ARMY INSTITUTE OF TECHNOLOGY PUNE Department of Electronics & Telecommunication Engineering Vocational Training 512 Army Base Workshop Presented By: Ajeet Pandey REG NO: 14494 ROLL NO: 1308 PROJECT: Modification of RN10 Voltage regulator of BMP2 TANK & Portable Testing Jig for BMP2 TANK Guided By: C ol . R K DESHMUKH D GM ETD CEL L

Transcript of Internship Report 512 -ABW

Page 1: Internship Report 512 -ABW

ARMY INSTITUTE OF TECHNOLOGY PUNE Department of Electronics & Telecommunication Engineering

Vocational Training

512 Army Base Workshop

Presented By:Ajeet PandeyREG NO: 14494

ROLL NO: 1308

PROJECT: Modification of RN10 Voltage regulator of BMP2 TANK &

Portable Testing Jig for BMP2 TANK

Guided By:Col. R K DESHMUKHDGM ETD CELL

Page 2: Internship Report 512 -ABW

INTRODUCTION• Three main requirements are Mobility, Firing Power and Protection.

• In BMP-2, capacity for 3 people. Commander, Driver and Gunner +7 Crew Member.

• Gunner is responsible for laying the gun.

• Driver drives the tank, and also serves as day to day mechanic.

• The commander is responsible for commanding the tank. The commander is provided with all round vision devices rather than the limited ones of the driver and gunner.

• The voltage regulator RN 10 is designed for functioning in the vehicle electrical equipment's jointly with the generator, storage batteries, , reverse current relay DMR – 400T and to automatically maintain the generator voltage with in 26.5 to 28.5 volts at variation of the generator armature rotation speed and variation of the generator load.

• It is fitted above the power distribution board in troops compartment. The generator voltage is regulated by the voltage regulator through the control transistor included in the circuit of the generator field winding as a variable resistance.

Page 3: Internship Report 512 -ABW

• The voltage regulator RN 10 is designed for functioning in the vehicle electrical equipment's jointly with the generator, storage batteries, , reverse current relay

DMR – 400T and to automatically maintain the generator voltage with in 26.5 to 28.5 volts at variation of the generator armature rotation speed and variation of the

generator load.

• It is fitted above the power distribution board in troops compartment. The generator voltage is regulated by the voltage regulator through the control transistor

included in the circuit of the generator field winding as a variable resistance.

The basic elements of regulator is:-

1.Measuring device

2.Regulating device

3. Feedback circuit

4.Circuit breaker element

IC -L4970ADESCRIPTION:-• The L4970A is a stepdown monolithic power switching regulator delivering 10A at a voltage variable from 5.1 to 40V• This technology allows the integration of isolated vertical DMOS power transistors plus mixed CMOS/Bipolar transistors.

Voltage regulator RN-10:-

Page 4: Internship Report 512 -ABW

L4970A BLOCK DIAGRAM

1. MILITARY STANDARDS2. EASILY AVAILABLE3. INTERNAL CURRENT LIMITING (SHORT CIRCUIT)4. THERMAL SHUTDOWN5. COMPACT 6. EASILY REPLACIABLE7. Very high efficiency8. LESS COMPLEX

ADVANTAGES OF USING L4970A IC

Page 5: Internship Report 512 -ABW
Page 6: Internship Report 512 -ABW
Page 7: Internship Report 512 -ABW
Page 8: Internship Report 512 -ABW

Portable Testing Jig

• We can Test Control Unit’s component with the help of inbuilt DMM present on Portable Test Jig without Dismantle whole Tank.

• Also called Built-in testing Equipment (BITE)

• A built-in test equipment (BITE) is a mechanism that permits a machine to test itself.

• The main purpose of BITE is to reduce the complexity, and thereby decrease the cost and reduce reliance upon test equipment

Page 9: Internship Report 512 -ABW

Working of Testing Jig

Parameters for testing• COVERTOR OUTPUT

• STABLIZE CARD FOR +/- 15V

• INPUT SIGNAL OF INTEGRATOR AND IT OUTPOT.

• SUMMING AMPLIFIER OUTPUT.

• TIME DELAY CIRCUIT.

W-2 and W-6 female sockets W4 MALE CONNECTOR

Page 10: Internship Report 512 -ABW

Components of Stabilization System

K-1 M Box

• Heart of stabilization system.

• It is also called the First Distribution Box.

• K1M box is the most important component of stabilization system.

• It contains all the relays, microcontrollers, ICs of the system, and manages all the input and output signals.

• K1M Box is responsible for all the inputs and outputs. It receives input signal ifCommander presses button to load ammunition, or driver rotates the turret, etc.and performs the desired action.

• To rotate the turret, K1M Box sends electrical signal to PWDM and it converts theelectrical signal to corresponding hydraulic force.

• High Torque Motor uses the signal sent by PWDM to rotate the turret

• Similar process is followed in the elevation side which is responsible for thevertical movement of Gun.

• The Elevation Booster receives the electrical signal and converts it tocorresponding hydraulic force.

• The Actuating Cylinder expands or retracts and varies the elevation of gun.

• Battery supplies 24V DC supply to Convertor which converts it to 40V AC supply at500 hz frequency, and supplies it to K1M box.

Page 11: Internship Report 512 -ABW
Page 12: Internship Report 512 -ABW

Components of Stabilization SystemElevation Unit

• This unit is responsible for the vertical movement of the gun.

• It comprises of Elevation Booster (like PWDM in Traverse unit), Actuating Cylinder (elevates the gun) and Gun.

Traverse Unit

• This part of Stabilization System rotates the Turret through 360o.

• It consists of PWDM (Pump with Dry Motor), High Torque Motor and Turret.

Rate Gyro

• Its function is to maintain the balance of turret in fixed position during jerks and pit holes, and provide gun enough power to maintain its position during tilted paths.

Page 13: Internship Report 512 -ABW

Working of Testing Jig

Traverse Output

• Optimum Range 6V-35.5 V

• Checked on W6 (pin 14 with 23, 24 shorted) for left

• Checked on W6 (pin 14 with 25, 26 shorted) for right

• In case of any error, change amplifier power

Elevation Output

• Optimum Range 6V-35.5V

• Checked on W6 (pin 17 with 10, 11 shorted) for up

• Checked on W6 (pin17 with 12, 13 shorted) for down

• In case of any error, change amplifier power

DC/AC Supply Checking

• The DC range should be around 22-28 V.

• The AC range should be around 38-44 V.

• In case of any error, the possible reason could be that convertor is damaged.

Rate Gyro Signal

• Range should be around 0-10V.

• It is checked on W2 12th pin.

Page 14: Internship Report 512 -ABW

Working of Testing JigCompensator

• Range should be 0-450 mV.

• Checked on W6 (pin 39 with 2, 3 shorted) for up

• Checked on W6 (pin 39 with 4, 5 shorted) for down

GSD Signal

• 24 V optimum

• Checked on W2 19th pin.

• In case of error, electromagnet might be damaged.

DC/AC Supply Checking

• The DC range should be around 22-28 V.

• The AC range should be around 38-44 V.

• In case of any error, the possible reason could be that convertor is damaged.

Rate Gyro Signal

• Range should be around 0-10V.

• It is checked on W2 12th pin.