Integration of MPE activities in the global LHC LS1 schedule
description
Transcript of Integration of MPE activities in the global LHC LS1 schedule
1
Integration of MPE activities in the global LHC LS1 schedule
M. Bernardini
MPE Review, November 22-23, 2012M. Bernardini
Contents
MPE Review, November 22-23, 2012 2M. Bernardini
• LS1– Where, When, What– Skeleton schedule– Access: a crucial point
• MPE activities schedule– ELQA– EE & EP maintenance and consolidation
• LHC coordination
3
LS1
MPE Review, November 22-23, 2012M. Bernardini
Where – When - What
• Concerns all the accelerator complex and their experiments
• Starts on February 12th, 2013
• Activities:– Consolidation– Upgrades– Maintenance
M. Bernardini MPE Review, November 22-23, 2012 4
S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8
Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.Aug.Sep.
Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.
Aug.Sep.
Oct.
Nov.Dec.
Jan.
Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.Aug.Sep.
Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.
Aug.Sep.
Oct.
Nov.Dec.
Jan.
2013
2014
P1
2013
2014
Feb.Mar.Apr.
Feb.Mar.Apr.
R2E R2
E
LHC machine - skeleton schedule
MPE Review, November 22-23, 2012 5
Beam Commissioning
Ion run
R2E
R2E
Physics
Access – a crucial point
Access conditions: – IMPACT will be running during the whole LS1, which means that
each activity will be approved by the coordination team and the safety officers.
– From T0 to end of warm-up:• Sec. 23, 45, 56, 78, 81: Restricted/closed mode w.r.t.
powering tests• Sec. 12, 34 & 67: Closed mode from 300K to 80K
– Till start of cool-down: General (underground = free)*– Cool-down: Closed from 300K to 80 K
Restricted after 80K– Powering tests: Restricted / Closed according to the
access matrix
* Points 3 and 7 will be set in general mode, following RP green light
MPE Review, November 22-23, 2012 6M. Bernardini
Access constraints
MPE Review, November 22-23, 2012 8M. Bernardini
RE
18
RE
22
RE
28
UJ3
2
RE
38
RE
42
RE
48
RE
52
RE
58
RE
62
RE
68
RE
72
RE
78
RE
82
RE
88
RE
12
Pt 5LSSArc 23 LSS Pt 3 LSS Arc 34 LSS
Pt 1LSS Arc 12 LSS Pt 2 LSS
MAY MAY
Arc 81 LSSR2E R2E R2E
Pt 7LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS
APR
8 8
1 1
FEB FEB
20
13
20
13
2 2
3 3
MAR MAR
4 4
5 5
6 6
7 7
12
APR9 9
10 10
11 11
16 16
13 13
14 14
15 15
12
JUNE
17 17
JUNE18 18
19 19
AUG AUG
26 26
27 27
20 20
JULY
21 21
JULY22 22
23 23
28 28
29 29
30 30
24 24
25 25
SEPT SEPT31 31
32 32
33 33
34 34
42 42
OCT OCT
35 35
36 36
37 37
38 38
47 47
JAN JAN
48 48
43 43
DEC DEC
44 44
45 45
46 46
NOV
39 39
NOV40 40
41 41
20
14
20
14
49 49
50 50
51 51
52 52
FEB FEB53 53
54 54
55 55
56 56
MAR MAR57 57
58 58
59 59
60 60
APR APR
61 61
62 62
63 63
64 64
69 69
JUNE JUNE70 70
71 71
72 72
MAY MAY
65 65
66 66
67 67
68 68
73 73
JULY JULY
74 74
75 75
76 76
77 77
AUG
78 78
AUG79 79
80 80
81 81
82 82
SEPT SEPT
83 83
84 84
85 85
86 86
OCT OCT
87 87
88 88
NOV NOV92 92
93 93
94 94
89 89
90 90
91 91
20
15
20
15
FEB FEB
MAR MAR
DEC
95 95
DEC
96 96
97 97
98 98
APR APR
MAY MAY
99 99
JAN JAN
DFBAK
Cabl
ing
Cam
paig
n
CRYO
CRYO
CRYO
CRYO
EPC 60A
EPC 60A
VSC IV
EPC 60A
EPC 60A
MPE
EE
MPE
EE
MPE EE
DYPBDYPB
DYPB
DYPB
Cool-Down
Cool-Down
Cool-Down
Cool-Down
IC train
ELQA
ELQA
UPS
ELQA
Leak tests
ELQA
Warm Up
IC train
Cool-Down
UPS
Preparation
Flushing
IC train
IC train
IC train
ELQA
Preparation
Flushing
ELQA
Wat
er C
oole
d ca
bles
MKI
gen
erat
ors m
aint
enan
ce
Wat
er C
oole
d ca
bles
WARM UP
ELQA
POWERING TESTS
UPS
POWERING TESTS
ELECTRICAL Maint. (No access)
ELECTRICAL Maint. (No access)
PREPARATION
FLUSHING
COOL DOWN
FLUSHING
PREPARATION
C15R1
A22R1
C30R1
C33R1
C33L2
A29L2
B25R2
A23R2 C
15L3
Q7R3
Q23R3
Q26R3
Q27R3
B32R3
C17R4
B31R4
Colli
mat
or c
ontr
ol
Colli
mat
or c
ontr
olM
KI g
ener
ator
s
MKQ
ARF
ACS
Wat
er C
oole
d ca
bles
Colli
mat
or c
ontr
ol
Wat
er C
oole
d ca
bles
MKD
mai
nten
ance
& a
dd. t
ank
MKD
mai
nten
ance
& a
dd. t
ank
MKD
& M
KB g
ener
ator
s mai
nten
ance
Colli
mat
or c
ontr
ol
Colli
mat
or c
ontr
ol
Colli
mat
or c
ontr
ol
Wat
er C
oole
d ca
bles
Cabl
ing
Cam
paig
n
CV a
ctivi
ties
UPS
relo
catio
nR2
Eca
blin
g fo
r cry
oSh
ield
ing
C15R
1
ELQA
Warm Up
ELQA
Leak tests
A22R
1
C30R
1
C33R
1
C33L
2
A29L
2
UPS
Preparation
Flushing
Warm Up
ELQA
ELQA
Leak tests
A23R
2
B25R
2
IC train
Warm up
ELQA
CSCM
ELQA
Leak tests
Q7R
3
Q23
R3
A26R
3
Q27
R3
B32R
3
Preparation
Flushing
ELQA
C17R
4
B31R
4
UPS
UPS
Preparation
Cool-Down
Flushing
ELQA
ELQA
Warm Up
ELQA
Leak tests
ELQA
Warm Up
ELQA
Leak tests
UPS
UPS
ELQA
ELQA
Preparation
ELQA
Leak tests
UPS
ELQA
ELQA
Warm Up
IC train
PreparationFlushing
Flushing
UPS
Cool-Down
Preparation
Flushing
IC train
ELQA
Leak tests
ELQA
Warm Up
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Beam Commissioning
Physics
Christmas
Com
mis
ioni
ng o
f eq
uipm
ent
Shie
lddi
ng R
R &
UJ
plug
Relo
c.
shie
ldi
ng
Access
Prep
. w
.D
ism
antli
ngPi
ping
Cabl
e Ca
mpa
ign
Cryo
.Pr
ep. w
.D
ism
antli
ngPi
ping
Opt. Fib.
PC
Ethernet
Pipe
s &
UTA
Wat
er C
oole
d ca
bles
Com
mis
ioni
ng o
f eq
uipm
ent
Shie
lddi
ng R
R &
UJ
plug
Relo
c.
shie
ldin
g
Access
Cabl
e Ca
mpa
ign
Cryo
.
Opt. Fib.
PC
Ethernet
CV :
UTA
& p
ipes
Cryo
geni
cs
Com
mis
ioni
ng o
f Ca
blin
g Ca
mpa
ign
Dismantling & dicsonnection
Pipi
ng &
Venti
latio
n W
ater
Co
oled
ca
bles
O.F
. (II
& II
I)
PC
Mov
e ra
cks
Acce
ss
Dismantling & dicsonnection
Cabling campaign
Civi
l eng
inee
ring
(inc
l. pr
otec
tion)
Dis
man
tle
OF
Cryo
geni
cs
Acce
ss
Alar
ms
Cabl
eTr
ayM
ove
rack
s
UTA
Ethe
rnet
Chic
ane
Vacu
um
CE
Cool-Down
Pipe
s &
UTA
Wat
er C
oole
d ca
bles
UPS
UPS
UPS
UPSUPS
UPS
UPS
UPS
UPS
UPS UPS
UPS
UPS
UPS
UPS
Q5L
8
C15L
3
B30R
7
B21L
8
Cabling Sart
Cabling Start
Cabling Sart
Civi
l eng
inee
ring
(inc
l. pr
otec
tion
)
Mur
tym
pan
Shie
lddi
ng R
R 53
Shie
lddi
ng R
R 57
Safe
Roo
m (
I)
Cabl
eTr
ay
Pipi
ngO
.F. (
I))
Div
erse
Wor
ks
Ethe
rnet
Mov
e ra
cks
Com
mis
ioni
ng o
f
0 0
DYPB
DYPB
DYPB
DYPB + MPE EPDYPB + MPE EP
VSC IV
VSC IV
VSC IV
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
ELQA
MPE EP
MPE EP
MPE EP
MPE EP
MPE EP
DYPB
DYPB
UTA
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
DFBX
Cabl
ing
Ca
m
Cabl
ing
Cam
paig
n
REPAIR LEAKS IN QRL 4-5
UPS UPS
UPS
CRYO
CRYO
CRYO
CRYO
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBX
DFBX
DFBX
DFBX
DFBX
DFBX
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
MPEEE
Voies EvacuationVoies Evacuation
Voies EvacuationVoies Evacuation
Voies EvacuationVoies Evacuation
Voies EvacuationVoies Evacuation
Voies Evacuation
SF-
M
SF-
W
UW-M
SF-
M1
SF-W
UW-M
UW-
W
UW-M
UW-
W
UW-
M
SF-
M
SF-
W
UW-
W
SF-M
SF-M
UW-
SF-M
UW-
SF-
M
UW-
SF-M
UW-
SF-
M
UW-
W
DYPB
DYPB
DYPB
DYPB
DYPB
DFBA
MKI
Beam
Vac
uum
A7L1
A4L1
A6L1
A1L1
Beam
Vac
uum
A1R1
A4R1
A6R1
A7R1
Beam
Vac
uum
MKI
TDI
A6L2
A1L2A4L2
B1L2
A7L2
I5L2
A5L2
C4L2
Beam
Vac
uum
A1R2
A4R2
A5R2
A7R2
Beam
Vac
uum
A7L3
B5L3
A5L3
A4L3
IP3
A5R3
B5R3
A7R3
Beam
Vac
uum
A7L4E5L4D5L4B5L4D5R
4E5R4
IP4A6R
4
A7R4
Beam
Vac
uum
A7L5
A6L5B4L5
A1L5A5L5A4L2
Beam
Vac
uum
A1RA4RA5R
B4R5
A6RA7R
Beam
Vac
uum
E5L6
A5L6
A4L6
IP6
IP6
A4R6
C5R6
A5R6
Beam
Vac
uum
A7L7
A7R7
A67B57A57IP7A4RA5RB5RA6R
Beam
Vac
uum
A7L8
A6L8A5L8A1L8
A4L8
Beam
Vac
uum
A4RA1RI5RA6R
B4R8
C4R8
A5R8
MKI
A7R8
Christmas
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
pai
gn
Cabl
ing
Cam
paig
n
Safe
Roo
m (
II)
Start Cabling
AUG Tests
Modification ODH (R2E) - No Access
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL GAZ_ANNUAL
GAZ_ANNUAL
GAZ_ANNUAL
GAZ_ANNUAL
GAZ_ANNUALGAZ_ANNUAL
GAZ_ANNUAL
GAZ_ANNUAL
GAZ_ANNUAL
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUART
ERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUAL
ODH_ANNUAL
ODH_ANNUAL
ODH_ANNUAL
ODH_ANNUALODH_ANNUAL
ODH_ANNUAL
ODH_ANNUAL
ODH_ANNUAL
VSC IV
DFBX
Electrical maintenance - No access
Electrical maintenance - No access
Electrical maintenance - No access
Electrical maintenance - No access
Electrical maintenance - No access
Test AUG (R2E)- No access
Test Fire Detection (R2E) - No access
Test Fire Detection (R2E) - No access
Test AUG (R2E) - No access
Electrical maintenance - No access
AUG Tests AUG Tests
AUG Tests
AUG Tests
DSO Tests
AUG Tests
AUG Tests
AUG Tests
Powering testsPowering tests
Powering testsPowering testsPowering tests
Powering testsPowering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Powering tests
Electrical maintenance
AUG tests
S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8
Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.Aug.Sep.
Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.
Aug.Sep.
Oct.
Nov.Dec.
Jan.
Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.Aug.Sep.
Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
May
Jun.
Jul.
Aug.Sep.
Oct.
Nov.Dec.
Jan.
2013
2014
P1
2013
2014
Feb.Mar.Apr.
Feb.Mar.Apr.
10 p
Access & Safety: nb of people in underground
9
PhysicsBeam Commissioning
15 p
20p
20p
20p
20p
10 p
15 p
15 p
15 p
10 p
15 p
15 p
15 p
15 p
15 p
15 p
15p
15p
10 p
10 p
30 p
10 p
30 p
10 p
30 p
50p
10 p
10 p
10 p
10 p
10 p 10
p
85 p85 p
85 p
85 p
85 p
85 p
85 p85 p
30 p
60 p
50 p30 p
20 p
20 p
20 p
30 p
20 p
20 p60 p
50 p30 p20 p
20 p
20 p
20 p 20 p20 p
60 p
50 p30 p20 p
60 p
50 p30 p20 p
60 p
50 p30 p20 p
30 p
60 p
50 p30 p20 p
30 p
60 p20 p
20 p
30 p20 p
60 p
20 p
10 p10 p
10 p
10 p
10 p
10 p
10 p
10 p
30 p
10
MPE activties
MPE Review, November 22-23, 2012M. Bernardini
MPE Review, November 22-23, 2012 11
ELQA
Before interconnection consolidation:- @1.9K before warm up;- @ T amb
During SMACC Train
After the IC consolidation- @ T amb- @ 1.9K
M. Bernardini
SMACC Sequence
12MPE Review, November 22-23, 2012M. Bernardini
ELQA
MPE Review, November 22-23, 2012 13M. Bernardini
RE
18
RE
22
RE
38
RE
42
RE
48
RE
52
RE
58
RE
62
RE
68
RE
72
RE
78
RE
82
RE
88
RE
12Pt 5 LSSArc 23 LSS Pt 3 LSS Arc 34 LSSPt 1 LSS Arc 12 LSS Pt 2 LSS
MAY MAY
Arc 81 LSSR2E R2E R2E
Pt 7 LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS
APR
8 8
1 1
FEB FEB
2013
2013
2 2
3 3
MAR MAR4 4
5 5
6 6
7 7
12
APR9 9
10 10
11 11
16 16
13 13
14 14
15 15
12
JUNE
17 17
JUNE18 18
19 19
AUG AUG26 26
27 27
20 20
JULY
21 21
JULY22 22
23 23
28 28
29 29
30 30
24 24
25 25
SEPT SEPT31 31
32 32
33 33
34 34
42 42
OCT OCT35 35
36 36
37 37
38 38
47 47
JAN JAN48 48
43 43
DEC DEC44 44
45 45
46 46
NOV
39 39
NOV40 40
41 41
2014
2014
49 49
50 50
51 51
52 52
FEB FEB53 53
54 54
55 55
56 56
MAR MAR57 57
58 58
59 59
60 60
APR APR61 61
62 62
63 63
64 64
69 69
JUNE JUNE70 70
71 71
72 72
MAY MAY
65 65
66 66
67 67
68 68
73 73
JULY JULY74 74
75 75
76 76
77 77
AUG
78 78
AUG79 79
80 80
81 81
82 82
SEPT SEPT83 83
84 84
85 85
86 86
OCT OCT87 87
88 88
NOV NOV92 92
93 93
94 94
89 89
90 90
91 91
DEC
95 95
DEC96 96
97 97
98 98
99 99
DFBAK
Cabl
ing C
ampa
ign
CRYO
CRYO
CRYO
CRYO
EPC 60A
EPC 60A
VSC IV
EPC 60A
EPC 60A
MPE
EE
MPE
EE
MPE EE
DYPBDYPB
DYPB
DYPB
Cool-Down
Cool-Down
Cool-Down
Cool-Down
IC train
ELQA
Powering tests
ELQA
UPS
ELQA
Leak tests
Powering tests
ELQA
Warm Up
IC train
Cool-Down
UPS
Preparation
Flushing
IC train
Powering tests
Powering tests
IC train
IC train
Powering tests
ELQA
Preparation
Flushing
Powering tests
ELQA
Wat
er C
oole
d ca
bles
MKI
gene
rato
rs m
ainte
nanc
e
Wat
er C
oole
d ca
bles
WARM UP
ELQA
POWERING TESTS
UPS
POWERING TESTS
ELECTRICAL Maint. (No access)
ELECTRICAL Maint. (No access)
PREPARATION
FLUSHING
COOL DOWN
FLUSHING
PREPARATION
C15R1
A22R1
C30R1
C33R1
C33L2
A29L2
B25R2
A23R2 C
15L3
Q7R3
Q23R3
Q26R3
Q27R3
B32R3
C17R4
B31R4
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
lM
KI ge
nera
tors
MKQ
ARF
ACS
Wat
er C
oole
d ca
bles
Colli
mat
or co
ntro
l
Wat
er C
oole
d ca
bles
MKD
main
tena
nce
& ad
d. ta
nk
MKD
main
tena
nce
& ad
d. ta
nk
MKD
& M
KB ge
nera
tors
main
tena
nce
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
l
Wat
er C
oole
d ca
bles
Cabl
ing C
ampa
ign
CV ac
tiviti
esUP
S relo
catio
nR2
Eca
blin
g for
cryo
Shie
ldin
g
C15R
1
Powering tests
ELQA
Warm Up
ELQA
Leak tests
A22R
1C3
0R1
C33R
1C3
3L2
A29L
2
UPS
Preparation
Flushing
Warm Up
ELQA
ELQA
Leak tests
A23R
2B2
5R2
IC train
Warm up
ELQA
CSCM
ELQA
Leak tests
Q7R3
Q23R
3
A26R
3Q2
7R3
B32R
3
Preparation
Flushing
Powering tests
ELQA
C17R
4
B31R
4
UPS
UPS
Preparation
Cool-Down
Flushing
Powering tests
ELQA
ELQA
Warm Up
ELQA
Leak tests
Powering tests
ELQA
Warm Up
ELQA
Leak tests
UPS
UPS
ELQA
Powering tests
ELQA
Preparation
ELQA
Leak tests
UPS
Powering tests
ELQA
Powering tests
ELQA
Warm Up
IC train
PreparationFlushing
Flushing
UPS
Cool-Down
Powering tests
Preparation
Flushing
IC train
ELQA
Leak tests
Powering tests
ELQA
Warm Up
Electrical maintenance - No access
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Christmas
Com
misi
onin
g of
eq
uipm
ent
Shie
lddi
ng R
R &
UJpl
ug
Relo
c . sh
iel
ding
Access
Prep
. w.
Dism
antli
ngPi
ping
Cabl
e Cam
paig
nCr
yo.
Prep . w
.Di
sman
tling
Pipi
ng
Opt. Fib.
PC
Ethernet
Pipe
s & U
TAW
ater
Coo
led
cabl
es
Com
misi
onin
g of
eq
uipm
ent
Shie
lddi
ng R
R &
UJpl
ug
Relo
c . sh
ield
ing
Access
Cabl
e Cam
paig
nCr
yo.
Opt. Fib.
PC
Ethernet
CV : U
TA &
pip
esCr
yoge
nics
Com
misi
onin
g of
Ca
blin
g Cam
paig
n
Dismantling & dicsonnection
Pipi
ng &
Venti
latio
n W
ater
Co
oled
ca
bles
O.F
. (II &
III)
PC
Mov
e ra
cks
Acce
ss
Dismantling & dicsonnection
Cabling campaign
Civi
l eng
inee
ring (
incl.
pro
tecti
on)Di
sman
tle
OF
Cryo
geni
cs
Acce
ss
Alar
ms
Cabl
eTr
ayM
ove
rack
s
UTA
Ethe
rnet
Chic
ane
Vacu
um
Electrical maintenance - No access
CE
Cool-Down
Pipe
s & U
TAW
ater
Coo
led
cabl
es
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
Q5L8
C15L
3
B30R
7
B21L
8
Cabling Sart
Cabling Start
Cabling Sart
Civi
l eng
inee
ring
(incl.
prot
ectio
n)
Mur
tym
pan
Shie
lddi
ng R
R 53
Shie
lddi
ng R
R 57
Safe
Roo
m (I
)Ca
ble
Tray
Pipi
ngO.
F. (
I))
Dive
rse
Wor
ks
Ethe
rnet
Mov
e ra
cks
Com
misi
onin
g of
0 0
DYPB
DYPB
DYPB
DYPB + MPE EPDYPB + MPE EP
VSC IV
VSC IV
VSC IV
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
ELQA
Powering tests
MPE EP
MPE EP
MPE EP
MPE EP
MPE EP
DYPB
DYPB
UTA
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Electrical maintenance - No access
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
DFBX
Cabl
ing
Ca
m
Cabl
ing C
ampa
ign
AUG Tests AUG Tests
AUG Tests
AUG Tests
DSO Tests
REPAIR LEAKS IN QRL 4-5
AUG Tests
UPS
UPS
UPS
CRYO
CRYO
CRYO
CRYO
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBX
DFBX
DFBX
DFBX
DFBX
DFBX
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
MPEEE
Electrical maintenance - No access
Electrical maintenance - No access
Voies Evacuation
Voies EvacuationVoies Evacuation
Voies EvacuationVoies Evacuation
Voies Evacuation
Voies EvacuationVoies Evacuation
Voies Evacuation
SF-
M
SF-
W
UW-M
SF-
M1
SF-W
UW-M
UW-
W
UW-M
UW-
W
UW-M
SF-
M
SF-
W
UW-
W
SF-
M
SF-M
UW-M
SF-M
UW-
SF-
M
UW-
SF-M
UW-
SF-
M
UW-
W
DYPB
DYPB
DYPB
DYPB
DYPB
DFBA
MKI
Beam
Vac
uum
A7L1
A4L1
A6L1
A1L1
Beam
Vac
uum
A1R1
A4R1
A6R1
A7R1
Beam
Vac
uum
MKI
TDI
A6L2
A1L2A4L2
B1L2
A7L2
I5L2
A5L2
C4L2
Beam
Vac
uum
A1R2
A4R2
A5R2
A7R2
Beam
Vac
uum
A7L3
B5L3
A5L3
A4L3
IP3
A5R3
B5R3
A7R3
Beam
Vac
uum
A7L4E5L4D5L4B5L4D5R
4E5R4
IP4A6R
4
A7R4
Beam
Vac
uum
A7L5
A6L5B4L5
A1L5A5L5A4L2
Beam
Vac
uum
A1RA4RA5R
B4R5
A6RA7R
Beam
Vac
uum
E5L6
A5L6
A4L6
IP6
IP6
A4R6
C5R6
A5R6
Beam
Vac
uum
A7L7
A7R7
A67B57A57IP7A4RA5RB5RA6R
Beam
Vac
uum
A7L8
A6L8A5L8A1L8
A4L8
Beam
Vac
uum
A4RA1RI5RA6R
B4R8
C4R8
A5R8
MKI
A7R8
Christmas
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing
Cam
paig
n
Cabl
ing C
ampa
ign
Cabl
ing
Cam
pai
gn
Cabl
ing C
ampa
ign
Test AUG (R2E)- No accessSa
fe R
oom
(II)
Test Fire Detection (R2E) - No access
Test Fire Detection (R2E) - No access
Start Cabling
Test AUG (R2E) - No accessAUG TestsAUG Tests
Modification ODH (R2E) - No Access
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUART
ERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
AUG Tests
VSC IV
Electrical maintenance - No access
DFBX
Detection Incendie_ANNUAL
ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_A
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_A
FLASH TEST ODH_ANNUAL
OF_CONOF_CON
OF_CON
OF_CON
OF_CO
OF_REM
OF_REM
OF_REM
OF_REM
OF_REM
OF_REM
O_REMF
OF_REMO
O
OF_CONOF_CO
OF_REM
OF_REM
O
O
OO
O
O
IC train: arc 56
14M. Bernardini
M. Bernardini
IC trainDFBA
DFBX
Powering testsELQA
ELQA
Leak tests
Warm up
Preparation
Flushing
Open W
Open MDesolder BB (15%)Solder BB (15%)
ShuntDiodesWeld MLeak Tests MNon Conformities M
Close W
Leak tests W
PAQ
Elec. non conformities
NOV
2013
AUG
SEPT
OCT
FEB
MAR
APR
MAY
JUNE
JULY
Detailed train arc 56
TRAIN TRAIN
6h00 8h00 11h00 15h00
Electrical non conformities
17h0010h00
HV ELQAPreparation
ELQA
6h00
Transport et RX
23h00
Train A Train
Daily activities
MPE Review, November 22-23, 2012 16M. Bernardini
MPE Review, November 22-23, 2012 17
Maintenance & consolidation
Electrical Engineering:• Consolidation of the extraction breakers 600A • Installation of snubber capacitor banks in the RFQ/RQD circuits • Revision of DQS in quadrupoles • Replacement of the arc chutes on quadrupoles• DQRB dump resistors (13kA)• Upgrade and ELQA of cabling for IPQ’s and IPD’s• Controls & ACQ topics – field –bus changes• nQPS extension and completion
Electronics for Protection• BIS Change the CPU module of all VME systems installed in the LHC • DYPB activities (only underground activities are included in the schedule)• Replace the CIBF units:• Install f-o monitoring for the beam permits loops:• SMP – change the CPU module for two SMP controllers:• Energy extraction for the 600A circuits mitigation package:• Maintenance and protection of 600A and quench loop controller
M. Bernardini
MPE Review, November 22-23, 2012 18
Maintenance & consolidation
DYPB:- 2 wks/arc for dismounting and 2 wks/arc for
reinstalling
Electrical Engineering- 6 wks/point at pt 2, 4, 6 and 8- 1 wk/pt at 1,3,5,7 (for DQRB)
Electronics for Protection- 1 wk/sector
M. Bernardini
MPE Review, November 22-23, 2012 19M. Bernardini
RE
18
RE
22
RE
38
RE
42
RE
48
RE
52
RE
58
RE
62
RE
68
RE
72
RE
78
RE
82
RE
88
RE
12Pt 5 LSSArc 23 LSS Pt 3 LSS Arc 34 LSSPt 1 LSS Arc 12 LSS Pt 2 LSS
MAY MAY
Arc 81 LSSR2E R2E R2E
Pt 7 LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS
APR
8 8
1 1
FEB FEB
2013
2013
2 2
3 3
MAR MAR4 4
5 5
6 6
7 7
12
APR9 9
10 10
11 11
16 16
13 13
14 14
15 15
12
JUNE
17 17
JUNE18 18
19 19
AUG AUG26 26
27 27
20 20
JULY
21 21
JULY22 22
23 23
28 28
29 29
30 30
24 24
25 25
SEPT SEPT31 31
32 32
33 33
34 34
42 42
OCT OCT35 35
36 36
37 37
38 38
47 47
JAN JAN48 48
43 43
DEC DEC44 44
45 45
46 46
NOV
39 39
NOV40 40
41 41
2014
2014
49 49
50 50
51 51
52 52
FEB FEB53 53
54 54
55 55
56 56
MAR MAR57 57
58 58
59 59
60 60
APR APR61 61
62 62
63 63
64 64
69 69
JUNE JUNE70 70
71 71
72 72
MAY MAY
65 65
66 66
67 67
68 68
73 73
JULY JULY74 74
75 75
76 76
77 77
AUG
78 78
AUG79 79
80 80
81 81
82 82
SEPT SEPT83 83
84 84
85 85
86 86
OCT OCT87 87
88 88
NOV NOV92 92
93 93
94 94
89 89
90 90
91 91
DEC
95 95
DEC96 96
97 97
98 98
99 99
DFBAK
Cabl
ing C
ampa
ign
CRYO
CRYO
CRYO
CRYO
EPC 60A
EPC 60A
VSC IV
EPC 60A
EPC 60A
Cool-Down
Cool-Down
Cool-Down
Cool-Down
IC train
ELQA
Powering tests
ELQA
UPS
ELQA
Leak tests
Powering tests
ELQA
Warm Up
IC train
Cool-Down
UPS
Preparation
Flushing
IC train
Powering tests
Powering tests
IC train
IC train
Powering tests
ELQA
Preparation
Flushing
Powering tests
ELQA
Wat
er C
oole
d ca
bles
MKI
gene
rato
rs m
ainte
nanc
e
Wat
er C
oole
d ca
bles
WARM UP
ELQA
POWERING TESTS
UPS
POWERING TESTS
ELECTRICAL Maint. (No access)
ELECTRICAL Maint. (No access)
PREPARATION
FLUSHING
COOL DOWN
FLUSHING
PREPARATION
C15R1
A22R1
C30R1
C33R1
C33L2
A29L2
B25R2
A23R2 C
15L3
Q7R3
Q23R3
Q26R3
Q27R3
B32R3
C17R4
B31R4
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
lM
KI ge
nera
tors
MKQ
ARF
ACS
Wat
er C
oole
d ca
bles
Colli
mat
or co
ntro
l
Wat
er C
oole
d ca
bles
MKD
main
tena
nce
& ad
d. ta
nk
MKD
main
tena
nce
& ad
d. ta
nk
MKD
& M
KB ge
nera
tors
main
tena
nce
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
l
Colli
mat
or co
ntro
l
Wat
er C
oole
d ca
bles
Cabl
ing C
ampa
ign
CV ac
tiviti
esUP
S relo
catio
nR2
Eca
blin
g for
cryo
Shie
ldin
g
C15R
1
Powering tests
ELQA
Warm Up
ELQA
Leak tests
A22R
1C3
0R1
C33R
1C3
3L2
A29L
2
UPS
Preparation
Flushing
Warm Up
ELQA
ELQA
Leak tests
A23R
2B2
5R2
IC train
Warm up
ELQA
CSCM
ELQA
Leak tests
Q7R3
Q23R
3
A26R
3Q2
7R3
B32R
3
Preparation
Flushing
Powering tests
ELQA
C17R
4
B31R
4
UPS
UPS
Preparation
Cool-Down
Flushing
Powering tests
ELQA
ELQA
Warm Up
ELQA
Leak tests
Powering tests
ELQA
Warm Up
ELQA
Leak tests
UPS
UPS
ELQA
Powering tests
ELQA
Preparation
ELQA
Leak tests
UPS
Powering tests
ELQA
Powering tests
ELQA
Warm Up
IC train
PreparationFlushing
Flushing
UPS
Cool-Down
Powering tests
Preparation
Flushing
IC train
ELQA
Leak tests
Powering tests
ELQA
Warm Up
Electrical maintenance - No access
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Christmas
Com
misi
onin
g of
eq
uipm
ent
Shie
lddi
ng R
R &
UJpl
ug
Relo
c . sh
iel
ding
Access
Prep
. w.
Dism
antli
ngPi
ping
Cabl
e Cam
paig
nCr
yo.
Prep . w
.Di
sman
tling
Pipi
ng
Opt. Fib.
PC
Ethernet
Pipe
s & U
TAW
ater
Coo
led
cabl
es
Com
misi
onin
g of
eq
uipm
ent
Shie
lddi
ng R
R &
UJpl
ug
Relo
c . sh
ield
ing
Access
Cabl
e Cam
paig
nCr
yo.
Opt. Fib.
PC
Ethernet
CV : U
TA &
pip
esCr
yoge
nics
Com
misi
onin
g of
Ca
blin
g Cam
paig
n
Dismantling & dicsonnection
Pipi
ng &
Venti
latio
n W
ater
Co
oled
ca
bles
O.F
. (II &
III)
PC
Mov
e ra
cks
Acce
ss
Dismantling & dicsonnection
Cabling campaign
Civi
l eng
inee
ring (
incl.
pro
tecti
on)Di
sman
tle
OF
Cryo
geni
cs
Acce
ss
Alar
ms
Cabl
eTr
ayM
ove
rack
s
UTA
Ethe
rnet
Chic
ane
Vacu
um
Electrical maintenance - No access
CE
Cool-Down
Pipe
s & U
TAW
ater
Coo
led
cabl
es
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
Q5L8
C15L
3
B30R
7
B21L
8
Cabling Sart
Cabling Start
Cabling Sart
Civi
l eng
inee
ring
(incl.
prot
ectio
n)
Mur
tym
pan
Shie
lddi
ng R
R 53
Shie
lddi
ng R
R 57
Safe
Roo
m (I
)Ca
ble
Tray
Pipi
ngO.
F. (
I))
Dive
rse
Wor
ks
Ethe
rnet
Mov
e ra
cks
Com
misi
onin
g of
0 0
VSC IV
VSC IV
VSC IV
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
ELQA
Powering tests
UTA
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Electrical maintenance - No access
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
DFBX
Cabl
ing
Ca
m
Cabl
ing C
ampa
ign
AUG Tests AUG Tests
AUG Tests
AUG Tests
DSO Tests
REPAIR LEAKS IN QRL 4-5
AUG Tests
UPS
UPS
UPS
CRYO
CRYO
CRYO
CRYO
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBA
DFBX
DFBX
DFBX
DFBX
DFBX
DFBX
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
Electrical maintenance - No access
Electrical maintenance - No access
Voies Evacuation
Voies EvacuationVoies Evacuation
Voies EvacuationVoies Evacuation
Voies Evacuation
Voies EvacuationVoies Evacuation
Voies Evacuation
SF-
M
SF-
W
UW-M
SF-
M1
SF-W
UW-M
UW-
W
UW-M
UW-
W
UW-M
SF-
M
SF-
W
UW-
W
SF-
M
SF-M
UW-M
SF-M
UW-
SF-
M
UW-
SF-M
UW-
SF-
M
UW-
W
DFBA
MKI
Beam
Vac
uum
A7L1
A4L1
A6L1
A1L1
Beam
Vac
uum
A1R1
A4R1
A6R1
A7R1
Beam
Vac
uum
MKI
TDI
A6L2
A1L2A4L2
B1L2
A7L2
I5L2
A5L2
C4L2
Beam
Vac
uum
A1R2
A4R2
A5R2
A7R2
Beam
Vac
uum
A7L3
B5L3
A5L3
A4L3
IP3
A5R3
B5R3
A7R3
Beam
Vac
uum
A7L4E5L4D5L4B5L4D5R
4E5R4
IP4A6R
4
A7R4
Beam
Vac
uum
A7L5
A6L5B4L5
A1L5A5L5A4L2
Beam
Vac
uum
A1RA4RA5R
B4R5
A6RA7R
Beam
Vac
uum
E5L6
A5L6
A4L6
IP6
IP6
A4R6
C5R6
A5R6
Beam
Vac
uum
A7L7
A7R7
A67B57A57IP7A4RA5RB5RA6R
Beam
Vac
uum
A7L8
A6L8A5L8A1L8
A4L8
Beam
Vac
uum
A4RA1RI5RA6R
B4R8
C4R8
A5R8
MKI
A7R8
Christmas
Cabl
ing C
ampa
ign
Cabl
ing C
ampa
ign
Cabl
ing
Cam
paig
n
Cabl
ing C
ampa
ign
Cabl
ing
Cam
pai
gn
Cabl
ing C
ampa
ign
Test AUG (R2E)- No access
Safe
Roo
m (I
I)
Test Fire Detection (R2E) - No access
Test Fire Detection (R2E) - No access
Start Cabling
Test AUG (R2E) - No accessAUG TestsAUG Tests
Modification ODH (R2E) - No Access
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUART
ERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTE
RLY
Detection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY
Detection Incendie/GAZ_QUARTERLY
AUG Tests
VSC IV
Electrical maintenance - No access
DFBX
Detection Incendie_ANNUAL
ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_A
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_ANNUAL
FLASH TEST ODH_ANNUAL
Detection Incendie_ANNUAL
ODH_ANNUALODH_A
FLASH TEST ODH_ANNUAL
OF_CONOF_CON
OF_CON
OF_CON
OF_CO
OF_REM
OF_REM
OF_REM
OF_REM
OF_REM
OF_REM
O_REMF
OF_REMO
O
OF_CONOF_CO
OF_REM
OF_REM
O
O
OO
O
O
DYPB
MPE EE
DYPB
MPE EP
DYPB
DYPB
MPE EP
MPE EE
DYPB
MPE EP
DYPB
MPE EP
DYPB
DYPB
MPE
EE
DYPB
DYPB
DYPB
DYPB
MPE
EE
DYPB + MPE EP
DYPB
DYPB
DYPB + MPE EP
MPE EP
MPE EP
MPE EP
MPE EP
DQR
DQR
DQR
DQR
DQR
DQR
DQR
DQR
DYPBDYPBDYPB
DYPBDYPB
DYPBDYPB
DYPB
DYPB
DYPB
DYPBDYPB
DYPB DYPB
DYPBDYPB
EE
EE
EE
EE
EPEP
EP
EP
EP
EPEP EP
DQR
DQR
DQR
DQR
DQR
DQR
MPE Review, November 22-23, 2012 20
OUTSTANDING ITEMS
DYPB:- Cable replacement
DQRB - Thermostats replacement at pt 7, on 2 DQRB
M. Bernardini
21
LHC Coordination
MPE Review, November 22-23, 2012M. Bernardini
LHC Coordination
• Schedule in a very good shape
• Preparation in progress : Work Package Analysis– Scheduling, manage co-activities– Operating procedure, methods, risk analysis– Environment– Logistics: access, circulation, storage, transport, utilities, etc.
• MPE WORKPACKAGE ANALYSIS: DECEMBER, 13TH, 2012.
MPE Review, November 22-23, 2012 22M. Bernardini
LHC coordination
MPE Review, November 22-23, 2012 23M. Bernardini
Safety • Documentation to be provided by Tech. Resp. to safety
coordinators– 1. PPSPS (plan particulier de sécurité et de protection de la santé)
Specific activities.
– 2a. PdP (Plan de Prevention) → Long term contract– 2b. Modus operandi / Task form
• Joint Inspection prior to the start (VIC)“ to check that the modus operandi and the environment is conform to what is described in the documentation”
LHC Coordination
MPE Review, November 22-23, 2012 24M. Bernardini
Follow-up• Monday Morning meetings• On site visits and meetings• Weekly coordination meeting• Upgrade, modifications, methods and schedule
MPE Review, November 22-23, 2012 25M. Bernardini
Conclusions
• The critical path of LS1 is related to the interconnection activities.
• Identify & COMMUNICATE deviations ASAP;
• Critical issue: resources impact on schedule and co-activities