Integrated Geologic Hazard Management System - August 2010

30
INTEGRATED GEOLOGICAL HAZARD MANAGEMENT SYSTEM Kirk D. Beach Ohio Department of Transportation Robert Y. Liang, Ph.D., P.E. University of Akron Frank Feng Acetek Ltd.

description

ODOT presentation from the 10th Annual Technical Forum (http://www.marshall.edu/cegas/geohazards/)Geohazards section of the GeoMS, which is the overlying 'umbrella' in which all parts are included.

Transcript of Integrated Geologic Hazard Management System - August 2010

Page 1: Integrated Geologic Hazard Management System - August 2010

INTEGRATED GEOLOGICAL HAZARD MANAGEMENT SYSTEM

Kirk D. BeachOhio Department of Transportation

Robert Y. Liang, Ph.D., P.E.University of Akron

Frank FengAcetek Ltd.

Page 2: Integrated Geologic Hazard Management System - August 2010

Ohio’s Geological HazardsAbandoned Underground MinesRockfallsLandslidesKarstShoreline Erosion

Page 3: Integrated Geologic Hazard Management System - August 2010

Development of a Geologic Hazard Management System

History1998

Abandoned Underground Mine Inventory & Risk Assessment2000

Developed a database application for AUMIRA Initiated inventory of AUMIRA sites

2001 Research work conducted to develop the Rockfall Inventory

2003 Research work began on the Landslide Inventory

2004 Development of a Remediation Cost Database Application

Page 4: Integrated Geologic Hazard Management System - August 2010

Development of a Geologic Hazard Management System

History2005

Implemented statewide Rockfall Inventory2008

Initiated an inventory of Landslide sites across the state2009

Integrated the Geohazard Inventories with the RCDA and DocMS

2010 Completed the statewide inventory of AUMIRA sites Completed the Integration of the Geological Hazard

Management System

Page 5: Integrated Geologic Hazard Management System - August 2010

DocMS• Document

Management System

LIMs • GeoLIMsGSMP

• Geologic Site Management Program

RCDA

• Remediation Cost Database Application

GHMS

• Geological Hazard Management System

Geotechnical Data Management

System

Page 6: Integrated Geologic Hazard Management System - August 2010

Enterprise Database

Pictures, Files,

Diagrams

Field Data

Laboratory Test Data

Page 7: Integrated Geologic Hazard Management System - August 2010

Xplore ix104c

Page 8: Integrated Geologic Hazard Management System - August 2010
Page 9: Integrated Geologic Hazard Management System - August 2010
Page 10: Integrated Geologic Hazard Management System - August 2010

Field Data InputConsistency

Project location informationFunctionalityEquipment compatibility

Multiple data input modesBluetoothSerial portsOther manual methods

Page 11: Integrated Geologic Hazard Management System - August 2010
Page 12: Integrated Geologic Hazard Management System - August 2010

Field & Office Data CollectionTier 3 & 4

Tier 2

Tier 1

6.2-hrs

1.58-hrs

0.83-hrs

5.17-hrs

Page 13: Integrated Geologic Hazard Management System - August 2010
Page 14: Integrated Geologic Hazard Management System - August 2010
Page 15: Integrated Geologic Hazard Management System - August 2010

Bluetooth…

Page 16: Integrated Geologic Hazard Management System - August 2010
Page 17: Integrated Geologic Hazard Management System - August 2010

Pictures

Page 18: Integrated Geologic Hazard Management System - August 2010
Page 19: Integrated Geologic Hazard Management System - August 2010

Field Operation

s

Server

Office

Page 20: Integrated Geologic Hazard Management System - August 2010
Page 21: Integrated Geologic Hazard Management System - August 2010
Page 22: Integrated Geologic Hazard Management System - August 2010
Page 23: Integrated Geologic Hazard Management System - August 2010

Geological Hazard Management SystemData Management

Part APart BPart C

GIS MapData Management

System ManagementUser ManagementGroup ManagementRole ManagementUser ApprovalSystem Tools

Page 24: Integrated Geologic Hazard Management System - August 2010

Geological Hazard Management SystemData Management Extension

ExportsGenerating ReportsDocuments and PicturesCost of RemediationInspectionValidation Settings

User ForumReporting BugsProviding Suggestions

NotificationGeohazard Report

Page 25: Integrated Geologic Hazard Management System - August 2010
Page 26: Integrated Geologic Hazard Management System - August 2010
Page 27: Integrated Geologic Hazard Management System - August 2010
Page 28: Integrated Geologic Hazard Management System - August 2010
Page 29: Integrated Geologic Hazard Management System - August 2010

Status of Statewide InventoriesAbandoned Underground Mine Inventory

Complete with 1776 site reviews with 1171 Inventoried Sites

Represents 495 lane miles Estimated remediation cost of $875 Million for 555 Priority

Sites Rockfall Inventory

47% complete5000 sitesEstimate 1.5-yrs to complete

Landslide Inventory23% complete5100 sitesEstimate 3-yrs to complete

Page 30: Integrated Geologic Hazard Management System - August 2010

Thank you!

Questions?