Integrated Transport Programme

33
www.aucklandtransport.govt.nz Integrated Transport Programme Presentation to Sustainability Society Transport Forum November 2013

Transcript of Integrated Transport Programme

Page 1: Integrated Transport Programme

www.aucklandtransport.govt.nz

Integrated Transport

Programme Presentation to Sustainability Society Transport Forum

November 2013

Page 2: Integrated Transport Programme

Integrated Transport Programme

Contents

1. Context

2. Demand Drivers

3. The Integrated Transport Programme (ITP)

4. Next Steps

Page 3: Integrated Transport Programme

Integrated Transport Programme

Plan Hierarchy

Page 4: Integrated Transport Programme

The Auckland Plan

Development Strategy

Growth will occur in:

• internationally acclaimed city centre

• 10 metropolitan centres, where much of

Auckland’s growth will occur.

• 33 town centres,.

• major business areas, - hubs for employment

• rural areas, - bush and country living, and rural

production.

• satellite towns, Pukekohe and Warkworth.

• greenfield land to investigate for future growth.

Least change in areas already zoned for the protection of

historic character.

High-rise apartments only in the city centre and

metropolitan centres.

Page 5: Integrated Transport Programme

The Auckland Plan Development Strategy

Page 6: Integrated Transport Programme

The Unitary Plan

Draft (Mar) vs Notified (Sept)

Balmoral

* As a general rule – the lighter the colour the less high and dense the zone

THAB

and

Local

Centre

zones

removed

Mixed

Housing

changed to

Single House

zone

Page 7: Integrated Transport Programme

Reduced

Rural

Urban

Boundary

Increase

in zoning

around

some

centres

Decrease

in level of

zoning

around

nodes

and

centres

Decrease

in zoning

level

Notified UP zoning Isthmus and West

Page 8: Integrated Transport Programme

Notified UP zoning Isthmus and West

Development sector are saying:

Upzoning needs to be in market

attractive areas, along with heights

Apartments/high rise developments

are not viable in all places

Existing opportunities for easy infill

and subdivision opportunities

limited

The less intensification provided for

… the more greenfield opportunities

needed

Page 9: Integrated Transport Programme

Sector Demands

Page 10: Integrated Transport Programme

PT growing as city access choice

• Since 2001, public

transport users to the

Auckland city centre

have increased and

people using cars

declined during the

morning peak period.

• Overall, the total

number of people

entering the city

centre has increased.

Page 11: Integrated Transport Programme

PT growing as city access choice

• 76% of the

growth in

public

transport to

the City

Centre since

2001 has

been in rail

and the

Northern

Busway

Page 12: Integrated Transport Programme

Investment in rail improves patronage

1991 Electrification

1992 Joondalup Line

2007 Mandurah Line

2003 Britomart opened

Page 13: Integrated Transport Programme

Timing Demand by Trip Type

Page 14: Integrated Transport Programme

Traffic and Freight Volumes

Page 15: Integrated Transport Programme

The Auckland Plan –

Transport Priorities

Four strategic transport priorities for Auckland:

1. Manage Auckland’s transport as a single system

2. Integrate transport planning and investment

with land-use development

3. Prioritise and optimise investment across

transport modes

4. Implement new transport funding mechanisms

The Auckland Plan places the highest priority

on three new projects:

1. City Rail Link

2. AMETI and East-West Link

3. Additional Waitematā Harbour Crossing.

Page 16: Integrated Transport Programme

What the ITP does

Page 17: Integrated Transport Programme

Four Stage Intervention Process

Page 18: Integrated Transport Programme

Business Process

Integrated Transport

Programme

Network, Corridor and Land Use

Plans

Prioritisation and Funding

(AMP/RLTP/LTP)

Delivery:

Capita and Operations

Asset Management

Plan

Page 19: Integrated Transport Programme

One System

• Balance needs (strategic & local, movement & place)

• Optimise the system

• Align effort

• Build strong partnerships

Page 20: Integrated Transport Programme

Operate and Maintain Infrastructure

Page 21: Integrated Transport Programme

Making better use of assets

Annual benefits of optimising a single major arterial

corridor like Dominion Road:

• Fuel savings of 10% or 215,000 litres

• Total time saving 64,000 hours

• Benefit/Cost ratio of 30 : 1

• CO2 reduction of 10% or 550 tonnes

Page 22: Integrated Transport Programme

Making better use of assets

Page 23: Integrated Transport Programme

Manage Demand Efficiently and Safely

Current focus is on work

and school travel plans

Pricing will become more

important once strategic

networks are completed

Page 24: Integrated Transport Programme

Integrated Transport Programme

Invest in New Infrastructure

Page 25: Integrated Transport Programme

Invest in new infrastructure

Page 26: Integrated Transport Programme

Transport Investment Profile

Page 27: Integrated Transport Programme

Transport Investment Profile – Public Transport

Page 28: Integrated Transport Programme

Funding Impacts

1: Based on ART model outputs

Indicator Description CurrentFull

funding

Committed

funding

Public transport boardings Number of annual public transport boardings 70 million 140.4 million 103 million

Public transport boardings per

capitaNumber of annual public transport boardings per capita 44 84 66

Public transport morning peak

motorised mode share

Proportion of morning peak motorised trips (PT & Auto) into the

CBD by public transport47% 56.1% 55.5%

Walking, cycling, and public

transport morning peak mode

share

Proportion of morning peak trips that are made by walking,

cycling, or public transport23% 32.2% 31.0%

Greenhouse gas emissions Greenhouse gas emissions from ground based transport 2009 base (0%) 17% increase 21% increase

People's access to jobs Number of jobs within 30 mins travel time by car 280 450 320

People's access to jobs Number of jobs within 60 mins travel time by public transport 100 200 170

Roadway congestion on QTN

where buses mix in traffic

Per cent of VKT operating at LoS E or F during morning peak

where buses mix in traffic on the QTN17.6% 2041: 8.4% 2041: 10.5%

Strategic freight network

congestion

Per cent of VKT that roads on the strategic freight network

operate at LoS E or F

12.0% AM 2041: 27.1% AM 2041: 30.1% AM

5.8% IP 2041: 28.4% IP 2041: 34.2% IP

Transport delay Annual excess delay (LoS E or worse) per capita 7% 2041: 34.0% 2041: 45.2%

KEY

Improved

Slight Improvement

Worse

Significantly worse

Page 29: Integrated Transport Programme

Integrated Transport Programme

2040 Congestion

Page 30: Integrated Transport Programme

Transport Outcomes

• Significant progress completing road,

cycle and PT networks

• Design new interventions to ensure

momentum is maintained

• Maintain momentum to complete

strategic networks

• Refine and expand intervention

suite

Decade 1 Decade 2 Decade 3

Auckla

nd P

lan

Tra

nsport

O

utc

om

es

Interventions:

• Sweat the assets

• Manage demand

• Invest in new infrastructure and

services

• Refine and expand intervention

suite

• Continued investment to enable

growth

Fully funded

Fully funded + additional

interventions

Committed funding only

Page 31: Integrated Transport Programme

Timeline

Population Growth

Employment growth

Technology

Energy costs

Urban form Dri

vers

:

J J J J J J

ITP

Fiscal RealitiesGPS

LTP / RLTP

Annual Plan

Deliverables:AMP

SOI

2013 2014 2015

Page 32: Integrated Transport Programme

Priorities for next ITP

• Prioritise programme for next RLTP/LTP in 2015

- Develop and test packages against transport outcomes

• Strategic justification and economic case for transport

projects

• Delivery Strategies

- Rail development strategy

- Arterial roads

- PT marketing plan

- Ferries

- Parking and Park ‘n Ride

• Additional funding initiative

• Web based and accessible

Page 33: Integrated Transport Programme

Making the Auckland Plan a Reality