International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International...

47
International Bridge Trade Corridor Investment Grade Traffic and Revenue Study April 2011

Transcript of International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International...

Page 1: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor

Investment Grade Traffic and Revenue Study

April 2011

Page 2: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Who is C&M?

U.S. Corporation founded by local investors and Cal y

Mayor y Asociados, S.C.

Offices and operations in 13 countries.

• C&M is a regional leader in the areas of

transportation planning and traffic engineering.

• More than $11 Billion in bonds & loans supported to

finance toll facilities

• Representative Clients

2

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Texas Turnpike Authority

Maryland Transportation Authority

Cameron Co. Regional Mobility Authority

Hidalgo Co. Regional Mobility Authority

Central Texas Regional Mobility Authority

Texas Department of Transportation

Georgia Department of Transportation

Virginia Department of Transportation

Washington State Dep. of Transportation

P3 Development Company

Citi Infrastructure Investments

The Bank of New York

ACS Infrastructure

Cintra

CCR

Macquarie

OHL

Skanska ID

Globalvia

Itinere

MBIA

BBVA

Banco Santander

Deutsche Bank

HSBC

3i

Page 3: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

• Hidalgo County IBTC Investment Grade Traffic and

Revenue Study

• South Padre Island Intermediate Level Traffic and

Revenue Study

• El Paso Commuter International Bridge Traffic and

Revenue Feasibility Study

• Brownsville West Loop Traffic and Revenue Study

• Eagle Pass SL-480 Traffic and Revenue Study2010

FARAC III Northeast Public Private Partnership

• 2009 El Paso Commuter Port of Entry Feasibility Study

• 2009 SH550 and US281 Connector Intermediate Traffic

and Revenue Study

• 2007 South Padre Island Second Causeway Traffic and

revenue Study

• 2005 NAFTA Study update for the Texas Department of

Transportation

• 2005 SL 480 (Eagle Pass Outer Loop) toll feasibility

study, Eagle Pass, Texas

• 2005 West Loop Project toll feasibility study, Brownsville,

Texas

• Estudio de demanda de la autopista Reynosa -

Matamoros y Puente Pharr, en el Estado de Tamaulipas

• Monterrey -Nuevo Laredo, Monterrey - Reynosa,

Reynosa Matamoros Toll Road P3 Concession Process

Manager

• Traffic and Revenue Study Update for the Cadereyta-

Reynosa, Monterrey-Nuevo Laredo, Reynosa-

Matamoros, Allende-Villa Juárez, Libramiento Sur de

Reynosa and Pharr and Los Tomates International

Bridges.

• Traffic and Revenue Study for Brownsville-Matamoros "B

y M", International bridge.

• Anzalduas and Donna International Bridges Traffic and

Revenue Study

• Estudio de tránsito, ingresos y evaluación social de la

prefactibilidad del Libramiento de Reynosa, Tamaulipas

• 2009 Traffic Management System in the Baja California

Border Region

• 2008 Intelligent Transportation System (ITS) Border

Corridor Study

• 2003 Investment Grade Traffic and Revenue Study for

the Tecate-Tijuana toll road

• Strategic Planning System for Freight Transportation in

Mexico Phases I, II & III

• 2004 Traffic and Revenue Study for the Laredo IV Bridge

“World Trade Bridge”

C&M Border Experience

3

• Ingeniero independiente en 9 tramos de autopistas en

Chihuahua, incluye: Caseta Sueco - Villa ahumada, Delicias -

Conchos, Conchos - Camargo, Camargo - Jiménez, Chihuahua

- Sacramento, Ojo Laguna - Flores Magón, Santa isabel -

Cuauhtemoc, Jiménez - Savalza, Flores Magón - Galeana)

• Estimación del tránsito e ingreso del periférico de Monterrey

• Estudio de mercado para 2 estacionamientos en la zona centro

del municipio de Chihuahua calle niños héroes 9,11y 13

• Estudio de Tráfico de la autopista Estación Don – Nogales

• Estudio de Prefactibilidad de la Concesión de la Carretera Santa

Clara – San Luis Río Colorado, en el Estado de Sonora (Incluye

Estudio de Demanda, Pavimentos y Diseño Geométrico)

• Plan Sectorial de Movilidad Urbana Sustentable de la

Ciudad de Chihuahua

• Estudio de estimación de transito de ingreso, evaluación

socioeconómica, modelo de negocio y prefactibilidad

técnica del Libramiento Quinta Martha-Lomas del Real en

Altamira, Tamaulipas

• Estudio de tránsito para evaluar la construcción de cinco

pasos a desnivel en la vía férrea de Ciudad Juárez,

Chihuahua

• "Análisis de disponibilidad al pago y de frecuencia de viajes

en la caseta de cobro Cuauhtémoc sobre la carretera

Chihuahua-Cuauhtémoc"

• Aforos e ingresos Libramiento Chihuahua

Page 4: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

0

100

200

300

400

500

600

700

800

900

18

20

18

30

18

40

18

50

18

60

18

70

18

80

18

90

19

00

19

10

19

20

19

30

19

40

19

50

19

60

19

70

19

80

19

90

20

00

20

10

20

20

20

30

Hid

alg

o C

ou

nty

Po

pu

lati

on

(in

Th

ou

san

ds)

Hidalgo and Transportation: a Growth Story

Old Military

Highway

St. Louis,

Brownsville, Mexico

Railway

Hidalgo

Int’l Bridge

US83

Progreso

Int’l Bridge US83 Freeway

US281 Freeway & US83/US281

Interchange

NAFTA &

Pharr Int’l Bridge

IBTC

Anzalduas Int’l

Bridge

Route to

California

Immigration

accelerates

Alliance Int’l

Bridge

TCC

Page 5: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

0%

5%

10%

15%

20%

25%

30%

35%

Val Verde County

El Paso County

Cameron County

Webb County

Hidalgo County

Texas United States

20

00

-200

9 G

row

th

Population Growth Employment Growth

Hidalgo County Growth

Page 6: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

0%

5%

10%

15%

20%

25%

30%

35%

40%

Tamaulipas Matamoros Hidalgo County Reynosa - Rio Bravo

Mexico

20

00

to

20

09

Po

pu

lati

on

Gro

wth

Reynosa-Rio Bravo Growth

Page 7: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

The International Bridge Trade Corridor

7

• Hidalgo County RMA is

planning to develop the

International Bridge Trade

Corridor and the Trade

Corridor Connector

• C&M performed an

Investment Grade T&R study

for the project in 2010

Page 8: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

T&R Methodology- Simplified

Page 9: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Project Scenarios

• IBTC Only: IBTC opens in 2013

– 16-mile new toll road connecting Pharr and Alliance bridges with US83

– Two lane road in opening year (one lane per direction)

– Expanded to four lanes with frontage road as ultimate design

• IBTC & TCC: IBTC opens in 2013 and TCC opens in 2015

– 13-mile TCC will connect Conway Avenue on the west to IBTC in 2015

– TCC will be a two lane road in opening year (one lane per direction)

– Expanded to four lanes road as ultimate design

Page 10: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Passenger cars and

Commercial vehicles

• Special attention on

major corridors

• International

bridges

• Mexican traffic

network south of

the border

Seasonal variation in

traffic

Existing ITS, Trusted

Traveler Programs

and ETC

Existing Maquiladoras

and Industrial Parks

Review of Traffic Characteristics

Page 11: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Data Collection

- 2008-09

extensive Valley

wide data

collection

- Additional data

collection March

2010

- Validation of

travel patterns

-Traffic

composition

- Origin-

destination.

Page 12: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Travel Time Study

• GPS based

study on nine

important

routes

Page 13: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

• Major concern is crossing times and efficiency at the border

• Dedicated lanes are critical for on-time performance

• Previous study showed maquiladoras’ traffic manager makes route decision.

• Interviewed major maquiladoras and exporters

• Routes optimized continuously by traffic managers

• 30% have weekend deliveries

• FAST trucks average travel time

• 2 hours at the border

• 20 minutes inside U. S.

• They are part of the solution to regional planning

Stakeholder and Maquiladora Interviews

Page 14: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

SP Survey Field Intercept

• Nine locations

• Bilingual Survey

- 14% Spanish

Page 15: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Commercial Vehicle SP and OD Survey

- Conducted in

October 2009

- Route choice

by maquiladoras

-Truck OD

survey on Phar

Int’l Bridge’s

Mexican side.

Page 16: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Origin-Destination (Pharr Bridge Truck Survey)

20%

15%20%

15%

15%

• 70% stay south of US 83

near McAllen/Pharr (15%

go to the Foreign Trade

Zone)

• 15% North of US 83, inside

Hidalgo County

• 10% have other

destinations inside Hidalgo

County

• 5% have destinations

outside Hidalgo County

Page 17: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Origins and Destinations for Passenger Cars

Page 18: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

IBTC Market Hidalgo-Cameron region in 2013

• 2.4 Million daily auto trips

• 300 Thousand daily truck trips

18

600k

45k

200k

20k

300k

25k

Intra-zone daily auto trips

Intra-zone daily truck trips

Inter-zone daily auto trips

Inter-zone daily truck trips

80k

11k

Page 19: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

IBTC Market Translates to the Transaction Forecast

19

Forecasted trips willing to pay for

IBTC time savings and reliability

80k Autos

11k Trucks

1

4

2

MarketTrips for

which a Free

IBTC is an

alternative

46k Autos

11k Trucks

20-30 % of US 83

BUS 83

FM 3072

Military Highway

15-20% Intl. Bridge

NB Toll Free Tolled NB Toll Free Tolled

(A) (B) (C) D E (F)

US 83 64% 48% 58% 59% 40% 52%

BU83 22% 21% 21% 20% 16% 18%

FM3072 3% 2% 3% 9% 3% 7%

Military Hwy 11% 3% 11% 13% 2% 12%

IBTC 0% 25% 6% 0% 36% 11%

Screenline Total 100% 100% 100% 100% 100% 100%

Roadway

2013 2030

NB Toll Free Tolled NB Toll Free Tolled

(A) (B) (C) D E (F)

US 83 33% 22% 29% 30% 18% 25%

BU83 42% 35% 39% 39% 26% 33%

FM3072 3% 2% 3% 8% 3% 6%

Military Hwy 22% 6% 21% 23% 4% 20%

IBTC 0% 35% 9% 0% 49% 16%

Screenline Total 100% 100% 100% 100% 100% 100%

Roadway

2013 20302030

6.5k Autos

2.5k Trucks

2013

2.7k Autos

1k Trucks

Page 20: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

IBTCAuto Destinations

20

Page 21: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

TXP Inc. produced socioeconomic projections for C&M

• Project specific census tract level population and employment forecasts up to 2040

• Three scenario to incorporate uncertainty

• Optimistic

• Most Likely

• Conservative

• Growth redistribution contributes to 6% of revenues

• Forecast of economic indicators – GDP, CPI

• Study of special trip generators

• Hospitals, schools, airports and major retail outlets

Socioeconomic Evaluation

Page 22: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Natural Population Growth

22

Page 23: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Population Redistributed Growth

23

Page 24: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Natural Employment Growth

24

Page 25: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Redistributed Employment Growth

25

Page 26: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Travel Demand Model Synthesis

C&M SPI TDM

Cameron- Hidalgo

Travel Demand Model

Hidalgo MPO

TDM

Page 27: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

0

3,000

6,000

9,000

12,000

15,000

18,000

0 3,000 6,000 9,000 12,000 15,000 18,000

Mo

del

Vo

lum

es

Counts

NT

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000

Mo

del

Vo

lum

es

Counts

PM

0

5,000

10,000

15,000

20,000

25,000

30,000

0 5,000 10,000 15,000 20,000 25,000 30,000

Mo

del

Vo

lum

es

Counts

MD

0

2,000

4,000

6,000

8,000

10,000

0 2,000 4,000 6,000 8,000 10,000

Mo

del

Vo

lum

es

Counts

AM Slope = 0.93R-Square = 0.98

Slope = 1.05R-Square = 0.99

Slope = 1.02R-Square = 0.99

Slope = 0.99R-Square = 0.97

Confidential Draft27

Model Volumes vs. Traffic Counts

Page 28: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Roadway Improvements in Model Network

Page 29: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Proposed Truck Network

Page 30: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

• Scenarios by project

• IBTC Only

• IBTC & TCC

• IBTC Only scenarios by socioeconomic forecast

• Base

• Optimistic

• Conservative

• IBTC Only scenarios by truck restrictions

• With truck restrictions (Base)

• Without truck restrictions (Alternate Base)

• Toll diversion modeling

• Auto toll diversion from project specific SP survey

• Truck toll diversion from commercial vehicle SP survey

Traffic and Revenue

Page 31: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

• All tolls would be collected by means of

• Electronic Toll Collection (ETC) – Registered Transponders with pre paid accounts.

• Video recognition systems – License plates recognition for non ETC equipped

vehicles including Mexican commuters and tourists.

Toll Collection

Page 32: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Toll Treatment – IBTC Only

• 4 Mainlane gantries

• 3 On ramp gantries

• 3 Off ramp gantries

Page 33: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Toll Rate Comparison

$-

$0.05

$0.10

$0.15

$0.20

$0.25

$0.30

$0.35

$0.40

Toll

Rat

e p

er

Mile

(Ju

ly 2

01

0 P

rice

s)

Page 34: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Travel Time Savings – IBTC Only (Base)

Time Savings in minutes

2013 7

2030 13

Time Savings in minutes

2013 5

2030 8

Page 35: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Travel Time Savings – IBTC Only (Base) Contd.

Toll

Path

Free

Path

Toll

Path

Free

PathAuto Truck Toll Path

Free

Path

Year 2013

A Pharr Int'l Bridge City of DonnaMilitary Hwy.

and FM49316.8 16.2 19 25 6 $2.13 $6.25 53 39

B Alliance Int'l BridgeFM 3072 &

US281

Military Hwy.

and US28111.2 11.1 16 20 4 $1.41 $4.12 41 33

Year 2030

A Pharr Int'l Bridge City of DonnaMilitary Hwy.

and FM49316.8 16.2 18 31 13 $4.63 $13.61 56 31

B Alliance Int'l BridgeFM 3072 &

US281

Military Hwy.

and US28111.2 11.1 16 25 8 $3.05 $8.96 41 27

Average

Speed(mph)Trip

Toll (nominal

dollars)Origin Destination Free Path

Length (miles) Time (minutes) Time

Saving

(minutes)Toll

Path

Free

Path

Toll

Path

Free

Path

Year 2013

A Pharr Int'l Bridge City of DonnaMilitary Hwy.

and FM49316.8 16.2 20 27 7

B Alliance Int'l BridgeFM 3072 &

US281

Military Hwy.

and US28111.2 11.0 14 19 5

Year 2030

A Pharr Int'l Bridge City of DonnaMilitary Hwy.

and FM49316.8 16.2 18 31 13

B Alliance Int'l BridgeFM 3072 &

US281

Military Hwy.

and US28111.2 11.0 16 25 8

Time

Saving

(minutes)

Trip Origin Destination Free Path

Length (miles) Time (minutes)

Page 36: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

IBTC Market Translates to the Transaction Forecast

36

Forecasted trips willing to pay for

IBTC time savings and reliability

80k Autos

11k Trucks

1

4

2

MarketTrips for

which a Free

IBTC is an

alternative

46k Autos

11k Trucks

20-30 % of US 83

BUS 83

FM 3072

Military Highway

15-20% Intl. Bridge

NB Toll Free Tolled NB Toll Free Tolled

(A) (B) (C) D E (F)

US 83 64% 48% 58% 59% 40% 52%

BU83 22% 21% 21% 20% 16% 18%

FM3072 3% 2% 3% 9% 3% 7%

Military Hwy 11% 3% 11% 13% 2% 12%

IBTC 0% 25% 6% 0% 36% 11%

Screenline Total 100% 100% 100% 100% 100% 100%

Roadway

2013 2030

NB Toll Free Tolled NB Toll Free Tolled

(A) (B) (C) D E (F)

US 83 33% 22% 29% 30% 18% 25%

BU83 42% 35% 39% 39% 26% 33%

FM3072 3% 2% 3% 8% 3% 6%

Military Hwy 22% 6% 21% 23% 4% 20%

IBTC 0% 35% 9% 0% 49% 16%

Screenline Total 100% 100% 100% 100% 100% 100%

Roadway

2013 20302030

6.5k Autos

2.5k Trucks

2013

2.7k Autos

1k Trucks

Page 37: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

-

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

0

2,000

4,000

6,000

8,000

10,000

12,000

14,0002

01

3

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

20

31

20

32

20

33

20

34

20

35

20

36

20

37

20

38

20

39

20

40

20

41

20

42

20

43

20

44

20

45

20

46

20

47

20

48

20

49

20

50

20

51

20

52

Tho

usa

nd

s

Tho

usa

nd

s

Auto Transactions

TC from IBTC_Only-Mixed_withReductions TC from IBTC_Only - With Truck Network 1 lane then 2 lanes (Mixed)

TC from IBTC_Only - With Truck Network - 2 lane only TXP Most Likely Population Forecast

PopulationTransaction Growth

37

Page 38: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Reduction Factors

38

Auto Truck Auto Truck Auto Truck Auto Truck Auto Truck Auto Truck Auto Truck Auto Truck

2013 50% 50% 50% 50% 50% 60% 10% 20% 33% 33% 80% 60% 15% 20% 38% 40%

2014 60% 60% 60% 60% 55% 65% 15% 25% 33% 33% 80% 60% 15% 20% 46% 49%

2015 70% 70% 65% 70% 60% 70% 20% 30% 33% 33% 80% 60% 15% 20% 55% 59%

2016 80% 80% 70% 80% 65% 75% 25% 35% 33% 33% 80% 60% 15% 20% 64% 68%

2017 85% 90% 75% 90% 70% 80% 30% 40% 33% 33% 80% 60% 15% 20% 70% 79%

2018 90% 100% 80% 100% 75% 83% 35% 45% 33% 33% 80% 60% 15% 20% 76% 89%

2019 95% 100% 85% 100% 80% 85% 40% 50% 33% 33% 80% 60% 15% 20% 82% 90%

2020 100% 100% 90% 100% 85% 88% 45% 55% 33% 33% 80% 60% 15% 20% 88% 91%

2021 100% 100% 95% 100% 90% 90% 50% 60% 33% 33% 80% 60% 15% 20% 91% 93%

2022 100% 100% 100% 100% 90% 90% 50% 60% 33% 33% 80% 60% 15% 20% 91% 93%

* The percentage of Mexican vehicles is shown for i l lustration purposes actual percentage per year varies according to model

IBTC Total

Reduction FactorsYear

% Mexican*

US MexicanUS Mexican US Mexican

Video Violation RateRamp Up ETC Penetration

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Combined Reduction Factors

Auto

Truck

Page 39: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

650

850

1,050

1,250

1,450

1,650

1,850

2010 2015 2020 2030 2040

Tho

usa

nd

s

TXP Conservative

TXP Most Likely

TXP Optimistic

Census Bexar Co.

Census Travis Co.

Census Hidalgo Co.

2010 Census 2% higher than TXP Most Likely forecast

By 2020 Hidalgo Co. may belarger than Travis Co. today

By 2030 TXP'sConservative forcast is 16% greater than Travis Co. today

Hidalgo County Population Forecast Referenced

39

Page 40: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

2030 Projected Congestion

40

Page 41: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Base Traffic and Revenue Summary

Annual Transactions

Annual Revenue

(Million Nominal

Dollars)

Annual Transactions

Annual Revenue

(Million Nominal

Dollars)

2013 2.0 $1.4 2.0 $1.4

2015 3.0 $2.6 4.8 $5.9

2020 5.3 $6.8 9.6 $17.3

2030 10.2 $19.7 21.6 $57.6

2040 12.6 $34.7 28.0 $107.8

2052 15.3 $62.0 35.7 $204.9

Year

IBTC Only IBTC & TCC

Page 42: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Annual Transactions Forecast – IBTC Only (Base)

0

2

4

6

8

10

12

14

16

18

2013 2018 2023 2028 2033 2038 2043 2048

An

nu

al T

ran

sact

ion

s (M

illio

ns)

Auto Truck

Page 43: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Annual Revenue Forecast – IBTC Only (Base)

$0

$10

$20

$30

$40

$50

$60

$70

2013 2018 2023 2028 2033 2038 2043 2048

An

nu

al R

eve

nu

e (

Mill

ion

s N

om

inal

)

Auto Truck

Page 44: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Revenue Growth Disaggregated

44

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

Regular Growth Ramp-Up for capacity increase Revenue Reduction Factors Ramp-Up Toll Rate Growth CPI Growth

Page 45: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

IBTC NPV Comparison

Scenario Truck RestrictionsSocioeconomic

Scenario

NPV (Million

2010 Dollars)

% Difference

from Base

Scenario 1 (Base) With Truck Restrictions Most likely $482

Scenario 2 With Truck Restrictions Conservative $387 -20%

Scenario 3 With Truck Restrictions Optimistic $681 41%

Scenario 4 Without Truck Restrictions Most likely $328 -32%

IBTC in IBTC & TCC With Truck Restrictions Most likely $586 22%

Page 46: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

Risks

• In addition to the inherent risks of forecasting population and economic growth the

following risks exist

• Truck restrictions are not enforced

• Truck restrictions contribute with about 33% additional revenue

• Lack of interchange fly over ramps at IBTC junction with US 83

• Revenue is estimated to be reduced by 16% without the interchange

• Mexico violence levels continue or increase

• Some correlation has been observe between violence levels with traffic decrease on

Mexican facilities

• Reynosa’s population growth has slowed down from 5.6% in 2000 to 3.6% in 2010

• Violence could impact maquila industry growth in Northern Mexico

• Gas prices rise

• Gasoline availability and prices were assumed to remain at levels that would not significantly

affect traffic

• Federal and state fuel taxes would not change to a degree that would affect travel behaviour

• U.S. immigration and/or border security policies have material changes

• Local economy is highly dependent on Mexican nationals

• U.S. trade policy has material changes

• Local economy is intertwined with the maquila/manufacturing industry in Reynosa

46

Page 47: International Bridge Trade Corridor Investment …M_HCRMA_Presentation_April_2011...International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue IBTC Market

International Bridge Trade Corridor and Trade Corridor Connector Traffic and Revenue

47

www.candm-associates.com

[email protected]

México

Dr. Pallares y Portillo 174

Col. Parque San Andrés

Coyoacán, D.F. 04040

T. + 52 (55) 5033 6190

F. + 52 (55) 5033 6193

[email protected]

Colombia

Calle 86 No.19A - 21, Piso 6

Bogotá D.C.

NIP 830,023,696-6

Tel. + 57 (1) 616 7377

Fax. + 57 (1) 635 9565

[email protected]

USA

Tollway Towers Suite 870

15770 Dallas Parkway

Dallas, Texas 75248

P. +1 (214) 764 2896

F. +1 (214) 889 5049

[email protected]

32

Thank You