Intelligent Undergrounding at San Diego Gas & Electric

44
Intelligent Undergrounding at San Diego Gas & Electric ICC Educational Program – October 23, 2019 – Scottsdale, AZ by Jon Erickson San Diego Gas & Electric © 2015 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1

Transcript of Intelligent Undergrounding at San Diego Gas & Electric

Intelligent Undergrounding at San Diego Gas & ElectricICC Educational Program – October 23, 2019 – Scottsdale, AZ by Jon Erickson San Diego Gas & Electric

© 2015 San Diego Gas & Electric Company. All copyright and trademark rights reserved.

1

Service Territory

– 4100 square miles

– ~1.4 million electric customers

– ~10,700 circuit miles of underground distribution primary cable

– ~ 62% underground

– 1052 electric distribution circuits ( 831 – 12 kV, 221 – 4 kV) 2

Topics

• Cable System Expansion

• Overhead to Underground Conversion

• Proactive Cable Replacement

• Substructure Water Removal

• Infrared Inspection

• 600 Amp Load Break Connector

• System Control and Data Acquisition (SCADA)

• Conclusions

3

Cable System Expansion

• Subdivision and commercial development

– City of San Diego and other cities in service territory required underground service

• Overhead to underground conversion

– Developed in 1969 by the California Public Utilities Commission (CPUC)

– Called Rule 20

– Five different rules

• 20 A – Funded by utility customers

– Cities and county allotted money each year based on number of meters served by the OH electric system

– Cities and county determine areas to convert

– Areas converted must provide a benefit to general public

• 20 B – Smaller projects

– Funded by rates or private funds – funded by customers primarily

– Areas converted must be along public streets

4

Cable System Expansion (cont.)

– Rule 20 (cont.)

• 20 C

– Smaller conversion projects funded by property owners

• 20 D

– Approved in 2014 by the CPUC

– Projects are exclusively for fire hardening

– The County of San Diego is primary recipient of allocations

– Only primary voltage conductor is converted – excludes secondaries

and services

– Uses ratepayer funds

– City of San Diego developed a program to convert all overhead lines to underground

• This program is funded 100% by customers residing within the City of San

Diego – a surcharge is collected

• Began in 2003

• Complete conversion in about 50 years

• City converts about 12 circuit miles per year

5

Examples of Overhead to Underground Conversion

Before After

6

Proactive Cable Replacement

• Unjacketed polyethylene cable installed beginning in 1963

– HMWPE installed from 1963 to 1979

• 1963 – 1979 - Copper conductor - 220 mil insulation

• 1974 – 1976 – Aluminum conductor – 175 mil insulation

– XLPE installed from 1968 to 1985

• Mainly 175 mil insulation – small amount of 220 mil insulation

– More than 99% of this cable installed in conduit

– Cable began failing at an increasing rate in the late 1980’s and early 1990’s

– Proactive cable replacement capital budget program established in 1994

– Extensive cable failure database established in the 1990’s – continues today

• Cable vintage

• Manufacturer

• Insulation type

• Cable length7

Cable Failure Rates

• Database used to establish failure rates for each cable vintage

– Rates determined for HMWPE feeder and lateral

– Rates determined for XLPE feeder and lateral

– Poor performing vintages were determined

• Oldest cable is not worst performing

– Worst performing cable is 1977 – 1983 XLPE

Feeder cable Lateral Cable

500 kCMIL copper #4 AWG copper

4/0 AWG copper #2 AWG copper

750 kCMIL aluminum #2 solid AWG aluminum

1000 kCMIL aluminum 2/0 AWG aluminum

8

Cable Failure Rates

9

Proactive Cable Replacement

• Between 1994 and 2016 the utility has replaced and average of

– 12.4 circuit miles of feeder cable each year

– 35 circuit miles of lateral cable each year

• Remaining unjacketed cable

– ~ 74 circuit miles of feeder cable

– ~ 1418 circuit miles of lateral cable

• Proactive cable replacement impact on cable failures

– Projected cable failures with no proactive replacement

– Projected cable failures with proactive replacement

– Possibly an additional 100 to 150 failures per year at the peak year without proactive replacement

– Reduction in annual SAIDI to the 65 minute range

10

Impact on Cable Failures With Proactive Cable Replacement

Projected cable failures without

proactive cable replacement

Cable failures with proactive

cable replacement

11

Substructure Water Removal

• Cities have restrictions on water being pumped from manholes and other substructures into gutters and storm drains

• Extended outage time waiting for pumper trucks

• Additional operating cost to the utility and its customers

12

Automated Sump Pump Filters

• Filters sediment and hydrocarbon discharges

to surface water

• Polymers and filters prevent passage of

sediment and hydrocarbons providing

secondary containment in the event of a major oil release

• Filter media can be changed to target specific pollutants/constituents

• Maintains low water levels in substructures

• Approved by local water quality authority

• 25 Automated, filtered sump pumps installed in locations with

switches in support of quicker service restoration

13

Dewatering Trailers

• Crews can begin dewatering versus waiting

for HazMat tanker trucks

• 500 gallon tank capacity – solids and

liquids

• 80 gallons of water storage

• Pressure unit with spray gun attached

• Can be used in conjunction with a filter

sock to discharge directly to a storm

drain

• Supports quicker troubleshooting and

service restoration

14

Infrared Inspection

• A major safety concern of any personnel entering manholes or other subsurface structures with energized cable and connections is the integrity of the connections.

• Inspection with an infrared camera is the best way to check connections

Substructure with 600 amp and 200 amp connections

15

Infrared Inspection Operating Practice

• Several years ago the utility implemented an operating practice to use an infrared camera to check all cable connections in a manhole/substructure prior to entering for any reason.

– Performed after proper venting of substructure for at least 10 minutes

• If water covers the connections process below is followed

– Pump water level below connection

– Take infrared reading

– Subsequent readings are taken every 5 minutes for 15 minutes to see if significant temperature rise has occurred

• Operating practice established several years ago for response time to correct an elevated temperature issue

– Based on connector temperature compared to temperature rise above cable temperature

16

Temperature Response Guidelines –Premolded Connectors

• Utility response guidelines for premolded connectors

17

Temperature Response Guidelines – Hand-Taped Splices

• Utility response guidelines for hand taped splices

18

Examples of “Hot” 600 Amp Tee Connections

Adjacent Connector

used as reference –

temperature in °F

19

Connecting plug

with elevated

temperature - °F

Examples of “Hot” 600 Amp Tee Connections

20

Connecting plug with

elevated temperature - °F

Cable temperature about

80°F

Connecting plug with

elevated temperature - °F

Cable temperature about

90°F

600 Load break Connector

• 600 amp tees are very common in the utilities underground electric distribution system

– Total number installed in substructures – ~ 106,400

– Number installed in manholes - ~ 36,700

– Number installed in handholes - ~ 67,600

– Number installed in vaults ~ 2,100

• Tee failures result in potentially a large

number of customers being impacted

for an extended period of time

21

Typical 600 amp tee installation

600 Amp Tee Installation (cont.)

• Manhole Examples

22

600 Amp Tee Installation (cont.)

• Handhole Examples

23

600 Amp Load Break Connector Types

24

600 Amp Load Break Connector Utility Operating Practice and Operating Advantages

• Do not operate as a load break device

• Faster isolation of underground cable system compared to 600 amp tees.

• Provides a test, ground, and isolation point for 600 amp tees

• Can energize system up to one side of the connector to restore service more quickly than a 600 amp tee

25

Installation History

26

• Developed Construction Standard in July 2016 for rectangular design

– Revisions in June and October 2017

• Developed Construction Standard in March 2018 for square design

• Developed operating guidelines in August 2016

• First installation in October 2017

• Have installed 600 amp load break connectors in 148 manholes

• Since the installation of the 600 amp load break connector is classified as system betterment the cost can be capitalized

Application Guidelines

• Install in manhole or walk in vault only

• Consider circuits where a tee failure will impact a high number of customers

• Consider the age of the tees

• Do not install in a manhole that has a switch in the manhole or a connection to a pad mount switch

• May be able to be installed in handhole if switch is being replaced

• Install 600 amp load break connectors when 600 amp tees fail

27

Field Installations

• Manhole – rectangular design

28

Field Installations (cont.)

• Manhole – square design

29

Field Installations (cont.)

• Handhole – rectangular design

30

Other Applications

• 600 Amp Live Front Terminator Conversion to Dead Front

– Minimize the pad footprint for dead front equipment when converting existing live front to dead front

31

System Control and Data Acquisition (SCADA)

• What is SCADA

– SCADA Control - The ability to monitor and control equipment remotely via radio communication

– Data Acquisition - The retrieval of information or data from the equipment being controlled and monitored

32

SCADA Features

• Data Acquisition & Archiving

• Alarms & Events

• Graphical Operator Interface

• Real-time Control

• Database and Log Files

• Reports and Information Sharing

• View only access available

33

SCADA Benefits

• Greater visibility of system

• Wider range of control

• Immediate response to events

• Data is readily available

• Easy to operate

• Time efficiency

• Reduced operational costs

• Forecasting & Trending

• Enables other technologies

34

SCADA Disadvantages

• Complex to configure

• Human errors can have serious consequences

• Security risks

• False Alarms

• Data overload

35

Utility SCADA

• The utility has greatly increased the use of the SCADA system throughout the overhead and underground electric distribution system in the past 30 years

• Allows operators to remotely operate switching devices to restore service faster

• SCADA is now being utilized with

– Substation circuit breakers

– Overhead and padmount/underground switches

– Overhead and padmount capacitors

– Line reclosers

– Line regulators

• First 3 substations were done in the mid 1980’s

• Deployment in downtown San Diego occurred in early 1990’s

36

Utility SCADA

• 79% of the distribution circuits at the utility are SCADA controlled.

– 835 electric circuits

• 91% of the customers are electrically supplied from automated circuitry.

• 96% of the applicable distribution load curtailment circuits are SCADA controlled.

• 2 Separate SCADA Systems:

– Transmission

– Distribution

• 98/136 12 kV Substations on SCADA

• 2100+ SCADA Controlled Devices

• 41 different device types are connected to the SCADA system

• Utilizes 900 MHz encrypted radio system + Fiber + LTE for communication

37

Available SCADA Data

• Voltage

• Phase and neutral current

• Watts

• Vars

• Battery voltage

• Fault indication for equipment installed from mid-1980’s until early 2000’s

• Fault targets for equipment installed after early 2000’s until now

38

SCADA Deployment Guidelines

• Substation

• Circuit midpoint – based on 50% of the customer count

• Circuit tie switches

• Circuits with large number of customers

• Consider circuit outage history

• Consider urgent/critical customers on a circuit

• Installation at key meteorological boundaries based on wind speed history and the need to interrupt electric service in extreme fire risk weather

39

Fault Location, Isolation and Service Restoration (FLISR)

• Self-healing grid

• Configured to either manual or automatic

• Circuit requirements:

– SCADA at breaker with fault targets

– SCADA at mid-point sectionalizing device with fault targets

– SCADA tie-switch

• Currently 441 circuits throughout the utilities service territory are in the manual mode that generates switching plans for operators

40

Examples of Padmount & Vault SCADA Equipment

5 way padmount

4 way padmount5 way vault

4 way vault

41

Examples of Polemount SCADA Equipment

Capacitor

Recloser Recloser

Switch

42

Conclusions

• Utilization of these various procedures and programs have resulted in a very reliable electric system

• The utility has been named as the most reliable utility in the western United States for 13 years in a row

• Co-winner of the National Reliability award in 2018

• The utility will continue to look for ways to improve reliability in the underground electric distribution system as it expands

43

44

Questions