International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on...
-
Upload
lena-jacka -
Category
Documents
-
view
215 -
download
0
Transcript of International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on...
International Civil Aviation Organization
Global ATM Operational Concept
Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology(Bangkok, 14-18/Nadi 21-25 May 2012)
SIP/ASBU/2012-WP/4
““Do we know where to go?”Do we know where to go?”
2ICAO SIP 2012 - ASBU workshops
YES.YES.
3ICAO SIP 2012 - ASBU workshops
““Vision without Action is a day-Vision without Action is a day-dream,dream,
Action without Vision is a Action without Vision is a nightmare.”nightmare.”
4ICAO SIP 2012 - ASBU workshops
The GapThe Gap
5ICAO SIP 2012 - ASBU workshops
ObjectiveObjective
To present the ICAO vision and the steps/actions towards the implementation of the “future” Air Navigation System focusing on the global drivers expressed in the GANP.
6ICAO SIP 2012 - ASBU workshops
Presentation OutlinePresentation Outline
• History and Background• Vision• Expectations• How to get there
7ICAO SIP 2012 - ASBU workshops
History and BackgroundHistory and Background
• FANS• Tenth Air Navigation Conference• Global Air Navigation Plan for CNS/ATM Systems
(Doc 9750)• Planning and Implementation Regional Groups
embarked on an extensive effort• SARPs, PANS, Guidance material• Eleventh Air Navigation Conference.
8ICAO SIP 2012 - ASBU workshops
Vision statementVision statement
To achieve an interoperable global air traffic management system for all users during all phases of flight, that
• meets agreed levels of safety;• provides for optimum economic operations;• is environmentally sustainable; and• meets national security requirements.
9ICAO SIP 2012 - ASBU workshops
Guiding principlesGuiding principles
10ICAO SIP 2012 - ASBU workshops
• Safety• Humans • Technology• Information• Collaboration• Continuity
Concept componentsConcept components
11ICAO SIP 2012 - ASBU workshops
• Airspace organization and management(AOM)• Aerodrome operations(AO)• Demand and capacity balancing(DCB)• Traffic synchronization(TS)• Airspace user operations(AUO)• Conflict management(CM)• ATM service delivery management(ATM/SDM)
TransitionTransition
• Technology is not an end in itself
• Based on clearly-established operational requirements
• Integrated system
12ICAO SIP 2012 - ASBU workshops
IntegrationIntegration
13
People Systems
Concept components
Management
ATMService provider
Aircraft operations
Maintenance Engineering
ATM service delivery management
Communications
Navigation
Surveillance
Airspace User
AerodromeOperator
Conflict Management
Information rich environment
Traffic synchronisation
Aerodrome operations
Airspace useroperations
Demand capacitybalancing
Airspaceorganization
and Management
ICAO SIP 2012 - ASBU workshops
ExpectationsExpectations
• Access and Equity• Capacity• Cost-effectiveness• Efficiency• Environment• Flexibility• Global interoperability• Participation by the ATM community• Predictability• Safety• Security
14ICAO SIP 2012 - ASBU workshops
Global SystemGlobal System
15ICAO SIP 2012 - ASBU workshops
Global SystemGlobal System
meeting safety objectives operate along preferred 4D trajectoriesenvironmental objectives other business requirements
16ICAO SIP 2012 - ASBU workshops
How to get thereHow to get there
• The GANP as a catalyst for change
• Provides a global interoperability framework
• Allows adaptation to efficiently meet regional and local needs
17ICAO SIP 2012 - ASBU workshops
How to get thereHow to get there
• Partnering with industry
• Delivering transitional benefits while we continue our evolution
18ICAO SIP 2012 - ASBU workshops
How to get thereHow to get there
• Modules• Elements as options for improvements• Result in direct performance enhancements• Based on Industry Roadmaps and current
regional activities• Bring near- and medium-term benefits
19ICAO SIP 2012 - ASBU workshops
GANPGANP
20
•Represents the initiatives that will contribute to attend the expectations of the aviation community
•Main drivers towards the seamless system.
ICAO SIP 2012 - ASBU workshops
SummarySummary
• We needed a vision: the operational concept
• Gap
• Address the KPAs
• Lots of ongoing work
• GANP one of the main drivers.
21ICAO SIP 2012 - ASBU workshops
We know where to go, but…We know where to go, but…
““Vision without Action is a day-dream,Vision without Action is a day-dream,Action without Vision is a nightmare.”Action without Vision is a nightmare.”
22ICAO SIP 2012 - ASBU workshops
23