Integrated Scenario Course Yfal01 - Pg103
Transcript of Integrated Scenario Course Yfal01 - Pg103
-
Lars Vogel SAP Germany - For internal use only Page 1 09.08.2002
Revision: 09 August 2002Version : 2.0
-
Lars Vogel SAP Germany - For internal use only Page 2 09.08.2002
Document
Overview:
Project Internal
Topic Integrated SCM-Model
SAPNet: http://intranet.sap.com/de-scm-consulting Menu entry: Training
Please check for updates on this website since this course is still under development.
For internal use only
This paper is the basis for an APO Workshop. Please check the schedule for the course YFAL01.
-
Lars Vogel SAP Germany - For internal use only Page 3 09.08.2002
Table of Contents:
1 GENERAL....................................................................................................................13
1.1 Summary..........................................................................................................................................................13
1.2 Purpose.............................................................................................................................................................13
1.3 Scope.................................................................................................................................................................13
1.4 Model Overview ..............................................................................................................................................14
1.5 Remarks ...........................................................................................................................................................14
1.6 Online Help ......................................................................................................................................................15 1.6.1 Help Portal ................................................................................................................................................15 1.6.2 Field help...................................................................................................................................................15
1.7 APO Transactions ...........................................................................................................................................16
1.8 Customizing Request.......................................................................................................................................16
2 MASTER PLANNING DATA .......................................................................................18
2.1 Model / planning version ................................................................................................................................18 2.1.1 General ......................................................................................................................................................18 2.1.2 Generation .................................................................................................................................................18
2.2 Planning Calendar ..........................................................................................................................................21 2.2.1 General: .....................................................................................................................................................21 2.2.2 Example.....................................................................................................................................................22
2.3 Production Planner .........................................................................................................................................25
3 SETUP OF MASTER DATA IN APO...........................................................................27
3.1 Locations ..........................................................................................................................................................27 3.1.1 Details .......................................................................................................................................................27 3.1.2 Example.....................................................................................................................................................28
3.2 Products ...........................................................................................................................................................32 3.2.1 Details .......................................................................................................................................................32 3.2.2 Example: ...................................................................................................................................................35 3.2.3 Information:...............................................................................................................................................42
3.3 Transportation lanes .......................................................................................................................................43
3.4 Resources .........................................................................................................................................................44 3.4.1 Production resources .................................................................................................................................44
-
Lars Vogel SAP Germany - For internal use only Page 4 09.08.2002
3.4.2 Example: ...................................................................................................................................................45 3.4.3 Storage resource ........................................................................................................................................49 3.4.4 Example.....................................................................................................................................................49
3.5 Production Process Models for SNP..............................................................................................................53 3.5.1 Overview...................................................................................................................................................53 3.5.2 Naming convention ...................................................................................................................................55 3.5.3 Details .......................................................................................................................................................56 3.5.4 Information:...............................................................................................................................................58 3.5.5 Example: ...................................................................................................................................................58 3.5.6 Time-Dependent Process Parameters ........................................................................................................71
3.6 Supply chain engineer.....................................................................................................................................73 3.6.1 Work area:.................................................................................................................................................73 3.6.2 Transportation lanes ..................................................................................................................................76 3.6.3 Example: Manual transportation lanes ......................................................................................................77 3.6.4 Mass creation of transportation lanes ........................................................................................................79
3.7 Quotations........................................................................................................................................................81 3.7.1 General ......................................................................................................................................................81 3.7.2 Example.....................................................................................................................................................82
4 SETUP FOR SNP ........................................................................................................86
4.1 Planning area...................................................................................................................................................86
4.2 Maintain Time Bucket Profile for SNP Planning book................................................................................87
4.3 Planning book ..................................................................................................................................................89 4.3.1 Overview...................................................................................................................................................89 4.3.2 Example.....................................................................................................................................................90 4.3.3 Planning area assignment for a planning book..........................................................................................92 4.3.4 Macro builder ............................................................................................................................................96
4.4 Initialize the planning area.............................................................................................................................97
4.5 Assign user to new planning book..................................................................................................................98
4.6 Usage of SNP..................................................................................................................................................100 4.6.1 Using the interactive supply network planning .......................................................................................100 4.6.2 Running SNP Heuristic ...........................................................................................................................103 4.6.3 Nice Features...........................................................................................................................................103
4.7 Creating a SNP macro ..................................................................................................................................104
5 MANUAL PLANNING IN SNP...................................................................................109
5.1 Data view change...........................................................................................................................................109
5.2 Manual activities ...........................................................................................................................................110
6 SETUP FOR CTM......................................................................................................115
6.1 Create CTM Time Stream............................................................................................................................115
6.2 Create CTM Profile ......................................................................................................................................116
-
Lars Vogel SAP Germany - For internal use only Page 5 09.08.2002
6.3 Running CTM only for a part of the network ............................................................................................122
6.4 Master Data check for CTM ........................................................................................................................123
6.5 CTM live-cache access ..................................................................................................................................125
6.6 Supply distribution........................................................................................................................................125 6.6.1 General ....................................................................................................................................................125 6.6.2 Usage within CTM..................................................................................................................................126
6.7 Global customizing for CTM........................................................................................................................127
6.8 Remark: Change global CTM setting for a CTM profile ..........................................................................128
7 SETUP FOR DEPLOYMENT HEURISTIC.................................................................132
7.1 ATP categories and groups...........................................................................................................................132
7.2 Location Master data ATP groups ...........................................................................................................134
7.3 Profiles............................................................................................................................................................135
7.4 Running Deployment ....................................................................................................................................141 7.4.1 Interactive................................................................................................................................................141 7.4.2 Background .............................................................................................................................................142
8 SETUP FOR TLB.......................................................................................................143
8.1 TLB Profile ....................................................................................................................................................143
8.2 Running TLB.................................................................................................................................................145 8.2.1 Interactive................................................................................................................................................145 8.2.2 Background .............................................................................................................................................145
9 SETUP FOR THE OPTIMIZER..................................................................................148
9.1 Master data....................................................................................................................................................148 9.1.1 Costs for PPMs ......................................................................................................................................148 9.1.2 Shelf life ..................................................................................................................................................148 9.1.3 Product master data .................................................................................................................................149
9.1.3.1 Storage costs........................................................................................................................................149 9.1.3.2 Safety stock penalty costs....................................................................................................................149 9.1.3.3 Delay and Non Delivery Penalty Costs ...............................................................................................150
9.1.4 Cost for expanding the capacity ..............................................................................................................150
9.2 Profiles............................................................................................................................................................151 9.2.1 Cost profile..............................................................................................................................................151 9.2.2 Optimizer profile .....................................................................................................................................152
9.3 Running the SNP optimizer..........................................................................................................................155 9.3.1 Batch Run................................................................................................................................................155 9.3.2 Interactive................................................................................................................................................157
9.4 Running the deployment optimizer .............................................................................................................158
9.5 Log files ..........................................................................................................................................................159
-
Lars Vogel SAP Germany - For internal use only Page 6 09.08.2002
9.6 Discretisation .................................................................................................................................................162 9.6.1 Overview.................................................................................................................................................162 9.6.2 Optimizer profile .....................................................................................................................................162 9.6.3 Master data transportation lanes...........................................................................................................163 9.6.4 Restrict the horizon for the discrete horizon ...........................................................................................163 9.6.5 Setting in the /SAPAPO/SNP_CONSTANTS ........................................................................................164
9.7 Advanced cost setup for the optimizer ........................................................................................................164 9.7.1 Storage costs............................................................................................................................................164 9.7.2 Safety stock costs ....................................................................................................................................165
10 SETUP FOR THE BUSINESS WAREHOUSE........................................................166
10.1 Definition of the InfoObjects ........................................................................................................................166 10.1.1 Create Info area .......................................................................................................................................167 10.1.2 InfoObject catalog ...................................................................................................................................167 10.1.3 Create InfoObjects by defining them ......................................................................................................168 10.1.4 Create InfoObjects by copying them.......................................................................................................170
10.2 Create InfoCube ............................................................................................................................................171
10.3 Upload the data to the InfoCube..................................................................................................................179 10.3.1 Create Source system ..............................................................................................................................179 10.3.2 Create Info Source...................................................................................................................................180
10.3.2.1 Create Application component ........................................................................................................180 10.3.2.2 Create the Info Source.....................................................................................................................181 10.3.2.3 Create the Link between Data Source and Info Source ...................................................................182 10.3.2.4 Update rule ......................................................................................................................................185 10.3.2.5 Info package ....................................................................................................................................188
10.4 Displaying data in the Infocube using listcube ...........................................................................................193
10.5 Viewing the data in the InfoCube using the BEx Analyzer .......................................................................194
11 SETUP FOR DP......................................................................................................201
11.1 Additional product master data...................................................................................................................201
11.2 Create DP model ...........................................................................................................................................202 11.2.1 Storage bucket profile .............................................................................................................................202 11.2.2 Define demand planning key figure ........................................................................................................203 11.2.3 Planning object structure .........................................................................................................................205 11.2.4 Planning area ...........................................................................................................................................208 11.2.5 Forecast settings ......................................................................................................................................210
11.3 Characteristics combinations .......................................................................................................................211 11.3.1 Create Characteristics combinations by manual assignment...................................................................212 11.3.2 Create Characteristics combinations out of an Infocube .........................................................................213
11.4 Initialise planning area .................................................................................................................................214
11.5 Copy InfoCube data into live-cache.............................................................................................................216
11.6 Create a time bucket for Demand Planning................................................................................................220
11.7 Planning Book................................................................................................................................................221 11.7.1 Creation ...................................................................................................................................................221
-
Lars Vogel SAP Germany - For internal use only Page 7 09.08.2002
11.7.2 Macros.....................................................................................................................................................230 11.7.3 Assign user ..............................................................................................................................................232
11.8 Using interactive Demand Planning ............................................................................................................233
11.9 Create Forecast Profile .................................................................................................................................233
11.10 Creating a forecast ....................................................................................................................................235
11.11 Manual forecast adjustment.....................................................................................................................236
11.12 Releasing Forecast figures to SNP ...........................................................................................................236
11.13 Distribution Function................................................................................................................................241 11.13.1 Creation ...............................................................................................................................................241 11.13.2 Usage...................................................................................................................................................242
11.14 Reorganizing Indep. Requirements / Forecast........................................................................................243
11.15 Forecast consumption ...............................................................................................................................244
11.16 Life cycle planning Phase in /Phase out...................................................................................................246
11.17 Promotion Planning ..................................................................................................................................250 11.17.1 Additional configuration .....................................................................................................................250 11.17.2 Working with promotions ...................................................................................................................251
12 SETUP FOR PP/DS................................................................................................256
12.1 Products .........................................................................................................................................................256
12.2 Resources .......................................................................................................................................................259 12.2.1 Introduction .............................................................................................................................................259 12.2.2 Shifts .......................................................................................................................................................260 12.2.3 Shift Sequences .......................................................................................................................................261 12.2.4 Capacity Variants ....................................................................................................................................261 12.2.5 Example...................................................................................................................................................261
12.3 Setup Group /Setup Matrix..........................................................................................................................264 12.3.1 Setup Group ............................................................................................................................................264 12.3.2 Setup Matrix............................................................................................................................................265 12.3.3 Assignment of the setup matrix to the resource ......................................................................................266
12.4 Generation of PP/DS PPMS........................................................................................................................267 12.4.1 Naming conventions................................................................................................................................267 12.4.2 Example: .................................................................................................................................................268
12.5 Generation of SNP PPMs out of PP/DS PPMs.........................................................................................274
12.6 Parameters for planning ...............................................................................................................................274 12.6.1 Strategy Profile........................................................................................................................................274 12.6.2 Detailed Scheduling Planning Board Profile...........................................................................................278 12.6.3 Work Area...............................................................................................................................................280 12.6.4 Time Profile ............................................................................................................................................283 12.6.5 Optimization Profile ................................................................................................................................283 12.6.6 Propagation Ranges.................................................................................................................................283 12.6.7 Master Profile..........................................................................................................................................286 12.6.8 Objects / Classes......................................................................................................................................286
-
Lars Vogel SAP Germany - For internal use only Page 8 09.08.2002
12.7 Interactive usage of PP/DS ...........................................................................................................................286 12.7.1 Product view............................................................................................................................................286 12.7.2 Product planning table.............................................................................................................................289
12.8 Background planning with PP/DS ...............................................................................................................291
13 HIERARCHICAL DATA..........................................................................................294
13.1 Resource hierarchy: ......................................................................................................................................294 13.1.1 Customizing: ...........................................................................................................................................294 13.1.2 Application:.............................................................................................................................................296
13.2 Products: ........................................................................................................................................................298
13.3 Locations:.......................................................................................................................................................299
14 ALERT HANLDING ................................................................................................303
14.1 Alert Monitor.................................................................................................................................................303 14.1.1 Alert-Profile: ...........................................................................................................................................303 14.1.2 Assign alert profile to your user ..............................................................................................................307 14.1.3 Assign DP / SNP alert profile to your user..............................................................................................308
14.2 Generate Alert Types ....................................................................................................................................310
14.3 Generate Alerts..............................................................................................................................................312 14.3.1 Overview.................................................................................................................................................312 14.3.2 Static alerts with SNP..............................................................................................................................312 14.3.3 Dynamic alerts with SNP ........................................................................................................................315 14.3.4 Customer specific alert generation ..........................................................................................................315
14.4 Viewing alerts ................................................................................................................................................316 14.4.1 Alert monitor ...........................................................................................................................................316 14.4.2 PP/DS......................................................................................................................................................317 14.4.3 DP / SNP .................................................................................................................................................317
14.5 Daily Alert Handling.....................................................................................................................................317
15 SUPPLY CHAIN COCKPIT ....................................................................................320
15.1 Setting up the access to BW..........................................................................................................................320
15.2 Queries and KPIs:........................................................................................................................................321
15.3 Usage of the Supply chain cockpit ...............................................................................................................321
15.4 Creation of a content menu ..........................................................................................................................323 15.4.1 General ....................................................................................................................................................323 15.4.2 BW KPIs ................................................................................................................................................324 15.4.3 Queries ....................................................................................................................................................325
15.5 Assign SCC content menu to the user .........................................................................................................327
16 PLAN MONITOR ....................................................................................................330
16.1 Overview ........................................................................................................................................................330
-
Lars Vogel SAP Germany - For internal use only Page 9 09.08.2002
16.2 Definition of a key figure profile ..................................................................................................................330
16.3 Using the Plan monitor .................................................................................................................................336
17 TP/VS .....................................................................................................................339
17.1 Additional Master Data ................................................................................................................................339 17.1.1 Transportation Group ..............................................................................................................................339 17.1.2 Product ....................................................................................................................................................340
17.2 Location hierarchy ........................................................................................................................................340
17.3 Maintain Transportation relevant hierarchy..............................................................................................341
17.4 Maintain the location hierarchy...................................................................................................................341
17.5 Define Freight Units ......................................................................................................................................343
17.6 Transportation mode ....................................................................................................................................344
17.7 Transportation method.................................................................................................................................345
17.8 Vehicle Resources..........................................................................................................................................346 17.8.1 General ....................................................................................................................................................346 17.8.2 Example...................................................................................................................................................346
17.9 Transportation lane.......................................................................................................................................349
17.10 Vehicle Scheduling Cost Profile ...............................................................................................................349
17.11 Dimensions / Units.....................................................................................................................................351
17.12 Optimizer Profile.......................................................................................................................................352
17.13 Vehicle Scheduling ....................................................................................................................................357
18 REPORTING ON SNP PLANNING AREAS...........................................................360
18.1 General Preparation .....................................................................................................................................360 18.1.1 Generate Export Data Source ..................................................................................................................360 18.1.2 Replicate data source...............................................................................................................................363 18.1.3 Data source Overview .............................................................................................................................364
18.2 Maintenance of a data source in APO .........................................................................................................368
18.3 Reporting with a Remote Info Cube............................................................................................................371 18.3.1 General ....................................................................................................................................................371 18.3.2 Creation ...................................................................................................................................................371 18.3.3 Assign source system ..............................................................................................................................376 18.3.4 Testing.....................................................................................................................................................377
18.4 Reporting using a basic infocube .................................................................................................................379 18.4.1 Creation ...................................................................................................................................................379 18.4.2 Update rule ..............................................................................................................................................381 18.4.3 InfoPackage.............................................................................................................................................384 18.4.4 Test..........................................................................................................................................................388
-
Lars Vogel SAP Germany - For internal use only Page 10 09.08.2002
19 MODEL CONSISTENCY CHECK...........................................................................389
19.1 Maintain profile.............................................................................................................................................389
19.2 Perform check................................................................................................................................................391
19.3 Background....................................................................................................................................................393
20 SUPPLY AND DEMAND PLANNING ADMINISTRATION.....................................397
20.1 Key figures .....................................................................................................................................................397
20.2 Explanation....................................................................................................................................................397
21 APPENDIX I............................................................................................................402
21.1 Important Reports ........................................................................................................................................402 21.1.1 Deletion of transactional data..................................................................................................................402 21.1.2 Creation of stock .....................................................................................................................................403 21.1.3 Creation of independent requirements.....................................................................................................403
21.2 Create DP planning job ................................................................................................................................404 21.2.1 Create an Activity for Forecasting via Planning Job ...............................................................................405 21.2.2 Create Planning Job for Forecasting........................................................................................................406 21.2.3 Schedule Background Job for Forecasting ..............................................................................................407
21.3 Excel Upload Files .........................................................................................................................................409
21.4 Change / display mode in the interactive planning ....................................................................................411
21.5 User Function macros ...................................................................................................................................412 21.5.1 Summary .................................................................................................................................................412 21.5.2 Interface Definition .................................................................................................................................413 21.5.3 Create the customer function...................................................................................................................416 21.5.4 Use the new function...............................................................................................................................418
21.6 User exits macros...........................................................................................................................................420
21.7 Checking Macro calculation.........................................................................................................................422
21.8 ATP Checking Horizon.................................................................................................................................423
22 APPENDIX II...........................................................................................................426
22.1 Input help (F4 help) ......................................................................................................................................426
22.2 Cost functions with the SNP Optimizer.......................................................................................................426
22.3 CTM standard categories .............................................................................................................................428
22.4 Go to customizing from master data fields. ................................................................................................430
22.5 Create reports with selection variants.........................................................................................................432
23 OFFICE IN R/3........................................................................................................437
-
Lars Vogel SAP Germany - For internal use only Page 11 09.08.2002
23.1.1 Upload Files ............................................................................................................................................437 23.1.2 Download files ........................................................................................................................................440
24 SAP QUERY...........................................................................................................444
24.1 Create a User Group.....................................................................................................................................444
24.2 Create a Info Set............................................................................................................................................445
24.3 Create a Query ..............................................................................................................................................447
24.4 Test the query ................................................................................................................................................451
24.5 Query-Reports ..............................................................................................................................................453
25 CATT- COMPUTER AIDED TESTING TOOL ........................................................455
25.1 Record transaction ........................................................................................................................................455
25.2 Assign Variables ............................................................................................................................................456
25.3 Prepare import file ........................................................................................................................................458
25.4 Running CATT..............................................................................................................................................460
26 PERFORMANCE ANALYSIS .................................................................................464
26.1 Runtime analysis ...........................................................................................................................................464 26.1.1 Runtime analysis interactively ................................................................................................................464 26.1.2 Runtime analysis in parallel session........................................................................................................467
26.2 SQL Trace......................................................................................................................................................468
27 ITS INSTALLATION ...............................................................................................471
27.1 General ...........................................................................................................................................................471
27.2 Pre-Requirements .........................................................................................................................................471
27.3 Configuration of the IIS port .......................................................................................................................471
27.4 Installation of the ITS server........................................................................................................................474
27.5 APO Settings..................................................................................................................................................482
27.6 Test the installation .......................................................................................................................................483 27.6.1 webgui .....................................................................................................................................................483 27.6.2 APO demand planning ............................................................................................................................483 27.6.3 Alert Monitor ..........................................................................................................................................483
28 MODEL-OVERVIEW...............................................................................................486
29 TIPS AND TRICKS .................................................................................................488
-
Lars Vogel Page 12 09.08.2002
-
Lars Vogel SAP Germany - For internal use only Page 13 09.08.2002
1 GENERAL
1.1 Summary
This paper describes in detail the creation of an integrated SCM model. After attaining the normal APO courses you can use this description to create a small model for your testing.
The description does not contain an explanation WHY specific action are done, only HOW.
1.2 Purpose
The overall goal of this paper is to provide a full data-set for an integrated scenario within APO.
The data and test-scenarios should be used to create an own APO-model. This paper is supposed to be another APO for dummies-guide and therefore will also include examples for specific problems.
The model and the simulation version are not 000, since we do not consider the integration with R/3. The master data description includes also an XX. Replace XX with an appropriate number.
Because of the APO system is always under development, it could be that the current view is slightly different to the scenario described in this paper.
Please check for updates on http://intranet.sap.com/de-scm-consulting. This scenario can be found under the entry Training.
If you have any suggestions, enhancement requests or questions please contact Lars Vogel. (mailto:[email protected])
You are more then welcome to contribute.
1.3 Scope
Right now this paper covers:
Master data generation within APO
DP
SNP
CTM (Capable to Match)
PP/DS
BW
Alerts handling
Supply Chain Cockpit
Plan Monitor
TP/VS
BW reporting on SNP planning areas with remote infocubes and remote infocubes.
Collaboration
Manual planning in SNP
The appendix covers for example the following general topics:
-
Lars Vogel SAP Germany - For internal use only Page 14 09.08.2002
The usage of R/3 Office (for project documentation)1
The usage of SAP Query.
The usage of the computer aided testing tool (CATT).
How to do a performance analysis.
In addition useful definitions / techniques are defined in the appendix, e.g. the definition of user function macros, the definition of a demand planning job, important test report etc.
Installation of the ITS server.
1.4 Model Overview
The following figure illustrates the structure of the APO scenario.
Figure 1: Model Structure
1.5 Remarks
Abbreviation TA will be used for transaction.
Since the following includes a lot of configuration, try to find logical steps, e.g. the master data and SNP configuration and test what you have created.
1 Even though this is not APO specific its quite useful.
-
Lars Vogel SAP Germany - For internal use only Page 15 09.08.2002
Please log on to the system in ENGLISH, otherwise some examples will not work.
Nice transactions: o STERM for translation words
o SEARCH_SAP_MENU to find menu entries in the SAP menu.
1.6 Online Help
1.6.1 Help Portal
You find the online help under http://help.sap.com.
To display the online help for a specific transaction, please select the menu entry, press the right mouse button and select display documentation.
This will bring you to the correct entry in the Help Portal.
Figure 2
1.6.2 Field help
Please press F1 on the field to get a explanation of the field purpose / content.
-
Lars Vogel SAP Germany - For internal use only Page 16 09.08.2002
Figure 3
1.7 APO Transactions
To enter an APO transaction you always have to use /n in front of it, e.g. TA /SAPAPO/MAT1 must be entered as /n/SAPAPO/MAT1.
1.8 Customizing Request
Depending on the system settings (record changes) you might have to work with customizing requests.
Create a new customizing request to gather the changes you made in one system. This information can later be transported to another system.
This way you customize your system once and after testing your bring your changes into your test / consolidation and production system.
Press F1 in this field
-
Lars Vogel SAP Germany - For internal use only Page 17 09.08.2002
Figure 4
Click on and enter an appropriated short description into the following screen.
Figure 5
Press .
Press enter and establish the new plant by creating your own customizing request. Save the request and press enter in the screen Prompt for Customizing Request.
-
Lars Vogel SAP Germany - For internal use only Page 18 09.08.2002
Figure 6
2 MASTER PLANNING DATA
2.1 Model / planning version
2.1.1 General
Model: Contains all the master data
Planning version: contains all the version specific master data and the transactional data.
2.1.2 Generation
Although in a real implementation we would use the active model and version, we will still create our own model and version for separate testing.2
Use TA /SAPAPO/MVM3 to create the following model and planning version.
2 R/3 is only integrated with model and version 000. 3 Report /SAPAPO/VERSION_COPY allows you to copy a version (or /SAPAPO/VERSION_COPY_TRANS for a new copy into an existing version).
-
Lars Vogel SAP Germany - For internal use only Page 19 09.08.2002
Figure 7
Name Description
Model MODEL_XX APO MODEL XX
Version VERS_XX APO VERSION XX
Table 1
Figure 8: Create a model / version
Figure 9: Create Model
To create a version for your model, select first your model, then follow Figure 10
For the planning version, use the parameters out of Table 2.
-
Lars Vogel SAP Germany - For internal use only Page 20 09.08.2002
Figure 10
Parameter Value
SNP: Change planning active Yes
PP/DS Change planning active YesPP/DS: Automatic planning active NoPP/DS: No order without source of supply NoPP/DS: Standard planning horizon (days) 35PP/DS: Determine priority 2PP/DS: Take safety stock in account 0
Table 2: Parameter for the planning version
Figure 11: Parameter for planning version
-
Lars Vogel SAP Germany - For internal use only Page 21 09.08.2002
2.2 Planning Calendar
2.2.1 General:
Create time streams by using the TA /SAPAPO/CALENDAR.
Figure 12: Create Time Stream
The following time streams should be created:
Time stream: Non-Workdays: Factory calendar
APO-T1-XX Saturday, Sunday 01
APO-T2-XX Sunday empty
APO-T3-XX Saturday, Sunday, Monday, Thursday empty
Table 3
Follow the example and just change the included days, e.g. the first calendar does not include Saturday and Sunday as workdays, the second has only Sunday as a none working day etc.
-
Lars Vogel SAP Germany - For internal use only Page 22 09.08.2002
2.2.2 Example
Figure 13: Create time stream
Header Data:
Time stream ID: APO-T1-XX
Description: Time Stream 1
Years in past: 1
Years in future: 3
Time zone UTC
Calculation: Factory calendar
Calendar 01
-
Lars Vogel SAP Germany - For internal use only Page 23 09.08.2002
Figure 14: Time Steam Header data
Press select as the calculation rule week (weekdays)
Figure 15
and fill the next table with the following values:4
4 With APO 3.0 a time stream until 24:00:00 must be used to include the whole day.
-
Lars Vogel SAP Germany - For internal use only Page 24 09.08.2002
Figure 16: Time Stream Calculation rule
Press again and save your time stream.
-
Lars Vogel SAP Germany - For internal use only Page 25 09.08.2002
Figure 17
This calendar is later assigned to the locations and will be used to calculate the termination between locations, e.g. transportation duration or possible delivery days.
2.3 Production Planner
Create the planner XX who is production, demand, supply and transportation planner.
Go to customizing (TA SPRO).
-
Lars Vogel SAP Germany - For internal use only Page 26 09.08.2002
Figure 18: Specify the planner I
Press and create the following:
Figure 19: Specify the planner II
-
Lars Vogel SAP Germany - For internal use only Page 27 09.08.2002
3 SETUP OF MASTER DATA IN APO
3.1 Locations
TA: /SAPAPO/LOC3
Figure 20: Create Locations
3.1.1 Details
Create the locations using Table 4 and .
Market 1 , Market 2 and Market 3 are also warehouses that will be used to satisfy the demand for special regions. Demand planning will later be used to created demand on the market level.
Market 2 and Market 3 will be connected by an transportation zone.5
The only master data that should be maintained is the description, the country and the calendars. Additional settings will be set later.
Assign all locations to your model.
Type: Name: Description: Country: Time zone
Production Plant P1XX Plant 1 de CET
Production Plant P2XX Plant 2 de CET
Distribution Center D1XX DC 1 de CET
Distribution Center D2XX DC 2 de CET
Customer C1XX Market 1 de CET
Customer C2XX Market 2 de CET
Customer C3XX Market 3 de CET
Supplier S1XX Supplier 1 de CET
Transportation zone T1XX Transport 1 de CET
Table 4: Location Data
5 Transportation zones can be used together with TP/VS and TLB. Therefore a hierarchy is necessary. This will created later.
-
Lars Vogel SAP Germany - For internal use only Page 28 09.08.2002
Name Production Calendar
Storage Calendar
Shipping Calendar
P1XX APO-T1-XX APO-T1-XX APO-T1-XX
P2XX APO-T1-XX APO-T1-XX APO-T1-XX
D1XX APO-T1-XX APO-T2-XX
D2XX APO-T1-XX APO-T2-XX
C1XX APO-T1-XX APO-T2-XX
C2XX APO-T1-XX APO-T3-XX
C3XX APO-T1-XX APO-T2-XX
S1XX APO-T1-XX APO-T1-XX
T1XX APO-T1-XX APO-T3-XX
Table 5: Assignment of calendars to locations
Assign your planer XX to your all of your products.
3.1.2 Example
Figure 21: Creation of location I
-
Lars Vogel SAP Germany - For internal use only Page 29 09.08.2002
Figure 22: Creation of location II
-
Lars Vogel SAP Germany - For internal use only Page 30 09.08.2002
Figure 23: Creation of locations III
-
Lars Vogel SAP Germany - For internal use only Page 31 09.08.2002
Figure 24 Creation of locations IV
Press .
Assign location to your model by pressing in the entry screen in TA /SAPAPO/LOC3.
Figure 25 Assign location to model
-
Lars Vogel SAP Germany - For internal use only Page 32 09.08.2002
Figure 26: Assign location to model
Press .
3.2 Products
Figure 27
3.2.1 Details
Create the products from Table 6.
The product P-F01-XX can be produced in location P1XX or in location P2XX. P2XX is an external company, therefore we can purchase the P-F01-XX from P2XX.
The finished product will be sold in every location.
Assign all product / location combinations to your model.
Please note the differences in:
o procurement types.
-
Lars Vogel SAP Germany - For internal use only Page 33 09.08.2002
o unit KG for the raw material.
Additional material master data will be created in the following chapters.
Product Description Unit Locations (with Procurement Type)
P-F01-XX Finished Product 1 PC P1XX (E),P2XX (F),D1XX (F),D2XX (F),C1XX (F),C2XX (F),C3XX (F),T1XX (F)
P-A01-XX Assembly 1 PC P1XX (E)P-C01-XX Component 1 PC P1XX (P)P-C02-XX Component 2 PC P1XX (E)P-C03-XX Component 3 PC P1XX (F)P-R01-XX Raw Material 1 KG P1XX (F),
S1XX (F)
Table 6: Product Data
The demand for these products will be created via demand planning on a monthly base and disaggregated on a weekly base during the release of demand planning to SNP. The DC will only order based on a period lot-size given in the following Table 7. Change the product/location master accordingly.
Location Product Lot-size rule Period ID Number of periods D1XX P-F01-XX By period W 3
D2XX P-F01-XX By period M 2
Table 7: Lot-Size rules for the DC's
The customers are using reorder points. They are also using a minimum lot-size quantity of 300 pieces.
Location Product Lot-size rule
Reorder Point Procedure
Reorder Days supply
Reorder point6
C1XX P-F01-XX Reorder Point
1 ( = Reorder stock from location product master)
200 pieces
6 Note that, depending on the method, both entry may not required, e.g. for 1 and 2.
-
Lars Vogel SAP Germany - For internal use only Page 34 09.08.2002
C2XX P-F01-XX Reorder Point
2 ( = Reorder supply from location product master)
10 Days
C3XX P-F01-XX 3 ( = Maximum from MB and MR from location product master)
20 Days 200 pieces
Table 8: Lot-Size rules for the Customers
In addition we would like to prevent the system to send any demand to the factories within the next 5 days. Therefore specify the following stock transfer horizon:
Location Product Stock transfer horizon D1XX P-F01-XX 5
D2XX P-F01-XX 5
Table 9: Stock transfer rules
Set for all locations the Fix transports flag for product P-F01-XX
Set for the product P-F01-XX in the locations P1XX and P2XX the flag Firm production.
Set the production horizon for P-F01-XX in P1XX and P2XX to 20 days.
The weight of product P-F01-XX is 10 KG and the volume of P-F01-XX is 50 M3.
Maintain a planned delivery time of 20 days for product P-R01-XX in S1XX.
Maintain a goods receipt and goods issue time of two days for product P-F01-XX in D1XX and D2XX:
-
Lars Vogel SAP Germany - For internal use only Page 35 09.08.2002
3.2.2 Example:
Figure 28: Create Products I
Click on .
-
Lars Vogel SAP Germany - For internal use only Page 36 09.08.2002
Figure 29: Create Products II
Click on .
To change the lot-size rule and the stock transfer horizon refer of the DCs refer to Figure 30 and Figure 31.
-
Lars Vogel SAP Germany - For internal use only Page 37 09.08.2002
Figure 30: Lot size for DCs
Figure 31: Stock transfer horizon for DCs
-
Lars Vogel SAP Germany - For internal use only Page 38 09.08.2002
Figure 32: Lot size for Customers Part
-
Lars Vogel SAP Germany - For internal use only Page 39 09.08.2002
Figure 33: Firm production and Fix transports for the plants
-
Lars Vogel SAP Germany - For internal use only Page 40 09.08.2002
Figure 34 Weight and volume for product P-F01-XX
-
Lars Vogel SAP Germany - For internal use only Page 41 09.08.2002
Figure 35
Figure 36: Assignment of planner to the product
-
Lars Vogel SAP Germany - For internal use only Page 42 09.08.2002
To assign the product to your model go to /SAPAPO/MAT1 and press .
Figure 37 Model assignment for products
Select your model and press .
3.2.3 Information:
E: In-house Production F: External Procurement X: In-house Production or External Procurement P: Procurement planning: external
Table 10: Procurement Types:
Bill of material for P-F01-XX in P1XX
-
Lars Vogel SAP Germany - For internal use only Page 43 09.08.2002
Figure 38: Bill of Material for P-F01-XX in P1XX and P2XX.
The raw material will be sourced from the Supplier 1.
For mass maintenance of products see chapter 12.1.
3.3 Transportation lanes
We could create transportation lanes over the TA /SAPAPO/SCC_TL1 but we will later use the Supply Chain Engineer.
-
Lars Vogel SAP Germany - For internal use only Page 44 09.08.2002
Figure 39
3.4 Resources
Create resources with TA /SAPAPO/RES01.
Figure 40
3.4.1 Production resources
Information: Resources that are transferred from R/3 follow the following notation:
W + Workcenter number + _ + Plant + _ Cap. Category
Example: W1500_P1XX_001
Using the information in Table 12, Table 13 and Table 14 create the Single-Mixed-activity resources out of Table 11.7
7 Use the possibility to copy resources (after you created your first one).
-
Lars Vogel SAP Germany - For internal use only Page 45 09.08.2002
Resource Description Location W1001_P1XX_01 Assembly P1XX
W1002_P1XX_01 Quality Inspection P1XX
W1003_P1XX_01 Test P1XX
W1004_P1XX_01 Fabrication P1XX
Table 11: Single-Mixed-activity resources
Category: P
Factory Calendar: 01
Time zone CET
From: 8:00
To: 20:00
Planner Group8 XX
Table 12: Resource template
Define buckets No
Loss factor % 10 %
Table 13: Bucket Capacity
Note: If the bucket capacity is not defined it will be calculated out of the time-continuous part of the resource.
Resource utilization rate: 100 %
Break duration: 00:00:00
Table 14: Mandatory for single/multi-activity resources used by CTM
3.4.2 Example:
8 Equals the planner.
-
Lars Vogel SAP Germany - For internal use only Page 46 09.08.2002
Figure 41
Click on and then on the tab.
Figure 42
After defining the General data select the Standard capacity tab.
-
Lars Vogel SAP Germany - For internal use only Page 47 09.08.2002
Figure 43
Do not select Define buckets the available bucket capacity will the automatically calculated
Save the resource and assign it to your model by selecting it, pressing , and .
Figure 44
After creating your resource and after this assignment of the resource to your model use this resource for creating the remaining.
Mark your resource and copy this resource to the rest of the resources by pressing on .
Figure 45
-
Lars Vogel SAP Germany - For internal use only Page 48 09.08.2002
Figure 46
Press .
Note: (Not required for this scenario): UTC is the best time zone to select for locations since the rest is not as well implemented.9
If you want to change the time zone of a location from one time zone to another time zone do the following (NOT relevant for this scenario, please dont run this report)
o Go to the location master and change the time zone in the general tab to UTC.
o Go to SE38 and run /SAPAPO/RESOURCES_LC_CREATE - this will rebuild the resources in liveCache. If you don't perform this step, you will still have problems.
9 SNP added the support for other time zones then UTC in SP15.
-
Lars Vogel SAP Germany - For internal use only Page 49 09.08.2002
3.4.3 Storage resource
The DC have a limited storage capacity. Create the following two resources. Assign the resources then to your DCs.
Resource Description Location STOR_D1XX_01 Storage 1 D1XX
STOR_D2XX_01 Storage 2 D2XX
3.4.4 Example
Go to the resource maintenance TA and select S as resource category.
Figure 47
Press , select bucket and create a bucket resource.
-
Lars Vogel SAP Germany - For internal use only Page 50 09.08.2002
Figure 48
Figure 49
Figure 50
Click on and select tab to define the following two rates.10
Figure 51
Select and and create two variants using your quantities/rate definition.
10 These rates will be used for both locations
-
Lars Vogel SAP Germany - For internal use only Page 51 09.08.2002
Figure 52 1. Capacity variant
The only difference in variant 1 to variant 2 is the usage of the quantiy rate definition DEPLOY02
Assign variant 2 as the active variant to your resource.
Figure 53
Assign the resource to your model by pressing .
-
Lars Vogel SAP Germany - For internal use only Page 52 09.08.2002
Figure 54
Assign this new resource to your location.
Figure 55
-
Lars Vogel SAP Germany - For internal use only Page 53 09.08.2002
Figure 56
Note: The only SNP engines that are supporting storage resources are the SNP and deployment optimizer.
3.5 Production Process Models for SNP
3.5.1 Overview
Based on the experience with this subchapter, this chapter is sometimes confusing.
Please read it through and follow the provided example.
In general, the usage is S.
Figure 57, Figure 58 and Figure 59 try to represent the production process of the end product P-F01-XX . On the left side of these diagrams you see the used resource on the right side the activity. Circles represent an activity on one resource, while squares represents materials.
A square with an outgoing arrow indicates that it is used as an input material, a square with in ingoing arrow indicated an output material.
If an input material is gray filled then it is an material with external procurement.
Use Table 15 to identify the material inside the figures.
-
Lars Vogel SAP Germany - For internal use only Page 54 09.08.2002
Node Product
5 P-F01-XX
4 P-A01-XX
3 P-C01-XX
2 P-C02-XX
1 P-C03-XX
0 P-R01-XX
Table 15: Node Description
Figure 57: PPM 1
-
Lars Vogel SAP Germany - For internal use only Page 55 09.08.2002
Figure 58 PPM 2
Figure 59: PPM 3
3.5.2 Naming convention
The following naming convention will be used.
-
Lars Vogel SAP Germany - For internal use only Page 56 09.08.2002
External Product number + plant (4)+ production version (4) + "N" + group (8)+ group counter (2) + SNP11
3.5.3 Details
Use the following Bill of Materials and the Routings to create three PPMS and Plans.
Product: P-F01-XX: Bill of Material
Item Input / Output Description Quantity Consumption P-F01-XX O Finished Product 1 1 E
P-A01-XX I Sub-Assembly 1 1 S
Table 16
Product: P-A01-XX: Bill of Material
Item Input / Output
Description Quantity Consumption
P-A01-XX O Sub-Assembly 1 1 E
P-C01-XX I Component 1 1 S
P-C02-XX I Component 2 1 S
Table 17
Product: P-C2XX: Bill of Material
Item Input / Output
Description Quantity Consumption
P-C02-XX O Component 2 1 E
P-C03-XX I Component 3 1 S
P-R01-XX I Raw Material 1 2 S
Table 18
Production Model: P-F01-XXP1XX0001N0000000101SNP in P1XX
PPM: P-F01-XXP1XX0001N0000000101SNP
Plan: P-F01-XXP1XX0001N0000000101SNP
Description: Production of P-F01-XX in P1XX
Usage: S
Lot sizes: 1 10000
Time effectively: 1.1.1999 31.12.2005
11 The CIF interface is following this naming convention, except the SNP add the end, since CIF cant transfer SNP PPMs from R/3.
-
Lars Vogel SAP Germany - For internal use only Page 57 09.08.2002
Operation Activity Operation Descr.
Process Step (Resource)
Setup time (fix)
Duration (var)
Materials
10 10 Test W1003_P1XX_01 0 200 sec I:P-A01-XX
20 10 Fabrication W1004_P1XX_01 0 200 sec O:P-F01-XX
Table 19
Production Model: P-A01-XXP1XX0001N0000000101SNP in P1XX
PPM: P-A01-XXP1XX0001N0000000101SNP
Plan: P-A01-XXP1XX0001N0000000101SNP
Description: Production of P-A01-XX in P1XX
Usage: S
Lot sizes: 1 10000
Time effectively: 1.1.1999 31.12.2005
Production Model: P-C02-XXP1XX0001N0000000101SNP in P1XX
PPM: P-C02-XXP1XX0001N0000000101SNP
Plan: P-C02-XXP1XX0001N0000000101SNP
Description: Production of P-C02-XX in P1XX
Usage: S
Lot sizes: 1 10000
Time effectively: 1.1.1999 31.12.2005
Operation Activity Operation Descr.
Process Step (Resource)
Setup time (fix)
Duration (var)
Materials
10 10 Assembly W1001_P1XX_01 0 200 sec I: P-C01-XXI: P-C02-XX
20 10 QualityInspection
W1002_P1XX_01 0 200 sec O: P-A01-XX
Operation Activity Operation Descr.
Process Step (Resource)
Setup time (fix)
Duration (var)
Materials
10 10 Assembly W1001_P1XX_01 0 200 sec I: P-C03-XXI: P-R01-XX
O: P-C02-XX
-
Lars Vogel SAP Germany - For internal use only Page 58 09.08.2002
3.5.4 Information:
CTM can plan bucket-orientated or time-continuous. The bucket-orientated approach creates production order for every day, while time-continuous can produce planned production that can overlap days. To respect the capacity consumption and if you want to plan time-continuous than you have to use PP/DS PPMs otherwise you can use both.
Only one mode (=resource) is possible inside the SNP-PPMs. Alternative modes are supported by CTM.12
Note: In SNP and CTM all input components need to be on the first activitiy and all output components on the last activity.
Note: The consumption type for input components should be S (Start) and for the output components E (End).
3.5.5 Example:
Use TA /SAPAPO/SCC05 or the following path.
Figure 60
Type in your PPM name and select usage S.
12 An alternative mode in one PPM allows the change the resource. This is used by CTM to select the next resource if the first one would be over-utilized by additional production.
-
Lars Vogel SAP Germany - For internal use only Page 59 09.08.2002
Figure 61: Create a PPM I
Press .
Enter the description and create the operations:
Figure 62
-
Lars Vogel SAP Germany - For internal use only Page 60 09.08.2002
Double-click on operation 0010
Create then the activity
Figure 63
Double-click on Produce and create the input components.
-
Lars Vogel SAP Germany - For internal use only Page 61 09.08.2002
Figure 64: Component Definition
Click on the Mode Tab.
-
Lars Vogel SAP Germany - For internal use only Page 62 09.08.2002
Figure 65
Double-click on resource.
-
Lars Vogel SAP Germany - For internal use only Page 63 09.08.2002
Figure 66:
Click on mode , and , double-click then on operation 0020 to maintain it.
-
Lars Vogel SAP Germany - For internal use only Page 64 09.08.2002
Figure 67
Double-click on the activity.
-
Lars Vogel SAP Germany - For internal use only Page 65 09.08.2002
Figure 68
Click on the mode tab.
-
Lars Vogel SAP Germany - For internal use only Page 66 09.08.2002
Figure 69
Double-click on resource and fill in SEC and 200 for variable bucket consumption.
-
Lars Vogel SAP Germany - For internal use only Page 67 09.08.2002
Figure 70
Go to the activities by clicking on and click on ActivityRelationships . Since activity 10 of operation 0020 is the direct successor of activity 10 of operation 0010 , enter Operation 0010 / Activity 1 on the next screen.
-
Lars Vogel SAP Germany - For internal use only Page 68 09.08.2002
Figure 71
Click on and create the PPM for location P1XX and lot-size from 1 10 000. Do not forget to enter the location since PPMs are location-specific.
Figure 72
-
Lars Vogel SAP Germany - For internal use only Page 69 09.08.2002
Figure 73
Click on the first line to navigate to the beginning of your PPM.
Figure 74
-
Lars Vogel SAP Germany - For internal use only Page 70 09.08.2002
Figure 75
Click on to assign the plan to your model.
Figure 76
The assignment will be confirmed:
-
Lars Vogel SAP Germany - For internal use only Page 71 09.08.2002
Additionally you can watch the plan in the display. Create a clearly arranged view by moving the
graphical objects clicking on first. The result might look like that:
Figure 77
Check the plan , activate it and leave the transaction without saving additionally .
3.5.6 Time-Dependent Process Parameters
Optional. Please include this step only if you need the time dependent values.
Define in the PPM the following time dependent settings.
Define the scrap time dependent. The first 4 week, we are going to have 50 % scrap, after that date, only 10 %.
Valid to Scrap
Today + 4 weeks
50,00 %
31.12.2005 10,00 %
Table 20
-
Lars Vogel SAP Germany - For internal use only Page 72 09.08.2002
E.g. you can maintain the scrap for the last activity of the last operation. Go to this activity and put
the cursor into any of the fields of the activity row. Press to maintain the scrap time-dependent.
Figure 78
You can maintain these time-dependent parameters while creating a new plan or for an existing
plan. In the second case save the changes and do not forget
Figure 79
to activate the PPM.
-
Lars Vogel SAP Germany - For internal use only Page 73 09.08.2002
3.6 Supply chain engineer
3.6.1 Work area:
A work area is a filter to object, e.g. plants and defines with objects can be viewed. It can also be used to define transportation lanes and / or assign objects to models.
Use TA /SAPAPO/SCE01 to set up your work area and your transportation lines.
Figure 80
Work area: WA_XX
Figure 81: Supply Chain Engineer - Entry
-
Lars Vogel SAP Germany - For internal use only Page 74 09.08.2002
Figure 82: Supply Chain Engineer
Press and then by pressing assign all your products and locations to your work area.
-
Lars Vogel SAP Germany - For internal use only Page 75 09.08.2002
Figure 83: Assign objects to work area
Press the button Work area. Save then your work area (see Figure 84).
Figure 84
If you want you can arrange your locations by pressing . Save your logical view.
Figure 85: Save your logical view
-
Lars Vogel SAP Germany - For internal use only Page 76 09.08.2002
Figure 86: Example view
3.6.2 Transportation lanes
Figure 87
-
Lars Vogel SAP Germany - For internal use only Page 77 09.08.2002
Create the transportation lanes out of Table 21. Create then the transportation method given in Table 22. Location T1 will be defined later.
The transportation lanes should be defined for all products.
Source location Target Location Lane Priority
P1XX D1XX 1
P1XX D2XX 2
P2XX D1XX 2
P2XX D2XX 1
D1XX C1XX 1
D1XX C2XX 2
D2XX C1XX 2
D2XX C2XX 1
D2XX C3XX 1
S1XX P1XX 1
S1XX P2XX 1
Table 21: Transportation Lanes
Transport Method Duration Transportation lane
Truck 72:00 P1XX D1XX
Truck 24:00 P1XX D2XX
Truck 8:00 All others
Table 22: Transportation Methods
3.6.3 Example: Manual transportation lanes
Use to create transportation lines. Click on the source location, hold the left mouse button and drag the line to the destination.
Figure 88: Creating transportation lanes I
Under ProductProcurement press .
-
Lars Vogel SAP Germany - For internal use only Page 78 09.08.2002
Figure 89: Creation of transportation lanes II
Press .
Select within the TransportMethod.
-
Lars Vogel SAP Germany - For internal use only Page 79 09.08.2002
Figure 90: Creating transportation lanes III
Press .
3.6.4 Mass creation of transportation lanes
This mass creation is an alternative method of creating the transportation lanes. If you reached this point you may have created all transportation lanes already .
In case you are lucky and didnt do it yet, just go on with TA /SAPAPO/SCC_TL2.
Prerequisite for using the mass creation is one existing transportation lane.
-
Lars Vogel SAP Germany - For internal use only Page 80 09.08.2002
Figure 91
Figure 92
Save your settings as a variant and create your transportation lanes one by one (or make multiple lines at the same time if it makes senses.
-
Lars Vogel SAP Germany - For internal use only Page 81 09.08.2002
Each new lane is an exact copy of the template, thus individual maintenance may be required. However, product procurement entries are only copied if the product exits at both locations. So add the missing information if necessary.
Go to the Transportation Lane sheet in the Supply Chain Engineer and double-click on the lane you want to change.
Figure 93
Change the transportation lane as explained above.
3.7 Quotations
3.7.1 General
The location C2XX will source 30 % of its demand from D1XX and 70 % from D2XX.
Maintain therefore the correct inbound quotations.
Note: A common misunderstanding is that quotations are needed to perform network planning. This is not true, since all engines can work with other master data, e.g. procurement priorities or costs.
-
Lars Vogel SAP Germany - For internal use only Page 82 09.08.2002
3.7.2 Example
Go to TA /SAPAPO/SCC_TQ1 .
Figure 94
Figure 95
Press .
-
Lars Vogel SAP Germany - For internal use only Page 83 09.08.2002
Figure 96
Press .
Figure 97
-
Lars Vogel SAP Germany - For internal use only Page 84 09.08.2002
Figure 98
Select the line you just created and double-click on it.
Figure 99
Press .
Figure 100
Select Quota Arrangement for locations and press the related button.
Select your first location and put in the following values:
-
Lars Vogel SAP Germany - For internal use only Page 85 09.08.2002
Figure 101
Figure 102
Click . Then create the quotation for D2XX of 70 %. Save your work.
-
Lars Vogel SAP Germany - For internal use only Page 86 09.08.2002
4 SETUP FOR SNP
4.1 Planning area
It is always recommended to make a copy of the standard SAP objects and to work only with these copies, this applies of course also for the planning area.
Using TA /SAPAPO/MSDP_ADMIN copy the planning area 9ASNP02 to your new planning area SNP_PAREA_XX .
Figure 103
Select therefore the correct planning area and press the right mouse-button. Select then copy.
-
Lars Vogel SAP Germany - For internal use only Page 87 09.08.2002
Figure 104: Copy Planning area I
Figure 105: Copy Planning area II
4.2 Maintain Time Bucket Profile for SNP Planning book