Interconnection Portal Wireframes
![Page 2: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/2.jpg)
ACE-IT New Application
2
This page appears after log in and provides the option to start a new application and an overview of
the interconnection process and relevant alerts and notifications.
![Page 3: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/3.jpg)
ACE-IT Application Flow
3
Throughout the Interconnection application flow, the customer has access to navigation options on the
left. The chevrons toward the top are dynamically populated based on program selections and show the
overall progression of the application through the process. Using the chevrons, customers navigate back
to (for example) correct information after viewing the “Review” page.
![Page 4: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/4.jpg)
ACE-IT Application Flow – Program Type
4
This is the first page of the
Interconnection process. Program
choices dynamically determine what
additional choices should apply, such as
sub-programs, relevant technologies,
and allowable system sizes.
![Page 5: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/5.jpg)
ACE-IT Application Flow – Project Contact Info
5
continued on next slide
The agreement and meter number
allow a customer to look up existing
account information. Contact
information can be easily copied from
the customer’s profile or from another
section such as facility information.
Below the facility information are the
forms for capturing contact
information.
![Page 6: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/6.jpg)
ACE-IT Application Flow – Project Contact Info
(continued)
6
Contact information can be easily
copied from the login account, or
from another section such as
facility information, using the first
drop down option.
continued on next slide
![Page 7: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/7.jpg)
ACE-IT Application Flow – Project Contact Info
(continued)
7
![Page 8: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/8.jpg)
ACE-IT Application Flow – Export Info
8
The export page dynamically shows choices based on service type selection.
![Page 9: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/9.jpg)
ACE-IT Application Flow – Equipment Data
9
The equipment page captures data structured as one
or more systems. Each system contains an inverter,
synchronous, or induction generator and one or more
sets of power modules. The program selection from a
previous page determines allowable technology
types, while the model lists are dynamically refreshed
based on manufacturer selection. (Only Smart
Inverters are displayed in the Inverter list.) If the
customer has an existing system, based on their
service agreement and meter number, that
information will automatically populate into these
forms.
continued on next slide
![Page 10: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/10.jpg)
ACE-IT Application Flow – Equipment Data
(continued)
10
Different power modules present different fields – below, we see the structure for energy
storage on the left, and for Solar PV on the right.
continued on next slide
![Page 11: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/11.jpg)
ACE-IT Application Flow – Equipment Data
(continued)
11
As with other equipment, the manufacturer selection for the
AC Disconnect also determines the model list to be used.
![Page 12: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/12.jpg)
ACE-IT Application Flow – Customer Sector
12
Questions about the customer are dynamically presented; with each
choice the customer is prompted for the appropriate related information.
continued on next slide
![Page 13: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/13.jpg)
ACE-IT Application Flow – Customer Sector
(continued)
13
![Page 14: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/14.jpg)
ACE-IT Application Flow – Document Upload
14
Customers can easily upload the required technical
documentation (and any kind of documentation).
Documents are scanned for viruses, securely
uploaded, and are then easily accessible from the
application details page.
The specific documentation required depends on
choices by the customer on previous pages.
![Page 15: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/15.jpg)
ACE-IT Application Flow – Review
15
The review page summarizes all
information provided by the customer. If
any corrections are needed, the customer
can simply click on the relevant chevron
at the top of the page (not shown on this
slide, but present on every page), such as
“Equipment”, to reload the page and apply
corrections.
The review is also saved as a PDF
document that is emailed to the customer.
![Page 16: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/16.jpg)
ACE-IT Application Flow – Review
(continued)
16
![Page 17: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/17.jpg)
ACE-IT Application Flow – Payment
17
The application fee is determined by
program selection, system size, and other
business rules.
The customer has the option to securely
pay by credit card or PayPal. After
choosing the payment method, the
appropriate options are displayed for
submitting the payment.
continued on next slide
![Page 18: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/18.jpg)
ACE-IT Application Flow – Payment
(continued)
18
Transaction reference information is
displayed upon successful
processing of the payment.
![Page 19: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/19.jpg)
ACE-IT Queue View
19
This page appears when clicking on “My Projects” and provides a list of every application the user
has entered. The list can be downloaded into Excel. The gear at the top right allows the user to
pick and order columns, while the columns can be clicked to sort the list.
![Page 20: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/20.jpg)
ACE-IT Application Details – Progress Tab
20
This page appears if a user clicks on an application in the queue view or a link in the summary email.
The progress tab, viewed by default on entering the page, shows where in the overall process the
application sits, and it indicates which tasks have been completed, are in progress, or are pending.
![Page 21: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/21.jpg)
ACE-IT Application Details – Documents Tab
21
The documents tab show every uploaded document, including versions.
![Page 22: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/22.jpg)
ACE-IT Application Details – Emails Tab
22
The emails tab shows every email sent by ACE-IT to the customer, including when it was sent, content
and recipients.
![Page 23: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/23.jpg)
ACE-IT Application Details – History Tab
23
The history tab shows an audit trail of activity for the application.
![Page 24: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/24.jpg)
ACE-IT Home Page
The Home Page appears when clicking on the “Home” button and provides an overview of program
types and additional links.
![Page 25: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/25.jpg)
ACE-IT Registration Page
25
Customers are able to self-register to create a secure account for accessing
the portal.
![Page 26: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/26.jpg)
ACE-IT My Profile Page
26
Customers are able to manage their own account details, including password.
![Page 27: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/27.jpg)
1 | P a g e
![Page 28: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/28.jpg)
2 | P a g e
![Page 29: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/29.jpg)
3 | P a g e
![Page 30: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/30.jpg)
4 | P a g e
![Page 31: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/31.jpg)
5 | P a g e
![Page 32: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/32.jpg)
6 | P a g e
![Page 33: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/33.jpg)
SNEM Portal Wireframes
![Page 34: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/34.jpg)
SNEM Landing Page
2
![Page 35: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/35.jpg)
Agreement and Authorization Account Look-up
3
![Page 36: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/36.jpg)
AA: Gen Facility and Responsible Parties
4
![Page 37: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/37.jpg)
AA: Gen Facility and Responsible Parties
5
![Page 38: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/38.jpg)
AA: Facility Size and Usage
6
![Page 39: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/39.jpg)
AA: Facility Size and Usage
7
![Page 40: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/40.jpg)
AA: Rate Selection Page
8
![Page 41: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/41.jpg)
AA: Review and Submit / PDF Viewer
9
![Page 42: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/42.jpg)
Application: Account Lookup
10
![Page 43: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/43.jpg)
App: Generating Facility and Responsible Parties
11
![Page 44: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/44.jpg)
App: Description of Generating Facility
12
![Page 45: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/45.jpg)
App: Additional Details
13
![Page 46: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/46.jpg)
App: Facility & Equipment Info Page
14
![Page 47: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/47.jpg)
App: Facility & Equipment Info Page
15
![Page 48: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/48.jpg)
App: Facility AC Disconnect Switch
16
![Page 49: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/49.jpg)
App: Single Line Diagram and Warranty
17
Basic single line diagram can be chosen for projects that meet certain criteria
![Page 50: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/50.jpg)
App: Supporting Documents
• Upload required documents
• Building Permit Search
18
![Page 51: Interconnection Portal Wireframes - Gridworks...ACE-IT Application Flow –Program Type4 This is the first page of the Interconnection process. Program choices dynamically determine](https://reader035.fdocuments.net/reader035/viewer/2022070912/5fb463c0342010014966924b/html5/thumbnails/51.jpg)
App: Payment
19