INTERMODAL TRANSPORT CORRIDORS: CHALLENGES AND
OPPORTUNITIES FOR MONGOLIA
EXPERT GROUP MEETING ON ENHANCING EFFICIENCY OF
SELECTED INTERMODAL TRANSPORT CORRIDORS IN ASIA, 2019
Speakers: Mr.Sereeter Jigjee, Acting Director and
Dr.Odgerel Ulziikhutag, Senior officer of Policy and Planning Department,
Ministry of Road and Transport Development, Mongolia
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 1
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
AGENDA
• COUNTRY OVERVIEW
• REGIONAL INTREGRATION AND COOPERATION
• INTERMODAL TRANSPORT INFRASTRUCTURE
DEVELOPMENT
• OPPORTUNES&CHALLENGES
• CONCLUSION
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
NATIONAL POLICY DOCUMENTS:
• MONGOLIA SUSTAINABLE DEVELOPMENT VISION-2030,19THRESOLUTION OF THE STATE GREAT HURAL, MONGOLIA,2016;
• ACTION PLAN OF GOVERNMENT OF MONGOLIA FOR 2016-2020, 45TH RESOLUTION OF THE STATE GREAT HURAL,MONGOLIA, 2016;
• PROGRAM ON DEVELOPMENT ROAD, GOVERNMENTRESOLUTION №142, 2017;
• PROGRAM OF THE THREE PILLARS DEVELOPMENT POLICY,GOVERNMENT RESOLUTION №42, 2018
COUNTRY OVERVIEW
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
1. COUNTRY OVERVIEW
EXISTING LAWS AND POLICIES ON TRANSPORT SECTORS:
• ROAD LAW ( RENEWED BY 11 MAY, 2017)
• WATERWAY TRANSPORT LAW (RENEWED BY 25 MAY 2017)
• STATE POLICY ON CIVIL AVIATION, 2013; (AMENDED, 2018)
• STATE POLICY ON RAILWAY TRANSPORT, 2010; (AMENDED, 2018)
• TO DEVELOP STATE POLICY ON ROAD TRANSPORT (RENEWED,
2018)
UNDER DEVELOPING AND RENEWING LAWS AND POLICIES
• TRANSPORT LAW (SUBMITTED TO PARLIAMENT)
• RAILWAY TRANSPORT LAW (PLANNING TO RENEW)
• CIVIL AVIATION LAW (PLANNING TO RENEW) Reason: New requirement and conditions of the Laws on Legislatives and General Administrates and Development Policy and Sustainable Development Vision-2030
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
1. COUNTRY OVERVIEW
Key Indicators
Roadway: 109,361 km (paved 9,022 km)
Airway: 46.5 thousand km
Railway: 1.9 thousand km
.
Waterway: 0.1 thousand km
Page 5
• Landlocked Country;
• High Costs of the
Infrastructure Development
and Maintenance;
• Environmental Impacts;
• Traffic Accidents and Safety Issues
Key Challenges:
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
COUNTRY OVERVIEW
EXPORT 9,272.4 thousand ton
IMPORT 2,798.4 thousand ton
TRANSIT 3,365.7 thousand ton
Railway freight transport, 2018
Mongolia is trading with 163
countries in 2018 and total trade
turnover of 10.5 billion US
dollars, of which exports $ 6.2
billion, Imports were $ 4.3 billion,
up from $ 27.3 billion in the
previous year.
200.9M passengers were
registered in 2018. 98.0 percent
of passengers by road transport
and others railways(1.2),
airways(0.7) and waterways(0.1).
In 2018, Mongolia delivered 69.8
million tones of cargo. Of this,
25.6 million tones were
transported by railways, 44.1
million tones by road transport
and 0.57 million tones by
airways.
2. REGIONAL INTREGRATION AND COOPERATION
• INTERGOVERNMENTAL AGREEMENT ON DRY PORTS, 2016 ( Zamyn-Uud, Sainshand,
Ulaanbaatar, and Altanbulag) ;
• INTERGOVERNMENTAL AGREEMENT ON ROAD TRANSPORTATION ALONG THE ASIA
HIGHWAY NETWORK BETWEEN GOVERNMENT OF MONGOLIA, RUSSIAN FEDERATION
AND PEOPLES REPUBLIC OF CHINA;
• INTERGOVERNMENTAL AGREEMENT ON THE ACCESS TO AND FROM THE SEA ANDTRANSIT TRANSPORTATION THROUGH CHINESE TERRITORY BY MONGOLIA, 2014 –INSTEAD OF 1991;
• INTERGOVERNMENTAL AGREEMENT BETWEEN GOVERNMENTS OF MONGOLIA ANDPEOPLES REPUBLIC OF CHINA ON DEVELOPING COOPERATION IN RAILWAY TRANSITTRANSPORTATION;
• INTERGOVERNMENTAL AGREEMENT ON THE ACCESS TO AND FROM THE SEA ANDTRANSIT TRANSPORTATION THROUGH RUSSIAN FEDERATION TERRITORY BYMONGOLIA 1992;
• INTERGOVERNMENTAL AGREEMENT BETWEEN GOVERNMENTS OF MONGOLIA ANDRUSSIAN FEDERATION ON TERMS FOR RAIL FREIGHT TRANSIT TRANSPORTATION
• INTERGOVERNMENTAL AGREEMENTS ON ROAD TRANSPORTATION WITHKAZAKHSTAN, LATVIA, RUSSIAN FEDERATION, PEOPLES REPUBLIC OF CHINA,BELORUSSIA, TURKEY, DEMOCRATIC PEOPLE’S REPUBLIC OF KOREA
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 7
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
• VIENNA PROGRAM OF ACTION FOR LANDLOCKED DEVELOPING COUNTRIES FOR THE
DECADE 2014-2024;
• TRANSPORT RELATED UN AGREEMENTS AND CONVENTIONS;
• CONVENTION ON THE CONTRACT FOR THE INTERNATIONAL CARRIAGE OF
GOODS BY ROAD (1956.05.19)
• CONVENTION ON ROAD TRAFFIC (1968.11.08)
• THE CONVENTION ON INTERNATIONAL TRANSPORT OF GOODS UNDER COVER OF
TIR CARNETS (TIR CONVENTION)
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 8
REGIONAL INTREGRATION AND COOPERATION
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP |9
FLEXIBLE TARIFF POLICY
FLEXIBLE TARIFF POLICY
TRANSIT CORIDORS
TRANSPORT CORRIDORS IN ASIA
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
TRANSPORTATION ROUTE OF INTERGOVERNMENTAL AGREEMENT ON ROAD
TRANSPORTATION ALONG THE ASIA HIGHWAY NETWORK BETWEEN GOVERNMENT OF
MONGOLIA, RUSSIAN FEDERATION AND PEOPLES REPUBLIC OF CHINA
ГУРВАН ТАЛТ
ХЭЛЭЛЦЭЭР
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
Transport Corridors: Implementation Progress 2020
Цахир
Баянтэс
Мянгад
Булган
Ховд
Дархан
Ханх
Гашуун Сухайт
Айраг
Налайх
Багануур
Багахангай
Сүхбаатар
IP1
IP2
IP101
Completed road construction projects On going road construction projects
Мянгад
Булган
Hovd
Дарви
Толбо
Цагааннуур
Olgiy
4a
Ulaanbaishint
Yarant
189.7 km paved road
construction project
funded by GOM and
ADB, completion rate is
89.5 % and will be
completed by 2020
IP11
Sainshand
Darkhan
Undurkhaan
Choir
Baruun Urt
Choibalsan
IP101
IP11
IP1
Western Regional Road
Development (PRC
Border at Yarant–
Khovd– Ulgii –
Ulaanbaishint)
Completed
IP2
Regional Road Development
(Construction of Darkhan-
Ulaanbaatar)
Baruun-Urt – Bichigt 272
km road is included to
the Concession list.
Access Road to the
New International
Airport in Ulaanbaatar.
Completion, completed
IP 10
IP 10
4b 4c
IP 5
Construction of New
International Airport in
Ulaanbaatar.
Construction works is
completed. Operation
will start in 2019
Railway Rolling Stock
Maintenance Depot
Railway Centralized Traffic
Control Center
Ulaanbaatar City Railway
Passenger Station
PLANNED
IP12, IP13, IP14
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
ULAANBAATAR LOGISTICS CENTER (PLANNED)
Regional logistic Center in Zamiin-Uud Dry port
Development of sufficient and efficient capacities for transshipment
Zone-2: 70Т GANTRY CRANE OPERATIONAL AREA
Zone-3: Open Warehouse
Zone-1: 50T CRANE 4 RAILWAY ACROSS
Zone-3
Enclosed Warehouse
Capacity
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 13
5 million ton/year
Investment 71,64 million USD
Operation starts 2019
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
FACILITATION MEASURES FOR RAILWAY TRANSPORT
tariff (2007):
2. RAILWAY TRANSIT TARIFF RATE
Container transportation15.5 %
tariffs for containersTransshipment (2017): 65.5 %
Differentiation rate system in tariff: basedon volume of transportation per month(2017)
Page 14
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
FACILITATION MEASURES AT RAILWAY BORDER CROSSINGS
RUSSIA to CHINA CHINA to RUSSIA1. Technological time:
• Train receiving procedure time at Zamiin-Udestation was 420 minutes:
• Mongolia introduced parallel technology system:train receiving procedure time reduced by 173minutes (248 minutes).
2. Fast processing of container trains:
• Excluded the locomotive changing procedure forwhole travel;
• Technical maintenance technology is reduced attechnical station from 60-70 minutes to 30-40minutes.
Reducing the travel time: freight transportation 850-950 km per day.
Russia to China: 28 hours, became 27% faster
China to Russia: 31 hours, became 26% faster
Page 15
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
CHALLENGES
• Supply more wagons for reloading both on Zamiin-Uud and
Erlian stations.
• Enhance cooperation between internal and external
stakeholders: Electronic information exchange between
railways and control authorities.
• Reduce long time taken for freight trains to cross the border
at the Erlian/Zamiin-Uud.
• Improve transshipment operations, reloading/receiving
capacities.
• Need capacity building on transport logistic services .
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP
CONCLUSIONS
• To build suitable Transport Legal and Policy
Framework;
• To increase investment for building selected
intermodal transport corridors and logistics
networks ;
• To promote intergovernmental transport agreements
for reducing travel time along corridors, time spent
land borders and transportation costs;
• To integrate Regional Transport Corridors and
• To enhance regional cooperation for capacity
building on transport sectors.
THANK YOU FOR YOUR ATTENTION
Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 18