EIA/EMP REPORT Of Integrated Township Project Village Ramchandi, Banarsi and Nakti District Raipur, Chhattisgarh for M/s DBH Township LLP. Prepared By GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.Accredited by QCI / NABET) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Accrediated by NABL, Recognized by MoEF, GoI) A unit of GRC India

Transcript of Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Page 1: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

EIA/EMP REPORT

Of

Integrated Township Project Village Ramchandi, Banarsi and Nakti

District Raipur, Chhattisgarh

for

M/s DBH Township LLP.

Prepared By

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD.

(An ISO 9001:2008 Certified Co.Accredited by QCI / NABET)

F-374-375, Sector-63, Noida, U.P.

Ph.: 0120- 4044630, Telefax: 0120- 2406519

Email: [email protected], [email protected]

Website: http://www.grc-india.com

GRC INDIA TRAINING & ANALYTICAL LABORATORY

(Accrediated by NABL, Recognized by MoEF, GoI)

A unit of GRC India

Page 2: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

TABLE OF CONTENTS

Table No. Description Page No.

CHAPTER 1 Introduction 1-9

1.1 Preamble 1

1.2 General information on project 1

1.3 Environment clearance process 2

1.4 Validity of Environment clearance 2

1.5 Post Environmental clearance monitoring 3

1.6 Transferability of Environment clearance 3

1.7 Generic structure of Environment impact assessment 3

1.8 Profile of project proponent 5

1.9 Brief description of project 5

1.10 Applicable legal requirement 6

1.11 Need of the EIA study 6

1.12 Scope of study 7

1.13 Study methodology 7

1.14 Eia methodology 8

CHAPTER 2 Project Description 10-44

2.1 Introduction 10

2.2 Project location and site surroundings 10

2.3 Brief Project features 11

2.4 Population details 15

2.5 Power Supply 17

2.6 Requirement of Natural Resources and their sources 17

2.7 Design Consideration 17

2.8 Parking 18

2.9 Water supply and sewage treatment plant 19

2.10 Rainwater Harvesting 26

2.11 Solid Waste Management 36

2.12 Landscape 40

2.13 Man power Requirement 42

2.14 Details of construction materials 43

2.15 List of Machinery During Construction 44

CHAPTER 3 Description of the Environment 45-93

3.1 Introduction 45

3.2 Study period 45

3.3 Study area 45

3.4 Baseline monitoring of environmental component 46

CHAPTER 4 Anticipated Environmental Impacts &

Mitigation Measures

94-116

4.1 Introduction 94

Page 3: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

4.2 Impact matrix 95

4.3 Pollution sources 97

4.4 Impact identification 98

4.5 Assessment of Environmental Impacts During Development and

Construction Phase

100

4.6 Assessment of the environmental impacts during post

construction phase

108

CHAPTER 5 Analysis of Alternative 117-124

5.1 Introduction 117

5.2 Building Materials 117

5.3 Natural Hazard Prone areas 120

5.4 Environment Friendly Development 120

5.5 Community issues 123

5.6 Energy conservation 123

5.7 Transportation 124

CHAPTER 6 Environmental Monitoring Program 125-129

6.1 Introduction 125

6.2 Performance indictors 125

6.3 Data Management 129

6.4 Reporting Schedules 129

6.5 Emergency 129

CHAPTER 7 Additional Studies 130-140

7.0 Introduction 130

7.1 Risk assessment And Disaster Management Plan 130

7.2 Response In Case of earthquake 134

7.3 Response For LPG leakage 135

7.4 Response In case of fire 136

7.5 Resource conservation 137

7.7 Resettlement and rehabilitation 140

CHAPTER 8 Project Benefits 141-142

8.1 General 141

8.2 Physical infrastructure 141

Page 4: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

8.3 Social Infrastructure 141

8.4 Economic Benefits 141

CHAPTER 9 Environmental Management Plan 143-169

9.1 Introduction 143

9.2 Environmental Management Strategies 144

9.3 Energy Conservation 160

9.4 Management And Maintenance System 160

9.5 Overall Mitigation Measures and Environmental Management

Plan

162

CHAPTER10 Summary And Conclusion 170-177

10.1 Project background 170

10.2 Project site 171

10.3 Project features 171

10.4 Environmental setting of the study area 172

10.5 Environmental Management Plan 176

CHAPTER11 Disclosure of consultants engaged 178-181

11.1 Accreditations from quality council of india QCI 179

Page 5: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

LIST OF FIGURES

S.No. Figure No. Particular Page No.

1. 2.1(a,b) Water balance diagram for rainy and non

rainy season.

21-22

2. 2.2 Schematic Diagram of STP 26

3. 2.3 Annual Rainfall Pattern in India 29

4. 2.4 Rainfall Pattern in India during Winter

Season

30

5. 2.5 Rainfall Pattern in India during Pre

Monsoon Season

31

6. 2.6 Rainfall Pattern in India during Monsoon

Season

32

7. 2.7 Rainfall Pattern in India during Post

Monsoon Season

33

8. 2.8 RWH Pit design 36

9. 2.9 Solid waste Management

scheme(construction Phase)

38

10. 2.10 Solid Waste Management During Operation

Phase

39

11 3.1 The wind-rose diagram for three months

(Oct 2015- Dec 2015)

46

12 3.2 Concentration of PM2.5 49

13 3.3 Concentration of PM 10 50

14 3.4 Concentration of SO2 51

15 3.5 Concentration of NO2 52

16 3.6 Concentration of CO 53

17 3.7 Land use pattern of project site within 10 km

radius of project site

68

18 4.1 Wind Rose - (Summer Season for 1st

October to 31st December - 2015)

110

19 4.2 Isopleths diagram 114

20 9.1 Waste management flow diagram 146

Page 6: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

LIST OF TABLES

S.

No.

Table No. Particular Page

No.

1. 2.1 Connectivity & Locational Features 10

2. 2.2 Detailed Area Statement 11

3. 2.3 Population Detail 15

4. 2.4 Calculation For Daily Water Requirement 19

5. 2.5 Wastewater Calculation 20

6. 2.6 Solid waste generation 37

7. 2.7 Proposed Tree Species (Evergreen) 40

8. 2.8 Proposed Tree Species (Deciduous and

Palm trees)

41

9. 3.1 Location of Ambient Air Quality

Monitoring Stations

47

10. 3.2(a) Ambient air quality w.r.t. PM (2.5) 49

11. 3.2(b) Ambient air Quality w.r.t PM (10) 50

12. 3.2(c ) Ambient air quality w.r.t. SO2 51

13. 3.2(d) Ambient Air Quality w.r.t NOx 52

14. 3.2(e) Ambient air quality w.r.t CO 53

15. 3.2 (f) Ambient Air Quality (January, 2016) 54

16. 3.3 Noise Level Monitoring Stations in the

Study Area

55

17. 3.4 Ambient Quality Standards in Respect of

Noise

56

18. 3.5(a) Hourly Leq Noise Level in the study

Area(Oct 2015)

56

19. 3.5 (b) Hourly Leq Noise Level in the study

Area(Jan 2016)

57

20. 3.6 Location of water sampling sites 58

21. 3.7(a) Ground water quality in study area(Oct

2015)

59

22. 3.7(b) Ground water quality in study area(Nov 60

Page 7: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

2015)

23. 3.7(c) Ground water quality in study area(Dec

2015)

62

24. 3.7(d) Ground water quality in study area(Jan

2016)

63

25. 3.8 Land use pattern of project area within 10

km.

67

26. 3.9 (a) Location of Soil sampling stations 69

27. 3.9 (b) Frequency and Methodology for Soil

Sampling & Monitoring

69

28. 3.9 (c) Soil Quality Data(October, 2015) 70

29. 3.9 (d) Soil Quality Data(January, 2016) 70

30. 3.10 Aspects to be covered in the study for the

Project

71

31. 3.11 Mode of Data Collection & Parameters

Considered During the Survey

72

32. 3.12 List of the Flora recorded of Core Zone 73

33. 3.13 Vegetation of Buffer Zone of Project,

District Raipur

74

34. 3.14 Mammal species present in Buffer Zone

of Project, District Raipur

77

35. 3.15 Reptiles and Lizard Species present in

Buffer Zone

77

36. 3.16 Avian fauna present in Buffer Zone 78

37. 3.17 Amphibian Species Present in Buffer

Zone of Present Project

79

38. 3.18 Land Use Pattern of the Study Area 84

39. 3.19 Demographic Particulars/Population

Details of the Study Area

86

40. 3.20 Occupational Structure of the Study Area 87

41. 4.1 Impact Assessment Matrix 96

42. 4.2 Pollutant Sources 97

43. 4.3 Environment aspects of Industrial project

other than source of Pollution

99

Page 8: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

44. 4.4 Noise Levels 105

45. 4.5 Stack and Emission Details 111

46. 4.6 Meteorological data for worst day 112

47. 4.7 Predicted GLC of All Pollutants 113

48. 6.1 Environment monitoring plan 127

49. 7.1 Activities during construction and

operation along with mitigation measure

130

50. 9.1 Plantation List 156

51. 9.2 Environment management plan during

construction and operation phase

163

52. 10.1 Salient features of the project 171

53. 10.2 Plantation List 175

Page 9: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

LIST OF ANNEXURE

Particular Annexure No.

Minute of meeting Annexure I

ToR Compliance Annexure II

Letter from DTCP Annexure III

Google Earth image of 500m Annexure IV

Toposheet image of 10 & 15 km Annexure V

Land Use Annexure VI

Monitoring Maps Annexure VII

Lab Reports Annexure VIII

Site Plan Annexure IX

Landscape Plan Annexure X

Undertaking for Nala Annexure XI

Dual Plumbing Plan Annexure XII

Lightening Plan Annexure XIII

Storm water Plan Annexure XIV

Land document Annexure XV

Ground water survey report Annexure XVI

AAI NOC Annexure XVII

Water permission Annexure XVIII

Electricity Permission Annexure XIX

Site photograph Annexure XX

Contour Plan and Drainage Map Annexure XXI

Traffic Plan Annexure XXII

SWM Permission Annexure XXIII

Road and Rail Connectivity Map Annexure XXIV

Access to township permission Annexure XXV

Page 10: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 1

CHAPTER 1: INTRODUCTION

1.1 PREAMBLE

Early identification and characterization of critical environmental impacts allow the public and

the government to form a view about the environmental acceptability of a developmental project

and what conditions should apply to mitigate or reduce those risks and impacts.

EIA is a technical exercise, to establish baseline environmental condition to predict

environmental impact, assess their significance and provide recommendations for their

mitigation. The impact assessment covers both construction and operation phase of the

development. The report covers areas such as noise, air quality, ecology, water quality,

hydrology, local architecture, landscape & visual character, sustainability and socio-economics.

Early identification and characterization of critical environmental impacts allow the public and

the Government to form a view about the environmental acceptability of a developmental project

and what conditions should apply to mitigate or reduce those risks and impacts. The report

describes how the project has been improved through the EIA process.

This report has been prepared as per the EIA Notification, 2006 & its amendments, EIA

Guidance Manual for Building, Construction, Group Housing and Area Development projects as

guiding documents.

1.2 GENERAL INFORMATION ON PROJECT

M/s DBH Township LLp has to develop an Integrated Township Project, with Residential Villas

Group Housing, Commercial, Hospital etc located at Village- Banarsi, Ramchandi and Nakti,

Distt-Raipur, Chhattisgarh on a land measuring 237.39 acres. It is mentioned that in the present

phase of development we are seeking Environment clearance for plot, villas, row houses,

community buildings and area development, as the building plan of school, hospital, group

housing and commercial is not yet finalized and developer will take separate Environment

Clearance for these buildings as per Applicability of EIA Notification 2006. However, as per the

proposed FAR details, tentative population and water calculation has been calculated for overall

project.

Page 11: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 2

1.3 ENVIRONMENTAL CLEARANCE PROCESS

As per EIA Notification, 2006 & its amendments, all building construction and area development

projects covering an area of 50 ha or greater and/ or built up area greater than 1,50,000 m2 are

designated as 8 (b) projects and are required to obtain prior environmental clearance from State

Environmental Impact Assessment Authority (SEIAA). The application for environmental

clearance comprises submission of Form 1, Form 1A, and Conceptual Plan along with Proposed

ToR in SEIAA.

The EIA/EMP is prepared on the basis of model ToR will be submitted to the SEAC for

appraisal and due recommendation and suggestions. Following the appraisal of the project to the

satisfaction of the SEAC and SEIAA, Environmental Clearance shall be granted.

Since, the project covers an area of 9,60,680 m2 and a built up area of 1,033,801.19 m

2, the

project is categorized as 8(b) project, under the EIA Notification, 2006 & requires environmental

clearance from the SEIAA, Uttar Pradesh.

As per the requirement of EIA notification, M/s DBH Township LLP had submitted the

application to State Level Environment Impact Assessment Authority (SEIAA) Chhattisgarh

which comprised of Form I, Form IA and Conceptual Plan. The case was placed before SEAC

(State Expert Appraisal Committee), Chhattisgarh for approval of Terms of Reference (ToR).

SEIAA Chhattisgarh approved the ToR during its 54th

meeting for carrying out the EIA/EMP

study.

The present EIA/EMP study has been carried out on the basis of approved ToR. The baseline

was carried out during non-monsoon season Oct to Dec 2015 with an additional study of one

month in January 2016. SEIAA meeting minutes in which ToR has been approved is enclosed as

Annexure-I. The compliance status to the ToR is enclosed as Annexure-II.

1.4 VALIDITY OF ENVIRONMENTAL CLEARANCE

As per the provisions of the EIA Notification, 2006 & its amendments, the environmental

clearance granted is for a period of seven years. This may be extended by a maximum of seven

Page 12: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 3

years, provided an application is submitted to the regulatory authority within the validity period

with updated Form 1, Form 1A and Conceptual Plan and Environmental Impact Assessment

Report.

1.5 POST ENVIRONMENTAL CLEARANCE MONITORING

It shall be mandatory for the project management to submit half-yearly compliance report in

respect of the stipulated prior environmental clearance terms and condition in hard and soft

copies to the regulatory authorities concerned on 1st June and 1

st December of each calendar

year.

All such compliance report submitted by the project management shall be public documents.

Copies of the same shall be given to any person on application to the concerned regulatory

authority.

1.6 TRANSFERABILITY OF ENVIRONMENTAL CLEARANCE

A prior environmental clearance granted for a specific project or activity to an applicant may be

transferred during its validity to another legal person entitled to undertake the project or activity

on application by the transferor or the transferee with a written “no objection” by the transferor,

to, and by the regulatory authority concerned, on the same terms and conditions under which the

prior environmental clearance was initially granted, and for the same validity period.

1.7 GENERIC STRUCTURE OF ENVIRONMENT IMPACT ASSESSMENT

The environmental impact assessment has been carried out to assess the impact of the Group

Housing on various environmental components. The methodologies and findings of the study are

detailed in the EIA Report along with other relevant information under the different chapter

headings as under:

Introduction- provides background information about the project falls in the category as defined

in EIA Notification 2006 and the amendment made thereof based on area statement and the

developers along with the legal environmental requirements of the project. The scope and EIA

methodology adopted in preparation of EIA report have also been described in this chapter.

Page 13: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 4

Project Description– briefly discusses the project features while elaborating on components

bearing environmental consequences.

Description of the Environment– Discusses the baseline data of environmental attributes such

as air, water, soil, noise and socioeconomic environment of the area based on primary and

secondary data collection at the site. Study of existing environment at the site and in the study

area comprising base-line and environmental quality after receive of new development during

construction & operation of the project.

Anticipated Environmental Impacts & Mitigation Measures – Predicts the environmental

impacts of the various components of the project during construction and operation phases to

highlight concern areas requiring mitigation measures. Accordingly, it also suggests controls and

mitigation measures to offset/ minimize the adverse impact while optimizing the positive

benefits from the project.

Analysis of Alternatives (Technology and site) – Explores the alternative sites and plans that

have been considered for the project and evaluates the different scenarios in the environmental

context.

Environmental Monitoring Programme – Outlines a monitoring programme for the different

environmental components during the construction and operation phase for evaluation of the

environmental status of the region against the project development.

Additional Studies – Discusses any study that has been carried out for the purpose of better

understanding of the environmental impacts of the project. It also highlights any pertinent

findings from the study that will aid decision-making.

Project Benefits – Brings out the positive impacts from the project.

Environmental Management Plan – Organizes the suggested mitigation measures to aid

implementation through formulation of performance indicators, reporting structure and

pronounced implementation periods.

Summary & Conclusion – Summarizes the important report findings and concludes on the

environmental sustainability of the project.

Disclosure of Consultants engaged – gives the names of the technical team involved in the

report preparation with accreditation of consultant from the quality council of India.

Page 14: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 5

1.8 PROFILE OF PROJECT PROPONENT

Integrated Township Project is proposed by the M/s. DBH Township LLp.

Name and Contact Address

As the company (M/s DBH Township LLp.) is in process of getting approval from competent

authorities in respect of construction of Integrated Township project now therefore company has

nominated Mr. Sandeep Misra as authorized signatory to represent the company before the

competent authorities for approval purpose.

Mr. Sandeep Misra

Chief Operating Officer

M/s DBH Township LLp

103, Shubham Corporate, Ring Road 1,

Opp. Telibandha Railway Station,

Raipur-492006.

Contact No. 9669004440

Email : [email protected]

ENVIRONMENT CONSULTANT: Grass Roots Research & Creation India (P) Ltd.

F-374-375, Sector-63, Noida-201301

Phone: 0120- 4044630

Email: [email protected]

Website: www.grc-india.com

1.9 BRIEF DESCRIPTION OF PROJECT

1.9.1 Project Background

The project site for Integrated Township Project is located at Village Ramchandi, Banarsi and

Nakti on a land measuring 237.390 acres. The project will be developed over net planning area

of 9,39,650 sq.m& built up area 1,033,801.19 sq.m. The coordinates of the site are 21º 11’

50.12’’N &81º 44’ 20.40’’E. There is neither any litigation (s) pending against the project and /

Page 15: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 6

or any directions or order passed by any court of law/any statutory authority against the project

that can be detailed out.

All reputed and accredited consultants are involved in the project providing their inputs and

expertise altogether required for a proper and authentic Environmental Impact Assessment study.

A proposal consisting of Form-I, Form IA and Conceptual plan was submitted.

1.9.2Site Description

The project site is well connected through road, rail & air network. The project site is well

connected through Mana Road and Naya Raipur Marg. The nearest highway is NH-6 which is

4.10 km (NNE) away from project site. The nearest railway station being Telibandha railway

station, about 7.99 km (NW) away from the project site. The nearest airport is Swami

Vivekananda Airport, at 1.46 km (S) from the project site.

1.10 APPLICABLE LEGAL REQUIREMENTS

Under the Environment Impact Assessment Notification, 2006, the project will obtain

environment clearance. The project shall abide by all applicable provisions of the Environment

Protection Act, 1986 and rules formed there under. As per the Air (Prevention & Control of

Pollution) Act 1981, Water (Prevention & Control of Pollution) Act 1974, and Hazardous

Wastes (Management, and Handling) Rules, 1989 and its amendments the project shall obtain

No Objection Certificate from Uttar Pradesh Pollution Control Board (UPPCB) and continue to

obtain yearly Consent for Operation from the same during the operation period.

1.11 NEED OF THE EIA STUDY

The project activities must co-exist in harmony with its surrounding environment, to reduce the

environmental impact, which is likely to arise during various project activities. To safeguard the

environment from adverse effects of developmental activities, the MoEF has issued regulations

to optimize the use of natural resources and protect environment for sustainable development. As

per the MoEF notification dated 14.09.06, Environmental Clearance is mandatory for any

construction projects with built-up area of more than 20,000 m2

and EIA/EMP will be carried out

for the Projects covering an area of 50 ha and/ or built up area greater than 1,50,000 m2.

Page 16: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 7

However, the built-up area of the project is 1,033,801.19 m2 which is more than 1,50,000 m

2 and

comes under category 8 (b). Hence, an Environment Impact Assessment Report has been

considered mandatory for the project. The study would facilitate M/s. AR Landcraft Pvt. Ltd. to

obtain Environmental Clearance (EC) from the SEIAA, Uttar Pradesh.

1.12 SCOPE OF STUDY

The scope of the study is:-

Compilation of baseline environmental and social scenario of the study area within a

radius of 10 km around the project site based on field studies covering one season (except

monsoon) i.e. March-May 2015 and secondary data collection;

Identification, prediction and evaluation of potential environmental impacts expected

during the construction and operation phase of the project;

Preparation of mitigation measures, Environmental Management Plan (EMP) and

Monitoring Programme for implementation of suggested mitigation measures.

1.13 STUDY METHODOLOGY

The approach followed by Grass Roots Research & Creation India Pvt. Ltd. in conducting the

EIA study is according to the applicable regulatory framework. The main stages followed are

described below:

Stage -I

Review of design and operational information of the Project through various

plans, drawing and identification of sources of major potential impacts.

Stage -II

An initial review of the project site and status of the physical environment around

the project site vicinity;

Understanding regarding project design and operation as well as macro

environmental aspects. The major issues needed to be addressed with due care were identified

and monitoring plan for the environmental baseline was prepared;

Page 17: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 8

Baseline environmental assessment was conducted within the study area of 10 km

radius around the project site;

Intense monitoring and primary field data collection of environmental

components viz. Micro-Meteorological Condition, Ambient Air Quality, Water (Surface and

Ground water) use and its Quality, Soil Quality, Noise Level, Traffic Volume etc.;

Survey study was carried out in the study area to assess the status of flora & fauna

and socio-economic profile of the study area; and

Information was also collected through Secondary sources like Department of

Census, Local and City Offices, National Institutions (Survey of India, National Information

Centre etc.), District Head Quarters and other Government Offices etc. as well relevant

Published Literatures.

Stage –III

Compilation of the Environmental Baseline of the Study Area.

Stage –IV

Assessment of Environmental Impacts by predicting the scale and extent of changes

associated with the project and their subsequent effects on the environment against the

environmental baseline condition, and evaluating the significance of such impacts against

accepted criteria.

Stage -V

Identification and preparation of measures to mitigate significant impacts (evaluated from

the impact prediction process) by proposing applicable alternatives and control measures; and

Finally, development of appropriate Environmental Management and Monitoring Plan to

audit and ensure that the proposed mitigation measures are in place and effective.

1.14 EIA METHODOLOGY

The project may have impact on environment attributes such as air, water, noise level, soil

quality, hydrology and drainage pattern and meteorology of surrounding environment due to on-

going project. In assessing the environmental impact, collection, collation and interpretation of

baseline data is of prime importance. Long term data sets help us to get better assessment. The

objective of EIA is to predict and address potential environmental problems/concerns at an early

Page 18: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 1

M/s DBH Township LLP. Page 9

stage of project planning and design as the infrastructure development has adverse impact on

environment. EIA/EMP assists in the decision making process by identifying the key impacts/

issues as a results of the activities and formulating mitigation measures, leading to an

improvement in environmental quality.

In order to achieve these objectives, the following procedures have been adopted for the study:-

Collection, collation and analysis of regional and local environmental status for various

environmental attributes (like topography, geology, ambient air quality, meteorology, water

quality, noise level, soil characteristics and land use, transport, settlement status and socio

economic aspects etc.) to assess base-line status of the project.

Identification of environmental impacts leads to assessment of impact on the base-line

status which will decide the feasibility of the project and suggests mitigation measures to control

pollution with respect to standards applicable for the area.

Evaluation of impacts leading to preparation of environmental management and

monitoring plan.

Addition study will cover disaster management plan during construction and operation

phase of the project.

Environment Monitoring Plan and annual budget – one time and recurring cost of EMP

will be discussed in Separate chapter.

This report is based on scientific principles and professional judgment with resultant subjective

interpretation. Professional judgments expressed herein are based on the available data and

information.

Page 19: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 10

CHAPTER 2: PROJECT DESCRIPTION

2.1 INTRODUCTION

The goal of the project is to develop the Integrated Township Project. The project will generate

employment opportunities for both skilled and unskilled workers in the vicinity, which will

produce multiple effects on the life and economy of the local people. The project will not have

any adverse effect on the land use pattern. The project has been planned to come up in Layer II

of Naya Raipur Development Area, which is permitted for Integrated Township Project. Letter

from Directorate of Town and Country Planning stating same is enclosed as Annexure III.

2.2 PROJECT LOCATION AND SITE SURROUNDINGS

2.2.1 Location

The Integrated Township Project is located at Village Banarsi, Ramchandi and Nakti, Distt.

Raipur, Chhattisgarh on a land measuring 237.39 acres. The coordinates of the site are 21º 11’

50.12’’N & 81º 44’ 20.40’’E. Google earth image of 500 m and Toposheet map of 10+15 km

showing location of project site and surroundings, are enclosed as Annexure IV & V

respectively. The landuse plan of the study area is enclosed as Annexure VI.

Connectivity

The site has good connectivity with various transport facilities as shown in table below.

Table 2.1: Connectivity & Locational Features

S.

No.

Features Description Distance &

Direction

1. Nearest Railway

Station

Telibandha railway station, 7.99 km (NW)

2. Nearest Airport Swami Vivekananda Airport 1.46 km (S)

3. Nearest Road NH-6 4.10 km (NNE)

Page 20: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 11

S.

No.

Features Description Distance &

Direction

4. Nearest School Vivekanand Higher Secondary

School

2.26 km; West

5. Nearest Densely

Populated area

Barauda 2.06 km (WSW)

2.3 BRIEF PROJECT FEATURES

The project will be spread over an area of 9,60,680 m2(or 237.39 acres)with a net planning area

of 9,18,600 m2(or 226.99 acres). The area statement of the project is given in Table 2.2.

Table 2.2: Detailed Area Statement

S.

No.

Particulars Area (in m2) Area (in acres)

1. Total Planning Area 9,60,680 237.390

2. EWS Area 21,050 5.44

3. Area under VIP Road Expansion 2,310.00 0.57

4. Nala Clearance Area 18,720 4.62

5. Net Planning Area 9,18,600 226.99

a) Area under Residential

Group Housing

Plot, odd shaped plots, row

houses, villas

4,49,038.80

1,58,397.61

2,90,641.19

b) Area under Commercial

Commercial Office

Commercial CBD/Hotel/SCO

66,148.54

36,420.15

29,728.39

c) Area under Public semi public facility

Speciality Hospital & Nursing

Home

Educational (Nursery, Primary &

45,949.59

11,348.84

Page 21: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 12

High School)

Club / Community / Sports

Facilities

Community Buildings

16,734.44

14,627.31

3,239

d) Road and Utility 2,29,650

e) Area under Green 91860.00

f) Area under Golf course 35953.07

6. Permissible Ground Coverage 2,59,231.071

a) Residential

Group Housing(@30%)

Plot, odd shaped plots, row

houses, villas(@60%)

47,519.283

1,74,383.634

b) Commercial

Commercial Office(@40%)

Commercial

CBD/Hotel/SCO(@25%)

14,568.06

7,432.09

c) Public Semi-public facility

Speciality Hospital & Nursing

Home (25%)

Educational (Nursery, Primary &

High School)(@30%)

Club / Community / Sports

Facilities(@40%)

Community Building(@50%)

2,837.25

5,020.33

5,850.924

1,619.5

7. Proposed Ground Coverage 2,47,125.52

a) Residential

Group Housing(@25.51%)

Plot, odd shaped plots, row

40,417.46

1,74,383.4

Page 22: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 13

houses, villas(@59.99%)

b) Commercial

Commercial Office(@33.32%)

Commercial

CBD/Hotel/SCO(@20.62%)

12,135.55

6,132.15

c) Public semi public facility

Speciality Hospital & Nursing

Home (@22.19%)

Educational (Nursery, Primary &

High School) (@26.50%)

Club / Community / Sports

Facilities(@37.48%)

Community Buildings(@49.97%)

2,519.06

4,435.84

5,483.32

1,618.74

8. Permissible FAR 1,046,832.553

a) Residential

Group Housing(@3)

Plot, odd shaped plots, row

houses, villas(@1.2)

4,75,192.83

3,48,769.428

b) Commercial

Commercial Office(@3)

Commercial

CBD/Hotel/SCO(@1.5)

1,09,260.45

44,592.585

c) Public-Semi Public facilties

Speciality Hospital & Nursing

Home (@1.5)

Educational (Nursery, Primary &

High School) (@1)

17,023.26

16,734.44

Page 23: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 14

Club / Community / Sports

Facilities(@0.85)

Community Buildings(@0.50)

12,590.06

1,619.50

d) EWS 21,050

9. Proposed FAR 10,31,676.19

1. Plots

Cluster 1 Plot size 3000(@1.2)

Cluster 2 Plot size 4005 (@1.2)

Cluster 3 Plot size 5994 and 7200

(@1.1)

Cluster 3 Plot size 18000 (@1)

21,405

28,129

31,624

25,084

2. Detached Villas

Cluster 1 Plot size 3000 (@1.2)

Cluster 2 Plot size 4005 (@1.2)

Cluster 3 Plot size 5994 (@1.1)

Cluster 3 and 6 Plot size

7200(@1.1)

39,799

28,129

16,539

53,712

3. Semi Detached

Cluster 4 and 5 Plot size

1800(@1.2)

Cluster 4 Plot size 2412 (@1.2)

31,706

30,923

4. Row House

Cluster 5(@1.2)

27,440

Page 24: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 15

5. Group Housing(@ 3)

Group Housing 1

Group Housing 2

Group Housing 3

Group Housing 4

2,40,280.79

43,291.05

1,51,950.26

40485.7

6. Commercial

Office

Hotel

Retail

109219.87

23351.46

21225.19

7. PSP

Hospital & Nursing Home

(@1.49)

School(@0.99)

Club (5 no.) (@0.75)

Community Building

(@0.49)

17,017.6

16727.94

10967

1619.33

8. EWS Area (@1) 21050

10. Service Area 2125

11. Built-up Area 10,33,801.19

2.4 POPULATION DETAILS

The residential population of the project will be 22,101 persons and the population for the

commercial block is assumed to be 9,515 persons and population for other facilities is assumed

to be 8,803 persons. So, the total population for the project is 43,319 persons.

The detailed population breakup is given below in the following Table 2.3.

Table 2.3: Population Break up

S.

No.

Type of Usage No. of

Plots/Area/Unit

PPU Total

Population

Page 25: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 16

A. Residential Population 22101

1. Plots 189 5 945

2. Semi Detached Villas 273 5 1365

3. Detached Villas 282 5 1410

4. Row Houses 183 5 915

5. Group Housing 2712 5 13,560

6. EWS 1302 3 3906

B. Commercial Population 9,515

1. Office

Staff (@80%)

1,09,219.90 m2 80% of 10922

(@1person/10sq.m)

8741

2. Mall and retail

Staff (@20%)

21225.19 m2 20% of 3033 @1

person/ 7sq.m of

covered area

607

3. Hotel

Staff (@10%)

23351.46m2 10% of 1667 @1

person/ 14 sq. m of

covered area

167

C. Public and semi Public Utilities 8,803

Hospital and Nursing Home

In patient

Out patient

Attendant with in

patient

Visitor with out-patient

Staff (including

Doctors, Nurses,

Maintenance/Housekee

ping staff)

17,017.60 m2 @1 person/ 8sq.m

of covered area

300

800

300

428

300

School and nursery school

(Staff & Student)

16,727.94 m2 @1 person/ 3sq.m

of covered area

5,578

Page 26: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 17

Club

Staff (@10%)

10967 m2

10% of 10970 @1

person/ 1sq.m of

covered area

1,097

D Maintenance Staff 900

E Visitor 2000

Total Population 43,319

2.5 POWER SUPPLY

The power shall be supplied by Chhattisgarh State Power Distribution Company Limited. Total

electricity requirement for the Township project is 39.5 MVA.

There is provision of 4 no. of DG sets of total 1, 270 kVA (1 X 320 kVA + 1 X 625 kVA + 1 X

125 kVA + 1 X 200 kVA) capacity for power back up to common services of individual clusters

only which shall be STP , WTP , Street lights and Clubs. DG sets shall be air/Radiator cooled

type and shall be provided in weather proof acoustic enclosure and shall be located in open

spaces. DG sets shall be with AMF operation facility.

2.6 REQUIREMENT OF NATURAL RESOURCES AND THEIR SOURCES

It is proposed to use environment friendly construction materials for the project that are locally

available to reduce concerns related to transportation of materials as well as achieve cost-

effectiveness.

It is proposed to use fly ash mixed cement, and bricks for the construction of the project. The use

of timber will be minimal with the provision of aluminum frames for windows. Paints with low

VOC and no ammonia are proposed to be used for all residential buildings.

All means of reducing water consumption during project construction will be undertaken through

the use of low water consuming material.

2.7 DESIGN CONSIDERATION

The project structures have been designed after due study of the local architecture. The project

area is largely undeveloped and does not bear any significant architectural aspect. Likewise, the

Page 27: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 18

building has been planned with modern design and facilities with large stretches of open spaces.

The following standards and bye-laws shall be followed for designing the various units:

Relevant IS Codes of Practice Published by the bureau of Indian standards.

Manuals on Sewerage and Water issued by the Ministry of Urban Development New

Delhi.

National Building Code (2005).

Building bye laws–Local Municipal Corporation bye-laws.

Good Engineering Practice.

2.8 PARKING

Adequate provision will be made for car/vehicle parking at the project site by plot owners.

Details parking calculation are given below:

Parking Required:

As per Chhattisgarh bye-laws

For Residential = 1.67 ECS/100 sq. m of floor area

= 810,497.8*1.67/100

= 13535 ECS

For Commercial = 1.67 ECS/100 sq. m of floor area

= 153,796.52*1.67/100

= 2569 ECS

For Hospital and Nursing home = 1.67 ECS/100 sq. m of floor area

=17,017.6*1.67/100

= 284 ECS

For School =1 ECS/100 sq. m of floor area

= 16727.94/100

= 167 ECS

Total Parking required = (13535+2569+284+167) ECS

= 16,555 ECS

Parking Proposed:

Page 28: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 19

Plot owners will provide the parking within the plots. Group Housing, Commercial, Hospital,

Hotel etc land will be sold to the developers and they will provide their separate parking as per

norms.

2.9 WATER SUPPLY AND SEWAGE TREATMENT PLAN

The total water requirement is approx. 4752 KLD, out of which total domestic water requirement

is 3,986 KLD, say 4.0 MLD. The fresh water requirement is approx. 2,790 KLD which is 70% of

the domestic water demand. The daily water requirement calculation is given below in Table

2.4:

Table 2.4:Calculation For Daily Water Requirement

S. No. Description Total

Occupancy

Rate of water

demand (lpcd)

Total Water

Requirement

(KLD)

A. Domestic Water Demand

1. Residential

General(Plots, Semi Detached

Villas, Detached Villas, Row

Houses, Group Housing, EWS

)

22,101 135 lpcd 2,983.64

2. Commercial

Office

Staff (@80%)

8741

45 lpcd

393.34

Mall and retail

Staff (@20%)

607

45 lpcd

27.31

Hotel

167

180 lpcd

30.06

3. Public Semi Public Facilities

Hospital and Nursing Home

In patient

2,128

300

450 lpcd

135

Page 29: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 20

Out patient

Attendent with in

patient

Visitor with out patient

Staff (including

Doctors, Nurses,

Maintenance/Housekee

ping staff)

800

300

428

300

15 lpcd

45 lpcd

15 lpcd

45 lpcd

12

13.50

6.42

13.50

School and nursery school

(Staff & Student)

5,578 45 lpcd 251.01

Club

Staff

1097

45 lpcd

49.36

4. Maintenance Staff 900 45 lpcd 40.50

5. Visitor 2000 15 lpcd 30.00

Total Domestic Water Requirement 3,985.64 KLD

Say 3,986 KLD

B. Horticulture and Landscape

Development

766 KLD

Total Water Requirement 4,752 KLD

Table 2.5: Wastewater Calculations

Domestic Water Requirement 3,986 KLD

Fresh (70% of domestic) 2,790 KLD

Flushing (30% of domestic) 1,196 KLD

Waste Water Generated for STP (90% of Domestic

consumption) 3,587 KLD

2.9.1 Freshwater Requirement

Water Balance

Page 30: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 21

It is expected that the project will generate approx 3587 KLD of wastewater which will be

treated in 2 STP of total capacity 3720 KLD*

STP 1 (8 x 325) 2600 KLD MBBR: For 461 Plots, 2 Club, 2 Nursery School, Nursing Home,

Hotel, Group Housing.

STP 2 (4 x 280) 1120 KLD MBBR: For 466 Plots, 2 Club, 1 VIP Club, Community Building, 1

Nursery School, High and Primary School, Retail and Office and Hospital.

EWS will have separate services.

Treated water will be recycled for Landscaping and Flushing The water balance diagram is as

follows:

Figure 2.1(a): Water Balance Diagram (Rainy season)

Recycled Water

FRESH WATER

(2790 KLD)

(70% of Domestic water)

SULLAGE GENERATED

3,587 KLD

TOTAL STP CAPACITY 3720

KLD (2600+1120)*

HORTICULTURE AND

GOLF COURSE

(766 KLD)

@ 90%

@ 80 % of

3587 KLD=

2,869 KLD

390 KLD

907 KLD

Waste Water

1196

KLD

FLUSHING

(1196 KLD)

(30% of Domestic water)

NEARBY CONSTRUCTION

ACTIVITIES/IRRIGATION/N

ALA

(907 KLD)

766 KLD

Domestic water

(3986 KLD)

Page 31: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 22

Since air-cooled DG set will be used, there will be no requirement of water for DG set cooling.

Therefore calculation for DG Cooling has not been considered for average water requirement

throughout the year.

Water Balance for Rainy season

During rainy season there shall be no demand of water for horticulture and thus this excess

amount of water will be used in nearby construction activity. Only emergency discharge will be

made to sewer.

Figure 2.1(b): Water Balance Diagram (Rainy season)

Wastewater treatment and re-use

The wastewater generated in the project will be about 3587 KLD (as calculated) and whole of

wastewater will be treated in a well designed Sewage Treatment Plant of total capacity 3,720

KLD).

Recycled Water

FRESH WATER

(2790 KLD)

(70% of Domestic water)

SULLAGE GENERATED

3,587 KLD

TOTAL STP CAPACITY 3720

KLD (2600+1120)*

@ 90%

@ 80 % of

3587 KLD=

2,869 KLD

390 KLD

1673 KLD

Waste Water

1196

KLD

FLUSHING

(1196 KLD)

(30% of Domestic water)

NEARBY CONSTRUCTION

ACTIVITIES/IRRIGATION/N

ALA

(1673 KLD)

Domestic water

(3986 KLD)

Page 32: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 23

The proposed STP within the project site will be based on MBBR technology which will be

installed by the proponent to take care of the discharge from the project. The expected recovery

of recycled water is approx. 80% of the wastewater and during non rainy season 1962 KLD

treated water will be used for flushing, and horticulture and extra 907 KLD will be used in

nearby construction, Irrigation, Nala etc. During rainy season (since there is no requirement of

treated water for horticulture) will be used in nearby construction, Irrigation, Nala.

2.9.2 Sewerage System

MBBR TECHNOLOGY

An external sewage network shall collect the sewage from all units, and flow by gravity to the

sewage treatment plant.

Following are the benefits of providing the Sewage Treatment Plant in the present

circumstances:

Reduced net daily water requirements, source for Horticultural purposes by utilization of the

treated Sullage.

Reduced dependence on the public utilities for water supply and sewerage systems.

Sludge generated from the Sewage Treatment Plant shall be rich in organic content and an

excellent fertilizer for horticultural purposes.

a. Sullage Details

(a) Daily load : 3,587 KLD

(b)Duration of flow to STP : 24 hours

(c) Temperature : Maximum 32oC

(d)pH : 7.5 to 8.5

(e) Colour : Mild

(f) T.S.S. (mg/l) : 100-400 mg/l

(g)BOD5 (mg/l) : 250-450 mg/l

(h)COD (mg/l) : 600-800 mg/l

b. Final discharge characteristics

(a)pH : 6.5 to 8.5

Page 33: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 24

(b) B.O.D. : <10 mg/l

(c) C.O.D. : <60 mg/l

(d) Total Suspended Solids : <20 mg/l

c. Treatment Technology

Moving bed biofilm reactor technology is based on the principle of attached growth process.

Raw sewage will be collected under gravity into the equalization tank after allowing to pass

through the bar screen. Screens will be provided in screen chambers and it will be manually

cleaned by going down to a platform. The bar screen, by removing coarse solids from the sewage

help in protecting the raw sewage pump.

Fully submersible centrifugal non clog sewage handling pump will be provided in the collection

cum equalization tank to pump the collected sullage to the next MBBR tanks. Automatic level

controller will be provided in the tank to turn the pump off at the low water level in the tank and

to start the pump when water level is high automatically. Air will be introduced in this tank to

prevent any potential foul smell problem & to provide the mixing of sullage to avoid the

sedimentation of solids in this tank. Air Grid used for aeration purpose shall be non-clog.

The sewage collected in equalization tank is pumped the moving bed bioreactor. There shall be

two nos. of bioreactors in series for the efficient working and removal of BODs for the required

retention time. The process inside the moving bed bioreactors consists of adding small

cylindrical-shaped polyethylene/polypropylene carrier elements in aerated basins to support

biofilm growth. The small cylinders are provided with a cross inside the cylinder and

longitudinal fins on the outside. The biofilm carriers are maintained in the reactor by the use of a

perforated plate with appropriate slot at the tank outlet. Air agitation or mixers are applied in a

manner to continuously circulate the packing. The packing may fill 25 to 50 percent of the tank

volume. Specific surface area of the packing is about 450-500m2/m

3 of bulk packing volume.

The sullage from first bioreactor flows by gravity through the perforated plate/mesh to the next

bioreactor kept in series. Inside the bioreactors, aerobic bacteria grow in an attached growth from

around the moving plastic media inside the reactors. The bacteria have to reduce BOD & COD

Page 34: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 25

of sullage in the presence of oxygen provided through the air grids located at the bottom of the

reactors. The Process does not require any return activated sludge flow or backwashing.

From the bio-reactors, the effluent passes by gravity into the clarifier (Tube Settling Tank).

Clarifier will be a hopper bottom sedimentation tank provided with appropriate size PVC tube

deck media. The suspended solids will settle at the bottom of the tank & clear supernatant will

overflow to filter feed tank through outlet launder. The collected sludge at bottom shall be

transferred through pumps to sludge holding tank.

The clear supernatant after clarifier will be collected in to filter feed tank. This tank will act as

housing tank for filter feed pumps. The clarified & dis-infected water will be then fed to

filtration unit.

Filtration unit consisting of Dual Media sand filter, activated carbon filter and ultra filtration

system (optional) will remove the residual impurities such as odor/color, suspended solids,

BOD/COD. The treated water after the filtration unit will be collected in Irrigation cum Flushing

water storage tank from where it is transferred to flushing water tank at terrace & Irrigation

System.

Excess sludge from the bottom of the settling tank will be removed and transferred to sludge

holding tank. Air grid shall be provided in this tank to avoid conversion into anaerobic

conditions, thickening of sludge and keep sludge in homogenous condition. The digested &

thickened sludge shall be further thickened through Sludge Dewatering System (Filter press with

screw pump) and disposed off periodically through closed tanker or can be reused as manure.

Page 35: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 26

Figure 2.2: Schematic Diagram of STP

Sewer System

The alignment and slope of the sewer line will follow the road network, drains or natural ground

surface and will be connected to the trunk sewers. The discharge point will be a treatment plant,

a pumping station, a water course or an intercepting sewer. Pumping stations would be provided

at places where the natural slope of the terrain is insufficient to permit gravity flow or the cost of

excavation is uneconomical to do the same.

2.9.3 Re-Use of Treated Wastewater

The domestic sewage will be treated through proposed Sewage Treatment Plant of appropriate

total capacity i.e. 3,720 KLD within the project premises. The recycled water from proposed

Sewage Treatment Plant will be used for the purpose flushing and horticulture.

2.10 RAINWATER HARVESTING

In township development with mixed use of other buildings, each buildings (Plots, Group

Housing, Commercial, Public and semi public buildings) should be having their own self

sustainable design for storm water system with adequate nos, of RWH structure as per norms. At

Page 36: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 27

the township level we will take care of paved green, roads and any surplus discharge from other

buildings in case sudden downpour. That has been considered 20% of their total runoff.

Rain water harvesting has been catered to and designed as per the guideline of CGWA for the

green paved and surplus discharge from other buildings . Peak hourly rainfall has been

considered as 45 mm/hr. The effective diameter and depth of a Recharge pit 3.20 m, and 2.40 m,

respectively is constructed for recharging the water

The bottom of the recharge structure will be kept 5 m above this level. At the bottom of the

recharge well, a filter media is provided to avoid choking of the recharge bore. Design

specifications of the rain water harvesting plan are as follows:

All gutter ends will be fitted with a wire mesh screen and a first flush device would be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic bags and

paper pieces will get arrested by the mesh at the terrace outlet and to prevent contamination by

ensuring that the runoff from the first 10-20 minutes of rainfall is flushed off.

No sewage or wastewater would be admitted into the system.

No wastewater from areas likely to have oil, grease, or other pollutants has been connected to

the system.

2.10.1 Storm Water Drainage

The storm water collection system for the premises shall be self-sufficient to avoid any

collection/stagnation and flooding of water. The amount of storm water run-off depends upon

many factors such as intensity and duration of precipitation, characteristics of the tributary area

and the time required for such flow to reach the drains. The drains shall be located near the

carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run

off from roads shall flow towards the drains. Therefore, it has been calculated to provide 15

infilteration wells and surplus rainwater will be disposed in Green areas developed as kachha

pond or water body.

1. Since the existing topography is congenial to surface disposal, a network of storm water

pipe drains is planned adjacent to roads.

Page 37: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 28

2. Storm water system consists of pipe drain, catch basins and seepage pits at regular

intervals for rain water harvesting and ground water recharging.

3. Peak Hourly Rainfall of 45 mm/hr shall be considered for designing the storm water

drainage system.

4. All the other building in township will have their self sufficient RWH Structure.

Rain Water Harvesting

The India Meteorological Department (IMD) designates four official seasons.

Winter

Summer or pre-monsoon

Monsoon or rainy season

Post-monsoon season

Page 38: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 29

Figure 2.3: Annual Rainfall Pattern in India

From above map it is concluded that our site i.e. Raipur, Chhattisgarh will come in the region

where annual rainfall varies between 60 to 100 days, whereas rainfall in the winter season will be

in between 1 to 5 cm as shown in Figure 2.5.

Page 39: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 30

Figure 2.4: Rainfall Pattern in India during Winter Season

Rainfall at the site during pre monsoon season is found to be in between 5 to 10 cm as shown in

Fig 2.6

Page 40: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 31

Figure 2.5: Rainfall Pattern in India during Pre Monsoon Season

Rainfall at the site during monsoon season is found to be in between 100 to 150 cm as shown in

Fig 2.7

Page 41: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 32

Figure 2.6: Rainfall Pattern in India during Monsoon Season

Rainfall at the site during post monsoon season is found to be in between 5 to 10 cm as shown in

Fig 2.8

Page 42: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 33

Figure 2.7: Rainfall Pattern in India during Post Monsoon Season

From above rainfall pattern it is clear that over all rainfall at the site is found to be very less, so it

explains soil erosion will not be much significantly at the site. Although M/s DBH Township

LLp. will take all preventive measures to prevent soil erosion. To conserve water, a rainwater

harvesting system is proposed across the project. Since the existing topography is congenial to

Page 43: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 34

surface disposal, a network of storm water pipe drains is planned adjacent to roads. All building

roof water will be brought down through rain water pipes and connected to the storm water

drains.

Summary of Seasonal - Rainfall (cm)

Season Rainfall (cm)

Winter - 1-5 cm

Summer - 5-10 cm

Monsoon - 100-150 cm

Post-monsoon - 5-10 cm

2.10.2 Rain Water Harvesting

Calculations for Infiltration Wells

Rainfall Intensity= 0.04500 m/hr

Rainfall Catchment from Township road Road/Greens etc.

a) Roof Top Area = 0.00m2

b) Road Area/Paved Area =229650.00 m2

c) Proposed Greens Area= 127799.72 m2

1 For Roof/Terrace only

(i) Average Runoff co-efficient for terraces and other built-up areas.= 0.85

(ii) Area-1 considered (For Terrace/Roof only) = 0.00 m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately

(Total Area x 0.85 x 0.045) = 0.00 m3/hr

2 For landscaped, green and other open areas.

(i) Average Runoff co-efficient for landscaped, green and other open areas. = 0.20

(ii) Area - 2 considered =127799.72m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately

(Total Area x 0.2 x 0.045) =1150.20 m3/hr

3 For road & paved areas:

(i) Average Runoff co-efficient for landscaped, green and other open areas. = 0.65

(ii) Area-3 considered =229650.00m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately (Total

Area x 0.65 x 0.045) =6717.26 m3/hr

Page 44: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 35

4. Total Volume Generated per hour (1+2+3) =7867.46m3/hr

Rainfall catchment for buildings

a) Plots =7454.90 m3/hr

b) Group Housings =4034.62m3/hr

c) Commercial =1697.40m3/hr

d) Public and Semi Public Buildings =1191.39m3/hr

Total Catchment =14378.31 m3/hr

Assuming above buildings should have their own self-suffient rain water harvesting system as

per norms. In case of sudden downpour, external storm water services will take care of 10% of

their catchment =20%

5. Grand total discharge to external storm water drainage network generated per hour

= 2875.66m3/hr

6. Grand total generated per hour (4+5) =10743.12m3/hr

For 15 minute holding capacity = 2685.78m3

Size of the Wells

Dia of Recharge well =3.20 m

Depth of Recharge well =2.40 m

Volume of 1 Infiltration well =19.29m3

Absorption capacity of Recharge pit @ 30% of yield capacity of bore well

Yield capacity of bore well (Assumed) =15.00 m3/hr

absorption (0.30) = 4.5

Absorption capacity in 1/4 hr = 1.13 m3

Total capacity of Recharge Pit (Volume of 1 filteration well+ Absorption capacity 15 mins)

=20.42 m3

Number of Infiltration Wells Provided =15.00

Total Rainwater holding/Absorbing capacity =306.26 m3

Surplus Rainwater Disposal to water body near golf course and nala as marked in

drawings =2379.52 m3

Area of proposed water body near golf course Green 2 = 2028 m

Depth of water body to assumed to hold surplus rain water disposal = 1.15 m

Volume of rain water stored in water body = 2332.20 m3

Excess rainwater disposal to both nala = 47.32 m3

Page 45: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 36

Figure 2.8: Typical Design of RWH pit

2.11 SOLID WASTE MANAGEMENT

Waste quantification is carried out to estimate the amount of waste generated by different

activities in the project site. For estimation of quantity of solid waste generated from the project,

waste generation factors are selected for each activity based on case studies available for similar

type of projects, assumptions and past experience.

2.11.1 Solid Waste Generation

Solid waste generation rate as 0.25 Kg/Capita/day for staff and 0.15 Kg/Capita/day for visitors

and 0.50 Kg/Capita/day for residents have been considered which generates about 16,462 kg/day

for the entire area. Collection systems comprise waste containers at ground floor of each tower,

the solid waste collected in garbage room shall be disposed to the appropriate site as per

municipal authority. The solid waste so generated shall be first segregated as plastic, glass, paper

Page 46: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 37

and other waste separately and disposed off as per MSW Rules, 2000. STP sludge will be used as

manure.

Table 2.6: Solid Waste Generation

S. No. Category kg per capita per day Waste generated

(kg/day)

1. Residential

Residents 22,[email protected] kg/day 11,050.5

2. Commercial

Staff 9,[email protected] kg/day 2,337

Hotel 167 @0.50 kg/day 83.5

3. Public Semi Public Facilities

Hospital

In-patient

Out patient

Attendant with

in patient.

Visitor with

out-patient

Staff

300@ 1.5 kg/day

800@ 0.15 kg/day

300@ 0.25 kg/day

428@ 0.15 kg/day

300@ 0.25 kg/day

450

120

75

64.2

75

School

Student and

staff of school

5578@ 0.25 kg/day

1,394.50

Club

Staff

1097@ 0.25 kg/day

274.25

4. Maintenance Staff [email protected] kg/day 225

5. Visitor [email protected] kg/day 300

Page 47: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 38

Solid Waste

Construction

Waste

Construction waste,

Broken Bricks,

Waste Plaster

Empty Cement

Bags

Used in re-filling,

raising site level

Road making

Excavated Soil

Top soil conserved for landscaping,

balance used in re-

filling

6. Landscape waste @ 0.2 kg/acre/day 13.62 kg

TOTAL SOLID WASTE GENERATED 16,462.32 kg/day say

16,462 kg/day

*25% of Hospital waste (784.2) i.e., 196.05 kg will be biomedical waste.

2.11.2 Solid Waste Disposal

Project will adopt a systematic approach for solid waste collection and disposal. Solid waste

generated from the project will be collected properly and will manage as per MSW rule, 2000.

The solid waste so generated shall be first segregated as plastic, glass, paper and other waste

separately and disposed off as per MSW Rules, 2000. The inert solid waste will be transported to

a govt. designated landfill site. Used oil will be sold off to authorized recyclers while there will

be buy-back arrangements with the supplier for DG Set batteries. The following diagrams will

briefly describe the solid waste Management process in the construction as well as during

operation phase.

Figure 2.9: Solid Waste Management During Construction Phase

Page 48: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 39

Figure 2.10: Solid Waste Management During Operational Phase

2.11.3 E-Waste Management & Disposal

"E-waste" is a popular, informal name for electronic products nearing the end of their "useful

life”. E-wastes are considered dangerous, as certain components of some electronic products

contain materials that are hazardous, depending on their condition and density. The hazardous

content of these materials pose a threat to human health and environment. Discarded computers,

televisions, VCRs, stereos, copiers, electric lamps, cell phones, audio equipment and batteries if

improperly disposed can leach lead and other substances into soil and groundwater. Many of

these products can be reused, refurbished, or recycled in an environmentally sound manner so

that they are less harmful to the ecosystem. Reducing e-waste requires that we reduce, reuse,

recycle and recover. The goal is nothing less than zero land fill. Network of scrap dealers will be

motivated to procure from door to door for the smaller quantities.

Only hazardous waste to be generated from project site is used oil from D. G. sets. Used oil will

be stored in HDPE containers and will be disposed as per hazardous waste (Management,

Handling and trans-boundary movement) rules, 2008.

Solid Waste

Recyclable Non- Recyclable

Biodegradable

Waste

Blue Bins

Organic wasteConverter

Dark grey Bins

Final disposal through Govt. approved agency

Non-Biodegradable Waste

Green Bins

Final disposal through a Govt. approved agency

torecycling industry Manure

Page 49: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 40

2.12 LANDSCAPE

Approx 91,860 m2 i.e. 10% of the net planning area (excluding EWS area) will be area under

greenery plantation within the residential blocks and along the roads. Evergreen tall and

ornamental trees like Alsotonia scholaris,Ficus benjamina, Ficus lyrata, Terminalia tomentosa

have been proposed to be planted inside the premises. Parks and golf course will also be

developed by the project proponent.

Peripheral Plantation:

Length: 15,859.40 m2

Width: 6-40 m

No. of Rows: 1-7 rows

Avenue Plantation

Length: 10,749.9439 m2

Width: 1-6 m

No. of Rows: 1-3 rows

Organised Green

Area- 82,509.72 m2

Total No. of trees proposed = 11,220

Evergreen Trees: 6,884

Deciduous Trees: 4,336

Palm Trees:164

The following tree species will be provided for the project along the roads / walkway and also in

green area:

Table 2.7: Proposed Tree Species (Evergreen)

Page 50: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 41

Table 2.8: Proposed Tree Species (Deciduous and Palm trees)

Page 51: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 42

2.13 MANPOWER REQUIREMENT

During the construction phase, a large number of professionals and workers will be engaged in

various related activities. An approximation of the manpower requirement for the project is

around 300-400 workers which include skilled, semiskilled and unskilled.

As a responsible corporate, the proponent shall comply with all applicable Acts related to

employees’ service and their welfare of the Government of India in terms of working hours,

basic amenities and welfare facilities such as given below:

Page 52: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 43

Minimum Wages Act, 1948,

Contract Labour (Regulation & Abolition) Act, 1970,

Inter-State Migrant Workmen (Regulation of Employment & Conditions of Services)

Act,1979,

The Building and other Construction Workers (Regulation and Employment of Service)

Act, 1996,

The Building and other construction workers Welfare Cess Act, 1996.

All workers and technicians will be provided with clean drinking water, sheds for resting and

sanitary facilities as mobile toilets/ toilets connected to septic tanks. Camps shall also be

organized for health check up every six months. No child shall be employed in the process.

Facilities and care will be made available to labor as per laws.

2.14 DETAILS OF CONSTRUCTION MATERIALS

List of building materials to be used at site is as follows:

Fly ash Brick will be used. RMC and CMC plant will be installed at site.

Coarse sand

Fine sand

Stone aggregate

Stone for masonry work

Stone for under floor soling

Cement

Reinforcement steel

Plywood & steel shuttering

Pipe scaffolding (cup lock system)

Bricks (Fly ash brick)

P.V.C. conduit

Indo-Asian MCBs

PVC overhead water tanks

Page 53: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 2

M/s DBH Township LLP. Page 44

2 1/2'’ thick red colour paver tiles

‘B’ class GI pipe (ISI marked)

PVC wastewater lines

S.W. sewer line upto main sewer

PVC rain water down take

Stainless steel sink in kitchen

5mm thick plane glass

3mm thick ground glass in toilets

Joinery hardware- ISI marked

2.14 LIST OF MACHINERY USED DURING CONSTRUCTION

(i) Dumper : Shall be used for mud and material handling

(ii) Concrete mixer with hopper : For RCC work

(iii) JCB : Shall be used for digging and earth work

(iv) Cranes : For lifting and moving of materials.

(v) Road roller : For compacting the earth

(vi) Bulldozer : For dismantling

Page 54: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 45

CHAPTER-3

DESCRIPTION OF ENVIRONMENT

3.1 INTRODUCTION

Information on the existing environmental status is essential for assessing the likely environmental

impacts of the project. In order to get an idea about the existing state of the environment, various

environmental attributes such as meteorology, air quality, water quality, soil quality, noise level, ecology

and socio-economic environment have been studied/ monitored.

3.2 STUDY PERIOD

Baseline environmental data generation for air, water, noise and soil quality monitoring around the

project site was conducted from October-December 2015, with an additional 1 month study of January

2016. Apart from field monitoring, additional data was also collected from secondary sources like India

Meteorological Department (IMD), State Pollution Control Board, Census of India and Local Forest

Department etc.

3.3 STUDY AREA

The site development area spreading across 9,60,680 m2 (237.39 acres) is a vacant land earmarked for

development of Integrated Township Project as per Naya Raipur Development Plan 2021. The

probability of impacts from the Integrated Township Project is generally within 2 kms. Field Monitoring

has been carried out beyond 2 km, in case of presence of sensitive receptors. The present report covers

baseline environmental data generated in the study area (5 km radius) all around the project site for land

use and the sample selection for monitoring are done within 5 km radius of the project site. Toposheet

image showing the project site within 5 km surroundings is attached as Annexure VII. For biological

studies, considering the ecological connectivity and widespread habitats of wildlife, a 15 km radius

around the project area has been considered for secondary data collection and the map showing the same

is attached as Annexure V.

Page 55: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 46

3.4 BASELINE MONITORING OF ENVIRONMENTAL COMPONENTS

In order to get an idea about the existing state of the environment, various environmental attributes such

as meteorology, air quality, water quality, soil quality, noise level, ecology and socio-economic

environment have been studied/monitored.

3.4.1 Meteorology

Meteorological data was taken for the period from October-December 2015.

The following parameters were recorded at hourly intervals continuously during monitoring period:

- Wind speed

-Wind direction

-Air temperature

Figure-3.1 gives the wind-rose diagram for the monitoring period.

Figure 3.1: The wind-rose diagram for three months Oct-Dec 2015

3.4.2 Air Environment

WRPLOT View - Lakes Environmental Software

PROJECT NO.:

DATE:

3/18/2016

MODELER:

COMPANY NAME:

COMMENTS:WIND ROSE PLOT:

Wind rose for Oct-Dec 2015

NORTH

SOUTH

WEST EAST

5%

10%

15%

20%

25%

WIND SPEED

(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 0.00%

AVG. WIND SPEED:

1.17 m/s

CALM WINDS:

0.00%

TOTAL COUNT:

2208 hrs.

Page 56: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 47

The prime objective of the baseline study with respect to ambient air quality is to establish the present

air quality and its conformity to National Ambient Air Quality Standards. This data has been further

used during impact assessment to predict the final air quality. This section describes the sampling

locations, frequency of sampling and methodology adopted for monitoring ambient air quality.

To quantify the impact of the project on the ambient air quality, it is necessary at first to evaluate the

existing ambient air quality of the area. The existing ambient air quality, in terms of Particulate Matter-

10(PM10), Particulate Matter-2.5 (PM2.5), Sulphur-dioxide (SO2), Oxides of Nitrogen (NO2), and Carbon

Monoxide (CO), has been measured through a planned field monitoring.

To assess the ambient air quality level, 5 (five) monitoring stations were set up. Table-3.2 gives location

of the ambient air quality monitoring stations.

Table 3.1: Location of Ambient Air Quality Monitoring Stations

Locations Locations Code Direction Distance (km)

AAQ1 Project Site - -

AAQ2 Bhat gaon SW 4.81

AAQ3 Mana SSW 3.34

AAQ4 Barauda W 2.15

AAQ5 Naya Raipur SE 5.0

3.4.2.1 Monitoring Schedule

Ambient air quality monitoring was carried out twice a week with a frequency of 24 hours for 12 weeks.

3.4.2.2 Methods of Sampling and Analysis

Fine particulate Sampler APM MFC550 was used for monitoring Particulate Matter (PM2.5 and PM10);

gaseous pollutants like SO2, and NO2 was collected by Gaseous Pollutant Sampler APM 433 and CO

was monitored by Serinous 30 CO Analyser with NDIR detector.

3.4.2.3 Method for measurement of Particulate matter, SO2 & NO2

Method for measurement of Particulate Matter (PM10) in ambient air is done by Cyclonic Flow

Technique. Particles with aerodynamic diameter less than the cut-point of the inlet are collected by a

filter. Ambient air at the monitoring location is sucked through a cyclone. Coarse and non-reparable dust

is separated from the air stream by centrifugal forces acting on the solid particles and these particles fall

Page 57: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 48

through the cyclone's conical hopper and get collected in the sampling cap placed at the bottom. The fine

dust (<10 microns) forming the particulate matter (PM10) passes the cyclone and is retained on the filter

paper. The mass of these particles is determined by the difference in filter weights prior to and after

sampling. The concentration of PM10 in the designated size range is calculated by dividing the weight

gain of the filter by the volume of air sampled. A tapping is provided on the suction side of the blower to

provide suction for sampling air through a set of impingers for containing absorbing solutions for SO2

and NO2. Samples of gases are drawn at a flow rate of 0.2 liters per minute. The APM MFC 550 is used

for PM2.5. This system is a manual method for sampling fine particles (PM2.5 fraction) and is based on

Impactor designs standardized by USEPA for ambient air quality monitoring.

PM2.5 & PM10 have been estimated by gravimetric method. Improved West and Gaeke method (IS-5182

part-II, 1969) has been adopted for estimation of SO2 and Modified Jacobs-Hochheiser method (IS-5182

part-VI, 1975) has been adopted for the estimation of NO2.

3.4.2.4 Method for measurement of Carbon Monoxide – NDIR method

Instrument used: Ecotech Serinus 30 Carbon Monoxide

This analyser is used to measure CO in ambient air, in the range of 0-200 ppm (220mg/m3) to a

sensitivity of 0.05 ppm 55µg/m3). The Serinus 30 combines the benefits of Microprocess control with

Non-Dispersive Infrared Spectrophotometry technology.CO Concentration is automatically corrected for

gas temperature and pressure changes.

3.4.2.5 Results and Discussions

The results of AAQ are given in details in Annexure-IX and summarized in the tabular form. The

results when compared with National Ambient Air Quality Standards (NAAQS) of Central Pollution

Control Board (CPCB) for "Industrial, Residential, Rural and Other Areas" show that the average

values of ambient air quality parameters are well within the stipulated limit.

The results of ambient air quality monitoring are summarized in the Tables below:

Page 58: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 49

Table 3.2 (a) Ambient Air Quality with respect to PM2.5

PM2.5 (µg/m3)

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 47.3 43.3 43.6 45.3 46.1

Max 55.7 52.0 52.4 54.0 54.5

Average 50.9 46.9 47.5 48.9 49.8

98 Percentile

55.5 51.8 52.4 53.8 54.5

Figure 3.2: Concentration of PM2.5

The values of PM2.5 in study area are presented in Table 3.3 (a). The seasonal minimum, maximum,

average values and 98 percentile of PM 2.5 at project site were observed 47.3µg/m3, 55.7µg /m

3,

50.9µg/m3 and 55.5 µg/m

3 respectively at the project site. The seasonal minimum, maximum and

average values ranged between 43.3-47.3 µg/m3, 52.0-55.7 µg/m

3 and 46.9-50.9 µg/m

3 respectively in

the study area

0

20

40

60

80

100

120

140

AAQ1 AAQ2 AAQ3 AAQ4 AAQ5

Co

nce

ntr

atio

n o

f P

M2

.5

Ambient Air Quality Stations

Concentration of PM 2.5

Min conc

Max. conc

98 Percentile

As per CPCB Limit

Page 59: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 50

Table 3.2 (b) Ambient Air Quality with respects to PM10

PM10 (µg/m3)

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 78.1 72.7 79.0 79.3 75.3

Max 96.6 91.8 99.2 98.1 93.8

Average 88.7 83.3 90.4 89.9 86.2

98 Percentile 96.4 91.3 99.1 97.7 93.8

Figure 3.3: Concentration of PM10

The values of PM10 in study area are presented in Table 3.3 (b). The seasonal minimum, maximum,

average values and 98 percentile of PM10 at Project site were observed 78.1µg/m3, 96.6 µg /m

3,

88.7µg/m3 and 96.4 µg/m

3 respectively at the project site. The seasonal minimum, maximum and

average values ranged between 72.7-79.3 µg/m3, 91.8-99.2 µg/m

3 and 83.3-90.4 µg/m

3 respectively in

the study area.

0

20

40

60

80

100

120

AAQ1 AAQ2 AAQ3 AAQ4 AAQ5

Co

nce

ntr

atio

n o

f P

m1

0

Air Quality Monitoring Station

Concentration of PM 10

Min conc

Max. conc

98 Percentile

As per CPCB Limit

Page 60: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 51

Table 3.2 (c) Ambient Air Quality with respect to SO2

SO2 (µg/m3)

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 4.5 4.3 4.8 4.6 4.8

Max 6.9 6.6 6.9 6.8 6.6

Average 6.1 5.9 5.9 6.1 5.8

98 Percentile 6.9 6.6 6.9 6.8 6.6

Figure 3.4: Concentration of SO2

The values of SO2 in study area are presented in Table 3.3 (c). The seasonal minimum, maximum,

average values and 98 percentile of SO2 at Project site were observed 4.3µg/m3, 6.9 µg /m

3, 6.1 µg/m

3

and 6.9 µg/m3 respectively at the project site. The seasonal minimum, maximum and average values

ranged between 4.3-4.8 µg/m3, 6.6-6.9 µg/m

3 and 5.8-6.1 µg/m

3 respectively in the study area.

0

10

20

30

40

50

60

70

80

90

AAQ1 AAQ2 AAQ3 AAQ4 AAQ5

Co

nce

ntr

atio

n o

f SO

2

Air Quality Monitoring Station

Concentration of SO2

Min conc

Max. conc

98 Percentile

As per CPCB Limit

Page 61: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 52

Table 3.2 (d) Ambient Air Quality with respects to NO2

NO2 (µg/m3)

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 13.7 13.1 12.2 11.7 12.9

Max 20.6 19.4 18.8 19.1 20.1

Average 16.7 15.8 15.3 14.5 16.0

98 Percentile 20.0 18.9 18.4 18.5 19.5

Figure 3.5: Concentration of NO2

The values of NO2 in study area are presented in Table 3.3 (d). The seasonal minimum, maximum,

average values and 98 percentile of NO2 at Project site were observed 13.7µg/m3, 20.6 µg /m

3, 16.7

µg/m3 and 20.0µg/m

3 respectively at the project site. The seasonal minimum, maximum and average

values ranged between 11.7-13.7 µg/m3, 18.8-20.6 µg/m

3 and 14.5-16.7 µg/m

3 respectively in the study

area

0

10

20

30

40

50

60

70

80

90

AAQ1 AAQ2 AAQ3 AAQ4 AAQ5

Co

nce

ntr

atio

n o

f N

O2

Air Quality Monitoring Station

Concentration of NO2

Min conc

Max. conc

98 Percentile

As per CPCB Limit

Page 62: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 53

Table 3.2 (e) Ambient Air Quality with respects to CO

CO (µg/m3)

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 490 470 530 490 460

Max 670 660 720 670 650

Average 581 561 628 584 556

98 Percentile 661 642 702 665 641

Figure 3.6: Concentration of CO

The values of CO in study area are presented in Table 3.3 (e). The seasonal minimum, maximum,

average values and 98 percentile of CO at Project site were observed 490.0µg/m3, 670.0µg/m

3, 581.0

µg/m3 and 661.0µg/m

3 respectively at the project site. The seasonal minimum, maximum and average

values ranged between 460-530 µg/m3, 650-720 µg/m

3 and 561-628 µg/m

3 respectively in the study

area.

0

500

1000

1500

2000

2500

3000

3500

4000

4500

AAQ1 AAQ2 AAQ3 AAQ4 AAQ5

Co

nce

ntr

atio

n o

f C

O

Air Quality Monitoring Station

Concentration of CO

Min conc

Max. conc

98 Percentile

As per CPCB Limit

Page 63: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 54

Additional study in the month of January, 2016 has been conducted as suggested by committee. Result

of the ambient air quality for Jan,16 is given as under in Table 3.2 (f).

Table 3.2 (f) Ambient Air Quality (January, 2016)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

Ambient Air Quality Data Jan-2016 Location: AAQ -1 (Project Site)

S.No Date PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO₂, µg/m3 CO, µg/m3

Gravimetric IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 IS:5182:Pt-10

1 02.01.2016 50.4 87.6 6.1 15.0 570

2 04.01.2016 48.5 78.8 7.2 16.4 640

3 08.01.2016 49.4 90.0 5.6 14.6 550

4 12.01.2016 49.0 80.0 <5.0 16.4 610

5 16.01.2016 53.7 92.6 7.0 17.5 510

6 20.01.2016 49.3 80.7 6.9 16.4 650

7 24.01.2016 49.1 89.3 5.9 17.0 580

8 28.01.2016 48.6 79.0 <5.0 17.6 690

Min 48.5 78.8 <5.0 14.6 510

Max 53.7 92.6 7.2 17.6 690

Average 49.8 84.7 6.5 16.4 600

98 Percentile 53.2 92.2 7.2 17.6 684

NAAQS, For 24

hourly monitoring

(except CO for One

hour)

60 100 80 80 4000

3.4.3 Noise Levels

Noise is one of the most undesirable and unwanted by-products of our modern life style. It may not

seem as insidious or harmful as air and water pollutants but it affects human health and well-being and

can contribute to deterioration of human well-being in general and can cause neurological disturbances

and physiological damage to the hearing mechanism in particular. It is therefore, necessary to measure

both the quality as well as the quantity of noise in and around the site.

Page 64: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 55

3.4.3.1 Methodology

The intensity of sound energy in the environment is measured in a logarithmic scale and is expressed in

a decibel, dB (A) scale. In a sophisticated type of sound level meter, an additional circuit (filters) is

provided, which modifies the received signal in such a way that it replicates the sound signal as received

by the human ear and the magnitude of sound level in this scale is denoted as dB (A). The sound levels

are expressed in dB (A) scale for the purpose of comparison of noise levels, which is universally

accepted by the international community.

Noise levels were measured using an Integrating sound level meter manufactured by Pulsar Instruments

Plc, Model NO. 91 (SL.No.B21625). It has an indicating mode of Lp and Leq. Keeping the mode in Lp

for few minutes and setting the corresponding range and the weighting network in “A” weighting set the

sound level meter was run for one hour time and Leq was measured at all locations.

The day noise levels have been monitored during 6.00 am to 10.00 pm and night noise levels, during

10.00 pm to 6.00 am at all the 4 locations, which covers residential areas, commercial area, industrial

area, Silence area if available within 10 km radius of the study area.

3.4.3.2 Sampling Locations

A preliminary survey was undertaken to identify the major noise generating sources in the area. The

noise survey was conducted to assess the background noise levels in different zones. Gazettes

Notification (S.O. 123(E)) of MoEF dated February 14, 2000 on ambient air quality standards has

different noise levels for different zones viz. project site, industrial, commercial, and residential and

silence zones. Four sampling locations were selected for the sampling of noise levels. The sampling

locations are given in Table-3.3 below:

Table 3.3 Noise Level Monitoring Stations in the study area

Location Code Locations Type of Area Direction Distance

NQ1 Project Site Residential - -

NQ2 Vivekanand Higher Sec.

School

Silence West 2.26

NQ3 Airport Commercial South 1.46

Page 65: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 56

Location Code Locations Type of Area Direction Distance

NQ4 Barauda Residential West 2.15

Ministry of Environment & Forests (MoEF) has notified the noise standards vide gazette notification

dated February 14, 2000 for different zones under the Environment Protection Act (1986). These

standards are given in Table-3.4. Noise monitoring locations map is attached as Annexure VIII(b).

Table 3.4 Ambient Quality Standards in respect of Noise

Area Code Category of Area Noise dB(A) Leq

Day time* Night time*

A Residential Area 55 45

B Silence Zone 50 40

C Industrial Area 75 70

D Commercial Area 65 55

Note:

1. Daytime is from 6.00am to 10.00 pm and Nighttime is from 10.00 pm to 6.00 am.

2. Silence zone is defined as area up to 100 meters around premises of hospitals, educational

institutions and courts. Use of vehicle hours, loud speakers and bursting of crackers are banned in these

zones.

3.4.3.3 Results and Discussion

The noise data compiled on noise levels during Oct. 2015 is given in Table-3.5(a). It can be seen that

the night time Leq (Ln) varies from 38.6-41.7 dB (A) and the daytime Leq (Ld) varies from 49.6 to 56.9

dB (A) within the study area

Table 3.5(a): Hourly Leq Noise Level in the study Area, (Oct 2015)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

Noise Quality data Oct-2015

S.No. LOCATION ZONE LIMIT as per CPCB

Guidelines Leq, dB(A)

Observed value

Leq, dB(A)

DAY* NIGHT** DAY* NIGHT**

1 Project Site Residential Area 55 45 50.1 40.2

2 vivekananda higher

secondary school

Silence zone 50 40 49.6 38.9

3 Airport Commercial Area 65 55 56.9 41.7

Page 66: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 57

4 Baruda Residential Area 55 45 51.4 38.6

* Day time 6.00AM TO 10.00PM

** Night time 10.00PM TO 6.00AM

Additional study in the month of January, 2016 has been conducted as suggested by committee. Result

of the ambient noise quality for Jan,16 is given as under in Table 3.5 (b).

Table 3.5(b): Hourly Leq Noise Level in the study Area, (Jan 2016)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

Noise Quality data Jan-2016

S.No. LOCATION ZONE LIMIT as per CPCB Guidelines Leq,

dB(A)

Observed value

Leq, dB(A)

DAY* NIGHT** DAY* NIG

HT**

1 Project Site

Residential Area 55 45 51.3 40.9

2 Vivekananda

Higher

Secondary

School

Silence zone

50 40 49.8 38.7

3 Airport

Commercial Area 65 55 57.5 40.8

4 Baruda

Residential Area 55 45 52.5 37.5

* Day time 6.00AM TO

10.00PM

** Night time 10.00PM TO

6.00AM

3.4.4 WATER ENVIRONMENT

3.4.4.1 Water Quality

Water quality assessment is one of the essential components of EIA study. Such assessment helps in

evaluating the existing health of water body and suggesting appropriate mitigation measures to minimize

the potential impact from development projects. Water quality of ground water has been studied in order

to assess water-uses in construction, drinking, cooling and horticulture purpose.

Page 67: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 58

The water quality at the site and other locations within the 5 km impact zone was monitored during Oct

2015 to Dec 2015. The locations of the monitoring sites are depicted in Annexure VIII(c) and the result

of the monitoring and analysis of ground is presented in the Annexure IX.

3.4.4.2 Sampling Frequency and Sampling Techniques

Parameters for analysis of water quality were selected based on the utility of the particular source of

water as per MoEF guidance. Hence quality of ground water was compared with IS: 10500: 1991

(Reaffirmed 1993 With Amendment NO -3 July 2010) for drinking purposes.

As per the standard practice, one sample from each station was taken each month in the study period.

Sampling was done by standard sampling technique as per the Standard Methods. Necessary precautions

were taken for preservation of samples. Location of Ground Water Sampling Sites Sampling Sites is

attached as Annexure VIII(c).

Table 3.6: Location of Water Sampling Sites

Location No. Sample collected from

Ground Water Samples

GW – 1 Project Site

GW – 2 Bhatgaon 4.81 km, SW

GW – 3 Naya Raipur 5 km, SE

Page 68: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 59

Table 3.7(a): Ground water quality in study area(Oct 2015)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

GROUND WATER QUALITY, Oct-2015

S.No Parameter Unit

Limit (IS-10500:2012) GW1 GW2 GW3

Desirable Permissible Project Site Bhat gaon

Naya

Raipur

1 Colour Hazen 5 15 <5 <5 <5

2 Odour - Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity NTU 1 5 2 2 1

5 pH - 6.5-8.5 No Relaxation 7.62 7.71 7.82

6 Total Hardness (as CaCO3) mg/l 200 600 295 305 315

7 Iron (as Fe) mg/l 0.3 No Relaxation 0.22 0.26 0.23

8 Chlorides (as Cl) mg/l 250 1000 64 75 81

9 Fluoride (as F ) mg/l 1 1.5 0.6 0.5 0.7

10 TDS mg/l 500 2000 445 493 479

11 Calcium(as Ca2+) mg/l 75 200 71 73 76

12 Magnesium (as Mg2+) mg/l 30 100 28 29 30

13 Copper (as Cu) mg/l 0.05 1.5 <0.01 <0.01 <0.01

14 Manganese(as Mn) mg/l 0.1 0.3 0.06 0.05 0.03

15 Sulphate (as SO4) mg/l 200 400 29 30 25

16 Nitrate(as NO3) mg/l 45 No Relaxation 5 4 6

17 Phenolic Compounds (as C6H5OH) mg/l 0.001 0.002 <0.001 <0.001 <0.001

18 Mercury (as Hg) mg/l 0.001 No Relaxation <0.001 <0.001 <0.001

19 Cadmium (as Cd) mg/l 0.003 No Relaxation <0.01 <0.01 <0.01

20 Selenium ( as Se ) mg/l 0.01 No Relaxation <0.01 <0.01 <0.01

21 Arsenic (as As) mg/l 0.01 0.05 <0.01 <0.01 <0.01

Page 69: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 60

22 Cyanide (as CN ) mg/l 0.05 No Relaxation <0.01 <0.01 <0.01

23 Lead (as Pb) mg/l 0.01 No Relaxation <0.01 <0.01 <0.01

24 Zinc (as Zn) mg/l 5 15 0.1 0.11 0.12

25 Anionic Detergent (as MBAS) mg/l 0.2 1 <0.01 <0.01 <0.01

26 Chromium (as Cr6+) mg/l 0.05 No Relaxation <0.01 <0.01 <0.01

27 Mineral oil mg/l 0.5 No Relaxation <0.01 <0.01 <0.01

28 Alkalinity (as CaCO3) mg/l 200 600 255 280 265

29 Aluminum (as Al) mg/l 0.03 0.2 <0.02 <0.02 <0.02

30 Boron (as B) mg/l 0.5 1 0.2 0.2 0.2

Microbiological Parameter

1 Total Coliform MPN/100ml Shall not be detectable ND (<2) ND (<2) ND (<2)

2 E. coli E. coli/100ml Shall not be detectable Absent Absent Absent

Table 3.7(b): Ground water quality in study area(Nov 2015)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

GROUND WATER QUALITY, Nov-2015

S.No Parameter Unit

Limit (IS-10500:2012) GW1 GW2 GW3

Desirable Permissible Project

Site Bhat gaon

Naya

Raipur

1 Colour Hazen 5 15 <5 <5 <5

2 Odour - Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity NTU 1 5 1 2 2

5 pH - 6.5-8.5 No Relaxation 7.75 7.82 7.69

6 Total Hardness (as CaCO3) mg/l 200 600 251 284 296

7 Iron (as Fe) mg/l 0.3 No Relaxation 0.22 0.23 0.25

8 Chlorides (as Cl) mg/l 250 1000 62 82 89

9 Fluoride (as F ) mg/l 1 1.5 0.6 0.5 0.4

Page 70: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 61

10 TDS mg/l 500 2000 419 464 482

11 Calcium(as Ca2+) mg/l 75 200 60 68 71

12 Magnesium (as Mg2+) mg/l 30 100 24 27 28

13 Copper (as Cu) mg/l 0.05 1.5 <0.01 <0.01 <0.01

14 Manganese(as Mn) mg/l 0.1 0.3 0.03 0.04 0.05

15 Sulphate (as SO4) mg/l 200 400 29 27 26

16 Nitrate(as NO3) mg/l 45 No Relaxation 4 5 3

17 Phenolic Compounds (as C6H5OH) mg/l 0.001 0.002 <0.001 <0.001 <0.001

18 Mercury (as Hg) mg/l 0.001 No Relaxation <0.001 <0.001 <0.001

19 Cadmium (as Cd) mg/l 0.003 No Relaxation <0.01 <0.01 <0.01

20 Selenium ( as Se ) mg/l 0.01 No Relaxation <0.01 <0.01 <0.01

21 Arsenic (as As) mg/l 0.01 0.05 <0.01 <0.01 <0.01

22 Cyanide (as CN ) mg/l 0.05 No Relaxation <0.01 <0.01 <0.01

23 Lead (as Pb) mg/l 0.01 No Relaxation <0.01 <0.01 <0.01

24 Zinc (as Zn) mg/l 5 15 0.1 0.11 0.12

25 Anionic Detergent (as MBAS) mg/l 0.2 1 <0.01 <0.01 <0.01

26 Chromium (as Cr6+) mg/l 0.05 No Relaxation <0.01 <0.01 <0.01

27 Mineral oil mg/l 0.5 No Relaxation <0.01 <0.01 <0.01

28 Alkalinity (as CaCO3) mg/l 200 600 235 246 253

29 Aluminum (as Al) mg/l 0.03 0.2 <0.02 <0.02 <0.02

30 Boron (as B) mg/l 0.5 1 0.3 0.2 0.1

Microbiological Parameter

1 Total Coliform MPN/100ml Shall not be detectable ND (<2) ND (<2) ND (<2)

2 E. coli E. coli/100ml Shall not be detectable Absent Absent Absent

Page 71: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 62

Table 3.7(c): Ground water quality in study area(Dec 2015)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

GROUND WATER QUALITY, Dec 2015

S.No Parameter Unit Limit (IS-10500:2012) GW1 GW2 GW3

Desirable Permissible Project Site Bhat gaon Naya Raipur

1 Colour Hazen 5 15 <5 <5 <5

2 Odour - Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity NTU 1 5 2 2 3

5 pH - 6.5-8.5

No

Relaxation 7.63 7.72 7.81

6 Total Hardness (as CaCO3) mg/l 200 600 285 295 312

7 Iron (as Fe) mg/l 0.3

No

Relaxation 0.12 0.13 0.15

8 Chlorides (as Cl) mg/l 250 1000 63 71 79

9 Fluoride (as F ) mg/l 1 1.5 0.7 0.9 0.6

10 TDS mg/l 500 2000 414 485 491

11 Calcium(as Ca2+) mg/l 75 200 64 71 75

12 Magnesium (as Mg2+) mg/l 30 100 25 28 30

13 Copper (as Cu) mg/l 0.05 1.5 <0.01 <0.01 <0.01

14 Manganese(as Mn) mg/l 0.1 0.3 0.04 0.03 0.02

15 Sulphate (as SO4) mg/l 200 400 32 28 25

16 Nitrate(as NO3) mg/l 45

No

Relaxation 2 5 3

17 Phenolic Compounds (as C6H5OH) mg/l 0.001 0.002 <0.001 <0.001 <0.001

18 Mercury (as Hg) mg/l 0.001

No

Relaxation <0.001 <0.001 <0.001

19 Cadmium (as Cd) mg/l 0.003

No

Relaxation <0.01 <0.01 <0.01

20 Selenium ( as Se ) mg/l 0.01 No <0.01 <0.01 <0.01

Page 72: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 63

Relaxation

21 Arsenic (as As) mg/l 0.01 0.05 <0.01 <0.01 <0.01

22 Cyanide (as CN ) mg/l 0.05

No

Relaxation <0.01 <0.01 <0.01

23 Lead (as Pb) mg/l 0.01

No

Relaxation <0.01 <0.01 <0.01

24 Zinc (as Zn) mg/l 5 15 0.08 0.11 0.1

25 Anionic Detergent (as MBAS) mg/l 0.2 1 <0.01 <0.01 <0.01

26 Chromium (as Cr6+) mg/l 0.05

No

Relaxation <0.01 <0.01 <0.01

27 Mineral oil mg/l 0.5

No

Relaxation <0.01 <0.01 <0.01

28 Alkalinity (as CaCO3) mg/l 200 600 225 282 278

29 Aluminum (as Al) mg/l 0.03 0.2 <0.02 <0.02 <0.02

30 Boron (as B) mg/l 0.5 1 0.2 0.2 0.2

Microbiological Parameter

1 Total Coliform MPN/100ml Shall not be detectable ND (<2) ND (<2) ND (<2)

2 E. coli E. coli/100ml Shall not be detectable Absent Absent Absent

Table 3.7(d): Ground water quality in study area(Jan 2016)

Integrated Township Project by DBH vill- Banarsi,Ramchand,Nakri Raipur,Chattishgarh.

GROUND WATER QUALITY, Jan-2016

S.No Parameter Unit Limit (IS-10500:2012) GW1 GW2 GW3

Desirable Permissible Project Site Bhat gaon Naya Raipur

1 Colour Hazen 5 15 <5 <5 <5

2 Odour - Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity NTU 1 5 1 3 2

Page 73: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 64

5 pH - 6.5-8.5

No

Relaxation 7.52 7.61 7.63

6 Total Hardness (as CaCO3) mg/l 200 600 295 288 296

7 Iron (as Fe) mg/l 0.3

No

Relaxation 0.13 0.14 0.16

8 Chlorides (as Cl) mg/l 250 1000 66 72 82

9 Fluoride (as F ) mg/l 1 1.5 0.6 0.7 0.5

10 TDS mg/l 500 2000 436 446 489

11 Calcium(as Ca2+) mg/l 75 200 71 69 71

12 Magnesium (as Mg2+) mg/l 30 100 28 27 28

13 Copper (as Cu) mg/l 0.05 1.5 <0.01 <0.01 <0.01

14 Manganese(as Mn) mg/l 0.1 0.3 0.02 0.01 0.03

15 Sulphate (as SO4) mg/l 200 400 34 25 31

16 Nitrate(as NO3) mg/l 45

No

Relaxation 3 4 2

17 Phenolic Compounds (as C6H5OH) mg/l 0.001 0.002 <0.001 <0.001 <0.001

18 Mercury (as Hg) mg/l 0.001

No

Relaxation <0.001 <0.001 <0.001

19 Cadmium (as Cd) mg/l 0.003

No

Relaxation <0.01 <0.01 <0.01

20 Selenium ( as Se ) mg/l 0.01

No

Relaxation <0.01 <0.01 <0.01

21 Arsenic (as As) mg/l 0.01 0.05 <0.01 <0.01 <0.01

22 Cyanide (as CN ) mg/l 0.05

No

Relaxation <0.01 <0.01 <0.01

23 Lead (as Pb) mg/l 0.01

No

Relaxation <0.01 <0.01 <0.01

24 Zinc (as Zn) mg/l 5 15 0.07 0.1 0.11

25 Anionic Detergent (as MBAS) mg/l 0.2 1 <0.01 <0.01 <0.01

26 Chromium (as Cr6+) mg/l 0.05

No

Relaxation <0.01 <0.01 <0.01

27 Mineral oil mg/l 0.5 No <0.01 <0.01 <0.01

Page 74: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 65

Relaxation

28 Alkalinity (as CaCO3) mg/l 200 600 236 249 263

29 Aluminum (as Al) mg/l 0.03 0.2 <0.02 <0.02 <0.02

30 Boron (as B) mg/l 0.5 1 0.2 0.2 0.2

Microbiological Parameter

1 Total Coliform MPN/100ml Shall not be detectable ND (<2) ND (<2) ND (<2)

2 E. coli E. coli/100ml Shall not be detectable Absent Absent Absent

Page 75: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 66

3.4.4.3 Result & Conclusion:

The results of analysis of ground water are given in Annexure IX.

The water quality in the impact zone was assessed through physico-chemical and bacteriological

analysis of ground water samples. The results have been compared with the drinking water quality

standards specified in IS: 10500. It was observed that all the physico chemical parameters and heavy

metals from ground water samples are below stipulated drinking water standards.

All the ground water samples analyzed can be considered fit for drinking purpose in the absence of

alternate sources

3.4.5 LAND ENVIRONMENT

Land is the most vital resource for sustenance of life and degradations of land due to industrialization,

urbanization and population growth is a matter of concern. Therefore, it is necessary to establish the

existing land use pattern to optimize the land use as well as minimize degradation due to the

developmental activities. Also it is necessary to the landform of the project site and the quality of the

soil as soil erosion further deteriorates the quality of the land. Soil erosion can be prevented by

following methods:

Planting vegetation which stabilizes the soil and prevent erosion.

Applying a layer of mulch/fertilizer to the soil top which allows the soil to slowly soak up water,

protects against rain impact.

Using Geotextiles which helps in stabilizing soil.

3.4.5.1 Topography

The landform of the project site is a plain land with average elevation of about 313.5 m to 296.00 m.

The land environment is described by landuse/landcover of the study area within 10 km radius and soil

environment of the study area within 5 km radius.

3.4.5.2 Land Use Description

Page 76: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 67

The land use / land cover of the project site was done to identify the land use pattern and land cover

pattern of the study area. The study of land use in the area enables one to know about the land that can

be used for various development activities envisaged in post project scenario. It also enables to envisage

the scenario emerging due to the increase in demand for land with increase in population and the

impacts arising due to the interface with the various project activities.

Objectives of the Study

The objectives of the present study are:

To map the study area with respect to various land use/land cover change over the past 10 years.

To identify the sensitive areas within 10 km radius around the project site.

Methodology

The land use / land cover pattern has been established based on the analysis of the data received from

satellite imagery by making land use/land cover map with the help of GIS technique. References have

been taken from Survey of India. Also the data based on Census of India, 2001 was referred and landuse

study was done within 10 km radius area with limited ground truth verifications. Ground and ancillary

information have been used to identify the sensitive places within 10 km radius of the project.

Land Use Pattern Classification and description

The classification of landuse / landcover pattern of the study area is mainly dominated by the types -

agricultural land, waterbodies, canals, settlements or cultural use,and etc. The agricultural land covers

the majority of the land which is about 79.97% of the study area. The land use data are presented in

Table 3.8 and also highlighted with a pie chart at Figure 3.3. The landuse /landcover map is presented in

Annexure VII.

Table 3.8: Land use pattern of project area within 10 km.

LAND USE CLASS AREA (Ha) %age

Settlement 3251.3 8.51

Water Bodies 1163.14 3.04

Vegetation 171.06 0.44

Page 77: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 68

Open Scrub 984.22 2.57

Stone quarry/stony waste 481.08 1.26

Open Land 1595.73 4.18

Agricultural Land 30540.3 79.97

Total 38186.83 100

Figure 3.7: Land Use Patten of the Project Site within 10 Km

Topography:

Slope form: Contour plan shown that land is flat land with highest RL 313.854 m and Lowest

RL 296.0 m. Project will not cause any change in natural slope.

Landform and Terrain analysis: According to the study of 10 km radius around the project in

topographical map of scale 1:10000, it was found that 79.97% is Agriculture, 8.51% is settlement,

3.04% is water bodies, vegetation is 0.44 %, 4.18 % is Open land, 1.26 % is stone quarry and 2.57% is

open scrub. Complete details are given in figure 3.3 above.

9% 3%

0% 3%

1%

4%

80%

%age Land use

Settlement

Water Bodies

Vegetation

Open Scrub

Stone quarry/stony waste

Open Land

Agricultural Land

Page 78: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 69

Soil:

Soil formation is influenced mainly by climate, geology, relief and other biotic interactions. To assess

the soil quality of the proposed area, following stations were selected. Soil profile and quality was

studied at 4 different locations.

The composite soil samples were collected from different location and were analyzed for

characterization., Monitoring maps are attached as Annexure VIII(d) and the results of the monitoring

and analysis is presented in the Table 3.9 (a).

Table 3.9(a): Soil Sample Collection Points

Location No. Sample collected from Direction Distance (Km)

SQ- 1 Project Site - -

SQ- 2 Bhatgaon SW 4.81

SQ- 3 Mana SSW 3.34

SQ- 4 Barauda W 2.15

SQ- 5 Naya Raipur SE 5.0

Methodology

The soil samples were collected in the Oct- Dec, 2015 from 5 locations as given in above Table. At each

of these locations 3 sub-locations were identified randomly from where soil was collected from up to 30

cm below the surface. The final 4 samples represent homogenously mixed soil from these 3 sub-

locations for each location. The samples were filled in polythene bags, labeled in the field with number

and site name and sent to laboratory for analysis. Table 3.9(b) gives the idea of the frequency and

methodology of selection of soil sampling stations and monitoring process.

Table 3.9(b): Frequency and Methodology for Soil Sampling & Monitoring:

Particulars Details

Frequency Once during the Study Period

Methodology Grab samples of the topsoil were collected from 3 depths, at particular locations

and all samples are mixed to provide a representative sample for analysis. They

were stored in airtight. Polythene Bags and analyzed at the laboratory.

Page 79: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 70

*Grab sample- a single sample or measurement taken at a specific time or over as a short period as

feasible.

Table 3.9 (c): Soil Quality Data(October, 2015)

Integrated Township Project by DBH vill- Banarsi,Ramchandi,Nakti Raipur,Chattishgarh.

Soil Quality Data Oct-2015

S.N

o

Parameter Unit SQ-1 SQ-2 SQ-3 SQ-4 SQ-5

Project site Bhat

gaon

Mana Baraud

a

Naya

Raipur

1 Texture -

Sandy Clay

Loam Loam

Clay

Loam Clay Clay

Sand % 57.8 52.3 42.9 39.2 36.8

Silt % 19.9 24.5 25.0 19.9 22.9

Clay % 22.3 23.2 32.1 40.9 40.3

2 pH (1:2) - 6.94 7.83 7.54 8.12 7.63

3

Electrical Conductivity

(1:2)

µmhos/c

m 226 235 309 315 385

4 Cation exchange capacity meq/100g 12.8 15.4 16.7 13.6 15.9

5

Exchangeable

Potassium mg/kg 79 98 89 102 112

6 Exchangeable Sodium mg/kg 69 86 71 67 88

7 Exchangeable Calcium mg/kg 1875 2245 2465 1952 2236

8

Exchangeable

Magnesium mg/kg 355 425 465 396 485

9 Sodium Absorption Ratio - 0.38 0.44 0.34 0.36 0.44

10 Water Holding Capacity % 26.9 27.8 28.3 30.1 30.6

11 Porosity % 37.2 34.6 33.1 32.5 31.2

Additional Soil quality data for Jan 2016 is given in Table below:

Table 3.9 (d): Soil Quality Data(January, 2016)

Integrated Township Project by DBH vill- Banarsi,Ramchandi,Nakti Raipur,Chattishgarh.

Soil Quality Data Jan-2016

S.No Parameter Unit SQ-1 SQ-2 SQ-3 SQ-4 SQ-5

Project site Bhat

gaon

Mana Barauda Naya

Raipur

1 Texture -

Sandy Clay

Loam Loam

Clay

Loam Clay Clay

Page 80: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 71

Sand % 57.9 52.6 42.8 39.5 36.8

Silt % 19.5 24.3 27.1 20.2 22.6

Clay % 22.6 23.1 30.1 40.3 40.6

2 pH (1:2) - 6.95 7.85 7.65 8.23 7.14

3

Electrical Conductivity

(1:2) µmhos/cm 225 236 296 309 396

4 Cation exchange capacity meq/100g 13.0 15.0 15.9 13.6 15.4

5 Exchangeable Potassium mg/kg 81 99 92 101 108

6 Exchangeable Sodium mg/kg 71 82 70 68 89

7 Exchangeable Calcium mg/kg 1895 2175 2273 1945 2132

8

Exchangeable

Magnesium mg/kg 356 424 475 395 491

9 Sodium Absorption Ratio - 0.39 0.42 0.35 0.37 0.45

10 Water Holding Capacity % 26.8 27.9 28.2 30.1 30.3

11 Porosity % 37.2 32.3 33.4 32.1 31.5

Result:

Results are summarized in Table 3.8 (c and d); the result shows that texture of the core is sandy clay

loam. The results of buffer zone show that texture is Loam, clay, clay loam. pH ranges from 7.14– 8.23.

3.4.6 Biological Environment

3.4.6.1 Biological Environment

Literally environment stands for the totality of surrounding conditions. Animals and plants form a vital

part of this sum total. Flora and fauna of an area are inter-related to each other and have a very crucial

impact on human life. With changes in environmental conditions, structure, density and composition of

plants and animals undergo changes as well. The present study was carried out in two separate headings

for floral and faunal community. The aspects to be covered in the study for the project are given in

Table 3.10

Table 3.10: Aspects to be covered in the study for the Project

Aspect of Environment Likely Impacts

A. Terrestrial Ecology Impacts on terrestrial flora and fauna

Impacts on wildlife

Page 81: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 72

Impacts on socially/economically/genetically/

biologically important project species

B. Aquatic Ecology Impacts on aquatic fauna/flora

The relevant environmental impacts out of the entire gamut of issues outlined in the Table 3.15 were

identified. For these impacts or aspects, environmental baseline data has been collected from

primary as well as secondary data sources. As a part of the study, detailed field studies on various

aspects were conducted. The baseline status has been ascertained for the following aspects:

3.4.6.2. Methodology

3.4.6.2.1. Period of Sampling

The ecological survey has been conducted during Post monsoon season for the collection of primary

data of flora-fauna, vegetation, soil and other environmental observations. The details are given as

below:

Post-monsoon: October to December

Core zone : At the project site

Buffer zone : Around 10 km radius of the project site

3.4.6.2.2. Mode of Data Collection

Detailed survey was conducted to evaluate floral and faunal composition of the study area. Primary data

on floral and faunal composition was recorded during site visit and secondary data was collected from

the Forest Department and published relevant literature. Inventory of flora and fauna has been prepared

on the basis of collected data. The mode of data and parameters considered during field investigations is

given in Table 3.11.

Table 3.11: Mode of Data Collection & Parameters Considered During the Survey

Aspect Data Mode of Data Collection Parameters Monitored

Terrestrial

Ecology

Primary data

collection By field survey Floral and Faunal diversity

Secondary data

collection

3.1.1 * Chhattisgarh Forest

Department

3.1.2 *An official website of district

Raipur

3.1.3 * Department of Fisheries,

Chhattisgarh

Floral and Faunal diversity,

Types of vegetation, forest

type, Importance etc.

Page 82: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 73

3.4.6.3. Biological Component of Core Zone

3.4.6.3. 1 Flora

The core zone comprises flat land of the plateau where construction has been proposed. Most of the

areas nearby project site are agriculture along with Human settlement. During the present survey some

seasonal vegetation observed in and around the core zone. Most of the vegetation are found in the

propose area after monsoon. List of the flora recorded from core zone are listed in Table 3.12.

Table 3.12: List of the Flora recorded of Core Zone

S. No. English/Botanical Name Common Name

Tree/ Plants

1 Acacia nilotica Babool

2 Albizia lebbeck Siris

3 Azadirachta indica Neem

4 Butea monosperma Palash

5 Delonix regia Gulmohar

6 Tectona grandis Teak

7 Vitex negundo Nirgundi

8 Ziziphus mauritiana Ber

Other small Plants

1 Agave sp.

2 Abultion indicum Kanghi

3 Cassia tora Chakvad

4 Calotropis gigantea Madar

5 Ipomea fistulosa Besharam

6 Lantana sp.

7 Solanum nigrum Makoi

8 Vetiveria zizanioides Khus

Grasses 1 Cymbopogon martini Rusa

2 Cynodon dactylon Doob

3 Echinochloa colonum Sama

4 Heteropogon contortus Kusul

5 Imperata cylindrica Chhir

Source: GRC Survey data supported by data of Chhattisgarh Forest Department

3.4.6.3. 2 Fauna

Core zone of the proposed mine area is devoid of forest land or dense plantation so; there is no any

permanent habitats of mammals and avifauna in the core zone. There is no any permanent aquatic

habitat in the core, so aquatic flora and fauna also does not exist. On the other hand, it was also observed

Page 83: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 74

that there is no any bird’s nest in the core zone. During the present survey some animals observed

moving in the core cone were Cow, Dogs, Got, and Lizard etc.

3.4.6.4. Biological Component of Buffer Zone

3.4.6.4. 1 Flora

Forests

Total area of the district is 9623 sq. km, out of which total forest area in the district is about 1188sq. km.

National Parks, Wildlife Sanctuary or any ecologically sensitive areas within the 10 km periphery of the

mine lease area are not present. Protected and Reserved forests are also not present within 10 km radius

of the proposed construction site as declared protected under “Wildlife Protection Act (1972).

The district is having vast forest wealth, wherein the production of Building Woods, Firewood and

valuable Medicinal Plants are produced. Sects of population depend on the forest for their livelihood in

Vegetation in and Around Human Settlement

During the present investigation, vegetation pattern in villages and surrounding was observed slightly

different from the rest of the areas. The common species grown near villages are mostly edible or useful

plants such as Albizia lebbeck, Artocarpus integrifolia, Azadirachta indica, Delonix regia, Eucalyptus

sp., Ficus religiosa, Mangifera indica, Madhuca indica, Sizygium cumini and Tamarindus indica,

Tectona grandis and Ziziphus mauritiana.

Terrestrial Flora of the Buffer Zone

Buffer zone of the proposed project is mainly agricultural land and forest land. The most common plat

species were observed in the buffer zone of Present construction projectcomprises of Anogeissus

latifolia (Dhautha), Butea frondosa(Palas), Diospyros melanoxylon (Tendu), Mangifera indica,

Madhuca latifolia (Mahua), Pterocarpus marsupium (Paisar) and Tectona grandis (Teak)etc. A list of

different types of plant species observed in during the present investigation is given Table 3.13.

Table 3.13: Vegetation of Buffer Zone of Present Project, District Raipur

S. No. Scientific Name Local name Family

Plants

1 Acacia arabica Babul Leguminosae

2 Acacia leucophloea Reunja Leguminosae

3 Adina cordifolia Haldu Rubiaceae

4 Aegle marmelos Bel Rutaceae

Page 84: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 75

5 Ailanthus excelsa Maharukh Simarubaceae

6 Albizia lebbeck Kala-siris Leguminosae

7 Albizia procera Safed-siris Leguminosae

8 Anogeissus latifolia D Dhaora Combretaceae

9 Azadirachta indica Neem Meliaceae

10 Bassia latifolia Mahua Sapotaceae

11 Bombax malabaricum Semal Malvaceae

12 Boswellia serrata Salai Burseraceae

13 Butea frondosa Palas Leguminosae

14 Cedrela toona Toon Meliaceae

15 Chloroxylon swietenia Bhirra Meliaceae

16 Cleistanthus collinus Garari Euphorbiaceae

17 Dalbergia latifolia Shisham Leguminosae

18 Dalbergia sissoo Sissoo Leguminosae

19 Dillenia pentagyna Kalla Dilleniaceae

20 Diospyros cordifolia Bhaktendu Ebenaceae

21 Erythrina suberosa Pangra Leguminosae

22 Eugenia jambolana Jamun Myrtaceae

23 Feronia elephantum Kaith Rutaceae

24 Ficus bengalensis Bar Urticaceae

25 Ficus glomerata Gular Moraceae

26 Ficus religiosa Pipal Moraceae

27 Gmelina arborea Gamari Verbenaceae

28 Lagerstroemia parviflora Seja Lythraceae

29 Mangifera indica Aam Anacardiaceae

30 Phyllanthus emblica Aonla Euphorbiaceae

31 Pterocarpus marsupium Bijasal Leguminosae

32 Schleichera trijuga Kusum Sapindaceae

33 Spondias mangifera Amra Anacardiaceae

34 Sterculia urens Kulu Sterculiaceae

35 Tamarindus indica Imli Leguminosae

36 Tectona grandis Sagon Verbenaceae

37 Terminalia arjuna Arjun Combretaceae

38 Terminalia belerica Bahera Combretaceae

39 Terminalia chebula Harra Combretaceae

40 Terminalia tomentosa Saj Combretaceae

Shrubs

1 Achyranthes aspera e Apamarg Amarantaceae

Page 85: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 76

2 Adhatoda vasica Adusa Acanthaceae

3 Calotropis gigantea Aak Asclepiadaceae

4 Eugenia heyneana Kath Jamun Myrtaceae

5 Indigofera pulchella Neel Leguminosae

6 Lantana camara Raimunia Verbenaceae

7 Woodfordia floribunda Dhawai Lythraceae

8 Zizyphus rugosa Churna Rhamnaceae

9 Zizyphus rotundifolia Jharberi Rhamnaceae

Grasses

1 Cymbopogon martini Rusa Gramineae

2 Cynodon dactylon Doob Gramineae

3 Echinochloa colonum Sama Gramineae

4 Eragrostis tenella Bhurbhusi Gramineae

5 Heteropogon contortus Kusul Gramineae

6 Imperata cylindrica Chhir Gramineae

7 Saccharum munja Munj Gramineae

Source:GRC Survey data supported by data of Chhattisgarh Forest Department

Aquatic Flora of the Buffer Zone

There is no any major aquatic habitat in the buffer zone except some sewage fed small ponds and some

monsoon fed streams. During the present survey some macrophytes were identified nearby the ponds

from the buffer zone were Azolla pinnata, Cyperus sp.,Eichhornia crassipes, Ipomoea aquatica, Lemna minor,

Limnophila indica, Ludwigia sp., Ottelia sp. and Polygonum glabrum.

3.4.6.4. 2 Fauna of the Buffer Zone

The major part of the study area lies under agriculture field and barren land which restrict the wildlife

habitat significantly. There is neither any wildlife sensitive area nor any corridor for the movement of

wildlife is present in the study area. A list of animals of the study area has been prepared on the basis of

local inquiry from the village people and from the available published literatures. The animals thus

recorded were cross checked with Wildlife ProtectionAct (1972) for their schedule.

Mammals

Domesticated mammal species were reported from buffer zone during the field survey. Common grazing

animals like Cow, Goat and Buffalo etc. were noticed in the buffer zone. Inquiry from village people

regarding wild animals reveals that monkey, Indian hare, fruits bat, Wild boar, Indian Fox etc. are often

Page 86: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 77

seen in the area. List of Mammal species recorded from Buffer zone of present the study area is given in

Table 3.14.

Table 3.14: Mammal species present in Buffer Zone of Present Project, District Raipur

Sl. No. Common name Scientific name Schedule/

WPA,1972 IUCN

1 Anathana ellioti Indian Tree Shrew V LC

2 Axis axis Chital/Spotted Deer III VU

3 Boselaphus tragocamelus Nilgai/Blue Bull III VU

4 Funambulus palmarum Three-striped Squirrel IV LC

5 Herpestes edwardsi Common Mongoose IV LC

6 Hystrix indica Indian Porcupine III LC

7 Lepus nigricollis Black-naped Hare V LC

8 Macaca mulatta Rhesus Macaque II LC

9 Mus booduga Indian Field Mouse V LC

10 Pteropus giganteus Indian Flying Fox V NA

11 Rattus rattus Indian House Rat V LC

12 Semnopithecus entellus Common Langur II LC

13 Suncus murinus Grey musk Shrew IV LC

14 Sus scrofa Indian Wild Boar III LC

15 Tatera indica Indian Gerbil IV LC

16 Vandeleuria oleracea Long-tailed Tree Mouse V LC

17 Vulpes bengalensis Indian Fox II LC

Source:GRC Survey Data supported by Chhattisgarh Forest Department

IUCN Red list: NA: Not Applicable, LC: Least Concern.

Reptiles and Lizard

During the present survey period some of the reptiles and lizard species were recorded in the buffer

zone of the present construction area while some information were also noted down by verbal

communication of the people living surroundings in the buffer area. A list of reptiles and lizard species

observed in the buffer area is given in Table 3.15.

Table 3.15: Reptiles and Lizard Species present in Buffer Zone

S. No. Scientific Name Common name Schedule Status

(WPA,1972)

IUCN

Status

Reptiles

1 Bungarus caeruleus Common Krait IV NA

2 Bungarus fasciatus Banded Krait IV NA

3 Naja naja Indian Cobra II LC

Page 87: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 78

4 Ophiophagus hannah King Cobra II V

5 Ptyas mucosus Rat Snake II NA

Lizards

1 Agama buberculatus Rock Lizard - DD

2 Chamelion calcarata Chameleon II DD

3 Hemidactylus flaviviridus Indian House Gecko - DD

Source:GRC Survey Data supported by Chhattisgarh Forest Department. IUCN Red list: DD: Data Deficient, LC: Least Concern.

Avian Fauna

During the present investigation it was observed that the various avian fauna are moving across the

mining area in the buffer zone. But, no fixed pattern in migratory behavior is noticed. No bird’s habitats

like nesting, breeding and forging patterns are noticed in the core zone as well as buffer zone. A list of

birds recorded in the buffer area of present construction project is given in Table 3.16.

Table 3.16: Avian fauna present in Buffer Zone

Sl. No. Scientific Name Common Name Abundance/

WPA-1972

1 Acridotheres tristis Common Myna C

2 Accipiter badius Shikra C

3 Aegithina tiphia Common Iora C

4 Ammomanes phoenicura Rufous-tailed VC

5 Anas acuta Northern Pintail C

6 Anas platyrhynchos Mallard NR

7 Anas poecilorhyncha Forester NR

8 Ardea cinerea Grey Heron C

9 Ardea purpurea Purple Heron NR

10 Aythya ferina Common Pochard NR

11 Bubulcus ibis Cattle Egret VC

12 Burhinus oedicnemus Stone-Curlew NR

13 Centropus sinensis Greater Coucal VC

14 Ciconia episcopus White-necked Stork VC

15 Coracias benghalensis Indian Roller VC

16 Cuculus canorus Common Cuckoo NR

17 Cuculus micropterus Indian Cuckoo NR

18 Dinopium benghalense Wood pecker VC

19 Egretta garzetta Little Egret VC

20 Eudynamys scolopacea Asian Koel C

21 Francolinus pondicerianus Grey Francolin C

22 Fulica atra Common Coot C

Page 88: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 79

23 Galerida cristata Common Crested Lark C

24 Gallinago gallinago Common Snipe NR

25 Hirundo rustica Common Swallow C

26 Milvus migrans Black Kite NR

27 Mirafra cantillans Singing Bush-Lark C

28 Motacilla cinerea Grey Wagtail C

29 Mycteria leucocephala Painted Stork C

30 Nettapus coromandelianus Cotton Teal C

31 Ocyceros birostris Indian Grey Hornbill C

32 Pavo cristatus Indian Peafowl VC

33 Pericrocotus cinnamomeus Small Minivet C

34 Plegadis falcinellus Glossy Ibis NR

35 Porphyrio porphyrio Purple Moorhen C

36 Pseudibis papillosa Black Ibis NR

37 Psittacula krameri Rose-ringed Parakeet VC

38 Pycnonotus cafer Red-vented Bulbul VC

39 Sarkidiornis melanotos Comb Duck C

Source:GRC Survey Data supported by Chhattisgarh Forest Department.

Note:VC=Very Common; C=Common; NR=Not Rare; R=Rare.

Aquatic Fauna

There is no any major aquatic habitat in the buffer zone except some sewage fed small ponds and some

monsoon fed streams. Some amphibians are commonly found at the places along the margin of aquatic

and terrestrial systems. Amphibian species recorded from buffer zone are listed in table 3.17.

Table 3.17.Amphibian Species Present in Buffer Zone of Present Project

S. No. Common name Scientific name Schedule /

WPA,1972 IUCN

1 Common Indian toad Duttaphrynus melanostictus IV NA

2 Indian skipper frog Euphlyctis cyanophlyctis IV NA

3 Indian bull frog Hoplobatrachus tigerinus IV NA

Source:GRC Survey Data supported.

3.4.6.5. Agricultural land

Chhattisgarh is a state in central India having an area of 135,194 sq. km. Chhattisgarh is a major source

of electricity and steel for India, accounting for 15% of the total steel produced in the country.

Page 89: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 80

Chhattisgarh is one of the fastest-developing states in India. The state is known for its abundant natural

resources including forest, minerals, rivers and valleys.

In Raipur district, a large numbers of population dependent on agriculture for their economic status.

Also, agriculture is the main occupation of the people living in the buffer zone. Important crops

grown in the area are wheat, rice, chickpea, soybean, lentil, black gram, linseed etc. The area also

produces vegetables like potato, cauliflower, onion, tomato, chilies and fruits like mangoes, guava,

citrus etc.

3.4.6.6. Fishery

Fisheries are an important economic activity in the state (including Raipur district) for additional

employment and income generation. Chhattisgarh is blessed with someRivers, Reservoirs, Dam and

ponds which supported the fish production in the state along with the Raipur district. Few fisherman

communities are involved in fish production and aquaculture practice in Raipur district. Whereas, in the

buffer area of present construction project, perennial water bodies for fisheries point of view are not

present.

3.4.6.7. Occurrence of Schedule-I and Rare, Endangered and Threatened Species (RET)

Overall studies reveal that, Schedule-I species as well as Plant species come under the category of RET

have not been observed from the buffer zone of Integrated Township Development Project. So, there is

no need of conservation plan. However, all care will be taken for protection of others flora & fauna also,

if any in the lease hold area.

3.4.7. SOCIO ECONOMIC IMPACT ASSESSMENT

3.4.7.1 INTRODUCTION

Socio-Economic Impact Assessment (SEIA) refers to the systematic analysis of various social and

economic characteristics of the human beings living in the geographical area/study area around the

proposed project location. SEIA is carried out separately but concurrently with Environment Impact

Assessment (EIA). The study area consists of core and buffer area around the project site. The SEIA

focuses on the likely effects of the project on social and economic well-being of the community. The

impact(s) may be direct or indirect, positive or negative.

Page 90: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 81

In this section of the EIA Report an attempt has been made to assess the Socio-Economic Impact of the

proposed ‘Integrated Township Project’ at village Banarsi, Ramchandi and Nakti, District Raipur in the

State of Chhattisgarh.

3.4.7.2 OBJECTIVES OF SEIA

The prime objective of the current study is to assess the likely impact of the proposed project on socio-

economic characteristics of people living in the study area. Further, it is to be established whether the

impact would be direct or indirect. Furthermore, it is to be examined whether the said impact would be

positive or negative. Lastly, it is to be comprehended if the impact is positive how long it would sustain

or if it is negative how soon the same could be eased.

3.4.7.3 SCOPE OF THE STUDY

The Scope of the study is as follows:

a) To collect baseline data of the study area.

b) To comprehend socio-economic status of the people of the study area.

c) To assess the probable impact of the project on social & economic aspects in the study area.

d) To evaluate the likely impact of the project on Quality of Life of the people living in the study area.

e) To ensure sustainability of the positive impact.

f) To suggest mitigation measures and agency responsible for taking action in case of adverse impact.

3.4.7.4 METHODOLOGY

For Socio-Economic Impact Assessment of the proposed project, we carried out systematic analysis of

the various socio-economic characteristics, both in terms of quality and quantity. Accordingly, both

qualitative and quantitative data was collected from secondary sources. The secondary data was

collected from the published data/information of the Census Authority. Records of the state and district

administration were also referred to.

For collection of primary data, a sample survey was conducted in the study area. In each selected

habitation, a specified number of representative households were selected scientifically for collection of

Page 91: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 82

information through face to face interviews with head of the household or any responsible member of

the family.

Census-cum Sample Survey in the Core Area

As the likely impact of the project will be greatest in the core area and it diminishes progressively when

move away from the core area to the periphery of the study area, a Census-cum-Sample Survey was

conducted in the core area for the collection of socio-economic data.

It is treated as a Census Survey because all the habitations located in the core area were surveyed for the

collection of information. Further, in each habitation a household survey was conducted by drawing

representative samples from a list of households prepared. Since, collection of information from all the

households in a habitation is time consuming and expensive, the Sample Survey

approach was adopted for collection of information from the selected households.

Sample Survey in the Buffer Area

In the buffer area, where the impact of the project progressively reduces with the distance from the

project area, two stage sample design was adopted. The first stage units were census village(s) and the

ultimate stage units were households.

Sample Design

Two-Stage Sampling Design was adopted in the study area. The First Stage Units were Census

villages/towns and the Ultimate Stage Units were households in the selected villages/towns.

Sample Size

The sample size at each level (village/town and household) was decided by using the formula = √

{(1.96 *σ)/Δ}; where = Sample size, 1.96 is the Table Value of Confidence Limit, σ = Standard

Deviation and Δ = Degree of Precision.

Selection of First Stage Units (Villages/Towns)

In buffer area the sample villages/towns were selected from the list of Census villages by adopting the

method of Probability Proportional to Size (PPS), the size being number of households in a given

village.

Page 92: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 83

Selection of Ultimate Stage Units (Households)

The sample households were selected from the list of households by adopting the method of Circular

Systematic Sampling. This method was adopted since the sampling frame i.e. the complete list of

households was readily available.

3.4.7.5 SURVEY INSTRUMENTS

The following Schedules/Questionnaires were developed for collection of primary data from the

households and villages/towns:

Questionnaire for Village/Town Particulars

Questionnaire for Household Details and Project Perception.

Each of these data instruments has segment blocks and there are both open-ended and closed-ended

questions.

3.4.7.6 CRONOLOGY OF VARIOUS STEPS TO PREPARE THE SEIA REPORT IS AS

UNDER:

3.4.7.7 PROJECT LOCATION AND ITS CONNECTIVITY

The project site is located at village Banarsi, Ramchandi and Nakti of district Raipur in the state of

Chhattisgarh. The total planning area of the project is estimated around 237.39 acres (96.07 ha). The

Literature Review

Referring to Terms of Reference (ToR)

Identification of the Study Area and

Important Landmarks

Preparation of List of Habitations

located in the study Area

Grouping of Habitations falling

under Core and Buffer Zones

Site Visit to collect the facts through

observations

Firming up of Approach & Methodology

Finalization of Questionnaire

/Schedules

Collection of Secondary Data

Collection of Primary Data from Sample Habitations

& Households

Manual scrutiny of Field-in-Schedules

Data Entry & Data Validation

Generation of Tables

Data Analysis

Preparation of Report

Page 93: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 84

lease area is well connected through road, railway and airport. The nearest highway is NH-6 which is

4.10 km in (N-E) away from the project site. Telibandha is the nearest railway station about 7.99 km in

the N-W from the project site whereas Swami Vivekananda airport is situated about 1.46 km in the South

from the project site.

3.4.7.8 STUDY AREA

The study area for the project is spread across a 10 km radius around the project having an area of

38,186.83 ha. In the study area there are 58 identified habitations which are distributed in rural and

various sectors and municipal wards of urban categories. The habitation in this area is largely

agricultural. The land use pattern of this area shows area under settlements of only 8.5% with the major

segment being agriculture land with a share of 80.0%. The segment-wise land use pattern of the study

area is detailed in Table 3.18 below:

Table 3.18 : Land Use Pattern of the Study Area

S. No. Land Use Pattern Area (In Ha) %

1. Settlement 3,251.3 08.5

2. Agricultural Land 30,540.3 80.0

3. Vegetation 171.06 00.4

4. Water Bodies/River 1,163.14 03.0

5. Open Scrub 984.22 02.6

6. Stone Quarry 481.08 01.3

7. Open Land 1,595.73 04.2

Total 38,186.83 100.0

Page 94: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 85

3.4.7.9 BASELINE DATA

The baseline data with respect to population and basic amenities in the study area is as under:

I. DEMOGRAPHIC PARTICULARS/POPULATION DETAILS:

The population of about 1,35,186 is housed in 27,657 households, giving an average household size of

five. The male-female population of 68,734 and 66,452 respectively gives a sex ratio of 967 females per

1000 males.

The total child population of 0-6 age group has been worked out to 21,561 which comprise around 15.9

per cent participation in the total population. The gender wise share in the population of 0-6 age group is

distributed with 51.0 per cent males and 49.0 per cent females. The sex ratio of this age group has been

worked out to 962 females per 1,000 males.

According to the Census of India-2011, the study area has total tribal population of 35,455 which

comprise 26.2# per cent of the overall population of the study area. In this tribal population, the share of

Scheduled Caste population has been worked out to 78.6* per cent of the total tribal population. Of this,

Settlement

8.5%

Water bodies

3.0%

Vegetation

0.4% Open scrub

2.6%

Stone Quarry

1.3%

Open Land

4.2%

Agri

80.0%

Land Use Patter

Page 95: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 86

the participation of male and female population is 50.3 and 49.7 per cent respectively. The sex ratio of

the Scheduled Caste population has been worked out to 987 females per 1,000 males.

Again, the share of Scheduled Tribe population has been worked out to 21.4**

per cent of the total tribal

population. Of this, the participation of male and female population is similar to Scheduled Caste i.e.

50.3 and 49.7 per cent respectively. The sex ratio of the Scheduled Tribe population has been worked

out to 989 females per 1,000 males.

The overall literacy rate in the study area is 75.5% with male literacy at 84.7% and female literacy at

66.0% which creates a gender gap of 18.7 per cent in the literacy rate. Rural population and households

predominate in the study area.

The above mentioned demographic details are presented in a tabular form 3.19 given below:

Table 3.19: Demographic Particulars/Population Details of the Study Area

S. No. Description Number Percentage to

Respective Total

1 Total Population 1,35,186 100.0

Male 68,734 50.8

Female 66,452 49.2

Sex Ratio 967

2 Population (0-6 Age Group) 21,561 100.0

Male 10,988 51.0

Female 10,573 49.0

Sex Ratio 962

3 Total Tribal Population 35,455 100.0 (26.2)#

Male 17,839 50.3

Female 17,616 49.7

Scheduled Caste Population 27,864 100.0 (78.6)*

Male 14,023 50.3

Page 96: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 87

Source: Census

of India, 2011

Further, based on Census of India-2011, the total number of workers in the study area is 52,596 which

are 38.9 per cent of the total population. Of the total workers, 68.5 per cent are male and remaining 31.5

per cent are female. Again, of total workers 76.8 per cent are Main Workers and remaining 23.2 per cent

are Marginal Workers. Of the total main workers, 75.7 per cent are male and the remaining 24.3 per cent

are female. Similarly, of the total marginal workers, 44.6 per cent are male and the remaining 55.4 per

cent are female.

Female 13,841 49.7

Sex Ratio 987

Scheduled Tribe Population 7,591 100.0 (21.4)**

Male 3,816 50.3

Female 3,775 49.7

Sex Ratio 989

4 Total No. of Households 27,657

Average Household Size 5

5 General Population (including OBC) 99,731 100.0

Male 50,895 51.0

Female 48,836 49.0

Sex Ratio 960

6 Total Literates 85,763 100.0

Male 48,898 57.0

Female 36,865 43.0

Overall Literacy Rate 75.5

Male 84.7

Female 66.0

Gender Gap in Literacy Rate 18.7

Table 3.20: Occupational Structure of the Study Area

S. No. Description Number Percentage to

Respective Total

Page 97: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 88

1 Total Workers 52,596 100.0

Male 36,014 68.5

Female 16,582 31.5

Gender Gap in Work Participation Rate 37.0

2 Main Workers 40,377 100.0

Male 30,559 75.7

Female 9,818 24.3

Gender Gap in Work Participation Rate 51.4

3 Marginal Workers 12,219 100.0

Male 5,455 44.6

Female 6,764 55.4

Gender Gap in Work Participation Rate -10.8

4 Household Industrial Workers 1,076 100.0

Male 726 67.5

Female 350

5 Agricultural Workers 24,370 100.0

Male 13,495 55.4

Female 10,875 44.6

6 Cultivators 8,681 100.0

Male 5,660 65.2

Female 3,021 34.8

7 Total Agricultural Labour 15,689 100.0

Male 7,835 49.9

Female 7,854 50.1

8 Total ‘Other Workers’ 27,150 100.0

Male 21,793 80.3

Page 98: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 89

Source: Census of India, 2011

II. BASIC AMENITIES & SOCIAL INFRASTRUCTURE:

EDUCATION

Educational Institutions

Primary School (Gov & Private)

Middle School (Gov & Private)

Secondary School (Gov & Private)

Senior Secondary School (Gov & Private)

School for Disable People (Gov)

Art & Science Degree College (Gov)

Engineering College (Gov& Private)

HEALTH

Health Institutions

Dispensary Primary Health Centre

Veterinary Hospital Primary Health Sub-Centre

Anganwadi

Centers/ASHA

Non-gov Medical Facility

Non-gov Medical Practitioner

WATER

Means of Drinking Water

Tap Tank/Pond/Other Sources

Hand pump River/Canal

Tube well

ELECTRICITY

Type of Electricity Available Power for Domestic Uses

Power for Agriculture Uses

Female 5,357 19.7

Page 99: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 90

Power for All Uses

TRANSPORT & CONNECTIVITY

Types of Road (s) Available Black Topped Footpaths

Gravel Roads Bus/Taxi Services (Private)

Railway Telibandha Railway Station (7.9 km in the N-W from the site)

Airport Swami Vivekananda airport- about 1.46 km South of

the project site

COMMUNICATION

Means of Communication Radio/Transistor Public Call Office (PCO)

Television Internet Cafe

Computer/Laptop Daily Newspaper

Telephone/Mobile Community Centre

BANKING & POST

Types of Banks Available Post Office

Commercial/Cooperative Bank

Agricultural Credit Society

OTHER AMENITIES & INFRASTRUCTURES

Types of Other Amenities &

Infrastructures

Recreation Centre

Cinema/Video Hall

Public Library

Birth/Death Registration Office

Public Distribution System (PDS) Shop

Agricultural Marketing Society

Source: Desk Research

3.4.7.10 SOCIO-ECONOMIC IMPACT OF THE PROJECT

Page 100: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 91

Impact on Demographic Composition

The proposed project will make some change in the demographic composition of the study area as the

additional estimated population of 43,319 including Residential Population, Commercial Population,

Public & semi-public Utilities, Maintenance Staffs and Visitors increase after the completion of the

project. Whereas the people recruited for providing employment will be met locally to the maximum

extent.

Hence, there is possibility of in-migration of people from outside the study area. Accordingly, there will

be some variation in the total population of the study area including that of sex ratio, when the project

completed.

Employment Opportunities

It is estimated that about 150-200 people will get employment due to the project. The proposed project

will provide employment mainly to the local people in the construction phase and during the operational

phase. Indirect employment is also expected due to the associated activities. It is a positive impact of the

project since it will provide employment opportunities to the local people.

Impetus to Trade & Business in Construction Materials

The proposed project will give much impetus to trade & business on construction materials in the

nearest market to the project area. It is expected that trading and business will flourish on various

construction materials namely coarse sand, fine sand, stone aggregate, cement, reinforcement steel,

pipes, bricks, conduit pipes, PVC overhead tanks, glaze & floor tiles, hardware, stainless sinks etc.

Impetus to Infrastructure Development

The project will pave the way for various infrastructure developments that includes roads, parks, play

grounds, schools, hospitals, bus shelters etc. This is a positive impact which will create further

employment opportunities for the local people.

Impact on Agriculture

There will be no negative impact on agriculture as no cultivation is taking place on the proposed area

and the area is likely to be free from annual floods, which destroy standing crops land and property.

Impact on Road Development

Page 101: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 92

Movement of trucks & tractors and other vehicles to & fro the project site is expected during the

construction period. Hence, there is ample scope for road development in the project area. Adequate

parking space within the project site will be developed for loading & uploading of materials.

There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow

smooth movement at the site.

Impact on Law & Order

As most of the workers to be employed in the proposed project are local residents no law & order

problem is envisaged. It is expected that the workers will attend to their duties from their residence and

return to their homes after the day’s work. However, to meet any untoward incident one police post may

be set up close to the project site.

Impact on Health

There are no chances of any major diseases due to the construction work.

However, to meet any emergency few safety measures are outlined below:

a) Safe Working Environment: The project proponent shall ensure health & safety of all the

employees at work. All efforts will be made to provide & maintain a safe work environment and

ensure that the machinery and equipments in use are safe for employees. Further, it will be ensured

that working arrangements are not hazardous to employees.

b) Provision of First Aid: In case of any accidents arising out of the proposed construction works,

timely and prompt first aid treatment is, often, the most important tool. Suitable first aid

arrangements shall be made at the site for rendering immediate first aid in case of any injury. The

first-aiders will be well trained in handling patients working in the project.

c) Regular Medical Examination: For all construction workers, medical examination will be made on

regular basis.

d) Health Education: Adequate health education and information related to the work will be provided

to the workers so that their health and safety can be ensured.

e) Tie-up with the Nearest Hospital for Medical Assistance: To meet the medical needs of the

construction workers in case of accidents, tie-up with nearest hospitals will be made. Efforts will be

Page 102: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 3

M/s DBH Township LLP Page 93

made to reserve a few beds in the said hospitals for the workers to meet any emergency. This will

ensure timely medical aid to the affected persons.

f) Supply of Mask and Gloves: The workers exposed to dust will be provided with dust masks to

prevent them from getting affected by respiratory diseases. Gloves will be provided to workers

working with hand tools, to ensure safety of their hands.

3.4.7.11 CONCLUSION

Due to the ‘Integrated Township Project’ the infrastructure of the study area may improve by setting up

and development of schools, hospitals & dispensaries, bank & post offices, bus shelters, roads, parks,

play grounds etc. This will give a boost in the quality of life of people of the study area.

The Socio-Economic standard of people living in the study area will improve due to employment

opportunities created due to the project. This will lead to better quality of life and will also set a standard

for future development in the study area.

In the study area, there is large scope of improving basic amenities & social infrastructures facilities. It

is expected that same will improve with operational running of the project and promoting the CSR

activities by the project proponent.

The overall impact of the project is expected to be positive for the habitants of the area and the persons

associated with the project.

Page 103: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 94

CHAPTER-4

ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

MEASURES

4.1 INTRODUCTION

This chapter discusses identification and appraisal of various environmental impacts due to

Integrated Township Project. Generally, the environmental impacts can be categorized as either

primary or secondary. The development, construction and functional phase of the project

comprise various activities, each of which may have some impact on environmental parameter.

Various impacts during the development, construction and operation phase on the environmental

parameters have been studied to estimate the impact on environment. Integrated Township

Project will be constructed and developed gradually in the time span of 2-3 years (approx.). In

development phase, basic infrastructure facilities like internal road, sewerage system, storm

water drainage, street lighting etc. will be developed.

For proper evaluation and assessment of the environmental impacts due to development,

construction and functional phase of project understanding to the various activities associated

with the Integrated Township Project is essential. Various activities related to the project would

be different, in terms of nature during the development, construction and functional phase.

The impact identification and prediction process aims to:

• Identify potential source or cause of impact through out the life of project.

• Characterize the potential impacts affecting a target or receptor (physical, human and

socio-economic).

• Assess the potential of changing likely-hood of impact through Environmental

Management Plan (EMP).

• Prediction of the impacts due to the development, construction and functional activities

encompass the developmental processes to be undertaken during construction and functional

phases.

For each category of environmental receptor (such as, ambient air quality, water quality, soils,

land, etc.) the potential impacts of activities during development & construction and functional

phases have been identified. Pollution sources & its characteristics, the potential impacts and

magnitude of the impacts have been assessed and discussed in detail in following sub sections.

Page 104: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 95

In each case, cognizance has been taken to mitigation measures inherited in the development &

construction and functional phase.

4.2 IMPACT MATRIX

Various activities from the Integrated Township project are likely to have some impact on the

environmental constituents during its construction as well as operational phase. The impact

assessment matrix given in Table 4.1 reveals the impact associated with each activity of the

project on various environmental parameters during construction and function phase respectively

before any mitigation measures are implanted. To assess the severity of the impacts, they are

categorized as follows:

Page 105: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 96

Table 4.1: Impact Assessment Matrix of Project on environmental components

Environmental

Parameters

Nature of Potential Impacts during Construction and Operation Phases

Local Regional Short Term

Long Term

Reversible Irreversible Adverse Beneficial No Impact

Significant Insignificant

Topography

√ √ √ √

Drainage

√ √ √

Soil

√ √

Water Resources

√ √ √ √

Water Quality

√ √

Land Use

√ √ √ √

Air Quality

√ √ √ √

Noise

√ √ √ √

Flora

√ √ √ √ √

Fauna

√ √ √ √ √

Employment

√ √ √ √ √

Aesthetic

√ √ √ √ √

Page 106: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 97

4.3 POLLUTION SOURCES

Pollutants generated in the development of Integrated Township project during both the

construction and functional phases are solid, liquid and gaseous in nature. Also the generation of

pollution could be continuous, periodic or accidental. Sources of pollutants and their

characteristics during the construction and functional phase are given below in Table 4.2.

Table 4.2: Pollutant Sources

SI. No. Activity /

Area Pollutant Sources Frequency

CONSTRUCTION PHASE

1. Site preparation and construction activities

Air emission- SO2, & NO2.

Dust from construction activities and excavation. Particulates matter, NO2 and CO from vehicle exhaust

Temporary during construction phase only. Bulk of the emissions is expected from ground work and leveling.

Earth/Solid waste

Solid waste from construction activity and excavation.

Periodic.

Hazardous waste generation such as used oil and paints.

From D.G. Sets and painting of the buildings.

Periodic and temporary

Noise Noise generated from construction equipment and machinery

Temporary lasting the construction phase.

2. Labour Camps

Sewage Sewage generated from temporary labor camps on site.

Temporary-during the initial construction phase

Solid Waste Solid Waste generated from

Temporary- during the initial

Page 107: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 98

SI. No. Activity /

Area Pollutant Sources Frequency

temporary labor camps on site.

construction phase

OPERATIONAL PHASE

1. Vehicular movement

Air emissions and noise

Vehicle exhaust emissions

Continuous/ periodic

2. Noise Noise due to running of equipment

Occasional - during power failure

Hazardous Waste Used Oil Generation

Occasional- during oil changes

3. Maintenance / House- keeping

Sullage Floor washing Sewage

Continuous

Solid waste Residential, Commercial and garden wastes

Continuous

4. Vehicle Parking

Oil spills Minor oil leaks Parking space

Continuous

5. Storm water drains

Rainwater Contamination discharge from site-mainly suspended solids

During rainy season

4.4 IMPACT IDENTIFICATION

The areas of environmental concerns for which the impacts and their predictions are taken into

consideration are mainly:

• Air Environment

• Water Environment

• Noise Environment

• Land Environment

• Biological Environment

• Socio economic Environment and

• Aesthetics Environment

Page 108: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 99

The impacts can be further categorized as positive impacts and negative impacts depending upon

their nature, potential and magnitude.

4.4.1 Environmental Aspects of Development & Construction Operations

• Generation, storage and disposal of construction wastes;

• Noise pollution due to plant, machinery, equipments and vehicle movement;

• Air pollution due to plant, machinery, equipments and vehicle movement;

• Generation and disposal of sullage;

• Impact on ecology;

• Consumption of resources such as water, electricity, and diesel.

• Physical change in landscape due to earth work excavation and related activities.

• Soil erosion caused due to loss of vegetation and other construction activities.

4.4.2 Environmental Aspects of Building Planning and Use

Impacts identified during operation of the Integrated Township Project and their use includes

major concerns such as:

• Disposal of domestic (sewage) effluent generation

• Disposal of solid wastes generated in the Residential Plotted colony project from house,

commercial and horticulture

• Increase in noise levels due to transport

• Consumption of water and impact on water resources

• Impact on traffic on the road

• Storm water during rains

• Management and maintenance project

Environmental aspects of the project are not just limited to impact of sources of pollution but

also relate to energy conservation, water conservation and other issues, which are mentioned in

Table 4.3.

Table 4.3: Environment aspects of project other than source of Pollution

S.No. Area Aspect

I. Energy conservation

• Solar Heating, Day Lighting, Design Natural Ventilation, Thermal Transfer value of Building Material, Energy Efficient

Page 109: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 100

Building Services and Equipment, • Solar and CFL’s Lighting in Public Area. • Solar Street Lighting

II. Water conservation

• Reuse of Recycled Water • Gardening Water sources • Rainwater Harvesting

III. Internal Roads and Accesses

• Pedestrian Access Ramps for Disabled persons Road painting and Signage Speed Breakers

IV. Material Use • Construction Materials Selection • Paint Selection • Use of Recycled Materials • Use of Timber

V. Aesthetics during functional Use

• Clothes Drying Facilities • Visitors Parking • Playground for children • Service Roads for walking • Flower bed water disposal • Provision for Garden and Group housing • Maintenance Staff

4.5 ASSESSMENT OF ENVIRONMENTAL IMPACTS DURING DEVELOPMENT

AND CONSTRUCTION PHASE

4.5.1 Topography

Impact: Topography around the project is almost plain. Therefore, topography and

physiography of the area will not be affected during the construction and post construction phase

of the project. Hence, no significant impact is anticipated on the topography and physiographic

from project by M/s DBH Township LLP.

It is further proposed to maintain 10 % of the total area as green through plantation of various

local and aesthetic species to improve the vegetation covers of the area.

Mitigation Measure: Since there is no significant impact on topography from the project, no

detailed mitigation measures are proposed. It is however proposed that apart from the proposed

plantation greens, turfing with local species will be carried out extensively.

Page 110: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 101

4.5.2 Land Use Pattern

Impact: Integrated Township Project will be developed as per Land Use Permissibility of Layer

II of Naya Raipur Development Plan which demarcates the project site as residential zone.

Hence, no significant impact is expected from the project which will be constructed after

obtaining all necessary permissions.

4.5.3 Land Environment

Impact: At Integrated Township Project, soil would be excavated at project site for foundations

of residential, commercial and other purposes. During the disposal of redundant overburden, soil

of filling area would be covered and lost permanently.

The soil excavated during construction will be first temporarily stored in an area earmarked and

then shall be used to fill up low lying area in and around the project site and rest of the soil shall

be transported by road to fill up low lying areas elsewhere. Proper drainage system shall be

provided to deal with the storm water in case of rain. The impact on soil during construction

phase will be marginal and reversible in the nature.

Mitigation: It is proposed to remove vegetative cover only from the specific site on which

construction is to take place and allowing minimal disturbance to the vegetation in adjacent

areas. Land clearing activities only confined to necessary areas. The top soil will be stripped

from constructional areas and stockpiled for later reuse in landscaping. The number, frequency

and area of movement of heavy machinery will also be restricted.

4.5.4 Water Environment

4.5.4.1 Ground water Quality

Impact: No hazardous chemical and material will be used in the development and construction

phase of Integrated Township project. Debris and wastes generated during this phase will be

collected and disposed suitably. Therefore, possibility of contamination of ground water will be

negligible. Hence, no impact is anticipated on the ground water quality during the construction

phase.

Page 111: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 102

Mitigation: A well planned solid waste management plan will be followed during the

construction phase including timely collection, segregation and disposal as per legal

requirements.

4.5.4.2 Ground Water Hydrology

Ground Water Hydrology

Impact: In the area around the Integrated Township project, rich aquifers are present. Water

requirement during construction phase will vary depending upon construction activities and will

be met from Canal water. Water will be required for site preparation activities dust settlement,

consolidation, compaction and curing as well as building construction and drinking water

requirement. The requirement of construction water will not put sudden pressure on the available

ground water recourses of area. Therefore, impact on ground water resources will be

insignificant during construction of project.

Mitigation Measures: Although no significant impact is anticipated on the groundwater regime,

it is proposed to carry out the following to further minimize the demand on freshwater resources:

• Curing water will be sprayed on concrete structures and free flow of water not allowed.

• After liberal curing on the first day, all concrete structures will be painted with curing

chemical to save water to stop daily water curing hence save water.

• Concrete structures will be covered with thick cloth/gunny bags and then water sprayed

on them to avoid water rebound and ensure sustained and complete curing.

• Ponds will be made using cement and sand mortar to avoid water flowing away from the

flat surface while curing.

• Water ponding will be done on all sunken slabs. This will also highlight the importance

of having an impervious formwork.

4.5.5 Air Environment

Emissions Source: The potential sources of air emissions during the construction and

development phase of the project will be as follows:

• Dust from earth works (during site clearance and preparation);

• Emissions from the operation of construction equipment and machines;

Page 112: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 103

• emissions from vehicles running to site;

• emissions during the unloading of material at the site;

• emissions during mixing of cement with other building materials during development and

construction activities;

• Air emissions other than dust arise from combustion of hydrocarbons. The pollutants of

concerns are NO2, SO2, CO, particulate etc.

Potential Impacts: Ambient air quality effects are normally assessed in relation to their

potential to cause;

• Health deterioration and nuisance in local communities

• Health deterioration amongst onsite workers

Assessment of the impacts from Dust Emissions: During the excavation of channels,

foundations, unloading of construction material, cement bags and mixing of cement with other

building materials such as brick and silica dust, wood dust, fugitive dust emissions may be

emitted at construction site. During construction, curtaining floors from all sides will be done to

prevent cement dust from becoming airborne. It may be noted that all the emissions will be in the

form of coarse particulate matter and settle down ultimately in closed vicinity of construction

site. Therefore, no significant impact is anticipated due to dust emission during development and

construction phase.

4.5.6 Noise Environment

During the construction phase of project, noise will be generated from the various sources. Some

major sources of noise generation at project site are listed here under:

• Generation of noise during movement of vehicles carrying materials and loading &

unloading activities.

• Generation of noise from excavation machines, concrete mixer and other construction

machines,

• Generation of noise during concreting, hammering, etc.

Page 113: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 104

All the above-mentioned sources of development and construction activities at Integrated

Township project would be intermittent and experienced occasionally. It may also be noted that

the most of the construction activities would be carried out only during the daytime.

The expected noise levels from various activities are given hereunder:

From vehicles bringing materials to the site 70 dB (A)

Excavation 80 dB (A)

Concrete Mixtures 80 dB (A)

Hammering 85 dB (A)

Resultant Noise Level:

The combined effect of above sources can be determined as per the following equation:

Lp (total) = 10 log (10(Lpl/10) + 10(Lp2/10) + 10(Lp3/10) +……..) ……. (1)

Where: Lp1, Lp2 and Lp3 are noise pressure level at a point due to different sources in dB (A). The

resultant maximum noise level for the above sources as calculated using equation (1) is 89.3 dB

(A).

For an approximate estimation of dispersion of noise in the ambient air from the sources point, a

standard mathematical model for sound wave propagation is used. The sound level generated by

noise source decrease with increasing distance from the source due to wave divergence. An

additional decrease in sound pressure level from the source is expected due to atmospheric effect

or its interaction with objects in the transmission path.

For hemispherical sound wave propagation through homogenous loss of free medium, noise

levels at various locations can be calculated due to different sources using model based on the

first principles as per the following, equation:

Lp2 = Lp1 -20 log (r2) – 8 ………. ( 2 )

Where: Lp2 and Lp1 – Sound Pressure Level (SPLs) at points located at sources and at distance

of r2 from the source respectively in dB (A).

Assuming no environmental attenuation factors, noise modeling has been done, which shows

that noise level will be mingle with baseline noise level with in short distance of 200 m as the

difference between background (56.8) and the projected noise level will be 10.6. Noise modeling

results for construction phase have been given in Table 4.4.

Page 114: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 105

Table 4.4: Noise Levels

The noise produced during, development and construction phase will have temporary impacts on

the existing, ambient noise levels at project site Therefore, the impact of noise levels on

surrounding area will be insignificant during the development and construction phase.

Mitigation: To minimize impacts of noise generation from construction activities, the workers

will be provided with ear muffs and other protection devices.

4.5.7 Terrestrial Ecology

Impact: There is no loss of forestland due to the construction of the Integrated Township

project. No tree felling is involved, as the site is devoid of vegetation.

Birds and other domesticated biodiversity observed near the project site are common and already

adapted to thrive in human - colonized habitats. The project will not have any major negative

ecological impact. There is no forest near the project site and therefore there will be no effect on

the ecology of the area.

Mitigation Measures: However, it is to develop extensive green areas in the project site to

improve the aesthetics of the area which will also help in reduction of air pollution, noise

pollution and provide suitable habitat for local birds and animal species.

4.5.8 Economic Impacts

Impact: Relatively long-lived economic impacts of the development and construction phase are

likely to be experienced in local area for the duration of construction phase of 2 years as workers

make everyday purchases from local traders in near by areas. This is likely to give a short-lived

stimulus to the traders that may disappear as soon as the construction is complete. Noticeable,

flow-on economic impacts will be experienced in other sectors of economy as a result of

purchase of construction materials and the payment of wages and salaries to the personnel

S.NO. Distance (km) Sound Pressure level

1 0.1 52.3

2 0.2 46.2

3 0.5 43.3

Page 115: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 106

engaged in the development and construction of colony. Once the development and construction

of residential project will complete, there will be some long-term positive impact on the

economic structure of the area. People in the area will get direct and indirect employment

opportunities and other benefits from the residents of the Integrated Township Project.

Therefore, overall positive impact is anticipated on economy of the area due to development and

construction activity of the Integrated Township Project.

4.5.9 Socio-Economic

During the development and construction of Integrated Township Project, about 300 to 400

skilled and semiskilled and unskilled workers per day will get direct employment opportunity,

which will have beneficial impact on the local people and improve socio-economic conditions of

the area.

4.5.10 Construction Camp

Impact: During the development and construction phase, most of the laborers will be from local

areas as Integrated Township Project will be developed gradually in the time span of about 5

years. Therefore, laborer camps will be constructed to accommodate the laborers at the project

site. This may lead to sanitation problems in the absence of adequate facilities.

Mitigation: Suitable measures will be taken at the construction camps to mitigate anticipated

impacts due to temporary accommodation of laborers such as provision of clean drinking water,

adequate toilet facilities, water and solid waste disposal system.

Other safety precautions to be maintained at work site including provision of PPEs, guarding of

dangerous machine parts, maintenance of equipments as hoists and lifts etc, and adequate

provision of different types of fire extinguishers will be made. All applicable rules and

regulations pertaining to workplace health and welfare of workers will be adhered to.

4.5.11 Solid Waste Management

Impact: The construction and demolition waste includes debris, concrete (often recycled and

reused at the site), steel and other metals, pallets, packaging and paper products, fluorescent

tubes, wood beams, joists, studs, baseboards, cabinets and cupboards, railings, brick, doors and

casings, interior windows, bathroom fixtures, light fixtures, ceiling grid and tile, furnishings,

Page 116: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 107

replant trees, shrubs. All wastes generated during the construction phase shall be collected and

segregated for disposal as per the standard practice.

During the development and construction phase, some amount of debris, cuttings of construction

materials may be observed at construction site. However, the quantity of these waste materials

would be very small and limited up to the construction site only. There will be no contamination

due to this waste as it will be collected time to time during construction phase and disposed

accordingly.

Mitigation Measures: After due waste segregation, recyclable wastes will be sold off to scrap

dealers and vendors, while inert wastes will be disposed off in landfills. Hazardous wastes will

be disposed off as per the provisions of the Hazardous Wastes (Management & Handling Rules,

1989).

4.5.12 Transport Linkage and Traffic

Impact: During development and construction phase, construction labour and construction

materials bringing vehicles will approach the project site. The residential colony is well

connected to neighborhood, where public transport facility, like, buses and minibuses are easily

available in the area as transport linkage. During construction phase, some impact is anticipated

on the transport linkage of the area, however increase in traffic will not adversely affect the local

traffic pattern since the site is well connected by broad road and present traffic load on these road

are not significant.

Mitigation: Through careful planning, the movement of the heavy vehicles will be scheduled to

reduce load on existing traffic such that the peak hours are avoided. It shall also be ensured that

all the vehicles to the site will be provided with Parking space such that there is no waiting time

along the access roads.

Page 117: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 108

4.6 ASSESSMENT OF THE ENVIRONMENTAL IMPACTS DURING OPERATION

PHASE

4.6.1 Land Environment

Impact: During the operation phase of the project, the soil may get polluted/ contaminated from

littering of various kinds of wastes generated within the site such as food items, paper, wood

pieces, paints, pesticides, oil & grease etc. However, owing to the proposed solid waste

management system, no significant impact is anticipated.

Mitigation Measures: To ensure against any chances of soil pollution, it is imperative to

establish a well planned solid waste collection system covering all areas of the project site apart

from door to door for the residential units. An identified area shall be designated for storage and

segregation of the wastes which will be treated/ disposed as per their characteristics.

4.6.2 Water environment

4.6.2.1 Ground water hydrology

Impact: During post construction phase, the total water requirement of the Integrated Township

Project is approx. 4,752 KLD, out of which total domestic water requirement is 3,986 KLD, say

4.0 MLD. The fresh water requirement is approx. 2,790 KLD which is 70% of the domestic

water demand. The water supply will be from Canal Water. Therefore, no significant impact is

anticipated on ground water resources due to project.

Mitigation Measures: The rainwater harvesting will recharge groundwater aquifers from the

open areas. Treated wastewater from the site will be recycled for landscaping and flushing to

further reduce demand on freshwater resources.

Water meters conforming to ISO standards should be installed at the inlet point of water uptake

and at the discharge point to monitor the daily water consumption. To further lower the water

consumption, options of Low flow flushing systems, sensor based fixtures, waterless urinals, and

tap aerators etc will be explored.

4.6.2.2 Ground Water Quality

Impact: The storm water from the site will be used for recharging groundwater resources after

adequate treatment of the storm water through oil, grease traps and filtration. The wastewater

Page 118: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 109

from the site is proposed to be used for landscaping only after adequate treatment in Sewage

Treatment plant. Hence, no adverse impact is anticipated on the groundwater quality form the

project.

Mitigation Measures: The Integrated Township Project will be well maintained. Solid waste

management practices will be adopted and followed to prevent groundwater pollution through

leaching.

4.6.3 Air Environment

Impact: During the post construction phase, cars, scooter/motorcycle will be owned by the

population of Integrated Township Project. Vehicular emissions will be major source of air

pollution. Quantum and dispersion of pollutants form vehicular emission will depend upon the

following:

• Emission of pollutants from additional traffic on the roads due to the projects,

• Meteorological conditions.

From vehicular emissions, PM, NO2, SO2 and CO is pollutants of primary concern released from

traffic movement. The dispersion of vehicular emissions would be confined within 300 m from

the road and from the line source model it is observed that concentration will decrease with the

increase in distance from road. It is anticipated that the contribution of vehicular emissions in

ambient air quality will be marginal but well within the stipulated National Ambient.

There is provision of 4 no. of DG sets of total 1, 270 kVA (1 X 320 kVA + 1 X 625 kVA + 1 X

125 kVA + 1 X 200 kVA) capacity for power back up in the Township Project only for Public

Utilities and External Lighting. The DG sets will be equipped with acoustic enclosure to

minimize noise generation and adequate stack height for proper dispersion. Multistoried Group

Housings, Commercial Building, Institutional Buildings etc. will have their own standby supply

arrangement.

Mitigation Measures: In the Integrated Township Project, green belt will be developed inside

the premises of the project site and along the internal road, which will work as barrier for the

movement of pollutants and help in pollution control.

Page 119: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 110

WRPLOT View - Lakes Environmental Software

PROJECT NO.:

DATE:

3/18/2016

MODELER:

COMPANY NAME:

COMMENTS:WIND ROSE PLOT:

Wind rose for Oct-Dec 2015

NORTH

SOUTH

WEST EAST

5%

10%

15%

20%

25%

WIND SPEED

(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 0.00%

AVG. WIND SPEED:

1.17 m/s

CALM WINDS:

0.00%

TOTAL COUNT:

2208 hrs.

Figure 4.1: Wind rose - (Winter season for 1

st October 2015 to 31

st December 2015)

Model details and Frame work of Computation:

The predictions for air quality during operation phase were carried using CPCB/MoEF approved

“USEPA, Industrial Source Complex (Version - ISCST3)” Dispersion model developed by the

US Environmental Protection Agency (USEPA) for prediction of pollutants dispersion from

single or multiple point sources using emission and hourly meteorological data of the study

period. Assumption used in the model was as follows:

• The plume rise is limited to that of the mixing layer as published by IMD in the

Catalogue of Atlas of Mixing Heights in India for the site

• Stack down-wash is not considered.

• Flat terrain is used for computations;

Page 120: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 111

• It is assumed that the pollutants do not undergo any physico-chemical transformation.

• Chemical and scavenging process occurred in the atmosphere in the pollutants released at

the stack exit is not considered.

• Prediction is based on single/multiplepoint sources, pollution released at stack exit and

dispersed on the ground under influence of local meteorological conditions during the season.

ISCST3 dispersion model was used to predict GLC caused by a single point source (4 stacks) at

each receptor of 40 m x 40 m of grid network covering total area of 2000 m x 2000m around the

proposed source with stack & emission values and 1-hourly meteorological data. It was

observed that SO2, NO2, Co and PM were significant pollutants released from the fuel of the

D.G. sets. Emission of PM, CO and SO2 were found insignificant with low values compared to

NO2. In this project, NO2 was the worst affected pollutant released into the atmosphere (Table

4.5) with high emission value.

Table 4.5 Stack and Emission Details

Note:-DG set will be operated only for Public Utilities and External Lighting.

Discussion of Results

Stac

k

No.

DG set

Capacity

(kVA)

Stack & Flue details Pollutants Emission

Height

(m)

velocit

y

(m/s)

Temp

(K)

Diamete

r (m)

NO2

(g/s)

SO2

(g/s)

PM

(g/s)

CO

(g/s)

1. 625 kVA 30 25 773 0.338 0.318 0.039 0.009 0.122

2. 320 kVA 30 25 773 0.245 0.163 0.020 0.005 0.062

3. 200 kVA 30 25 773 0.153 0.102 0.012 0.004 0.152

4. 120 kVA 30 25 773 0.096 0.063 0.007 0.001 0.034

Total Emission in g/s for 1270 KVA (i.e. 1 x 62.5 KVA

+ 2 x 82.5 KVA + 1 x 125 KVA+ 2 x 160 KVA+ 1 x 200

KVA) 0.646 0.078 0.019 0.37

Page 121: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 112

ISCST3 - Dispersion model was used to predict GLC of all pollutants; SO2, NO2, CO and PM

with stack & emission and hourly meteorological data. 24-hours average maximum Incremental

GLC of NO2 was to be 6.90 µg/m3occurred at (500m, 500m), NE from the DG sets fitted with

30 m chimney. It was found that GLC of NO2 was less than the permissible limit of 80µg/m3 (as

per CPCB guidelines) under worst meteorological condition (Table 4.6) with meteorological

data monitored on 8th Oct 2015.

Table 4.6 Meteorological data for the 24-hour average maximum predicted Concentration

under worst meteorological condition

Year Month Day Hour Wind

direction

Wind

Speed

Temperature

2015 10 8 1 45 1.0286 298

2015 10 8 2 45 1.0286 298

2015 10 8 3 45 1.0286 298

2015 10 8 4 45 1.0286 296

2015 10 8 5 45 1.0286 296

2015 10 8 6 45 1.0286 296

2015 10 8 7 225 1.0286 299

2015 10 8 8 225 1.0286 299

2015 10 8 9 225 1.0286 299

2015 10 8 10 225 1.0286 305

2015 10 8 11 225 1.0286 305

2015 10 8 12 225 1.0286 305

2015 10 8 13 225 1.0286 307

2015 10 8 14 225 1.0286 307

2015 10 8 15 225 1.0286 307

2015 10 8 16 225 1.0286 304

2015 10 8 17 225 1.0286 304

2015 10 8 18 225 1.0286 304

Page 122: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 113

2015 10 8 19 225 1.0286 300

2015 10 8 20 225 1.0286 300

2015 10 8 21 225 1.0286 300

2015 10 8 22 225 1.0286 299

2015 10 8 23 225 1.0286 299

2015 10 8 24 225 1.0286 299

Spatial distribution of NO2 is shown in Isopleth Figure 4.2. It was observed that GLC closed to

the proposed source will be not significant. 24-h maximum incremental GLC was 6.90 µg/m3

occurred at the distance 707.10 m, NE of the project site.

Conclusion

Maximum Incremental GLC of NO2 is 6.90 µg/m3 due to DG sets in the Integrated Township

project. High to moderate wind speed and minimum stack height of 30 m facilitates dispersion at

the distance of 707.10 m NE under the influence of local meteorology. Low GLC of pollutants

was predicted due to high Stack height of 30 m fitted with DG sets. Predicted GLC of all

pollutants are given in Table 4.7 as below:

Table 4.7 Predicted GLC of All Pollutants

S.No. Pollutants Maximum Incremental

GLC (µg/m3)

Distance of occurrence

1 NO2 6.90 707.10 m, NE

Low incremental value was predicted from DG sets due to high stack height of 30 m. No

significant impact was envisaged due to proposed DG sets to be installed at site.

Page 123: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 114

Figure 4.2: Spatial distribution of 24-hours average NO2 maximum incremental GLC (6.90

µg/m3). Moderate to high wind speed and stack height of 30 m facilitates dispersion at long

distance of 707.10 m, NE under the influence of local meteorology.

Mitigation Measures: The project proponent will develop a green belt inside the premises of the

project site and along the internal road, which will work as barrier for the movement of

pollutants and help in pollution control.

Page 124: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 115

4.6.4 Noise Environment

Impact: The main sources of noise from the project are running of D.G. Sets and vehicular

traffic. D.G. Sets will provide emergency electricity supply during power failure. This will be

intermittent and for short durations. The vehicles playing within the site will be mainly of the

residents and are hence not expected to cause unnecessary noise. Hence, during this phase, no

major impact on noise environment is anticipated.

Mitigation Measures: D.G. Sets will be fitted in acoustic enclosures to control the noise

generated within 25 dB (A) insertion loss or for meeting the ambient noise standard whichever is

on higher side as per E (P) Act, GSR 371 (E) and its amendments. Adequate personnel protective

equipment (PPE) will be provided. The traffic noise will diminish within a short distance from

the source of origin. Honking within the site will be discouraged. Proposed rows of plantation

will further restrict the noise on other side of the plantation i.e. outside the boundary.

4.6.5 Terrestrial Ecology

Impact: The project proposes 91,860 m2 of green area (10% of net planned area, excluding EWS

area) that will be planted with local species with aesthetic appeal that will attract local bird and

insect species. As against the existing barren stretch of land, the project will add to the greenery

and beauty of the region.

Mitigation Measures: Various kinds of plantation such as curtain, avenue and ornamental

plantation and lawns will be started during the construction phase itself and maintained during

the operation phase. Open space and Parks will be fenced through the grasses and ornamental

plants. Local and low water demanding plants that will also be effective as sinks for various

pollutants and attract birds will be grown in the site that will contribute in positive to the local

ecology.

4.6.6 Socio-economic Impact

Impact: During operational phase of Integrated Township Project, more than 200 persons will

get employment opportunities as staff for management, maintenance and security. As an

Page 125: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 4

M/s DBH Township LLP. Page 116

estimate, during post construction phase, more than 400 persons will get marginal employment

opportunities from the residents of Integrated Township Project who would work as domestic

helpers. This will help in improving the quality of life of economically weaker sections of the

local area.

Mitigation Measures: To further improve the socio-economic conditions of the area, it may be

proposed to employ mainly local people as workers. Much of the maintenance arrangements may

also be made with local companies and purchase of new parts from the local market.

4.6.7 Transport Linkage and Traffic

Impact: The vehicle from the project will increase car and two wheeler traffic load along the

road during peak hours. However, since present load is lean, increase in traffic load may not lead

to traffic congestion problem.

Mitigation Measures: As per the conceptual plan, the entrance to the project site is proposed

along the road. The available width provided shall have sufficient merging space for the vehicles

while meeting the road.

4.6.8 Energy Resources

Impact: During the operation phase of the project, electric supply will be provided from

Chhattisgarh State Power Distribution Company Limited. The proponents will make

arrangements for meeting any electricity shortage for the project. Therefore, energy resources of

the region will not be affected significantly.

Mitigation Measures: To promote energy conservation, it is proposed to provide the buildings

with low energy consuming fixtures maximize availability of natural light.

Page 126: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 117

CHAPTER-5

ANALYSIS OF ALTERNATIVES

5.1 INTRODUCTION

This chapter discusses the assessment of various options that may be available for different

components of the project in terms of environmental suitability. Lately, there are a number of

options available for the use of building materials, means of energy conservation and methods of

transportation. The various applicable options are thus evaluated for their suitability to project

and environment.

5.2 BUILDING MATERIALS

The choice of building materials plays an important role in terms of energy efficiency of the

building. The manufacturing of building materials should also be assessed to ensure the use of

environment friendly and recycled/recyclable construction materials.

5.2.1 Wall

Conventionally, sun burnt clay bricks are cemented in the construction of walls. The strength of

these construction materials cannot be compromised which will otherwise pose a threat to the life

and property of the occupants. However, presently, materials with similar properties are easily

available that are made of waste products, thereby reducing the waste burden and conserving

natural resources. Thus, the project proposes the use of the following for walls:

Brick and block products with waste and recycled contents such as fly ash (15 to 35%),

blast furnace slag (20 to 25%), sewage sludge, waste wood fibre etc.

Fly ash based lightweight aerated concrete blocks (CLC blocks) – flyash being a waste

product of thermal power plant poses the challenge of disposal. Hazardous in powder

form, it is rendered harmless when moulded as bricks. Fly ash-based lightweight aerated

concrete blocks are manufactured for walling and roofing purposes by mixing fly ash,

quick lime, or cement and gypsum with a foaming agent like aluminium powder

Fal-G products – are manufactured by use of two waste products being fly ash, calcined

gypsum (a byproduct of phosphogypsum or natural gypsum) along with lime.

Perforated bricks

Page 127: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 118

Materials proposed for use in the wall openings such as doors and windows include:

Precast thin lintels, use of ferrocement-sunshade cum lintel etc.

Renewable timber

Steel manufactured from recycled content

Aluminum manufactured from verified recycled content

Saw dust based doors and window frames

Ferrocement shutters, PVC doors and windows, Rice husk boards, Natural fibre-

reinforced

Polymer composite door panels

The finishing for the openings will be by the use of Fly ash, Ceramic tiles, Terrazzo

floors.

5.2.2 Roof

The conventional material used for roofing is RCC, as it is suitable for longer spans. The

constituents of RCC, i.e. cement, sand, aggregate and steel are energy intensive materials and

high embodied energy content.

Alternately, it is proposed to use lightweight synthetic aggregates such as fly ash based

aggregates, which is suitable for manufacture of brick, blocks, and is good substitute for clinker

and natural aggregates. When pre-cast/aerated cellular concrete walling blocks and roofing slabs

are used in multi- storied structures, they reduce the weight, resulting in a more economical

design. They have high rating to fire resistance and provide better insulation and thus improved

energy efficiency. These are manufactured by the aerated cellular concrete manufacturing

process.

5.2.3 Superstructure

Structural frame of building comprises of footing, columns, beams and lintels, over which the

envelope of building is supported. A variety of metals are used in buildings, but the major

building material used structurally is steel. Steel has a high-embodied energy and recyclable

content, as well as scrap value. Aluminum forms the second most common material used for

Page 128: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 119

roofing sheets, window frames, and cladding systems, which has the highest recyclable content.

Hence, bulk of the metal needs for the building shall be met by steel and aluminum.

Problem with RCC. The choice of cement will be:

Use of fly ash and/or blast furnace slag concrete: The amount of cement used in

concrete can be reduced by replacing a portion of the cement with coal fly ash (waste

material from coal burning power plants) and/or GGBF (ground granulated blast furnace)

slag in conventional mixes.

Recycled aggregates: Recycled aggregates include crushed concrete, brick, glass, or

other masonry waste can also be used in conventional mixes

Lightweight concrete:Aluminum powder when added to lime reacts and form hydrogen

bubbles, and a lightweight cementitious material is formed which could be used in

conventional mixes.

5.2.4 Roads and open spaces

Roads and open spaces consist of compound walls, grills, roads, sidewalks, parking lots, drains,

curbs, landscaped areas, street furniture, tree covers, and flowerbeds.

In line with environment friendly design it is proposed to provide:

Permeable paving- Permeable (porous) paving will be provided to control surface water

runoff by allowing storm water to infiltrate the soil and return to the ground water. The

traffic areas will however continue to be impermeable.

Gravel/crusher fines- Loose aggregate materials from masonry wastes will be used to

cover pedestrian surfaces.

Use of grass pavers on the road, parking and pedestrian areas to reduce the heat island

effect.

Use of steel in fencing, grills, tree covers, and benches and even in streetlights will be

replaced by bamboo in the parks and green landscaped areas.

Page 129: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 120

5.3 NATURAL HAZARD PRONE AREAS

The project will be situated in low earthquake risk area (Seismic zone- II). Special attention is

thus given to the structural design of foundation, elements of masonry, timber, plain concrete,

reinforced concrete, pre-stressed concrete, and structural steel. All applicable guidelines will also

be followed in this regard to ensure safety of the building and its residents.

5.4 ENVIRONMENT FRIENDLY DEVELOPMENT

Without compromising on the safety and comfort of the occupants, care will be taken to achieve

an energy efficient, water conscious project the benefits of which will be enjoyed in monetary

terms by the residents and other intangible benefits will result for the society at large. This will

be achieved by:

a. Minimal disturbance to landscapes and site condition

The project aims to integrate the new development with the local existing surroundings. Efforts

are made to minimize on-site tree cutting by careful and detailed layout planning. Tree felling

shall be undertaken only after receiving requisite permissions and under strict supervision. The

original landscape of the site has also been integrated with the design of the plotted residential

such that there is no alteration the site topography.

b. Resource Conservation and Environmental Friendly Building Materials

To reduce the ecological footprint of the development, use of recycled material for construction

and conserving natural resources is of primary importance. In this light, the use of recyclable

building materials has been proposed for various building materials. It is also proposed to reuse

building components, minimization of construction wastes etc.

The project is also committed towards conservation of water. This includes use of treated

sullage, rainwater harvesting, provision of low water flow fixtures and raising awareness on

means of water conservation.

c. Efficient use of Water and Water Recycling

The need for water conservation in the face of impending water crisis cannot be overemphasized.

The project will follow a three pronged management for water resource viz water resource

development, minimize use of water and recycle sullage generated within the site.

Page 130: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 121

Rainwater harvesting across the entire project area is proposed to recharge groundwater. A

detailed storm water drainage system and water harvesting procedures are proposed to achieve

this.

The water demand is proposed to be brought down by the use of water efficient fixtures,

implement best management practices for water in both the Integrated Township Project and

horticultural activities. An important means for achieving this is spreading awareness to the

occupants for generating water conservation awareness.

To reduce the freshwater demand of the project, sullage from site will be treated in a STP and

recycled for landscaping and flushing.

d. Use of Energy Efficient design and Eco-Friendly Equipment

The project will be designed such that there is optimal solar energy utilization, especially for

natural light availability. Shading will be provided on sides that will otherwise reduce the energy

efficiency of the building. Energy conservation will be one of the focuses during the planning,

development, construction and post construction stages.

e. Use of Renewable Energy

The electrical supply is largely dependent on thermal power plants that are largely responsible

for accelerating the phenomenon of global warming and consumption of limited natural

resources. It is of paramount importance to shift focus on other renewable sources of energy to

achieve sustainable development in the energy sector. The project area in Raipur receives

adequate hours and intensity of sunlight for effective solar energy generation. Taking full

cognizance of the availability of natural sunlight and technology, the project proposes the use of

solar energy to reduce the power demand of the project.

Solar energy will be used for the purpose of heating of the water.

f. Indoor Air Quality for Human Safety and Comfort

To provide the occupants with a safe building is the primary responsibility of a developer. Indoor

pollution sources that release gases or particles into the air are the primary cause of indoor air

Page 131: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 122

quality problems in homes. Inadequate ventilation can increase indoor pollutant levels by not

bringing in enough outdoor air to dilute emissions from indoor sources and by not carrying

indoor air pollutants out of the home. High temperature and humidity levels can also increase

concentrations of some pollutants. Likewise, it is proposed to use all user safe building materials

such as:

i. The buildings will be painted with low VOC, ammonia free paints.

ii. Asbestos will not be used.

iii. Adequate ventilation will be provided in each residential unit and floor.

iv. Adequate openings for sunlight to enter the building, thereby reducing chances of

microbial growth.

v. All building maintenance and cleaning materials will be kept in an isolated and well

ventilated room with restricted entry.

g. Effective Controls and Management Systems

It is proposed to establish a Management System that will comprise modern equipment’s as well

as an efficient team of maintenance staff.

i. Each tower as well as common area will be provided with fire alarm as well as water

sprinklers.

ii. A security system for the entire plotted residential will be provided comprising intercom

facility, closed circuit camera to the entrance and round-the-clock manning.

iii. Separate entries and exits of residents from the guests are proposed. The staffs’ vehicles

will be provided with identification stickers while visitors’ vehicles will be monitored

through security guards at the entrances.

The project further proposes extensive green areas as avenues, parks and roadside plantations.

The plants not only serve various direct environmental facilities, but also have indirect positive

environmental impacts such as reduction in overall energy use in buildings. The balcony garden

is a natural development of the balcony’s role as a link between interior and exterior

environments. Efforts will be made to cover walls with climbers, as feasible.

Page 132: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 123

5.5 COMMUNITY ISSUES

Apart from the site occupants, all efforts will be made to ensure that the existing neighborhood is

not adversely affected by the project.

While, the site will not act as a thoroughfare for vehicles, there shall be no restriction to

movement of on-foot visitors and cyclists.

5.6 ENERGY CONSERVATION

To achieve conservation of energy, appropriate design of a building is of paramount importance.

Accordingly, it is proposed to incorporate the guidelines of Energy conservation Building Code,

2005 for the structures of the Integrated Township project.

The concept of passive solar design emphasizes architectural design approaches that minimize

building energy consumption by integrating conventional energy-efficient devices, such as

mechanical and electrical pumps, fans, lighting fixtures, and other equipment, with passive

design elements, such as building citing, an efficient envelope, appropriate amounts of

fenestration, increased day lighting design, and thermal mass. The basic idea of passive solar

design is to allow daylight, heat, and airflow into a building only when beneficial.

The project layout has been finalized after careful citing consideration of various plotted

residential components to optimize availability of natural sunlight. Advanced Solar Passive

Techniques are employed to achieve energy efficiency.

Glazed windows are located to receive maximum sunlight in winter. To reduce

heat losses during the night these windows are often double-glazed and have

insulating curtains.

Thermal storage wall is placed between the glazing and habitable space to prevent

solar radiation from directly entering the living space.

Passive cooling systems i.e. cooling directly from evaporation, convection

radiation without using any intermediate electrical devices.

Provisions for use of desert cooler (Indirect evaporative cooling which comprises

water, evaporative pads, a fan and a pump).

Page 133: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 5

M/s DBH Township LLP Page 124

Effective measures have been incorporated to minimize the energy consumption in following

manners:

• Use of CFL lamps instead of GLS lamps for Flats.

• Use of CFL lamps instead of GLS lamps for Common area.

• T5 lamps are used instead of Normal Fluorescent lamps in Basements

• Using electronic ballast for Discharge Lamps.

• Solar water heating systems shall be provided as per HAREDA norms.

5.7 TRANSPORTATION

A well planned road network is proposed within the project premises. Adequate parking will be

provided during construction phase to ensure that all heavy vehicles visiting the site are provided

parking space within the site. There shall be no parking on the access roads. The movement of

the vehicles will also be scheduled such that the peak hours are avoided.

In the operation phase, entry and exits will be from separate gates to minimize disturbance to the

approach roads to the project site. To avoid congestion of the approach roads, space will be

provided for vehicles waiting checking. Adequate parking is also proposed to ensure there is no

parking along the roads. Within the site, adequate wide roads are proposed. To achieve the same,

speed humps will be provided.

Page 134: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 6

M/s DBH Township LLP Page 125

CHAPTER-6

ENVIRONMENTAL MONITORING PROGRAM

6.1 INTRODUCTION

The purpose of the monitoring programme is to ensure that the specified mitigative measures

defined in the EMP are complied with and leads to the desired benefits for the target area and its

population. To ensure the effective implementation of the EMP and gauge the efficiency of the

mitigative measures, monitoring shall be undertaken both during the construction and operation

period of the project.

6.2 PERFORMANCE INDICATORS (PIs)

The physical, biological and social components are of particular significance to the project is as

listed below:

Air quality

Water quality

Noise levels

Solid Waste Management

Replantation success / survival rate

Of these, the following are selected as the Performance Indicators (PIs) and shall be monitored,

since these are well known and comparative data series exist:

Air Quality

Noise levels

Water Quality

Flora

To ensure the effective implementation of the mitigation measures and environmental

management during construction and operation phase of project road, it is essential that an

effective Environmental Monitoring Plan be designed and followed as given in Table 6.1.

6.2.1 Ambient Air Quality (AAQ) Monitoring

Ambient air quality parameters recommended for monitoring with regard to constructional

activities are PM, CO, SO2, and NO2. Monitoring shall be carried out twice a week for one

Page 135: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 6

M/s DBH Township LLP Page 126

month in each season during construction phase in accordance to the National Ambient Air

Quantity Standards. The locations with the pollution parameters to be monitored are detailed out

in the Environmental Monitoring Plan (Table 6.1).

6.2.2 Noise Level Monitoring

The measurements of noise levels will be carried out at all designated locations in accordance to

the ambient Noise Standards formulated by MoEF as given. Noise level will be monitored on

twenty-four hourly bases. Noise should be recorded at “A” weighted frequency using a slow time

response mode of the measuring instrument. The measurement location, duration and the noise

pollution parameters to be monitored are detailed in the Environmental Monitoring Plan (Table

6.1).

6.2.2.1 Success of Vegetation

To ensure the proper maintenance and monitoring of the proposed plantation activities, a regular

survey of the survival rate of the planted trees is being up to a period of 5 years from the start of

operation of the project.

Page 136: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 6

M/s DBH Township LLP Page 127

Table 6.1: Environmental Monitoring Plan

Environment

Component

Project

stage

Parameter Standards Location Duration / Frequency

Ground Water Quality Construction

Stage

Drinking

water

parameters

Drinking

water

standards

(IS:10500)

Onsite borewell and pond Half-yearly

Operation

Phase

Drinking

water

parameters

Drinking

water

standards

(IS:

10500)

Onsite borewell and pond Once every year during the dry

season

Drinking water Construction

Stage

Drinking

water

parameters

Drinking

water

standards

(IS 10500)

Supply water after treatment Half-yearly

Operation

Phase

Drinking

water

parameters

Drinking

water

standards

(IS 10500)

Supply water after treatment Half-yearly

Treated wastewater Operation

Phase

pH, BOD,

COD, TDS

, TSS, DO,

General

Standards

for

discharge

of

effluents

Outlet of the Sewage Treatment

Plant

Half-yearly

Air Construction

Phase

PM, SO2,

NO2, CO

National

Ambient

Air

Quality

Standards

Bhatgaon

Mana

Barauda

Project site

Naya Raipur

Half-yearly

Page 137: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 6

M/s DBH Township LLP Page 128

Environment

Component

Project

stage

Parameter Standards Location Duration / Frequency

Operation

Phase

PM, SO2,

NO2, CO

National

Ambient

Air

Quality

Standards

Project Site

Half-yearly

Noise Construction

Phase

Noise

Level in

dB (A)

As per

Ambient

Noise

Standards

Project site

Vivekanand Higher Sec.

School

Airport

Barauda.

Half-yearly

Operation

Phase

Noise

Level in

dB (A)

As per

Ambient

Noise

Standards

Project site Half-yearly

Rainwater harvesting Operation

Phase

Inspection

of storm

water

drains and

rainwater

harvesting

pits

Design

parameters Project site Prior to monsoons

Page 138: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT CHAPTER 6

M/s DBH Township LLP Page 129

6.3 DATA MANAGEMENT

The monitoring shall be carried out through MoEF/ NABL approved laboratory. All

results shall be maintained at the project site and submitted to the SPCB as per the

reporting requirements in the Environmental Clearance.

6.4 REPORTING SCHEDULES

The environment management cell shall be responsible for timely conduct of the

monitoring activities. The results of the analysis shall be intimated to the project head. Any

anomaly in test results shall be investigated into and proper corrective actions shall be

undertaken.

A complaint register shall also be maintained to note any complaints from the staff and

visitors in the project or any other stakeholder. Corrective actions taken against the

complaints shall also be noted.

6.5 EMERGENCY

Alarming levels of pollutants in any of the monitored component may raise alarm in the

Integrated Township project. However, such information should be made available to the

residents/ occupants through notices. The latter may also be consulted on necessary steps to

be taken on an immediate and long term basis to tide over the problem.

Page 139: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 130

CHAPTER-7

ADDITIONAL STUDIES

7.1 INTRODUCTION

This chapter broadly looks at various aspects related to disaster management, resource

conservation.

7.2 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

Integrated Township project encompasses the lives of a large number of people. It also

involves installation of various structures and machineries that meet the comfort and needs

of its population but may also pose serious threat to the occupants in case of an accident. It

is thus considered necessary to carry out a risk assessment and disaster management plan

for the project.

7.2.1 Risk Hazard & its control measures

It is attempted to plan and construct the buildings following all safety norms. However, it is

not always possible to totally eliminate such eventualities and random failures of

equipment or human errors. An essential part of major hazard control has therefore, to be

concerned with mitigating the effects of such emergency and restoration of normalcy at the

earliest. A detailed table showing activities during construction and operation phase along

with mitigation measures are given in Table 7.1

Table 7.1: Activities during construction and operation along with mitigationmeasures

HAZARDS ASSOCIATED WITH

ACTIVITIES

(During Construction & Operation)

CONTROL/MITIGATION MEASURES

Manual Handling

- Strains and sprains due to incorrect lifting

- too heavy loads

-twisting - bending - repetitive movement - body

vibration.

- Exercise/warm up

- get help when needed

- control loads

- rest breaks/no exhaustion

- no rapid movement /twisting/ bending / repetitive

movement

Page 140: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 131

- good housekeeping.

Falls - Slips - Trips

- Falls on same level

- falls to surfaces below

- poor housekeeping

- slippery surfaces

- uneven surfaces

-poor access to work areas climbing on and off

plant

-unloading materials into excavations wind

- falling objects.

- Good Housekeeping

- tidy workplace

- guardrails, handholds, harnesses, hole cover,

hoarding, no slippery floors/trip hazards

- clear/ safe access to work areas

- egress from work areas

- dust/water controlled

- PPE.

Fire

- Flammable liquids/Gases like LPG, Diesel

Storage area and combustible building

materials

- poor housekeeping

- grinding sparks

- open flames, absence of Fire hydrant net

work.

- Combustible/flammable materials properly

stored/used

- good housekeeping

- fire extinguishers made available & Fire hydrant

Network with reserve Fire water (As per NFPA

Code)

- Emergency Plan in case of Fire or collapse of

structure.

Absence of Personal Protective Equipment

-Lack of adequate footwear

- head protection

-hearing/eye protection

- respiratory protection

- gloves

-goggles.

- Head/face

- footwear

- hearing/eye

- skin

- respiratory protection provided

- training

- maintenance

Defective or wrong Hand Tools

- Wrong tool

- defective tool

- struck by flying debris

- caught in or on

- missing guards

- Right tool for the job

- proper use of tools

- good condition/ maintenance guards

-isolation/ proper demarcation of work space

- eye/face protection

- flying debris controlled

Electricity

- Electrocution

- overhead/underground services

- any leads damaged or poorly insulated

- temporary repairs

-no testing and tagging

- Leads good condition and earthed

- no temporary repairs

- no exposed wires

- good insulation

Page 141: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 132

- circuits overloaded

- non use of protective devices.

- no overloading

- use of protective devices

- testing and tagging

- no overhead/ underground services

Scaffolding

- Poor foundation

- lack of ladder access insufficient planking

- lack of guardrails and toe boards

- insufficient ties or other means

- all scaffolds incorrectly braced or stabilized to

prevent overturning.

- All scaffolds correctly braced and stabilized

- 3:1 height to base ratio

- firm foundation, plumb and level

- ladder access provided and used

- proper platform (3 planks/675 mm)

- planks secured

- guardrails and toe boards

- 900mm to 1100mm high, within 200mm of working

face, mid-rail.

Ladders

- Carrying loads

- not secured against dislodgement

- defective ladders

- not sufficient length

- wrong positions

- incorrectly placed (angles, in access ways,

vehicle movements.

- Secured against movement or footed

- ladders in good condition

- regularly inspected

- extend 1m above platform

- 4:1 angle

- out of access ways, vehicle movements

- not carrying loads

- 3 points of contact

- no higher than 3rd

step down

- use for access only, not working platforms

Excavations

- Trench collapse

- material falling in undetected underground

services

- falls

- hazardous atmosphere struck by traffic and

mobile plant.

- Soil stability known

- no water accumulation

- existing services known

- material 600mm from edge

- clear of suspended loads

- hardhats/PPE

- ladders

- public protection

– atmospheric testing

- traffic controls

- Emergency Plan.

Gas Cutting and Welding

- Fire

- Welding flash and burns controlled with PPE and

Page 142: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 133

- welding flash, burns, fumes, electrocution in

wet conditions

- flashback in oxygen set, leaking cylinders,

acetylene cylinders lying down

- poorly maintained leads.

shields

- fumes controlled with ventilation and PPE (in good

condition and properly positioned),Gas cylinders be

kept upright & secured position (properly tied)

- combustible materials to be kept at secured place to

avoid fire & Fire Extinguishers to be kept in fire

prone area with training to people for its use.

Noise

- Unknown noise levels

- known noise levels over 85 decibels

- Levels below 85 decibels

- proper protection.

Falling Material

- Fall during carrying/Lifting materials-

dislodged tools and materials from overhead

work areas.

- Materials to be secured

- kept away from edge

- toe boards

- Use of hard hats.

Craneage & Lifts

- Display of carrying capacity i.e. load (No. Of

person), incorrectly slung, defective lifting

equipment, unsecured loads, craning in close

proximity to building people and plant

- falls

- falling materials.

- Periodic testing by competent authority

- correctly slung/secured loads, lifting equipment good

condition

- use of proper hand signals

- falls while unloading controlled.

Visitors Presence at site

- Falls

- struck by dropped materials

- road accidents

- insufficient hoarding or fencing

- pedestrian access past site

- mechanical plant movement on and off site.

- Sufficient hoarding

- fencing and barricades

- safe pedestrian access past site traffic management

for loading and delivery

- construction separated from occupied areas of

projects.

7.2.2 Emergency Response Plan (ERP)

The overall objective of an Emergency Response Plan (ERP) is to make use of the combined

resources at the site and outside services to achieve the following:

1. To localize the emergency and if possible eliminate it;

2. To minimize the effects of the accident on people and property;

3. Effect the rescue and medical treatment of casualties;

Page 143: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 134

4. Safeguard other people;

5. Evacuate people to safe areas;

6. Informing and collaborating with statutory authorities;

7. Initially contain and ultimately bring the incident under control;

8. Preserve relevant records and equipment for the subsequent enquiry into the cause

and circumstances of the emergency;

9. Investigating and taking steps to prevent reoccurrence

The ERP is therefore related to identification of sources from which hazards can arise and

the maximum credible loss scenario that can take place in the concerned area. The plan

takes into account the maximum credible loss scenario - actions that can successfully

mitigate the effects of losses/ emergency need to be well planned so that they would require

less effort and resources to control and terminate emergencies, should the same occur.

Main hazards identified for the project include hazards pertaining to fires in buildings and fire in

diesel storage areas, earthquake and LPG leakage and an ERP pertaining to these is described in

the following section.

7.3 RESPONSE IN CASE OF EARTHQUAKE

7.3.1 Response Procedures for Occupants

If indoors:

1. Take cover under a piece of heavy furniture or against an inside wall and hold on.

2. Stay inside: The most dangerous thing to do during the shaking of an earthquake is to try to

leave the building because objects can fall on you.

If outdoors:

Move into the open, away from buildings, streetlights, and utility wires. Once in the open, stay

there until the shaking stops.

If in a moving vehicle:

Page 144: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 135

Stop quickly and stay in the vehicle. Move to a clear area away from buildings, trees, overpasses,

or utility wires. Once the shaking has stopped, proceed with caution. Avoid bridges or ramps

that might have been damaged by the quake.

After the quake

1. After the quake be prepared for aftershocks.

2. Although smaller than the main shock, aftershocks cause additional damage and may bring

weakened structures down. Aftershocks can occur in the first hours, days, weeks, or even

months after the quake.

Help injured or trapped persons.

1. Give first aid where appropriate. Do not move seriously injured persons unless they are in

immediate danger of further injury. Call for help.

2. Remember to help those who may require special assistance--infants, the elderly, and people

with disabilities.

3. Stay out of damaged buildings.

4. Use the telephone only for emergency calls.

7.3.2 Response Procedure for Emergency Team

1. Formulate an Emergency Response Team for earthquake response.

Using the public address system, inform residents of response procedures discussed above.

2. Inform the necessary authorities for aid.

3. Ensure no person is stuck beneath any debris, in case of a structural failure.

4. Ensure that all occupants standing outside near the buildings are taken to open areas.

5. Ensure that the first aid ambulance and fire tender vehicles are summoned if necessary.

6. Inform the nearby hospitals if there are any injuries.

7. Check the utilities and storage tanks for any damage.

7.4 RESPONSE FOR LPG LEAKAGE

1. The affected area should be evacuated and cordoned off immediately

Page 145: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 136

2. Initiate an Emergency Response Team for LPG leakage.

3. Shut down the main valves in the gas bank.

4. Ensure that only concerned personnel are present in the affected area and all other personnel

and visitors are moved to the nearest assembly points.

5. Rescue trapped personnel, also check if any personnel are unconscious in the area and

immediately move them outside and provide first aid. Ambulance should be summoned to take

injured personnel to the nearest hospital.

6. Personnel in the nearby buildings to close all doors and windows to prevent entry of the leaked

gas.

7. Source of leakage to be traced and isolated from all the other areas. And if required use

pedestal fans to bring down the gas concentration.

8. In case of a fire follow the instructions in case of fire.

7.5 RESPONSE IN CASE OF FIRE

1. Required response during in the event of a fire should be described in signs located in the

lobby.

2. On sighting a fire, it should be immediately informed to the environment manager

giving the exact location and type of fire in detail.

3. Initiate the Emergency Response Team for fires.

4. If the fire is small, engage in extinguishing the fire using the nearest fire extinguisher.

5. Guide the Emergency Response Team staff to the emergency assembly point.

6. The Emergency Response Team should immediately inform the nearest dispensary and

security force. If required a fire tender should be summoned.

7. The response team should immediately move to the point of fire and take all necessary steps to

stop the fire. If the fire is not controllable and spreads then the manager in charge should inform

the district authorities and call for external help.

Page 146: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 137

8. The Emergency Response Team will provide immediate relief to the injured residents at the

scene of incident. Any injured persons should be evacuated on priority to the dispensary or one

of the nearest hospitals based on their condition.

Instructions for occupants

1. Get out of buildings as quickly and as safely as possible.

2. Use the stairs to escape. When evacuating, stay low to the ground.

3. If possible, cover mouth with a cloth to avoid inhaling smoke and gases.

4. Close doors in each room after escaping to delay the spread of the fire.

5. If in a room with a closed door.

6. If smoke is pouring in around the bottom of the door or if it feels hot, keep the

doorclosed.

7. Open a window to escape or for fresh air while awaiting rescue.

8. If there is no smoke at the bottom or top and the door is not hot, then open the door

slowly.

9. If there is too much smoke or fire in the hall, slam the door shut.

10. Stay out of damaged buildings.

11. Check that all wiring and utilities are safe.

A state of the art fire fighting system is proposed for the project to prevent and control fire

outbreaks. The fire fighting system will consist of portable fire extinguishers, hose reel, wet riser,

yard hydrant, automatic sprinkler system, and manual fire alarm system. The group housing

buildings will also be provided with automatic fire detection and alarm system.

7.6 RESOURCE CONSERVATION

The project will lead to utilization of various natural resources. As an environmentally

responsible corporate, the developers endeavor to conserve these resources by judicious

management and recycling and strive to build up these resources where possible.

Water Resources: The project will use water from onsite borewell and pond during construction

phase and operation phase of the project. Given the national water scenario, where availability if

Page 147: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 138

fresh water is fast dwindling, judicious use of the same cannot be over emphasized. Following

means are proposed to be adopted for conservation of this life sustaining resource:

Limited withdrawal of groundwater: There will be no use of groundwater both during

construction and operational phase of the project. The construction and operation phase will

make use of canal water supply.

Reduced use of water: To further minimize the use of available freshwater, various low flow

fixtures may be provided such as Low flow flushing systems, sensor based fixtures, waterless

urinals, tap aerators. Awareness will also be spread amongst the residents on the following lines:

Timely detection and repair of all leakages;

Turning off tap while brushing teeth;

Use of mug rather than running water for shaving;

Avoiding/minimizing use of shower/bath tub in bathroom;

Turning off faucets while soaping and rinsing clothes;

Using automatic washing machine only when it is fully loaded;

Avoiding use of running water while hand-washing;

Avoiding use of running water for releasing ice tray ahead of time from freezer;

Turning off the main valve of water while going outdoor;

Avoiding use of hose for washing floors; Use of broom may be preferred;

Watering of lawn or garden during the coolest part of the day (early morning or

late evening, hours) when temperature and wind speed are lowest. This reduces

losses due to evaporation.

Planting of native and/or drought tolerant grasses, ground covers, shrubs and

trees. Once fully grown, they need not to be watered frequently.

Avoiding over watering of lawns. Good rains eliminate the need for watering for

more than a week.

Setting sprinklers to water the lawn or garden only, not the street or sidewalk;

Page 148: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 139

Avoiding installation or use of ornamental water features unless they recycle the

water and avoiding running them during drought or hot weather;

Installation of high-pressure, low-volume nozzles on spray washers;

Replacement of high-volume hoses with high-pressure, low-volume cleaning

systems;

Equipping spring loaded shutoff nozzles on hoses;

Installation of float-controlled valve on the make-up line, closing filling line

during operation, provision of surge tanks for each system avoid overflow;

Washing vehicles less often, or using commercial car wash that recycles water;

Treatment and Recycling: The sullage generated from the sites will be treated in an on-

site Sewage Treatment Plant. This will enable the treated sullage to be used for flushing

and landscaping thereby reducing the requirement of freshwater for these purposes.

Rainwater harvesting: The increased hard surface of plotted residential increases the

runoff as compared to the otherwise barren land. It is proposed to harvest this rainwater

runoff that will recharge the groundwater resource while reducing the burden of storm

water management of the city and eventually natural water bodies. Apart from the open

spaces, it is proposed to harvest the roof top rainwater. The storm water will be treated

through an oil and grease trap and allowed to flow through layers of sand and gravel for

filtration prior to reaching the water table, to avoid any possibility of groundwater

contamination.

Construction materials: As a large construction, the project will require various kinds of

natural construction materials such as sand, gravel etc. It is proposed for prior estimation of

required quantities of these materials and procurement only as per requirement. This will

also result in cost-efficiency. Excavated soil from the project site will be used within the

site to the extent feasible. Excess soil will be made available to the construction sites, as

per need.

Energy: To conserve the energy resources, good practices will be followed during the

construction phase such as turning off lights and equipments when not in use, ensuring fuel

Page 149: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 7

M/s DBH Township LLP Page 140

efficiency of motors and vehicles through proper maintenance and minimal work at night.

The principles of energy conservation will also be embedded in the buildings through use

of energy efficient fixtures, maximum availability of natural light and use of solar energy

for street lighting.

7.7 RESETTLEMENT AND REHABILITATION

The project will not result in displacement of any local population and hence, does not

require a resettlement and rehabilitation study.

Page 150: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Haryana EIA/EMP REPORT

CHAPTER 8

M/s DBH Township LLP Page 141

CHAPTER-8

PROJECT BENEFITS

8.1 GENERAL

The project site is situated at Village- Ramchandi, Banarsi and Nakti, Distt. Raipur,

Chhattisgarh. The project will be developed on a total area of 9,60,680 m2(or 237.39 acres). The

project site is adjacent & connected to NH-6 in NE direction. The nearest Railway station is

Telibandha railway station which is 7.99 km NW from the project site. The nearest airport is

Swami Vivekananda Airport (Raipur) which is 1.46 km (South) from the project site.

The salient features of the project include:

Rain Water Harvesting with Bioswales

Emergency Alarm System

Lush greenery

Golf Course

Seamless telecommunication networks

8.2 PHYSICAL INFRASTRUCTURE

The Integrated Township Project will help in meeting the growing residential needs of people; it

also provides state-of-the-art apartments and modern terms of comfort and safety of its

residential units. Care has been taken to provide the occupants and visitors with necessary

facilities as power, water supply and broad roads that are safe and secure.

8.3 SOCIAL INFRASTRUCTURE

An Integrated Township Project of this scale sets in an overall development of the region,

maintenance of existing roads, power supply and water supply, since a large construction

generally brings the focus of the development authorities in the locality.

8.4 ECONOMIC BENEFITS

The project will entail positive impact on the local economy in a convenient way. The

construction phase of the project will engage a large number of construction workers, whether

skilled, semi-skilled or unskilled. The workers will also be ensured welfare facilities such as

drinking water, sheds for resting, medical aids, and aid in children’s education.

Page 151: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Haryana EIA/EMP REPORT

CHAPTER 8

M/s DBH Township LLP Page 142

In meeting the day-to-day and recreational demands of the residents of the site, the region is also

likely to develop a number of shopping and amusement facilities, thereby, further stimulating the

local economy.

Page 152: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 143

CHAPTER-9

ENVIRONMENTAL MANAGEMENT PLAN

9.1 INTRODUCTION

Identification and prediction of impacts further needs to suggest the mitigative measures which

would play a vital role in prevention of environmental degradation during construction and

operational phase of the Integrated Township Project. This leads to preparation of Environmental

Management Plan (EMP), therefore EMP forms an imperative part of EIA process.

The Environmental Management plan is a site specific plan developed to ensure that the project

is implemented in an environmentally sustainable manner where all contractors and

subcontractors, including consultants if any, understand the potential environmental risks arising

from the project and take appropriate actions to minimize those risks. EMP also ensures that the

project implementation is carried out in accordance with the planned design and by taking

appropriate mitigates actions to reduce adverse environmental impacts during project’s life cycle.

The project will create certain inevitable impacts, mainly during construction phase, although

within permissible limits as mentioned in Chapter 4 and can be reduced significantly with the

help of effective implementation of a well-designed EMP. The potential environmental impacts,

which need to be regulated, are mentioned below:

Noise pollution due to various noise generating equipment as well as vehicular

movement;

Water resource management to ensure continuous water supply.

Sullage generation from sanitary/domestic activities; and

Generation of municipal solid wastes from residences, maintenance of roads, parks,

common areas including constructional, electrical and plumbing wastes.

Energy conservation methods.

Maintenance of Building Management Systems and emergency aids.

To ensure better environment in & around the project site, effective EMP is developed

separately for construction and operational phase.

Page 153: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 144

9.2 ENVIRONMENTAL MANAGEMENT STRATEGIES

Strategy for environmental management in construction work should be based on three-pronged

approach comprising of:

Pollution prevention.

Pollution control.

Protection of pollution recipients.

9.2.1 Topography and Physiography

During the development, construction and post construction phase of the Integrated Township

Project, no significant impact is anticipated on local or regional topography and Physiography,

hence exhaustive management plan is not required. It is however proposed to carry out extensive

turfing with local species apart from proposed plantations and greens.

9.2.2 Soil

9.2.2.1 Development & Construction Phase

During the construction phase, various kinds of wastes are generated that will be disposed in

varied ways. The following measures will be taken to prevent soil contamination at site and

ensure waste management:

Vegetation and top soil management:

Remove vegetative cover only from the specific site on which construction will take

place.

Plantation as proposed shall be started at the earliest.

The top soil will be stripped from constructional areas and stockpiled for later reuse in

landscaping.

Promote use of organic fertilizers.

Construction of erosion prevention troughs, as deemed necessary.

To prevent the erosion of excavated loose soil produced as a result of excavation, site

preparation activities and excavation work would be undertaken during dry season after

monsoon is over.

Construction Debris:

Page 154: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 145

Fuel and oil would be stored in cement lined storage yard and handled carefully to

prevent soil contamination through leakage or spillage.

All metal, paper, plastic wastes, debris and cuttings would be collected from site as soon

as particular construction activity is over.

During construction of flexible pavement, bitumen wastes will be collected (if any) and

disposed in environmentally sound manner.

The number, frequency and area of movement of heavy machinery will also be restricted.

Recycling of construction wastes into aggregates for use in the project site.

Wastes from the labor camps will be collected and disposed as per the existing practices

in the site.

9.2.2.2 Post Construction Phase

To prevent soil contamination at site, the most important aspect is to manage the solid wastes

that will be generated during the operation phase. The Environmental Management Plan for the

solid waste focuses on three major components during the life cycle of the waste management

system i.e. collection, transportation, and treatment or disposal.

Collection and segregation of wastes

Solid waste generated from project would be collected door to door and segregated into

decomposable, recyclable and inert wastes.

Decomposable wastes will be decomposed and converted to manure to be used for

horticulture.

Recyclable waste would be sold to vendors.

Inert waste which comprises a very small amount of the total solid waste generated would

be temporarily stored within the project premises.

Waste bins would be placed at the strategic locations such as inter section of internal

roads, parks, common places, etc.

To minimize littering and odors, waste will be stored in well-designed containers/ bins

that will be located at strategic locations to minimize disturbance in traffic flow.

Page 155: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 146

Care would be taken such that the collection vehicles are well maintained and generate

minimum noise and emissions. During transportation of the waste, it will be covered to

avoid littering.

Transportation:

Only the non-recyclable and non-biodegradable waste will be transported to the Govt. approved

agency. The segregation, transportation and disposal of wastes will be done by the authorized

agency that will take care of the waste management of the project during the operational phase of

the project.

Figure 9.1: Waste Management Flow Diagram

Disposal

With regards to the disposal/ treatment of waste, the management will take the services of the

authorized agency for waste management and disposal of the same on the project site during its

operational phase.

Page 156: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 147

9.2.3 Hydrology

9.2.3.1 Ground water Hydrology

Development & Construction Phase

The water requirement during the construction period will be met water from existing pond and

borewell on the site.. The following are also proposed to further reduce the demand of

freshwater:

Curing water will be sprayed on concrete structures and free flow of water not allowed.

After liberal curing on the first day, all concrete structures will be painted with curing

chemical to save water to stop daily water curing hence save water.

Concrete structures will be covered with thick cloth/gunny bags and then water sprayed

on them to avoid water rebound and ensure sustained and complete curing.

Pools will be made using cement and sand mortar to avoid water flowing away from the

flat surface while curing.

Water ponding will be done on all sunken slabs. This will also highlight the importance

of having an impervious formwork.

Post Construction Phase

It is proposed to conserve groundwater resources through the combined means of water resource

development, minimized water consumption and reuse of treated sullage to reduce freshwater

demand.

9.2.3.2 Water Resource Development

In township development with mixed use of other buildings, each buildings (Plots, Group

Housing, Commercial, Public and semi public buildings) should be having their own self

sustainable design for storm water system with adequate nos, of RWH structure as per norms. At

the township level we will take care of paved green, roads and any surplus discharge from other

buildings in case sudden downpour. That has been considered 20% of their total runoff.

Rain water harvesting has been catered to and designed as per the guideline of CGWA for the

green paved and surplus discharge from other buildings . Peak hourly rainfall has been

Page 157: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 148

considered as 45 mm/hr. The effective diameter and depth of a Recharge pit 3.20 m, and 2.40 m,

respectively is constructed for recharging the water

The bottom of the recharge structure will be kept 5 m above this level. At the bottom of the

recharge well, a filter media is provided to avoid choking of the recharge bore. Design

specifications of the rain water harvesting plan are as follows:

All gutter ends will be fitted with a wire mesh screen and a first flush device would be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic bags and

paper pieces will get arrested by the mesh at the terrace outlet and to prevent contamination by

ensuring that the runoff from the first 10-20 minutes of rainfall is flushed off.

No sewage or wastewater would be admitted into the system.

No wastewater from areas likely to have oil, grease, or other pollutants has been connected to

the system.

Calculations for Infiltration Wells

Rainfall Intensity= 0.04500 m/hr

Rainfall Catchment from Township road Road/Greens etc.

a) Roof Top Area = 0.00m2

b) Road Area/Paved Area =229650.00 m2

c) Proposed Greens Area= 127799.72 m2

1 For Roof/Terrace only

(i) Average Runoff co-efficient for terraces and other built-up areas.= 0.85

(ii) Area-1 considered (For Terrace/Roof only) = 0.00 m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately

(Total Area x 0.85 x 0.045) = 0.00 m3/hr

2 For landscaped, green and other open areas.

(i) Average Runoff co-efficient for landscaped, green and other open areas. = 0.20

(ii) Area - 2 considered =127799.72m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately

Page 158: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 149

(Total Area x 0.2 x 0.045) =1150.20 m3/hr

3 For road & paved areas:

(i) Average Runoff co-efficient for landscaped, green and other open areas. = 0.65

(ii) Area-3 considered =229650.00m2

(iii) Theoretical Volume of Infiltration Wells required. Approximately (Total

Area x 0.65 x 0.045) =6717.26 m3/hr

4. Total Volume Generated per hour (1+2+3) =7867.46m3/hr

Rainfall catchment for buildings

a) Plots =7454.90 m3/hr

b) Group Housings =4034.62m3/hr

c) Commercial =1697.40m3/hr

d) Public and Semi Public Buildings =1191.39m3/hr

Total Catchment =14378.31 m3/hr

Assuming above buildings should have their own self-suffient rain water harvesting system as

per norms. In case of sudden downpour, external storm water services will take care of 10% of

their catchment =20%

5. Grand total discharge to external storm water drainage network generated per hour

= 2875.66m3/hr

6. Grand total generated per hour (4+5) =10743.12m3/hr

For 15 minute holding capacity = 2685.78m3

Size of the Wells

Dia of Recharge well =3.20 m

Depth of Recharge well =2.40 m

Volume of 1 Infiltration well =19.29m3

Absorption capacity of Recharge pit @ 30% of yield capacity of bore well

Yield capacity of bore well (Assumed) =15.00 m3/hr

absorption (0.30) = 4.5

Page 159: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 150

Absorption capacity in 1/4 hr = 1.13 m3

Total capacity of Recharge Pit (Volume of 1 filteration well+ Absorption capacity 15 mins)

=20.42 m3

Number of Infiltration Wells Provided =15.00

Total Rainwater holding/Absorbing capacity =306.26 m3

Surplus Rainwater Disposal to water body near golf course and nala as marked in

drawings =2379.52 m3

Area of proposed water body near golf course Green 2 = 2028 m

Depth of water body to assumed to hold surplus rain water disposal = 1.15 m

Volume of rain water stored in water body = 2332.20 m3

Excess rainwater disposal to both nala = 47.32 m3

Figure 9.2: Typical Rain Water Harvesting Pit Design

Page 160: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 151

Storm water management system

Since the storm water on site will be harvested for ground water recharge, proper management of

this resource is necessary to prevent contamination. Hence, regular inspection and cleaning of

storm drains shall be carried out. Use of fertilizers and pesticides will be avoided prior to and

during monsoons. Clarifiers or oil/ water separators shall also be installed.

Minimal Water Consumption

To reduce the water consumption, awareness along the following lines will be spread amongst

the management and maintenance team:

Installation of water meters conforming to ISO standards at inlet and outlet point of

water supply.

To further lower the water consumption, options of Low flow flushing systems,

sensor based fixtures, and tap aerators etc. will be explored.

Leak detection

Drip irrigation for shrubs and trees

Use of low-volume, low-angle sprinklers for lawn areas

The message of water conservation will be spread amongst the residents through awareness

campaigns and pamphlets. Following tips shall be provided to the residents for conserving water.

Timely detection and repair of all leakages;

Turning off tap while brushing teeth;

Use of mug rather than running water for shaving;

Avoiding/minimizing use of shower/bath tub in bathroom;

Turning off faucets while soaping and rinsing clothes;

Using automatic washing machine only when it is fully loaded;

Avoiding use of running water while hand-washing;

Avoiding use of running water for releasing ice tray ahead of time from freezer;

Turning off the main valve of water while going outdoor;

Avoiding use of hose for washing floors; Use of broom may be preferred;

Page 161: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 152

Watering of lawn or garden during the coolest part of the day (early morning or late

evening, hours) when temperature and wind speed are lowest. This reduces losses

due to evaporation.

Planting of native and/or drought tolerant grasses, ground covers, shrubs and trees.

Once fully grown, they need not to be watered frequently.

Avoiding over watering of lawns. Good rains eliminate the need for watering for

more than a week.

Setting sprinklers to water the lawn or garden only, not the street or sidewalk;

Avoiding installation or use of ornamental water features unless they recycle the

water and avoiding running them during drought or hot weather;

Installation of high-pressure, low-volume nozzles on spray washers;

Replacement of high-volume hoses with high-pressure, low-volume cleaning

systems;

Equipping spring loaded shutoff nozzles on hoses;

Installation of float-controlled valve on the make-up line, closing filling line during

operation, provision of surge tanks for each system avoid overflow;

Washing vehicles less often, or using commercial car wash that recycles water.

Re-use of treated sullage

It is expected that the project will generate approx. 3587 KLD of sullage. The sullage will be

treated in the STP of total capacity of 3720 KLD provided within the complex generating of

2869 KLD recoverable water from STP which will be recycled.

The treated sullage conforming to standards for effluent discharge on land will be reused to meet

various non-potable and non-contact requirements of the Integrated Township Project and its

residents.

9.2.3.3 Ground water Quality

Development and Construction Phase

To ensure against any groundwater pollution through leaching of soil, solid waste management

plan ensuring timely collection of wastes will be followed. The collected wastes will be stored at

Page 162: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 153

designated area and disposed as per the standard procedures in line with the statutory

requirements.

Post Construction Phase

The ground water pollution can arise from improper waste handling or by recharge of

groundwater through contaminated storm water. A well planned solid waste management as

discussed in chapter 2 is proposed for the operation phase that will ensure against any chances of

soil or groundwater pollution on this account.

Storm water collects dirt and garbage along its flow. Contamination of this water with spilled oil/

grease is especially of concern when recharging is proposed. Hence, preliminary treatment for oil

and grease and filtration through layers of sand and gravel is proposed prior to recharge of the

groundwater.

Landscaping water enters the soil and finally the groundwater. It is thus of utmost importance

that only clean water is used for horticulture purposes. The water from the households will

contain significant amounts of detergent and soap that is undesirable for plants, soil and in

groundwater. Hence, it is proposed to treat sullage from the sites up to tertiary level, and be used

for landscaping only thereafter. Regular monitoring of treated sullage shall be carried out to

ensure that all parameters are within acceptable levels.

9.2.4 Air Quality

9.2.4.1 Development and Construction Phase

The construction phase for the Integrated Township project is about 2-3years, causing only

marginal impact on ambient air quality from constructional activities, unloading of construction

materials, cement, soil and vehicular movement etc. The main pollutant of concern is PM 2.5,

PM10 (dust). Likewise, following mitigation measures will be adopted during this phase to

mitigate the impacts on ambient air:

Installation of batch plant at isolated place and providing cover shed around

plants.

Loading and unloading of cement and other material in covered shed.

Providing dust suppression system in unloading area (as per requirement).

Developing avenue and curtain plantation on the internal roads and peripheral

plantation around the site to protect the movement of dust and other pollutants.

Page 163: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 154

Cover scaffolding, hosing down road surfaces and cleaning of vehicles.

On-Road- Inspection for black smoke generating machinery.

Vehicles having pollution under control certificate will be allowed to ply.

Use of covering sheets for trucks to prevent dust dispersion from the trucks.

Reducing the speed of a vehicle to 20 km/hr to reduce emissions on site.

All material storages will be adequately covered and contained.

Training to the workers to reduce idling time of machines that otherwise tends to

produce hydrocarbons ad carbon monoxide.

Best practices for maintenance and repair of all machineries and equipments.

9.2.4.2 Post Construction Phase

During the post construction phase, following measures will be adopted for pollution control in

the plotted residential Colony project:

Traffic pollution management

Plantation development

Power Back up: There is provision of 4 no. of DG sets of total 1, 270 kVA (1 X 320 kVA + 1 X

625 kVA + 1 X 125 kVA + 1 X 200 kVA) capacity for power back up in the Township Project

only for Public Utilities and External Lighting. The DG sets will be equipped with acoustic

enclosure to minimize noise generation and adequate stack height for proper dispersion.

Multistoried Group Housings, Commercial Building, Institutional Buildings etc. will have their

own standby supply arrangement.

Traffic pollution management: Internal roads would be maintained in good conditions to

control the dust emissions. Awareness will be raised amongst the residents for use of low sulphur

fuel.

Plantation development: Vegetation is an effective means for controlling air pollution due its

dual action of acting as a barrier between the source of emission and receptors and also as a sink

Page 164: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 155

for various pollutants. It is proposed to develop plantation of species effective in absorption of

expected pollutants at site, along the internal roads and on the periphery of the Residential

Plotted colony project. Suggested species for plantation are:

Cassia Fistula(Amaltas)

DelonixRegia(Gulmohar)

Bauhinia purpurea(Kachnar)

Dalbergiasissoo(Shisham)

9.2.5 Noise Levels

9.2.5.1 Development and Construction Phase

During the construction phase, some noise will be generated through the operation of

construction machines, excavators, etc. Following measures would be taken; into consideration

to mitigate the noise at construction site:

Use of well-maintained equipment fitted with silencers and providing noise

shields near the heavy construction operations

Earmuff and other protection devices shall be provided to laborers working in

high noise generating machines.

High noise activities shall be carried out during daytime.

9.2.6 Post Construction Phase

The main sources of noise during this phase are the intermittent use traffic. The principles of

noise emission control and screening are proposed for noise generation.

Barriers:

Trees having thick and fleshy leaves with flexible petioles having capacity to withstand vibration

are suitable. Heavier branches and trunk of the trees also deflect or refract the sound waves. The

following species are proposed to be used in a greenbelt especially surrounding housing groups

and along the periphery of the project.

Ficus glomerata (Guler)

Polyathia longifolia (Debdaru )

Terminalia arjuna(Arjun)

Page 165: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 156

9.2.7 Biological Environment

9.2.7.1 Development and construction phase

During the development, construction and post construction phase, no tree will be cut and

therefore no impact is anticipated on terrestrial ecology. Site clearing shall be carried out strictly

as per plan. Workers shall be advised against cutting, uprooting, coppicing of trees or small trees

present in and around the project site for cooking. Workers shall also be discouraged from

wandering in nearby areas with plantation or dense vegetation.

Further, green belt will be developed on the periphery and along the internal roads of project site

during the construction phase itself that will act as a curtain to restrict the movement of

pollutants from either side of the project and improve site aesthetics.

9.2.7.2 Post construction phase

During the post construction phase, green belt will be developed and maintained. Ornamental

plant species and grasses will be planted in open space within the premises. 30% area of net

planned area is proposed to be maintained green in the project site. Proposed list of species for

plantation is given below in Table 9.1:

Table 9.1: Plantation List

Page 166: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 157

Page 167: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 158

9.2.8 Demographic and Socio-Economic Environment

9.2.8.1 Development and Construction Phase

During the development and construction phase of the Residential Plotted colony project, more

than 200-300 skilled, semiskilled and unskilled workers will get direct and indirect employment

opportunities which will have beneficial impact on the socio-economic conditions of the area.

Following suggestions are given to strengthen the beneficial impacts on the socio-economical

environment.

All the applicable guidelines under relevant acts and rules related to labor welfare and

safety shall be implemented during the construction work activities.

Proper sanitary and drinking water facilities should be provided to workers living in the

construction camps within the project premises.

Workers will be provided with appropriate PPEs during work.

Guarding of dangerous machine parts, maintenance of equipments as hoists and lifts will

be ensured.

Adequate provision of different types of fire extinguishers will be made.

Construction Camps will be provided with clean and safe drinking water and toilet

facilities. Domestic refuse generated at the construction camps will be disposed off on a

regular basis. First Aid Medical facilities will also be provided for the construction

workers.

9.2.8.2 Post Construction Phase

The project envisages addressing the wider goal of environmental protection through a social

investment strategy for the communities around the project. The project seeks to increase the

benefits to the local population and contribute towards meeting community’s expectation of

benefits from the project.

Some of the concerns raised by local people relate directly to the project. Concerns and

aspirations not directly related to the project were also solicited so as to identify areas that could

be addressed through socially responsible initiatives and interventions. These were:

a) Demand for employment opportunities.

b) Infrastructure development

Page 168: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 159

The proposed strategy envisages addressing the wider goal of sharing benefits with the local

community. The following activities would be undertaken.

Income Generation Opportunity for local community

The local people will be given preference, although they will be recruited on their individual

merit. Tender specification for post construction services will include favorable employment

opportunities towards the local population. The main principles of employment are outlined

below:

Employment strategy will provide for preferential employment during operation phase.

General recruitment procedures will be transparent, public and open to all.

Recruitment procedures will be publicized at locally prominent locations in advance.

There will be no discrimination on basis of gender, caste or other factors.

Contractors would be required to abide by the Indian labor laws regarding standards on

employee working conditions, minimum wages for workers, safety and welfare measures.

Following the appointment of the contractor, information on employment will be

available to the local community at the Panchayat office or other prominent places like

the school, frequently visited spots in the village etc. Information on the following

aspects would be provided- scale and duration of employment, type of available work and

demand projection.

Improved working conditions

The project would provide safe working conditions for the labor and other workers employed at

the facility during construction and operation phase. Conditions of employment should address

issues like minimum wages and medical care for the workers.

9.2.9 Vehicle Parking and Traffic Management

Adequate provision will be made for car/vehicle parking at the project site. There shall also be

adequate parking provisions for visitors so as not to disturb the traffic and allow smooth

movement at the site. For Plotted development, individuals plot owner will be responsible for

providing parking within their plots itself.

Page 169: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 160

9.3 ENERGY CONSERVATION

The Project will be designed in such a way that natural light and air will be enhanced in the

residences. Houses at the Residential Plotted Colony project will be energy efficient through use

of low energy consuming fixtures. Energy conservation will be achieved through various means

as given below.

Site Plan and building design:

Maximum utilization of solar light will be done

Public areas will be cooled by natural ventilation as opposed to air-conditioning

Maximize the use of natural lighting through design

The orientation of the buildings will be done in such a way that maximum daylight is

available

The water bodies and green areas will be spaced, so that a significant reduction in the

temperature can take place.

Energy saving:

Energy efficient lamps will be provided within the complex.

Constant monitoring of energy consumption and defining targets for energy conservation.

Adjusting the settings and illumination levels to ensure minimum energy used for desired

comfort levels.

Awareness:

Promoting resident awareness on energy conservation.

Training staff on methods of energy conservation and to be vigilant to such opportunities.

9.4 MANAGEMENT AND MAINTENANCE SYSTEM

Management and maintenance system is an important issue for the Integrated Township Project.

During the construction phase, M/s DBH Township LLP will take care for the implementation of

environmental management plan for the project. They will review the effectiveness of

implemented mitigation measures adopted by contractors and sub-contractors from time to time.

The houses will be provided with water sprinklers and fire alarms and there will be provision of

adequate number of fire extinguishers.

Page 170: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 161

Post construction, management and maintenance of the internal services laid in Residential

Plotted Colony project will be done by M/s DBH Township LLP and subsequently the same

shall be transferred to the local Municipality/designated authority.

9.4.1 Institutional Capacity Building

a. Reporting: For effective implementation of any system/ plan, a systematic reporting

system is essential. An Environmental Management Cell shall be set up for

implementation of the proposed Management Plan. Reporting of the results of all the

management and monitoring plan shall be submitted to the designated Project Head. The

reports shall be reviewed and parameters exceeding their limits should be identified and

the reason for the same investigated. Any requisite mitigation plan shall be taken up

accordingly.

The Environment Management Cell will be a permanent organizational set up charged

with the task of ensuring its effective implementation of mitigation measures and conduct

environmental monitoring. The major duties and responsibilities of Environmental

Management Cell shall be as given below:

To implement the environmental management plan

To assure regulatory compliance with all relevant rules and regulations

To ensure regular operation and maintenance of pollution control devices

To minimize environmental impact of operations as by strict adherence to the EMP

To initiate environmental monitoring as per approved schedule

b. Review and interpretation of monitored results and corrective measures in case

monitored results are above the specified limit.

c. Maintain documentation of good environmental practices and applicable environmental

laws for a ready reference

d. Maintain environmental related records

e. Coordination with regulatory agencies, external consultants, monitoring laboratories

f. Maintenance of log of public complaints and the action taken.

Page 171: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

CHAPTER 9

M/s DBH Township LLP Page 162

9.4.2 Hierarchical Structure of Environmental Management Cell

Normal activities of the EMP cell would be supervised by a dedicated person who will report to

the project Head.

9.4.3 Awareness and Training

Training and human resource development is an important link to achieve sustainable operation

of the facility and environment management. For successful functioning of the project, relevant

EMP would be communicated to residents and contractors.

Occupants must be made aware of the importance of waste segregation and disposal, water and

energy conservation. The awareness can be provided by periodic Integrated Society meetings.

They would be informed of their duties.

9.4.4 Environmental Audits and Corrective Action Plans

To assess whether the implemented EMP is adequate, periodic environmental audits will be

conducted by the project proponent’s Environmental division. These audits will be followed by

Correction Action Plan (CAP) to correct various issues identified during the audits.

9.5 OVERALL MITIGATION MEASURES AND ENVIRONMENTAL

MANAGEMENT PLAN

Overall impact assessment of anticipated environmental impacts and mitigation measures &

environmental management plan to mitigate the potential impacts during the development &

construction and operation phase are summarized in Table 9.2.

Page 172: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 163

Table 9.2:Environmental Management Plan during construction and operation phases of the project.

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

1. Groundwater

Quality

Ground water

contamination

Construction Phase

Sullage generated

from Labor tents.

1. Modular STP/

Mobile

toilets

No significant

impact as majority

of laborers would

be locally deployed.

Operation Phase

Sewage treatment,

sludge disposal on

land.

Sewage will be

treated in Sewage

Treatment Plant.

Sludge will be used

for horticultural

purpose as manure.

No significant

negative impact on

ground water

quality envisaged.

In an unlikely event

of soil and ground

water

contamination,

remediation

measures shall be

implemented.

2. Groundwater

Quantity

Ground Water

Depletion

Construction Phase

Ground water will

not be used for

construction

activity.

Not Applicable

Not Applicable

Page 173: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 164

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

Operation Phase

Water will be

supplied by

HUDA.

Recycling of treated

sullage to reduce

freshwater

requirement

Storm water

collection for Water

Harvesting.

Awareness

Campaign for

reduced water use by

occupants.

No significant

impact on ground

water quantity

envisaged.

3. Air Quality

Dust

Emissions

Construction Phase

All heavy

construction

activities.

Dust suppression

through water

sprinkling using

water trucks,

handheld sprays and

automatic sprinkler

systems.

Vehicles

transporting loose

construction material

should be covered.

Contractors will be

advised to provide

dust masks for the

employed labor.

Not significant

because dust

generation will be

temporary and will

settle fast due to

dust suppression

techniques used.

Page 174: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 165

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

Emissions of

PM, SO2, NO2

and CO

Construction Phase

Operation of

construction

equipment and

vehicles during site

development.

Rapid on site

construction

Improved

maintenance of

equipment’s.

Not significant

Regular monitoring

of emissions and

control measures to

reduce the emission

levels.

Operation Phase

Emissions from

vehicular traffic.

Green belt to be

provided with

specified species to

help reduce PM

levels.

Page 175: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 166

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

4. Noise

Environment

Noise

emissions

Construction Phase

Operation of

construction

equipment and

vehicles during site

development.

Equipments should

be fitted with

silencers, where

applicable and

maintained well.

Providing noise

shields near heavy

construction

operations.

Construction activity

will be limited

mostly to daytime

hours only.

Use of Personal

Protective

Equipment (PPE)

like earmuffs and

earplugs during

construction

activities.

Operation Phase

Noise from

vehicular

movement.

Peripheral

plantations.

Not significant

Short-term

exposure within

permissible limit.

Page 176: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 167

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

5. Land

Environment

Soil

contamination

Construction Phase

Disposal of

construction

debris.

Construction debris

will be collected and

suitably used on site

as per construction

waste management

plan.

Impact will be

local, as any waste

generated will be

reused for

construction

activities. Not

significant.

Operation Phase

Dumping of

municipal solid

waste on land.

Solid waste from site

will be collected on

a daily basis and

disposed as

municipal wastes.

The segregation,

transportation and

disposal of wastes

will be handled by a

private agency

authorized by

government.

Not Significant

Negligible impact

6. Biological

Environment

(Flora and

Fauna)

Removal of

Flora and

Fauna on site.

Construction Phase

Site development

during

construction.

The site comprises

of small grasses.

No negative impact

--

Page 177: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 168

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

Increase of

Green Cover

Operation Phase

Plantations along

the periphery of

the complex.

Plantations of

species that are

native to the area,

fast growing and

with good canopy

cover.

Beneficial impact

7. Socio -Economic

Environment

Population

displacement

and economic

impact

Construction Phase

No relocation is

involved.

Constructional

activities

Compensation has

been provided to the

land owners by

development

authority.

Employment for

laborers

No negative impact

Beneficial impact

--

Operation Phase

Site operation.

Project will provide

employment

opportunities.

Boost to local

market for increased

demand in goods of

daily need.

Beneficial impact

--

Page 178: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Residential Plotted Colony

Village Teha & Garhi Keshri EIA/EMP REPORT

Sonepat, Haryana CHAPTER IX

M/s DBH Township LLP Page 169

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

8. Traffic Pattern Increase of

Vehicular

traffic

Construction Phase

Heavy vehicular

movement during

construction.

Heavy vehicular

movement will be

restricted to daytime

only and adequate

parking facility will

be provided.

No negative impact

Operation Phase

Increased traffic

from the project.

Vehicular movement

will be regulated

inside the site

Adequate parking

space provided.

Moderate negative

impact

Page 179: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 170

CHAPTER-10

SUMMARY AND CONCLUSION

10.1 PROJECT BACKGROUND

M/s DBH Township LLP intends to construct the Integrated Township Project at Village-

Ramchandi, Banarsi and Nakti, Distt. Raipur, Chhattisgarh.

As per EIA Notification, 2006 & its amendments for all Group Housing and area development

projects covering an area of 50 ha and/ or built up area greater than 1, 50,000m2 are designated

as category 8 (b) projects and are required EIA Report to obtain prior environmental clearance

from respective State Environmental Impact Assessment Authority (SEIAA). The project is thus

categorised as 8(b) under Schedule of the Environmental Impact Assessment Notification and

requires Environmental Clearance from the State Environment Impact Assessment Authority,

Haryana since the built up area is 1,033,801.19 m2. So, EIA/EMP study is required. The

EIA/EMP study has been carried out by Grass Roots Research & Creation India Pvt. Ltd.

For this study, the impact zone shall confine within an angular radius of 5 km from the project

boundary. For the purpose of certain environmental components, the radius has extended up to

10 km as well. The EIA is conducted to establish the baseline environmental setting in the study

area, assessment of potential impacts on different environmental components, design of

mitigation measures so as to keep impacts within acceptable limits and strengthen the positive

impacts.

The Executive Summary summarizes the findings of the EIA study to aid in decision making and

provides project related information and environmental impacts to non-technical sections of

society. The summary highlights the baseline environmental status, key environmental issues and

their likely impacts and also lists the major recommended mitigation measures to attenuate the

impacts.

Page 180: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 171

10.2 PROJECT SITE& CONNECTIVITY

The project is located at Village- Ramchandi, Banarsi and Nakti Distt. Raipur, Chhattisgarh.The

project site is adjacent & connected to Mana Road and Naya Raipur Marg in South and West

direction, respectively. The nearest Railway station is Telibandha railway station which is 7.99

km (North West) from the project site. The nearest airport is Swami Vivekananda Airport which

is 1.46 km (South) from the project site.

10.3 PROJECT FEATURES

The design population of the site is 43,319 person. Salient features of the project are:

Table 10.1:Salient Features of the project

S. No. Facility Value

1. Power Supply 39.5 MVA

2. Water Supply Operational Phase: Canal Water

Construction Phase: Existing borewell and

pond onsite.

3. Water Demand 4752 KLD, Fresh water- 2,790 KLD

4. Sullage generation 3,707 KLD

5. STP Capacity 3720 KLD*

6. Solid waste generation 16,462 kg/day

7. Manpower requirement 200-300 persons

STP 1 (8 x 325) 2600 KLD MBBR: For 461 Plots, 2 Club, 2 Nursery School, Nursing Home,

Hotel, Group Housing.

STP 2 (4 x 280) 1120 KLD MBBR: For 466 Plots, 2 Club, 1 VIP Club, Community Building, 1

Nursery School, High and Primary School, Retail and Office and Hospital.

EWS will have separate services.

The project will be implemented over a span of two to three years from the commencement of

construction.

Page 181: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 172

10.4 ENVIRONMENTAL SETTING OF THE STUDY AREA

The baseline environmental status was assessed based on primary and secondary data collected

either through in-site field observation or obtained from agencies such as India Meteorological

Department (IMD), State Pollution Control Board, Census of India and Local Forest Department

etc. The baseline status established from analysis of secondary and primary data and predicted

impacts are discussed below. The proposed mitigation measures are also provided along with

10.4.1 Land Environment

The land use pattern of the study area is mainly residential, agricultural and open & degraded

vegetation. The site falls under residential land use as per Naya Raipur Development Plan 2031.

When awarded to the project proponent, the land was a barren stretch.

The project will be developed as per the provisions of the Naya Raipur Development Plan 2031.

The construction phase of any construction project poses the threat of soil contamination and soil

erosion, mainly during the construction phase. Inadequate solid waste management may also

cause soil contamination during operation phase. The estimated waste generation during

operation phase is 16,462 kg/day.

During construction phase, excavation related work will be avoided during the monsoons and

site clearing will be carried out for specific areas being developed. All wastes from site will be

regularly removed and disposed/ sold. An efficient solid waste management is proposed

comprising door-to-door waste collection, segregation of solid waste management facility within

the site, and their disposal. Solid waste will be disposed by sale of recyclable wastes to vendors.

10.4.2 Water environment

The project site is located at Village- Ramchandi, Banarsi and Nakti, Distt. Raipur, Chhattisgarh.

. The water requirement during construction phase will be met onsite borewell and pond. A

combination of efficient water management to reduce water consumption, reuse of treated

wastewater to reduce freshwater demand and rainwater harvesting to replenish groundwater is

proposed to have a positive bearing on the water environment of the region.

Sewage Treatment Plant (STP) of total capacity 3720 KLD will be set up to treatwaste water.

Page 182: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 173

10.4.3 Air Environment

During construction phase, the major air pollutant of prime concern is PM2.5,PM10as impacts of

other emissions such as SO2, NO2, and CO will not be significant because the nature of sources

is such that the emissions are distributed spatially as well as temporal. Monitored average

PM2.5,PM10 level exceeded NAAQS at all the five locations. The levels of PM 2.5,PM10,NO2, SO2

and CO at all the five locations were within the standards prescribed by NAAQS at all the five

locations. Thus dust emissions from construction activities shall require comprehensive

mitigation measures and best construction practices.

Water sprinklers will be used to suppress dust during construction. During the operation phase,

green belt and green area development is proposed to restrict and absorb air pollutants.

10.4.4 Noise Environment

Noise levels were observed at four locations within the study area. Levels of background noise

monitored in exceed the limits at 55 dB (A) and 45dB (A) for daytime and night time

respectively.

The noise emitted from heavy-duty construction equipments during construction period being

high shall require occupational preventive measures and temporary noise barriers for noise

attenuation. The construction period being about four to five year duration, will require

significant mitigation measures such as restricted loud noise activities to daytime and provision

of PPEs In the operation phase, noise pollution will be checked through acoustic enclosures of

DG Sets and green belt plantation.

10.4.5 Biological environment

There is also no tree cutting involved in the project. Additionally, there will be avenue

plantations, green walls and roof tops. The landscaping will include native species that will

attract local birds and insects, reduce pollution and improve aesthetics and micro-climate of the

region. Total green area measures 91,860 m2i.e 10% of net planned area which will be area under

tree plantation at periphery and along the roads. Evergreen tall and ornamental trees like Acacia

auriculiformis, Acacia delbata, Aeglemarmelos, Adina cordifolia and ornamental shrubs like

Page 183: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 174

Bambusaarundinacia, Bambusa vulgaris have been proposed to be planted inside the premises.

Parks will also be developed by the project proponent.

List of the plants is given below in table 10.2

Table 10.2: Plantation List

Page 184: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 175

10.4.6 Socio-economic environment

The Integrated Township Project does not call for any land acquisition and no change in the

existing land use pattern. The execution of the project will not disturb the people living in area as

there will be no blasting and large scale digging. The project will generate employment

opportunities for both skilled and unskilled workers in the vicinity, which will produce multiple

effects on the life and economy of the local people. Thus from socio-economic point of view the

project is beneficial to the people and can be executed with little hesitation.

10.4.7 Energy efficiency

The total energy demand of 39.5 MVA for the project will be met by Chhattisgarh State Power

Distribution Company Limited. There is provision of 4 no. of DG sets of total 1, 270 kVA (1 X

Page 185: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 176

320 kVA + 1 X 625 kVA + 1 X 125 kVA + 1 X 200 kVA) capacity for power back up in the

Township Project only for Public Utilities and External Lighting. The DG sets will be equipped

with acoustic enclosure to minimize noise generation and adequate stack height for proper

dispersion. Multistoried Group Housings, Commercial Building, Institutional Buildings etc. will

have their own standby supply arrangement.

.Various provisions are made to reduce the energy efficiency of the building, such as use of solar

energy, provision of low energy fixtures, design features to maximise sunlight and use of

materials to improve energy efficiency.

10.4.8 Others

Resource Conservation:A concerted effort is made towards resource conservation by way of

using recycled building materials, reduced water consumption and improving energy efficiency

of the building.

Indoor Air Quality: Special attention will be given to maintaining indoor air quality through

use of low VOC paints, provision of adequate ventilation, proper storage of chemical and

cleaning materials.

Safety:A network of manned security gates, security men, closed circuit TV and intercom

facilities are proposed to ensure safety of the occupant. The buildings will also be provided with

adequate fire tenders, fire alarms and water sprinklers.

10.5 ENVIRONMENTAL MANAGEMENT PLAN Adequate environmental management measures will be incorporated during the entire planning,

construction and operating stages of the project to minimize any adverse environmental impact

and assure sustainable development of the area.

For the effective and consistent functioning of the campus, an Environmental Management

System (EMS) will be established at the site including an Environmental Management cell for

implementation of the EMP and monitoring plan, training and awareness, audits and

maintenance of records.

Page 186: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP Page 177

The total estimated cost of the Integrated Township Project is Rs. 202.81 crores which includes

the cost of the land as well as the development cost.

Based on the environmental assessment, the associated potential adverse environmental impacts

can be mitigated to an acceptable level by adequate implementation of the measures as stated in

the EIA and the EMP. Some of the benefits from the project are:

Use of solar energy for street lighting

Provision of green walls and green terraces

Use of CLC blocks (containing approx. 33% flyash)

Use of steel manufactured from recycled content.

Provide permeable paving to control surface water runoff

Rainwater harvesting

Meet all requirements for buildings in moderate earthquake prone areas.

Provision of fire alarms and water sprinklers.

Provision of welfare schemes to workers.

Extending educational and healthcare facilities to the local people.

Commitment to engaging local people and businessmen for maintenance and

repair work.

Hence, it may be concluded that the project will have significant positive economic and social

impact on the local community apart from meeting the housing needs of the occupants, without

bearing any significant adverse environmental impact

Page 187: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP. Page 177

CHAPTER-11

DISCLOSURE OF CONSULTANTS ENGAGED

Project Name: Integrated Township Project- M/s DBH Township LLP.

Name and address of

the Consultant

GRC India (P) Ltd.

F-374 &375, Sector- 63,

Noida, UP, India

ISO 9001:2008 Certified,

QCI-NABET Accredited.

Personnel’s involved

in preparation of

EIA/EMP report

Ms. Mudita Tomar

Ms. Akshara Abhimanyu ( Project Associate)

Base line data GRC India Training and

Analytical Laboratory

F-375, Sector - 63

Noida, U.P, India

NABL Accredited Laboratory,

Recognized by MoEF under

Environment (Protection) Act,

1986.

A unit of GRC India (P) Ltd.

The EIA/EMP report has been prepared under the guidance of following

Coordinators & Functional Area Experts:

EIA Coordinator Mr. K.D. Choudhury

FAE-WP Dr. P.R. Chaudhari

FAE-AP Mr. K.D. Choudhury

FAE-AQ Prof. B. Padmanabha Murty

FAE-LU Mr. P. Radhakrishnamoorthy

FAE-EB Dr. P.R. Chaudhari

FAE-NV Mr. K.D. Choudhury

FAE-SE Mr. Subimal Pattadar

FAE-HG Prof. Tapan Majumder

FAE-G Prof. Tapan Majumder

FAE-SC Dr. S.R. Maley

FAE-RH Mr. K.D. Choudhury

FAE-SHW Mr. Rajesh Bhaskaran

Page 188: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP. Page 178

11.1 ACCREDITION/ FROM QUALITY COUNCIL OF INDIA, QCI

AND LIST OF COORDINATORS

GRC India (P) Ltd. has got the accreditation from QCI NABET as per MoEF, GoI

requirements. As per the recently published QCI NABET ‘List of Accredited Consultant

Organizations/Rev. 39/Mar. 08, 2016’, listed in as Accredited consultant, Category ‘A’

Sl. No. 78. For reference, a snapshot of the list where GRC India’s name is listed is

pasted below

Page 189: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP. Page 179

ACCREDITATION LETTER FROM NABET

Page 190: Integrated Township Project Village Ramchandi, Banarsi and Nakti ...

Integrated Township

At Village Banarsi, Ramchandi and Nakti

Raipur, Chhattisgarh EIA/EMP REPORT

M/s DBH Township LLP. Page 180