 0 0 0 227,869
Existing ITIP Funds (ITIP Program Code: ** 20.XX.025.700)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 12,599 12,599R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 12,599 0 0 0 0 0 0 12,599
Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 TotalE&P (PA&ED) 0
CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan
(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.
2808 0PPNO * EA* Region/MPO/TIP ID *
2159A0
Corridor Management Improvement Account (CMIA) Program
Interstate 5 Carpool Lane from Orange County Line to Interstate 605
Proposed ITIP Funds (Program Code ** 20.XX.025.700)
1
CMIA Guidelines
Date: 9-Jan-07County CT District
LOS ANGELES 7Project Title:
* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO
CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan
(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.
2808 0PPNO * EA* Region/MPO/TIP ID *
2159A0Interstate 5 Carpool Lane from Orange County Line to Interstate 605
PS&E 12,599 12,599R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 12,599 0 0 0 0 0 0 12,599
Existing 'Grandfathered STIP' Funds (GF Program Code: **20.XX.075.400)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 455 455PS&E 12,366 12,366R/W SUP (CT) * 5,273 5,273CON SUP (CT) * 0R/W 0CON 0TOTAL 18,094 0 0 0 0 0 0 18,094
Proposed 'Grandfathered STIP' Funds (GF Program Code: **20.XX.075.400)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 455 455PS&E 12,366 12,366R/W SUP (CT) * 5,273 5,273CON SUP (CT) * 0R/W 0CON 0TOTAL 18,094 0 0 0 0 0 0 18,094
Existing Non-STIP Funding - LACMTA Loc FundsComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 57,509 19,245 117,208 193,962CON 0TOTAL 57,509 0 0 19,245 117,208 0 0 193,962
Proposed Non-STIP Funding - LACMTA Loc FundsComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 57,509 19,245 117,208 193,962CON 0TOTAL 57,509 0 0 19,245 117,208 0 0 193,962
Existing Non-STIP Funding - TCRPComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 6,000 6,000
Shaded fields are automatically calculated. Please do not fill these fields.
2
CMIA Guidelines
Date: 9-Jan-07County CT District
LOS ANGELES 7Project Title:
* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO
CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan
(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.
2808 0PPNO * EA* Region/MPO/TIP ID *
2159A0Interstate 5 Carpool Lane from Orange County Line to Interstate 605
PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 119,000 119,000CON 0TOTAL 125,000 0 0 0 0 0 0 125,000
Proposed Non-STIP Funding - TCRPComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 6,000 6,000PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 119,000 119,000CON 0TOTAL 125,000 0 0 0 0 0 0 125,000
Existing Non-STIP Funding - CMAQComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 19,739 57,700 77,439TOTAL 19,739 0 0 0 57,700 0 0 77,439
Proposed Non-STIP Funding - CMAQComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 19,739 57,700 77,439TOTAL 19,739 0 0 0 57,700 0 0 77,439
Existing Non-STIP Funding - LACMTA Loc FundsComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 4,401 4,401CON 0TOTAL 4,401 0 0 0 0 0 0 4,401
Proposed Non-STIP Funding - LACMTA Loc FundsComponent Prior 07/08 08/09 09/10 10/11 11/12 12/13 Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0
3
CMIA Guidelines
Date: 9-Jan-07County CT District
LOS ANGELES 7Project Title:
* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO
CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan
(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.
2808 0PPNO * EA* Region/MPO/TIP ID *
2159A0Interstate 5 Carpool Lane from Orange County Line to Interstate 605
R/W 0CON 113,322 113,322TOTAL 0 0 0 0 0 0 113,322 113,322
Additional Funding Needs (funding needs not yet committed)Component Prior 07/08 08/09 09/10 10/11 11/12 12/13+ Total
E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 0 0 0 0 0 0 0 0
Shaded fields are automatically calculated. Please do not fill these fields.