Installing a servo-stabilizer in Woodland Guest House A servo-stabilizer installed Woodland Guest...

5
Installing a servo-stabilizer in Woodland Guest House A servo-stabilizer installed Woodland Guest House lighting load. Date: 24 th February 2012 Capacity: 30 KVA Company: Muskaan’s History: Servo was initially in line but after loading AC’s it was bye-passed. Load Analysis of connected load was done. Reason: Installing AC’s in Woodland-boys could result in the over- loading servo, hence resulting in a flash. 1

description

Load Analysis of Woodland Guest House ItemsNumberLoad (Watts)Total Load (Watts) TV Fan Tubelights Cooler Total Load 8240  Lighting load is under 30 KVA  A new cable was dug in and geysers and AC’s would be fed by it.  This cable would not be under Servo-stabilizer’s load.  Now only the lighting load of Woodland would be fed under a stabilizer. Load Analysis 3

Transcript of Installing a servo-stabilizer in Woodland Guest House A servo-stabilizer installed Woodland Guest...

Page 1: Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012

1

Installing a servo-stabilizer in Woodland Guest House

A servo-stabilizer installed Woodland Guest House lighting load.

Date: 24th February 2012 Capacity: 30 KVA Company: Muskaan’s

History: Servo was initially in line but after

loading AC’s it was bye-passed. Load Analysis of connected load was

done.

Reason: Installing AC’s in Woodland-boys

could result in the over-loading servo, hence resulting in a flash.

Page 2: Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012

2

SLD of Previous Arrangement of Woodland Supply

Charged Bus-bar

Bus-bar charged

Boys lighting + geyser

Girls lighting + geyser

Servo-stabilizer

Page 3: Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012

3

Load Analysis of Woodland Guest House

Items Number Load (Watts) Total Load (Watts)

TV 18 120 2160

Fan 32 75 2400

Tubelights 32 40 1280

Cooler 16 150 2400

Total Load 8240

Lighting load is under 30 KVA

A new cable was dug in and geysers and AC’s would be fed by it. This cable would not be under Servo-stabilizer’s load. Now only the lighting load of Woodland would be fed under a stabilizer.

Load Analysis

Page 4: Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012

4

SLD of New Arrangement of Woodland Supply

Charged Bus-bar

Bus-bar charged

Boys lighting Girls lighting

Servo-stabilizer

Girls + Boys geyser/AC

Page 5: Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012

5

Comparison on behalf of 3 Day Load Manager Study

Consumption Before Stabilizer 52 Units/day

Consumption After Stabilizer 47 Units/day

Savings :

30 INR per Day

930 INR per Month

10,980 INR per Year

Units Comparison44

45

46

47

48

49

50

51

52

53

BeforeAfter

Savings Calculations