Interreg V B Adriatic-Ionian ADRION First call for proposals main features ADRION Info Day Bologna, 12 February 2016

Transcript of Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main...

Page 1: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

Interreg V B Adriatic-Ionian ADRION

First call for proposals main features

ADRION Info Day

Bologna, 12 February 2016

Page 2: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION Programme

• 4 EU Member States: Croatia, Greece, Italy (part of the country), Slovenia;

• 3 candidate countries: Albania, Montenegro, Serbia;

• 1 potential candidate country: Bosnia and Herzegovina

ERDF Partner States

IPA Partner States

Page 3: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

…to act as a policy driver and governance innovator fostering European integration among Partner States,

taking advantage from the rich natural, cultural and human resources surrounding the

Adriatic and Ionian seas and enhancing economic, social and territorial cohesion in the

Programme area.

ADRION first call for proposals – Overall objective

Page 4: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Priorities and Specific Objectives

1. Innovative and Smart

Region

1.1Support the development of a regional Innovation

system for the Adriatic-Ionian

area

2. Sustainable Region

2.1 Promote the sustainable valorisation of natural and cultural assets as growth assets

2.2 Enhance the

capacity in transnationally tacking

environmental vulnerability,

fragmentation and the safeguarding of

ecosystem services

3. Connected Region

3.1 Enhance capacity for integrated

transport and mobility

services and multimodality

system including

multimodal links

Page 5: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Financial allocation

ERDF

EUR

IPA II

EUR

Total

EUR

Total budget

(incl. Nat. cofin 15%)

EUR

Priority Axis 1

6.677.418,80

1.199.244,40

7.876.663,20

9.266.662,59

Priority Axis 2

15.358.062,00

2.830.888,40

18.188.950,40

21.398.765,18

Priority Axis 3

6.009.676,40

1.073.733,20

7.083.409,60

8.333.423,06

TOTAL

28.045.157,20

5.103.866,00

33.149.023,20

38.998.850,82

Budget allocation 1st call for proposals: 40% programme budget of Priority Axes 1-3

Ranking list of assessed project proposals per Priority Axis!

Page 6: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Main features

PROJECT FINANCIAL SIZE

From EUR 800.000 to 1.500.000 ERDF+IPA II contribution (total budget: from EUR 941.176 to 1.764.706) In exceptional cases an increase or decrease of the amounts above of 5% can be accepted

EU CO-FINANCING

Up to 85% for all partners

PROJECT DURATION

Up to 24 months

WAY OF SUBMISSION

1-step call Electronically submitted

DEADLINE FOR SUBMISSION

25 March 2016, h: 17:00 (CET time)

Page 7: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Ways of involvement

Financing partners: Are the ” bones” of the project proposals; Financially contribute to the project ; Located in the programme area.

Associated Partners: Do not financially contribute to the project; Related expenditure is borne by the financing partners (limited to travel and accommodation); Do not act as service providers; Must demonstrate being involved for the benefit of the project; Can also be located outside the Programme area; Do not count for the fulfilment of the eligible partnership.

Non-EU Partners located outside the Programme area: Have to be public institutions; Contribute with their own funds or with the financial support of other sources of funding (e.g.: ENI, IPA II, United Nation); Do not count for the fulfilment of the eligible partnership.

Page 8: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Eligible partnership

Partnership composed by: • Financing partners from at least 3 Partner States, out of

which • At least one financing partner must be from an ERDF

Partner State.

• Larger partnership possible: up to 10 financing partners;

• Even larger partnership also possible if duly justified.

Page 9: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Eligible financing partners

National, regional and local public bodies (including EGTCs) Bodies governed by public law (Article 2(4) of Directive 2014/24/EU) ) Private bodies (operational from at least 2 years) International organisations acting under the national law of an ADRION Partner State (operational from at least 2 years)

• Be liable to the national law of the Partner States participating to the Programme;

• Have their official seat and their seat of operations in the country/part of the country included in the Programme area;

• Be endowed with legal personality.

Page 10: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Exception: Assimilated partners

Assimilated partners: • Italian public authorities/bodies governed by public law competent in

their scope of action for certain parts of the eligible area but are located outside of it (e.g. ministries located in Rome);

• Have equal rights and obligations to applicants located in the programme area;

• Attribution of the status of assimilated partner shall be duly justified and further assessed with the support with the Italian National Authority/National Contact Point.

Page 11: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Lead Applicant

The following institutions can be Lead Applicant: • Public bodies (national, regional or local level; also “assimilated”);

• Bodies governed by public law (also “assimilated”);

• International organizations acting under national law.

Lead Applicant must be located in an ADRION ERDF Partner State.

Page 12: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Private bodies

• Can be profit or non-profit;

• They must be operational from at least 2 years;

• They must respect specific financial requirements in order to ensure their financial viability;

• In case of project proposal, they must provide a financial guarantee for an amount corresponding to their respective share of EU contribution;

• Financial guarantee is one of the pre-conditions for signing the Subsidy Contract by the Managing Authority.

Page 13: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Application package

• Call announcement; • Cooperation Programme; • Off-line Application Form; • Declarations of Lead Applicant and Project Partners (1 document per

partner); • Declaration of Associated Partner(s) (1 document per associated partner); • Declaration on financial viability (for private partner(s) only);

In addition you have to provide: • Documents attesting that the legal representatives/delegated persons

hold the power of signature or representation; • a copy of his/her valid identity document (e.g. identity card, passport).

Page 14: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Submission of the project proposals

• Electronically submitted via e-MS;

• Registration access required;

• Application submitted by the Lead Applicant;

• Paper documentation required in case of project

approval only.

Page 15: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Selection process

Administrative & Eligibility checks

Strategic assessment

Operational assessment

State Aid & Anti-fraud checks

Monitoring Committee decision

If the proposal does not pass one of the steps, it does not progress the appraisal or the affected partner is excluded from the partnership.

Awarding score (contribution to EUSAIR)

Financial capacity check of private partners

Page 16: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

Page 17: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Programme intervention logic

All 2014-2020 programmes are based on a result oriented approach:

• Result orientation of the programme;

• Programme monitoring through indicators;

• Definition of a performance framework: targets to be reached

within 2018;

• Evaluation and reporting.

Page 18: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Programme intervention logic

Page 19: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Projects contributions to Programme

Programme Priority Axis Project

Programme Priority /Specific Objective

Actions to be supported

Programme result indicator

Programme output indicator

Project overall

objective

Project results

Project specific

objective

Project main

outputs

Projects feeds Programme outputs and results

Page 20: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Projects contributions to Programme

Programme Priority Axis Project

Support development regional innovation system for

the area

Indicative actions listed in the Cooperation Programme

Increase capacity of key innovation

actors to be involved in trans.

actions

No. enterprises cooperating

No. coop. networks &

clusters …

Project overall

objective

Project results

Project specific

objective

Project main

outputs

Example:

Page 21: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project intervention logic

Page 22: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

Project proposal structured in Work Packages (WP)

Preparation

Management

Communication

Implementation

Compulsory WPs

Page 23: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

Project proposal structured in Work Packages (WP)

Preparation

• Related to preparatory activities;

• Eligible expenditure from 1 January 2014 to the day before the submission of the project proposal;

• Lump sum: max EUR 11.800;

• Reimbursed only if the project proposal is approved; Subsidy Contract & Partnership Agreement signed.

Page 24: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Projects structure

Project proposal structured in Work Packages (WP)

Management

• Project coordination and implementation;

• Financial management;

• Internal communication;

• Project closure.

Page 25: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

Project proposal structured in Work Packages (WP)

Communication

• Strategic communication planning;

• Reference to target groups;

• Specific and measurable communication objectives (i.e.: proposing of “raising awareness” or to “spread results” without providing to whom and how is not enough).

Page 26: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

Project proposal structured in Work Packages (WP)

Implementation

• Heart of the project;

• Up to three work packages can be devoted to describe project implementation;

• Strictly follows the intervention logic;

• Contributes to feeding programme outputs and results.

Page 27: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project structure

WP Implementation structure:

Activity 1 Deliverable a) Deliverable b) Deliverable c)

Activity 2 Deliverable d) Deliverable e) Deliverable f)

Activity 3 Deliverable g) Deliverable h) Deliverable i)

OUTPUTS

Each project proposal shall contribute to the realization of at least 2 programme outputs. Outputs shall be documented.

Page 28: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Activities outside the EU part of the Programme area

• Activities outside the EU part of the programme area refers to EU partners which implement some activities in the IPA countries;

• These activities shall amount to not more than 20% of the total eligible

budget;

• Activities in the EU but outside the EU part of the programme are possible if communicated in advance and authorized (e.g.: participation to an event).

Page 29: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Programme and projects outputs

ADRION shall mainly support the delivery of the following outputs:

• Networking structures;

• Joint management systems and cooperation agreements;

• Strategies and Action Plans;

• Methodologies and Tools;

• Pilot Actions (small scale investments and demonstration projects).

Page 30: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project budget

Page 31: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Hierarchy of rules on eligibility of expenditure

Rules defined in EU legal framework

Programme rules • Established jointly by the Member States in the programme monitoring

committee • Apply to the programme as a whole • Without prejudice to the rules on EU level

National rules For any other matters not covered by EU rules and programme rules Stricter rules in areas prescribed by EU rules

Reg. (EU) No 1303/2013

Reg. (EU) No 1301/2013

Reg. (EU) No 1299/2013

Del .Reg. (EU) No 481/2014

Page 32: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Budget line

According to the Delegated Regulation No 481/2014 the budget is structured according to the following: • Staff costs;

• Office and administrative expenditure;

• Travel and accommodation costs;

• External expertise and services costs;

• Equipment expenditure.

Page 33: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Staff costs

Two options are possible: a) Real costs; or b) Flat rate (20% of direct costs other than staff costs)

REAL COSTS • Staff costs can be higher

than the amount foreseen by the flat rate option;

• Budget appraised during the evaluation;

• To be validated by national controllers before being reimbursed;

• Adequate audit trail is necessary;

• More detailed information required in the AF.

FLAT RATE • Maximum ceiling; • No accountancy is

requested; • No validation by national

controllers is required to get the reimbursement;

• No specific information required in the AF.

Decision is taken at project partner level; it cannot be changed during the project implementation.

Page 34: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Office and administrative expenditure

a) Calculated as flat rate (10% of staff costs);

b) Must refer to the list of expenditure reported in the Programme Manual;

c) Automatically calculated in the AF (no details required);

d) No accountancy requested.

Page 35: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Travels and accommodation

It refers to the expenditure of travels and accommodation of staff costs: • Travel costs (e.g. tickets, travel and car insurance, fuel, car mileage, toll, and

parking fees); • Meals costs; • Accommodation costs; • Visa costs; • Daily allowances.

• Limitations on eligibility of travel and accommodation costs outside the programme area apply;

• Expenditure item already covered by a daily allowance, cannot be accounted for and reimbursed in addition to the daily allowance;

• Travel and accommodation costs of external experts and “associated partners” are reimbursed under budget line “external expertise and services costs”;

• Consider budget to attend meetings organised by the Programme/National authorities.

Page 36: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Travels and accommodation

Example:

Destination

Travel and accommodation costs

Location of the partner Greece Albania Belgium

Greece No ceiling

20% project

eligible budget

No ceiling (if

allowance

applies)

No ceiling (but

it has to be duly

justified)

Albania

(Inside the programme but

outside the EU part of the

programme area)

20% project

eligible budget

20% project

eligible budget

20% project

eligible budget

Turkey Own funds Own funds Own funds

Page 37: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – External expertise and services costs

It refers to external expertise and services provided by a public or private body or a natural person other than the financing partners: • Exhaustive list of eligible expenditure included in the Programme Manual;

• Public procurement rules apply to all partners regardless their legal status: ERDF and Directive rules for ERDF partners; PRAG for IPA partners;

• Specific threshold defined by the Programme and below the national thresholds apply;

• Costs related to project-related tasks sub-contracted by the beneficiary to in-house bodies are eligible under external expertise and service budget line on condition: o they are charged on a real costs basis without any profit margin; o sub-contracting complies with national and institutional public procurement

provisions in force.

Page 38: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Equipment expenditure

It refers to equipment purchased, rented or leased by a beneficiary for project implementation: • Office equipment; • IT hardware and software; • Furniture and fittings; • Laboratory equipment; • Machines and instruments, • Tools or devices; • Vehicles; • Other specific equipment needed for the project.

• Equipment for general office use as computers, office furniture, printers, cameras, etc. upon condition that it is for the exclusive use for the project;

• Equipment devoted to the realization of the “implementation WPs”; • Full cost reimbursement only on condition that all conditions below apply:

o Equipment item is exclusively used for the project implementation; o The depreciation period is shorter than the time lap between the purchase of

the equipment and the end of the project; o Equipment item is not depreciable (e.g. low value asset) according to the

national legislation of the concerned partner.

Page 39: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Public procurement rules

Page 40: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Project budget

Activity 1 Budget

Deliverable a) Deliverable b) Deliverable c)

Activity 2 Budget

Deliverable d) Deliverable e) Deliverable f)

Activity 3 Budget

Deliverable g) Deliverable h) Deliverable i)

WP

BUDGET

ECONOMY, EFFICIENCY, EFFECTIVENESS

Page 41: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Page 42: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Selection process

Administrative & Eligibility checks

Strategic assessment

Operational assessment

State Aid & Anti-fraud checks

Monitoring Committee decision

If the proposal does not pass one of the steps, it does not progress the appraisal or the affected partner is excluded Awarding score

(contribution to EUSAIR)

Financial capacity check on private partners

Evaluation supported by external independent experts and National

Contact Points

Page 43: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Administrative & Eligibility checks

• Verification of submission requirements;

• Verification of presence of minimum requirements;

• List of administrative and eligibility criteria to be respected available in the Programme Manual;

• Healing of the identified errors is not possible.

Page 44: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Strategic assessment

Operational assessment

Quality assessment

Project’s context (relevance and strategy)

Cooperation character

Partnership relevance

Project’s contribution to programme’s

objectives

Management

Communication

Work plan

Budget

Page 45: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Quality assessment scores…

5 Excellent – the section of the application analysed in accordance with the requirement of the criterion is of

excellent quality and provides clear and coherent information

4 Good– the section of the application analysed in accordance with the requirement of the criterion is clear

and contain minor shortcomings

3 Adequate -the section of the application analysed in accordance with the requirement of the criterion is

sufficiently clear and requires further clarification from the applicant

2 Sufficient - the section of the application analysed in accordance with the requirement of the criterion is of

low quality

1 Poor- the section of the application analysed in accordance with the requirement of the criterion does not

meet the requirement/the information is not present

Page 46: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

… and quality threshold …

Strategic Assessment: only those project proposals which have reached: • an overall score of at least 48/80 (60% of the overall score related to

strategic elements) and • at least 12/20 for each criteria (60% of the score at criterion level) of

the Strategic Assessment will be subject to the Operational assessment.

Operational Assessment: only those proposals which have reached: • an overall score of at least 48/80 (60% of the overall score related to

strategic elements) and • at least 12/20 (60% of the score at criterion level) for each criterion shall be appraised according to the foreseen further steps.

Page 47: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Awarding score (contribution to EUSAIR)

ADRION supports EUSAIR Action Plan

Page 48: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Awarding score (contribution to EUSAIR)

• Attribution of the awarding score takes place after the strategic assessment on condition that the proposal has positively passed the strategic assessment;

• Attribution of up to 5 points if the project proposal contributes to the implementation of the EUSAIR strategy;

• The awarding score does not contribute to the overall strategic score but it shall contribute to the overall final project score;

• Overview tables highlighting relations between ADRION and EUSAIR available in the Programme Manual (annexes).

Page 49: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Assessment process

Verification of the declarations provided by private partners through checks of balance sheets.

Financial capacity check of private partners

State Aid & Anti-fraud checks

Verification on the respect of Competition rules and verification on the presence of fraudulent behaviours.

Page 50: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – State Aid checks

State Aid

• State Aid checks apply to all project financing partners (public & private, ERDF and IPA partners;

• Use of de minimis (i.e.: ceiling of EUR 200.000 for those activities considered State Aid relevant over any three tax year period);

• The ceiling applies per EU Member State (i.e.: Italy);

• Checks performed by independent experts.

Page 51: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Approval for funding

Page 52: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Monitoring Committee decision

Your project proposal can be:

Approved the proposal is considered ready to start

Approved under conditions

the proposal is considered approved provided that the Lead Partner and/or the project partners satisfy specific conditions within a given deadline

Rejected the proposal is considered not matching a certain readiness and quality level and responding to the selection criteria

Monitoring Committee decisions are taken by consensus.

Page 53: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Next steps

• Fulfilment of conditions for improvement (if any) and update of the relevant documentation;

• Update of the de minimis declarations; • Submission of original documentation (paper version); • Provision of financial guarantees by private partners;

Signature of the Subsidy Contract

Page 54: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Next steps

• Reimbursement of preparation costs (if funds available); • Advance payment to IPA partners up to 10% of their budget (if

funds available).

Signature of the Partnership Agreement

The advance payment shall be compensated - in equal shares - with the first two payments due to the concerned partners, according to actually incurred and validated expenditure included in the related Progress Reports.

Page 55: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – Tips and recommendations

Page 56: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – tips and recommendations

CONTENT

• Ensure effective contribution to the programme goals through the realization of programme outputs;

• Positively contribute to the needs and challenges in a transnational perspective rather than highlighting on the needs of a limited number of partners;

• Support the exchange and transfer experiences between regions, transnational interventions and capacity building, and ensure that results are disseminated and used beyond project partners;

• Cohesion policy and capacity building as multiplier of prosperity and growth;

• Projects can be a leverage for future initiatives and investments;

• Do not reinvent the wheel; take profit from studies, analyses and projects outcomes already available (e.g.: www.keep.eu);

Page 57: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – tips and recommendations

PARTNERSHIP

• Carefully define the members of your partnership according to their skills and experience in relation to the characteristics of your project;

• Select partners according to the transnational approach requested by your project; clearly define their role and contribution;

PROJECT STRUCTURE

• Carefully define your project activities having regard to its maximum duration;

• Define a realistic work plan: limit deliverables and schedule them appropriately: avoid too many deliverables with the same deadline;

• Ensure consistency along the entire project proposals (content and financial);

• Plan activities that can start as soon as possible;

• Cooperate, spread, share!

Page 58: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

ADRION first call for proposals – How to get information

ADRION web site www.interregadrion.eu Email: [email protected] Phone: 0039 051 527 8886

527 5165 527 8013

Network of National Contact Points

Page 59: Interreg V B Adriatic-Ionian ADRION First call for ... · ADRION first call for proposals – Main features PROJECT FINANCIAL SIZE From EUR 800.000 to 1.500.000 ERDF+IPA II contribution

THANK YOU FOR YOUR ATTENTION!