Institute of Integrated Electrical Engineers of the Philippines, INC. 39 th Annual National Convention and 3E XPO 2014 SMX Convention Center, MOA, Pasay City November 28, 2014 “The Philippine Power Crisis: Proposed Solutions from the Academe” Eduardo Luis Barros Fernandez Department of Energy

Transcript of Institute of Integrated Electrical Engineers of the...

Page 1: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Institute of Integrated Electrical Engineers of the Philippines, INC. 39th Annual National Convention and 3E XPO 2014

SMX Convention Center, MOA, Pasay City November 28, 2014

“The Philippine Power Crisis: Proposed Solutions from the Academe”

Eduardo Luis Barros Fernandez Department of Energy

Page 2: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Power Sector Situation LUZON Capacity by Grid

Installed Dependable Installed Dependable

Coal 4,671 4,391 36.10 38.14

Oil Based 2,020 1,494 15.61 12.98

Diesel 750 634 5.80 5.51

Oil Thermal 650 320 5.02 2.78

Gas Turbine 620 540 4.79 4.69

Natural Gas 2,861 2,759 22.11 23.97

Geothermal 844 692 6.52 6.01

Hydro 2,471 2,131 19.10 18.51

Wind 33 17 0.26 0.15

Biomass 38 29 0.30 0.25

TOTAL 12,939 11,514

FUEL TYPE

LUZON

Percent Share (%)Capacity (MW)

Source: List of Existing Power Plants, released October 2014

36.10

15.61

5.80

5.02 4.79

22.11

6.52

19.10

0.26 0.30

LUZON CAPACITY MIX (%)

Coal

Oil Based

Diesel

Oil Thermal

Gas Turbine

Natural Gas

Geothermal

Hydro

Wind

Biomass

Page 3: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Power Sector Situation VISAYAS Capacity by Grid

Source: List of Existing Power Plants, released October 2014

Installed Dependable Installed Dependable

Coal 806 777 31.97 35.97

Oil Based 670 505 26.60 23.40

Diesel 615 463 24.42 21.46

Gas Turbine 55 42 2.18 1.94

Geothermal 965 817 38.30 37.83

Hydro 11 11 0.45 0.50

Biomass 44 32 1.76 1.50

Natural Gas 1 1 0.04 0.05

Solar 22 17 0.87 0.76

TOTAL 2,520 2,160

FUEL TYPE

VISAYAS

Capacity (MW) Percent Share (%)

31.97

26.60

24.42 2.18

38.30

0.45

1.76 0.04

0.87

VISAYAS CAPACITY MIX (%)

Coal

Oil Based

Diesel

Gas Turbine

Geothermal

Hydro

Biomass

Natural Gas

Solar

Page 4: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Power Sector Situation MINDANAO Capacity by Grid

Source: List of Existing Power Plants, released October 2014

Installed Dependable Installed Dependable

Coal 232 210 10.79 11.59

Oil Based 713 654 33.15 36.08

Diesel 713 654 33.15 36.08

Geothermal 108 98 5.04 5.41

Hydro 1,061 840 49.31 46.35

Solar 1 0.3 0.05 0.02

Biomass 36 10 1.67 0.55

TOTAL 2,151 1,812

Capacity (MW)FUEL TYPE

MINDANAO

Percent Share (%)

10.79

33.15

33.15 5.04

49.31

0.05 1.67

MINDANAO CAPACITY MIX (%)

Coal

Oil Based

Diesel

Geothermal

Hydro

Solar

Biomass

Page 5: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

11,000

12,000

W1

W

2

W3

W4

W5

W6

W7

W8

W9

W1

0

W1

1

W1

2

W1

3

W1

4

W1

5

W1

6

W1

7

W1

8

W1

9

W2

0

W2

1

W2

2

W2

3

W2

4

W2

5

W2

6

W2

7

W2

8

W2

9

W3

0

W3

1

W3

2

W3

3

W3

4

W3

5

W3

6

W3

7

W3

8

W3

9

W4

0

W4

1

W4

2

W4

3

W4

4

Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve

LUZON POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)

Holy Week

January February

Actual Peak Demand = 8,717 MW (21 May)

17 Jun 2014: Malampaya Gas Restriction

Red Alert Manual Load Dropped: 105 MW

25 Jun 2014: Outages of Sual 1 (647 MW), Calaca 1 (300 MW), Masinloc

2 (315 MW), derated capability of GN power 1&2

12 -13 Jul 2014 PIGging, Ilijan Pipeline

Limited Capacity of Ilijan Gas plant

Typhoon “Glenda” 16 Jul 2014

March April May June July August

Source: NGCP Daily Operations Report

September

8-11 Sep 2014 Natural Gas restriction

Limited Capacity of Ilijan Gas plant

October

30 Aug - 28 Sep 2014 Sual Unit 2 (647 MW) Maintenance

26 Sep – 25 Oct 2014 Sual Unit 1 (647 MW) Maintenance

Page 6: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

LUZON SUPPLY-DEMAND OUTLOOK 2014-2020

Notes a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 7

percent GDP growth rate (GR) target for 2014-2015. c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 8

percent GDP growth rate (GR) target for 2016-2020. d. Assumed average forced outage of the total available capacity

Actual

Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

(%) 5.3 6.2 6.3 4.9 7.7 7.0 6.3 4.7 5.5 8.2 5.89 5.6

MW 677 794 801 621 983 888 800 601 708 1041 738 716

2017 Nov: 420 MW Pagbilao 3

2018 Jun: 460 MW SBPL**

2014 Nov: 19 MW NWPDC Wind Ph3* 87 MW Burgos Wind Ph1* 81 Caparispisan Wind* Dec: 135 MW SLTEC Puting Bato U1* 10 MW Pampanga Solar 63 MW Burgos Wind Ph2* 24 MW SCJIpower Bio 7.5 MW Bataan Cogen

2016 Jan: 12 MW Green Innov Bio Mar: 450 MW San Gabriel NG May: 150 MW Limay Coal U1 Sep: 150 MW Limay Coal U2

2015 Mar : 150 MW SLPGC Coal U1 18 MW IBEC Bio Jun: 150 MW SLPGC Coal U2 13 MW Sabangan HEPP Jul: 67.5 MW Pililia Wind Oct: 82 MW Anda Coal Nov: 150 MW SLTEC Puting Bato Coal U2 Dec: 4 MW Bicol Biomass

** Upon Secretary’s consideration Note: 100 MW Avion and 40 MW Majestics considered as additional capacity (not in the committed power projects)

* On-going testing and commissioning

Page 7: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

* Excluding Off-grid power projects ** New Entry from Indicative list

As of 30 September 2014

LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW) Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Testing &

Commissioning

Target Commercial

Operation

Bangui Bay Wind Power Project

(Phase 3)

NorthWind Power

Development Corporation

NorthWind Power

Development Corporation Bangui, Ilocos Norte 18.9 Sep-2014 Nov-2014

Burgos Wind Power Project

(Phase 1)

EDC Burgos Wind Power

Corporation

Energy Development

Corporation (EDC)

Nagsurot-Saoit,

Burgos, Ilocos Norte 87.0 Nov-2014 Nov-2014

Caparispisan Wind Energy Project Northern Luzon UPC Asia

Corporation UPC Asia Corporation

Brgy. Caparispisan,

Pagudpud, Ilocos

Norte

81.0 Nov-2014 Nov-2014

135 MW Puting Bato Coal Fired

Power Plant Phase I

South Luzon Thermal

Energy Corp. (SLTEC)

Trans Asia Oil and Energy

Development Corporation

(TAOil)

Brgy. Puting Bato

West, Calaca,

Batangas

135.0 Oct 2014 Dec-2014

Pampanga Solar Power Project Raslag Corporation Raslag Corporation Brgy. Suclaban,

Mexico, Pampanga 10.0 Dec 2014 Dec 2014

Burgos Wind Power Project

(Phase 2)

EDC Burgos Wind Power

Corporation

Energy Development

Corporation (EDC)

Nagsurot-Saoit,

Burgos, Ilocos Norte 63.0 Dec 2014 Dec 2014

12 MW SJCiPower Rice Husk-Fired

Biomass power Plant Project

Phase 1

San Jose City I Power

Corporation

San Jose City I Power

Corporation

Brgy. Tulat, San

Jose, Nueva Ecija 10.0 Dec 2014 Dec 2014

12 MW SJCiPower Rice Husk-Fired

Biomass power Plant Project

Phase 2

San Jose City I Power

Corporation

San Jose City I Power

Corporation

Brgy. Tulat, San

Jose, Nueva Ecija 10.0 Dec 2014 Dec 2014

12.5 MW Bataan 2020 Rice hull-

fired Cogen Plant Bataan 2020 Inc. Bataan 2020 Inc. Bataan 7.5 Oct 2014 Dec 2014

150 MW SLPGC Coal-Fired Power

Plant Phase I Unit 1

Southwest Luzon Power

Generation Corporation

(SLPGC)

DMCI Power Corporation Brgy. San Rafael,

Calaca, Batangas 150.0 Dec-2014 Mar-2015

20 MW IBEC Biomass Power Plant Isabela Biomass Energy

Corporation (IBEC)

Isabela Biomass Energy

Corporation (IBEC) Isabela 18.0 Mar 2015 Mar 2015

150 MW SLPGC Coal-Fired Power

Plant Phase I Unit 2

Southwest Luzon Power

Generation Corporation

(SLPGC)

DMCI Power Corporation Brgy. San Rafael,

Calaca, Batangas 150.0 Dec-2014 Jun-2015

Sabangan HEPP Hedcor Sabangan, Inc. Aboitiz Power Corporation Mt. Province 13.2 Jun 2015 Jun 2015

Pililla Wind Power Project

(Phase 1)

Alternergy Wind One

Corporation Alternergy

Brgy. Halayhayin,

Pililla, Rizal 67.5 Jul 2015 Jul 2015

Page 8: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Testing &

Commissioning

Target Commercial

Operation

Anda Power Corporation's 82 MW

Ciculating Fluidized Bed Coal Fired

Power Plant

Anda Power Corporation Anda Power Corporation

Brgy. Bundagul,

Mabalacat,

Pampanga

82.0 Jun 2015 Oct-2015

135 MW Puting Bato Coal Fired

Power Plant Phase II

South Luzon Thermal

Energy Corp. (SLTEC)

Trans Asia Oil and Energy

Development Corporation

(TAOil)

Brgy. Puting Bato

West, Calaca,

Batangas

135.0 Oct 2014 Nov-2015

3.5 MW Bicol Biomass Energy

Corporation

Bicol Biomass Energy

Corporation

Bicol Biomass Energy

Corporation Camarines Sur 3.2 Dec 2015 Dec-2015

12 MW GITC Biomass Power Plant

Project

Green Innovations for

Tomorrow Corporation

(GITC)

Green Innovations for

Tomorrow Corporation

(GITC)

Nueva Ecija 10.8 Dec-2015 Jan-2016

San Gabriel Plant Phase II First Gas Power Corp. First Gen Power

Corporation

San Gabriel,

Batangas 450.0 Jan-2016 Mar 2016

Limay Power Plant Project Phase I

Unit 1

SMC Consolidated Power

Corporation

SMC Consolidated Power

Corporation

Brgy. Lamao, Limay,

Bataan 150.0 Mar 2016 May-2016

Limay Power Plant Project Phase I

Unit 2

SMC Consolidated Power

Corporation

SMC Consolidated Power

Corporation

Brgy. Lamao, Limay,

Bataan 150.0 Jul-2016 Sep-2016

Pagbilao Coal-Fired Thermal

Power Plant

Pagbilao Energy

Corporation

TeaM Energy / Aboitiz

Power

Pagbilao Power

Station, Nrgy.

Ibabang Polo,

Pagbilao, Quezon

420.0 May-2017 Nov-2017

San Buenaventura Power Ltd. Co.

(SBPL) Project

San Buenaventura Power

Ltd. Co. (SBPL) QPPL/EGCO Mauban, Quezon 460.0 Dec-2017 Jun-2018

TOTAL 2,682.1

LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW)

As of 30 September 2014

* Excluding Off-grid power projects ** New Entry from Indicative list *** by informal consideration from indicative to committed upon approval of Secretary

***

Page 9: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)

As of 30 September 2014

* Excluding Off-grid power projects

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

2 X 20 MW FDC

Camarines CFB Coal

Power Plant

FDC Utilities, Inc. FDC Utilities, Inc. Camarines Sur 40.0 Mar 2016

2 X 300 MW Coal-Fired

Power Plant

Redondo Peninsula

Energy, Inc.

MERALCO MGEN Power

Corporation/ Aboitiz Power

Corporation/ Taiwan

Cogeneration Corporation

Sitio Naglatore, Cawag,

Subic Bay Freeport Zone 600.0

Unit I - Oct 2016

Unit II - Dec 2016

2 X 150 MW SLPGC Coal-

Fired Power Plant Phase II

Southwest Luzon Power

Generation Corporation

(Project Company)

DMCI Power Corporation Brgy. San Rafael, Calaca,

Batangas 300.0

Unit I - Dec 2016

Unit II - Dec 2016

2 X 300 MW Masinloc

Expansion

AES Masinloc Power

Partners Co., Inc.

AES Philippines Power

Partners Co., LTD. Zambales 600.0

Unit 3 (300 MW) - Oct 2017

Unit 4 (300 MW) - Oct 2017

300 MW Limay Power Plant

Project Phase II SMC Consolidated Power

Corporation

SMC Consolidated Power

Corporation

Brgy. Lamao, Limay,

Bataan 300.0

Unit 1 - 150 MW - Jan 2017

(2x150MW) Unit 2 - 150 MW - Jul 2017

1x300 MW LEI Coal Power

Plant Lucidum Energy, Inc. (LEI) Lucidum Energy, Inc. (LEI) Silanguin Bay, Zambales 300.0 Jun 2017

Limay Power Plant Project

Phase III Unit 1

SMC Consolidated Power

Corporation

SMC Consolidated Power

Corporation

Brgy. Lamao, Limay,

Bataan 300.0 Oct-17

Limay Power Plant Project

Phase III Unit 2

SMC Consolidated Power

Corporation

SMC Consolidated Power

Corporation

Brgy. Lamao, Limay,

Bataan 300.0 Dec-17

JGS Coal Fired Thermal

Power Plant Unit 1 JG Summit Holdings, Inc. JG Summit Holdings, Inc.

Brgy. Pinamukan Ibaba,

Batangas City 150.0 Unit 1 - June 2018

JGS Coal Fired Thermal

Power Plant Unit 2 JG Summit Holdings, Inc.

Brgy. Pinamukan Ibaba,

Batangas City 150.0 Unit 2 - Dec 2018

2 X 600 MW Mariveles

Expansion Project

GNPower Mariveles Coal

Plant Ltd. Co. GNPower Ltd. Co. Mariveles, Bataan 1,200.0 Dec 2018

JGS Coal Fired Thermal

Power Plant Unit 3 JG Summit Holdings, Inc.

Brgy. Pinamukan Ibaba,

Batangas City 150.0 Unit 3 - June 2019

JGS Coal Fired Thermal

Power Plant Unit 4 JG Summit Holdings, Inc.

Brgy. Pinamukan Ibaba,

Batangas City 150.0 Unit 4 - Dec 2019

2 x 600 MW (net) Coal-

Fired Power Plant Atimonan One Energy

Meralco PowerGen

Corporation Atimonan, Quezon 1,200.0 Dec 2019

TOTAL COAL 5,740.0

Page 10: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)

As of 30 September 2014 * Excluding Off-grid power projects

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Aero Derivative Combined

Cycle Power Plant

Calamba Aero Power

Corporation

MERALCO MGEN Power

Corporation Calamba, Laguna 150.0 TBD

TOTAL OIL-BASED 150.0

Pagbilao 600 MW

Combined Cycle Gas Fired

Power Plant*

Energy World Corporation

(EWC)

Energy World Corporation

(EWC)

Isla Grande, Pagbilao,

Quezon Province 600.0

U1 (200 MW)- Jan 2015

U2 (200 MW)- Dec 2015

U3 (200 MW)- Dec 2016

2 x 1,200 MW Combined

Cycle Gas Turbine Power

Plant Project

Atlantic, Gulf and Pacific

Company of Manila, Inc AG&P

Limay, Bataan

(PNOC-AFC Industrial

Estate)

2,400.0

Unit 1 - Mar 2017

Unit II - Mar 2018

415 MW San Isidro

Combined Cycle Gas

Turbine Plant Project

Trans Asia Oil and Energy

Development Corporation

(TAOil)

Trans Asia Oil and Energy

Development Corporation

(TAOil)

Pilipinas Shell Petroleum

Co.'s Tabangao Refinery,

Brgy. San Isidro and

Tabangao-Ambulong,

Batangas City

415.0 Sep 2017

2x450 San Gabriel Power

Plant

(Phase II)

First Gen Corproration First Gen Corproration San Gabriel, Batangas 900.0 U1 - 2017

U2 - 2019

TOTAL NATGAS 4,315.0

Bacman 3 (Tanawon)

Geothermal Project

Energy Development

Corporation (EDC)

Energy Development

Corporation (EDC) Guinlajon, Sorsogon 40.0 Dec 2016

Rangas Geothermal

Project

Energy Development

Corporation (EDC)

Energy Development

Corporation (EDC) Bacon District, Sorsogon 40.0 Jun 2017

Kayabon Geothermal

Project

Energy Development

Corporation (EDC)

Energy Development

Corporation (EDC) Manito, Albay 40.0 Dec 2019

TOTAL GEOTHERMAL 120.0

Ibulao Hydroelectric Power

Project Hydrocore, Inc. Hydrocore, Inc. Lagawe, Ifugao 4.5 May 2015

Dupinga Hydroelectric

Power Project

Constellation Energy

Corporation Exelon Corporation Gabaldon, Nueva Ecija 3.0 Oct 2015

Main Aklan Sunwest Water & Electric

Co., Inc. (SUWECO)

Sunwest Water & Electric

Co., Inc. (SUWECO) Libacao, Albay 15.0 Jul 2016

Tinoc 2 Philnew Hydro Power

Corporation

Philnew Hydro Power

Corporation Tinoc, Ifugao 11.0 Dec 2016

Tinoc 3 Philnew Hydro Power

Corporation

Philnew Hydro Power

Corporation Tinoc, Ifugao 5.0 Jun 2017

Page 11: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)

As of 30 September 2014 * Excluding Off-grid power projects

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Pinacanauan Sunwest Water & Electric

Co., Inc.

Sunwest Water & Electric

Co., Inc. (SUWECO) Peñablanca, Cagayan 6.0 Jul 2017

Tinoc 1 Quadriver Energy Corp. Quadriver Energy Corp. Tinoc, Ifugao 4.1 Apr 2018

Tinoc 4 Philnew Hydro Power

Corporation

Philnew Hydro Power

Corporation Tinoc, Ifugao 5.0 Apr 2018

Colasi Colasi Mini Hydro Electric

Power Plant Corporation

Colasi Mini Hydro Electric

Power Plant Corporation Mercedes, Camarines Norte 1.0 Feb 2019

Majayjay Majayjay Hydro Power

Company, Inc.

Majayjay Hydro Power

Company, Inc.

Majayjay,

Laguna 2.2 Apr 2019

Biyao AV Garcia Power Systems

Corp

AV Garcia Power Systems

Corp Balbalan, Kalinga 0.8 TBD

Kapangan HEP

Cordillera Hydro Electric

Power Corporation

(COHECO)

Cordillera Hydro Electric

Power Corporation

(COHECO)

Kapangan & Kibungan,

Benguet 60.0 TBD

Abdao HEP AV Garcia Power Systems

Corp. Tabaan Sur, Tuba, Benguet 1.0 TBD

Barit (Irrigation Discharge)

Hydroelectric Power Project

NASCENT Technologies

Corporation Buhi, Camarines Sur 0.4 TBD

2.6 MW Maapon River Mini-

Hydro Power Project (MHP)

Renesons Energy

Corporation

Renesons Energy

Corporation Brgy. Piis, Lucban, Quezon 2.6 TBD

TOTAL HYDRO 121.6

Currimao Solar Photovoltaic

Power Project

Mirae Asia Energy

Corporation

Mirae Asia Energy

Corporation Currimao, Ilocos Norte 20.0 Mar 2015

SM North Edsa Solar Power

Project

Solar Philippines

Commercial Rooftop

Projects, Inc.

Solar Philippines

Commercial Rooftop

Projects, Inc.

SM North Edsa, Quezon

City 1.5 Mar 2015

Burgos Solar Power Project Energy Development

Corporation

Energy Development

Corporation Burgos, Ilocos Norte 4.0 Jul 2015

Macabud Solar Photovoltaic

Power Project

ATN Philippines Solar

Energy Group, Inc.

ATN Philippines Solar

Energy Group, Inc.

Brgy. Macabud, Rodriguez,

Rizal 30.0 Feb 2016

TOTAL SOLAR 55.5

Page 12: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)

As of 30 September 2014 * Excluding Off-grid power projects

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Balaoi Wind Power Project Northern Luzon UPC Asia

Corporation UPC Asia Corporation

Brgy. Balaoi, Pagudpud,

Ilocos Norte 45.0 Sep 2015

Pasuquin East Wind Power

Project (Phase 1)

Energy Logics Philippines,

Inc.

Delgado Group of

Companies Pasuquin, Ilocos Norte 48.0 Oct 2015

Sembrano Wind Power

Project

(Formerly Mabitac Wind

Power Project Phase 2)

Alternergy Sembrano Wind

Corporation Alternergy

Mt. Sembrano, Mabitac,

Laguna 72.0 Apr 2017

Pagudpud Wind Power

Project

EDC Pagudpud Wind

Power Corporation

Energy Development

Corporation

Brgy. Balaoi and

Caunayan, Pagudpud,

Ilocos Norte

84.0 Dec 2018

TOTAL WIND 249.0

20 MW Waste-to-Energy

Project using Thermal

Gasifier Conversion

CJ Global Green Energy

Philippine Corp.

CJ Global Green Energy

Philippine Corp. Camarines Sur 18.0 Dec 2015

TOTAL BIOMASS 18.0

TOTAL 10,769.1

Page 13: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

800

900

1,000

1,100

1,200

1,300

1,400

1,500

1,600

1,700

1,800

1,900

2,000

W1

W

2

W3

W4

W5

W6

W7

W8

W9

W1

0

W1

1

W1

2

W1

3

W1

4

W1

5

W1

6

W1

7

W1

8

W1

9

W2

0

W2

1

W2

2

W2

3

W2

4

W2

5

W2

6

W2

7

W2

8

W2

9

W3

0

W3

1

W3

2

W3

3

W3

4

W3

5

W3

6

W3

7

W3

8

W3

9

W4

0

W4

1

W4

2

W4

3

W4

4

Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve

VISAYAS POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)

Source: NGCP Daily Operations Report

26 Jan 2014: Earthquake in Leyte

Affected Power Plants: Mahiao Geo (120 MW)

Actual Peak Demand = 1,636 MW (27 May)

PEDC 1 Forced Outage: 18-24 May 2014 PEDC 2 Forced Outage: 24-29 May 2014 CEDC 1 Forced Outage: 16-23 May 2014

CEDC U3 Forced Outage: 28 May-3 Jun 2014

CEDC 1 Planned Outage: 5 Jun-5 Jul 2014 KSPC 1 Coal Planned Outage: 5-24 Jul 2014

Holy Week

January February March April May June July August September October

Page 14: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Notes a. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW

to increase by 135 MW in 2016) b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth

applied to 7 percent GDP growth rate (GR) target for 2014-2015. c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth

applied to 8 percent GDP growth rate (GR) target for 2016-2020. d. Assumed 4.35 percent average forced outage of the total available capacity

VISAYAS SUPPLY-DEMAND OUTLOOK 2014-2020 2014

Nov: 8 MW Villasiga HEP Dec: 82 MW TPC Expansion* 54 MW San Lorenzo Wind 46 MW URC Bio 12 MW Hpo Bagasse

2015 Jan: 34 MW Nabas Wind Ph1 Sep: 16 MW Nabas Wind Ph2 Dec: 20 MW SCBiopower

2016 Jun: 135 MW Concepcion Coal 1 Nov: 135 MW Concepcion Coal 2

2017 Jun: 8 MW Cantakoy HEPP 34 MW VMCI Bio (TBD**)

** TBD – To be determined (target commercial operation)

* On-going testing and commissioning

Actual

Page 15: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

* Excluding Off-grid power projects ** New Entry from Indicative list As of 30 September 2014

VISAYAS GRID COMMITTED POWER PROJECTS (527.0 MW) Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Testing &

Commissioning

Target Commercial

Operation

Villasiga HEP

Sunwest Water &

Electric Co., Inc.

(SUWECO)

Sunwest Water &

Electric Co., Inc.

(SUWECO)

Brgy. Igsoro,

Bugasong, Antique 8.0 Sep 2014 Nov 2014

8.0 MW HPCo Bagasse

Cogeneration Plant

Hawaiian Philippines

Company

Hawaiian Philippines

Company Negros Occidental 3.0 Nov 2014 Nov 2014

46 MW Universal

Robina Corporation

Bagasse Cogeneration

Facility

Universal Robina

Corporation

JG Summit Holdings

Inc. Negros Occidental 31.0 Dec 2014 Dec 2014

54 MW San Lorenzo

Wind Power Project

Trans-Asia Renewable

Energy Corporation

Trans Asia Oil and

Energy Development

Corporation (TAOil)

San Lorenzo, Guimaras

Island 54.0 Dec 2014 Dec 2014

TPC Coal-Fired Power

Plant Expansion

Project*

Toledo Power

Company

Global Business Power

Corporation Toledo City, Cebu 82.0 Oct 2014 Dec 2014

Nabas Wind Power

Project Phase 1

Petrogreen Energy

Corporation

Petrogreen Energy

Corporation

Brgy. Pawa, Nabas,

Aklan 36.0 Jan 2015 Jan 2015

Nabas Wind Power

Project Phase 2

Petrogreen Energy

Corporation

Petrogreen Energy

Corporation

Brgy. Pawa, Nabas,

Aklan 14.0 Sep 2015 Sep 2015

20 MW SCBiopower

Bagasse-Fired Power

Generation Project

San Carlos Biopower

Inc. Bronzeoak Philippines Negros Occidental 18.0 Dec 2015 Dec 2015

2 X 135 MW

Concepcion Coal-fired

Power Plant

Palm Thermal

Consolidated Holdings

Corp.

AC Energy Holdings,

Inc./ Palm Thermal

Consolidated Holdings

Corporation/ Jin

Navitas Resource, Inc.

Brgy. Nipa,

Concepcion, Iloilo 270.0

U1 - Sep 2015

U2 – May 2016

U1 - Jun 2016

U2 - Nov 2016

Cantakoy HEP Quadriver Energy Corp. Quadriver Energy Corp. Danao, Bohol 8.0 Jun 2017 Jun 2017

34 MW VMCI Bagasse-

Fired Cogeneration

Plant

Victorias Milling

Company Inc.

Victorias Milling

Company Inc. Negros Occidental 3.0 TBD TBD

TOTAL 527.0

Page 16: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)

As of 30 September 2014

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

PEDC Expansion Project Panay Energy

Development Corporation

Global Business Power

Corporation

Brgy. Ingore, La Paz,

Iloilo 150.0 May 2016

Former report (1x150

MW Circulating Fluidized

Bed (CFB) Coal-Fired

Power Plant)

(Global Business Power

Corporation)

1 X 20 MW FDC Danao

CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016

300 MW Therma Visayas

Energy Project Therma Visayas Inc.

Aboitiz Power

Corporation

Brgy. Bato, Toledo City,

Cebu 300.0 Mar 2017

TOTAL COAL 470.0

18.9MW Calumangan

Diesel Power Plant

Energreen Power

Development &

Management, Inc.

Brgy. Calumangan, Bago

City, Negros Occidental 18.9 Dec 2014

TOTAL OIL-BASED 18.9

49 MW Biliran

Geothermal Plant Project

Biliran Geothermal

Incorporated

Orka Energy Philippines

(Iceland) Biliran, Biliran 49.0 Dec 2015

Dauin Geothermal

Project

Energy Development

Corporation (EDC)

Energy Development

Corporation (EDC) Dauin, Negros Oriental 40.0 Dec 2021

Southern Leyte

Geothermal Plant

Geothermal Project

(formerly known as Mt.

Cabalian Geothermal)

Energy Development

Corporation

Energy Development

Corporation (EDC) Cabalian, Southern Leyte TBA TBA

TOTAL GEOTHERMAL 89.0

Leyte Solar Photovoltaic

Power Project

Phil. Solar Farm-Leyte,

Inc.

Phil. Solar Farm-Leyte,

Inc. Ormoc City, Leyte 30.0 Jan 2015

San Carlos Solar Power

Project

Phase C-10

Phase D-13

San Carlos Solar Energy

Inc.

San Carlos City, Negros

Occidental 30.0 Feb 2015

Cadiz Solar Power

Project

Phil.Power Exploration &

Development Corporation

Brgy., Tinampa-an Cadiz

City, Negros Occidental 100.0 Jul 2015

TOTAL SOLAR 160.0

Page 17: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)

As of 30 September 2014

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

PEDC Expansion Project Panay Energy

Development Corporation

Global Business Power

Corporation

Brgy. Ingore, La Paz,

Iloilo 150.0 May 2016

Former report (1x150

MW Circulating Fluidized

Bed (CFB) Coal-Fired

Power Plant)

(Global Business Power

Corporation)

1 X 20 MW FDC Danao

CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016

300 MW Therma Visayas

Energy Project Therma Visayas Inc.

Aboitiz Power

Corporation

Brgy. Bato, Toledo City,

Cebu 300.0 Mar 2017

TOTAL COAL 470.0

18.9MW Calumangan

Diesel Power Plant

Energreen Power

Development &

Management, Inc.

Brgy. Calumangan, Bago

City, Negros Occidental 18.9 Dec 2014

TOTAL OIL-BASED 18.9

49 MW Biliran

Geothermal Plant Project

Biliran Geothermal

Incorporated

Orka Energy Philippines

(Iceland) Biliran, Biliran 49.0 Dec 2015

Dauin Geothermal

Project

Energy Development

Corporation (EDC)

Energy Development

Corporation (EDC) Dauin, Negros Oriental 40.0 Dec 2021

Southern Leyte

Geothermal Plant

Geothermal Project

(formerly known as Mt.

Cabalian Geothermal)

Energy Development

Corporation

Energy Development

Corporation (EDC) Cabalian, Southern Leyte TBA TBA

TOTAL GEOTHERMAL 89.0

Leyte Solar Photovoltaic

Power Project

Phil. Solar Farm-Leyte,

Inc.

Phil. Solar Farm-Leyte,

Inc. Ormoc City, Leyte 30.0 Jan 2015

San Carlos Solar Power

Project

Phase C-10

Phase D-13

San Carlos Solar Energy

Inc.

San Carlos City, Negros

Occidental 30.0 Feb 2015

Cadiz Solar Power

Project

Phil.Power Exploration &

Development Corporation

Brgy., Tinampa-an Cadiz

City, Negros Occidental 100.0 Jul 2015

TOTAL SOLAR 160.0

Page 18: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)

As of 30 September 2014

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Pulupandan Wind Power

Project

First Maxpower International

Corporation

First Maxpower International

Corporation

Pulupandan, Negros

Occidental 50.0 Sep 2015

TOTAL WIND 50.0

Igbulo (Bais) Hydroelectric

Power Project

Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp Igbaras, Iloilo 5.1 Jan 2015

Hilabangan (Upper Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp

Kabankalan, Negros

Occidental 4.8 Aug 2015

Hilabangan (Lower Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp

Kabankalan, Negros

Occidental 3.0 Aug 2015

Maninila (Lower Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp San Remigio, Antique 4.5 Oct 2016

Maninila (Upper Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp San Remigio, Antique 3.1 Oct 2016

Sibalom (Upper Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp San Remigio, Antique 4.2 Oct 2016

Sibalom (Middle Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp San Remigio, Antique 4.0 Oct 2016

Sibalom (Lower Cascade) Century Peak Energy

Corporation

Century Peak Metals

Holdings Corp San Remigio, Antique 3.3 Oct 2016

Basak II Meadowland Developers,

Inc. Badian, Cebu 0.5 Apr 2017

Timbaban Hydroelectric

Power Project

Oriental Energy and Power

Generation Corporation

Oriental Peninsula

Resources Group Inc (ORE) Madalag, Aklan 18.0 Aug 2017

Main Aklan River

Hydroelectric Power Project

Sunwest Water & Electric

Company, Inc. Libacao, Aklan 15.0 TBD

Amlan (Plant A) Natural Power Sources

Integration, Inc. Amlan, Negros Oriental 3.2 TBD

Amlan (Plant B) Natural Power Sources

Integration, Inc. Amlan, Negros Oriental 1.5 TBD

Amlan (Plant C) Natural Power Sources

Integration, Inc. Amlan, Negros Oriental 0.8 TBD

Loboc Hydro Power Project Sta Clara Power Corporation Sta Clara Int’l Corporation Loboc, Bohol 1.2 TBD

TOTAL HYDRO 72.2

South Negros 25 MW

Biomass Power Plant South Negros Biopower Inc.

Brgy. Cubay, La Carlota City,

Negros Occidental 22.4 Dec 2016

35.0 MW Mina Multi-Fuel

Biomass Power Generation

Facility

Green Power Panay Phils.,

Inc. Iloilo 32.0 TBD

TOTAL BIOMASS 54.4

40 MW Battery Storage

Project

AES Philippines Power

Partners Co., LTD.

AES Philippines Power

Partners Co., LTD.

Kabankalan, Negros

Occidental 40.0 Mar 2015

TOTAL BATTERY 40.0

TOTAL 954.5

Page 19: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

600

700

800

900

1,000

1,100

1,200

1,300

1,400

1,500

1,600

1,700

1,800

1,900

2,000

W1

W

2

W3

W4

W5

W6

W7

W8

W9

W1

0

W1

1

W1

2

W1

3

W1

4

W1

5

W1

6

W1

7

W1

8

W1

9

W2

0

W2

1

W2

2

W2

3

W2

4

W2

5

W2

6

W2

7

W2

8

W2

9

W3

0

W3

1

W3

2

W3

3

W3

4

W3

5

W3

6

W3

7

W3

8

W3

9

W4

0

W4

1

W4

2

W4

3

W4

4

Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve

MINDANAO POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)

Source: NGCP Daily Operations Report

2014 Actual Peak Demand = 1,444 MW (22 Oct)

Holy Week

27 Feb 2014 Mindanao Blackout

Affected Power Plant 200 MW Mindanao Coal-fired (MCF)

Restoration of 200 MW MCF Unit 2 : 8 May 2014 Unit 1 : 1 June 2014

January February March April May June July August September October

Page 20: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

MINDANAO SUPPLY-DEMAND OUTLOOK 2014-2020

Notes a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth

applied to 7 percent GDP growth rate (GR) target for 2014-2015. c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth

applied to 8 percent GDP growth rate (GR) target for 2016 d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth

applied to 8 percent GDP growth rate (GR) target for 2017-2020 e. Assumed 3.3 percent average forced outage of the total dependable capacity ** TBD – To be determined (target commercial operation)

* On-going testing and commissioning

Actual

2015 Mar: 150 MW Therma South 1 Jun: 150 MW Therma South 2 Sep: 2 x 100 MW SEC Coal Dec: 15 MW LPC Bio

2014 Nov: 15 MW MEGC DPP* 21 MW Peak Power PSI 5.2 MW Peak Power PSFI

2016 Feb: 150 MW SMC Davao U1 Mar: 25 MW Lake Mainit Jun: 135 MW FDC Coal U1 Jul: 150 MW SMC Davao U2 Sep: 135 MW FDC Coal U2 Dec: 135 MW FDC Coal U3 10 MW Malaybalay Bio

2017 Jan: 9 MW Limbatangon HEPP Jul: 30 MW Puyo HEP Dec: 540 MW GNPower Kauswagan 5 MW Asiga HEPP (TBD**) 3 MW PTCI Bio (TBD**)

Page 21: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

* Excluding Off-grid power projects ** New Entry from Indicative list

As of 30 September 2014

MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW)

Name of the Project Project Proponent Mother/ JV

Company Location

Rated Capacity

(MW)

Target Testing &

Commissioning

Target Commercial

Operation

15 MW MEGC Diesel Power

Plant

Mapalad Energy

Generating

Corporation (MEGC)

Mapalad, Dalipuga, Iligan

City 15.0 Oct 2014 Nov 2014

3x6.97 PSI MW Bunker-Fired

Power Plant

Peak Power

Soccsargen, Inc.

(PSI)

Peak Power Energy

Inc. (subsidiary of A

Brown)

National Highway,

Brgy.Apopong, General

Santos City

20.9 Sep 2014 Nov 2014

1x5.2 MW PSFI Bunker-Fired

Power Plant

Peak Power San

Francisco (PSFI)

Peak Power Energy

Inc. (subsidiary of A

Brown)

ASELCO Compound,

Brgy. San Isidro,San

Francisco, Agusan del

Sur

5.2 Sep 2014 Nov 2014

2 X 150 MW Coal-Fired Therma

South Energy Project Therma South Inc.

Aboitiz Power

Corporation

Brgy. Binugao, Toril,

Davao City and Brgy.

Inawayan, Sta. Cruz,

Davao Del Sur

300.0 U1 – Nov 2014 U2 – Nov

2014

U1 – Mar 2015 U2 –

Jun 2015

Southern Mindanao Coal Fired

Power Station Unit 1

Sarangani Energy

Corporation

Alsons Power

Corporation

Brgy, Kamanga, Maasim,

Sarangani 100.0 Feb 2015

Unit 1 Sep 2015

SMC Davao Power Plant Project

Phase I Unit 1

San Miguel

Consolidated Power

Corporation

San Miguel

Consolidated Power

Corporation

Brgy. Culaman, Malita,

Davao del Sur 150.0 U1 - Jul 2015 U1 - Dec 2015

15 MW LPC Biomass Power

Plant Project

Lamsan Power

Corporation

Lamsan Power

Corporation Maguindanao 10.0 Dec 2015 Feb 2016

Lake Mainit Agusan Power

Corporation Tranzen Group Inc.

Jabonga, Agusan del

Norte 25.0 Mar 2016 May 2016

SMC Davao Power Plant Project

Phase I Unit 2

San Miguel

Consolidated Power

Corporation

San Miguel

Consolidated Power

Corporation

Brgy. Culaman, Malita,

Davao del Sur 150.0 U2 - May 2016 U2 - Jul 2016

3 X 135 MW FDC-Misamis

Circulating Fluidized Bed (CFB)

Coal-Fired Power Plant Project

FDC Utilities, Inc. FDC Utilities, Inc.

Phividec Industrial

Estate, Villanueva,

Misamis Oriental

405.0

U1 – Dec 2015

U2 – Mar 2016

U3 – Jun 2016

U1 – Jun 2016

U2 – Sep 2016

U3 – Dec 2016

Southern Mindanao Coal Fired

Power Station Unit 2

Sarangani Energy

Corporation

Alsons Power

Corporation

Brgy, Kamanga, Maasim,

Sarangani 100.0 Feb 2015 Nov-16

10 MW Malaybalay Bio-Energy

Corporation Multi Feedstock

Power Generating Facility

Malaybalay

Bioenergy

Corporation

Malaybalay

Bioenergy

Corporation

FIBECO, Anahawan,

maramag, Bukidnon 9.0 Dec 2016 Dec 2016

Page 22: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

* Excluding Off-grid power projects ** New Entry from Indicative list

As of 30 September 2014

MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW) MW Name of the Project Project Proponent

Mother/ JV

Company Location

Rated Capacity

(MW)

Target Testing &

Commissioning

Target Commercial

Operation

Limbatangon Hydroelectric

Power Project

Turbines Resource

& Development

Corp.

Turbines Resources

and Development

Corp. (TRDC)

Cagayan de Oro City,

Misamis Oriental 9.0 Jan 2017 Mar 2017

Puyo Hydroelectric Power

Project

First Gen Mindanao

Hydropower Corp.

First Gen Power

Corporation

Jabonga, Agusan del

Norte 30.0 Jul 2017 Jul 2017

GNPower Kauswagan Ltd.

540MW Clean Coal-Fired

Power Plant

GN Power

Kausawagan GN Power Ltd. Co.

Kauswagan, Lanao del

Norte 540.0 Feb 2017 Dec 2017

3 MW Biomass Cogeneration

Facility

Philippine Trade

Center, Inc.

Philippine Trade

Center, Inc. Maguindanao 1.6 TBD TBD

TOTAL 1,870.7

Page 23: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8MW)

As of 30 September 2014

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Davao del Norte 20 MW

Circulating Fluidized Bed

Biomass-Coal Fired Thermal

Power Plant

FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20.0 Mar 2015

ZAM 100 MW Circulating

Fluidized Bed (CFB) Coal-

Fired Power Station

San Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.

Talisayan, Zamboanga City 100.0 Dec 2015

600 MW SMC Davao Power

Plant Project Phase III

San Miguel Consolidated

Power Corporation

San Miguel Consolidated

Power Corporation

Brgy. Culaman, Malita, Davao

del Sur 600.0

150 MW - Jan 2016

150 MW - Jun 2016

300 MW - Dec 2018

Sibuguey Power Plant Project Philippine National Oil

Company (PNOC-EC)

Philippine National Oil

Company (PNOC) Sibugay, Zamboanga 100.0 Sep 2016

2x55 MW Balingasag

Thermal Power Plant

(Circulating Fluidized Bed

Combustion (CFBC) Coal-

Fired Power Plant Plant)

Minergy Coal Corporation Minergy Brgy. Mandangoa,

Balingasag, Misamis Oriental 110.0 Jan 2017

300 MW Coal Fired Power

Plant

Phase 1 - 2 x 100MW

Phase 2 - 1 x 100MW

Ozamiz Power Generation,

Inc.

Brgy. Pulot,Ozamiz

City,Misamis Occidental 300.0

Phase 1 - Mar 2018 Phase 2 - Dec

2018

300 MW SMC Davao Power

Plant Project Phase II

San Miguel Consolidated

Power Corporation

San Miguel Consolidated

Power Corporation

Brgy. Culaman, Malita, Davao

del Sur 300.0 Dec 2018

TOTAL COAL 1,530.0

Mindanao 3 Geothermal Energy Development

Corporation

Energy Development

Corporation Kidapawan, North Cotabato 50.0 Dec 2017

TOTAL GEO 50.0

Tagoloan Hydropower First Gen Mindanao

Hydropower Corp. First Gen Power Corporation

Impasugong & Sumilao,

Bukidnon 39.0 Oct 2015

Bubunawan Hydroelectric

Power Project

First Gen Mindanao

Hydropower Corp. First Gen Power Corporation

Baungon and Libona,

Bukidnon 23.0 Oct 2015

Tumalaong Hydroelectric

Power Project

First Gen Mindanao

Hydropower Corp. First Gen Power Corporation Baungon, Bukidnon 9.0 Oct 2015

Page 24: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8 MW)

As of 30 September 2014

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Cabadbaran Hydroelectric

Power Project

First Gen Mindanao

Hydropower Corp.

First Gen Power

Corporation

Cabadbaran, Agusan del

Norte 9.8 Dec 2015

New Bataan Euro Hydro Power (Asia)

Holdings, Inc.

New Bataan, Compostela

Valley 2.4 Jan 2017

Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017

Culaman Hydroelectric

Power Project

Oriental Energy and Power

Generation Corporation

Oriental Energy and Power

Generation Corporation Manolo Fortich, Bukidnon 10.0 Jun 2018

Mangima Hydroelectric

Power Project

Philnew Hydro Power

Corporation Manolo Fortich, Bukidnon 10.0 TBD

Clarin Philnew Hydro Power

Corporation Clarin, Misamis Occidental 5.0 TBD

Mat-i-I Philnew Hydro Power

Corporation Claveria, Cagayan de Oro 2.0 TBD

Mat-i-2 Philnew Hydro Power

Corporation

Cagayan de Oro, Misamis

Oriental 4.0 TBD

Mat-i-3 Philnew Hydro Power

Corporation

Cagayan de Oro, Misamis

Oriental 4.0 TBD

TOTAL HYDRO 118.3

Centralla Solar Power

Project

NV Vogt Philippines Solar

Energy One, Inc.

Brgy. Centralla, Surallah,

South Cotabato 6.3 Mar 2015

Kirahon Solar Power

Project Phase 1

Kirahon Solar Energy

Corporation

Brgy.

Kirahon,Villanueva,Misamis

Oriental

12.5 May 2015

Digos Solar Photovoltaic

Power Project

Enfinity Philippines

Renewable Resources, Inc. Enfinity Digos City, Davao del Sur 10.0 Oct 2015

TOTAL SOLAR 28.8

12 MW Biomass Power

Plant Project

Misamis Oriental Bio-

Energy Corporations

Misamis Oriental Bio-

Energy Corporations Misamis Oriental 10.8 Dec 2015

10MW Kalilangan Bio-

Energy Corporation Multi-

Feedstock Power

Generating Facility

Kalilangan Bio-Energy

Corporation Bukidnon 9.0 Dec 2016

10MW Don Carlos Bio-

Energy Corporation Multi-

Feedstock Power

Generating Facility

Don Carlos Bio-Energy

Corporations Bukidnon 9.0 Dec 2016

TOTAL BIOMASS 28.8

TOTAL 1,755.8

Page 25: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

• Introduced Interruptible Load Program (ILP) • Implemented Modular Genset Program in Mindanao • Implemented Interim Mindanao Electricity Market (IMEM) • Managed Maintenance Program of Generation Facilities jointly with NGCP

(GOMP) • Increased Institutional/Technical Capacities of DUs in Formulating Distribution

Development Planning • Created Task Force on Electricity • Developed Policy on Demand Aggregation and Supply Auctioning • Institutional strengthening through more aggressive information Education and

Communication Campaign on developments in the power industry, energy programs and projects including energy efficiency

• More aggressive Energy Efficiency and Conservation Programs

Measures Undertaken to Address Power Supply Issues

Page 26: Institute of Integrated Electrical Engineers of the ...iiee.org.ph/wp-content/uploads/2014/12/IIEE-Power-Crisis-Proposed... · Institute of Integrated Electrical Engineers of the

Sending market signals to provide incentives for EE

Strengthening existing policy, advocacy, programs and institutional structures

Harnessing private sector / partner finance

Enabling innovation and new technologies

Residential Buildings

Industry

Energy Efficiency Roadmap for the Philippines, 2014-2030

Short Term (2014-15) Medium Term (2016-20) LongTerm (2021-30) Energy Savings over

baseline (by 2030)

• Link existing training projects with ESCO capacity building • Develop sectoral focus programs to facilitate EE in energy intensive industries (e.g. cement and construction, sugar)

• Develop standards for motors • Facilitate example models including ESCOs, finance • Implement demand response programs • Review of energy pricing

• Review inward investment rules for EE to remove distortions

• Enforceable minimum energy standards for appliances, with a focus on space cooling and refrigeration • Building envelope measures – cool roofs and insulation

• Develop role of utilities as key implementation partners and information providers • Specific EE programs for low-income households

• Towards energy efficient housing precincts • inclusion of residential measures in Building Code

Commercial Buildings

• Reformulate group to oversee EE measures in Building Code • Retro-commissioning program for existing buildings • Benchmarking and ratings for building information and reporting

• EE measures for inclusion in national building code • Government demonstration retrofits to showcase ESCOs and financing models • Promote green building ratings

• Incentive funds in place for EE, including private financiers • Mandatory disclosure of commercial building performance

Cross- Sectoral

• Support passage of Enercon Bill • Establish EE database, data collection regime, M&E framework • Establish enforcement regimes • Strengthen ESCO capacity • Continue awareness-raising

• National strategy for efficiency in power supply sector • Stronger coordination with other levels of government (LGUs) • Regular reporting and monitoring to commence

• Energy Efficiency and Conservation Center mandated and established

20

30

Ob

jecti

ve

s:

40%

reduct

ion in e

nerg

y inte

nsi

ty c

om

pare

d t

o 2

010 b

ase

line

Decr

ease

d e

nerg

y c

onsu

mption o

f 1.6

% p

er

year

again

st b

ase

line f

ore

cast

s Savin

gs

of appro

x. 10,6

65 K

TO

E p

.a. (o

ne-t

hird o

f cu

rrent

dem

and)

by 2

030

15 %

20 %

25 %