Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two –...

11
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations INPO Perspectives NRC Buried and Underground Piping Meeting June 11, 2014 Joe Sears Manager, Nuclear Asset Protection

Transcript of Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two –...

Page 1: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

I n s t i t u t e o f N u c l e a r P o w e r O p e r a t i o n s

INPO Perspectives NRC Buried and Underground Piping Meeting June 11, 2014

Joe Sears Manager, Nuclear Asset Protection

Page 2: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Key Topics • INPO’s NEI 09-14 role • Industry Performance

–Plant evaluations –Operating experience

• ICES reporting

Page 3: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

NEI 09-14 INPO’s Role

• Evaluate programs.

• Communicate issues to the industry.

• Compile and report operating experience.

Page 4: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Key Topics • INPO’s NEI 09-14 role • Industry Performance

–Plant evaluations –Operating experience

• ICES reporting • Questions

Page 5: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Areas for Improvement

5

0

2

4

6

8

10

12

2007 2008 2009 2010 2011 2012 2013 2014

Leaks Program U/G & CP CP TOTAL AFIs

Page 6: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

2014 Summary • Two AFIs; Four Performance Deficiencies

– Two – underground piping – Four – cathodic protection

• Improvement needed – Degraded coatings and cathodic protection not

properly maintained – Cathodic protection equipment work

prioritization and completion – Cathodic protection site knowledge weaknesses – Leaks occurring and the source is not

determined

Page 7: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Good Underground Piping Program Attributes

• ICES reporting quality improvement • Zero leak tolerance – especially in piping

containing radioactive fluids • Cathodic protection installed and maintained • Failure causes identified • Effective station and corporate oversight • Effective use of corrective action program

Page 8: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Key Topics • INPO’s NEI 09-14 role • Industry Performance

–Plant evaluations –Operating experience

• ICES reporting

Page 9: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

May 2014 Number of Reported Events by Year and Failure Mode

80 106 93 106 106

18

8

15 8

5 4

6 12 6 5 5

3

2 4 13 3

4 0

20

40

60

80

100

120

2009 2010 2011 2012 2013 2014

Adverse inspection finding (requires

immediate repair)

Other degradation or maintenance

Significant leak

Leak

Source: ICES

Page 10: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Most Commonly Affected Systems

0

50

100

150

200

250

300 Relative to NEI 09-14

Page 11: Institute of Nuclear Power Operations• Two AFIs; Four Performance Deficiencies – Two – underground piping – Four – cathodic protection • Improvement needed – Degraded

© 2014 Institute of Nuclear Power Operations

Contains Licensed Material

5% Safety Related

7%

Contains Environmentally Hazardous Fluid

5%

Other Buried Piping-run to

failure 71%

Other Buried Piping-not run to

failure 12%

Buried Pipe Events Classification