Installing a servo-stabilizer in Woodland Guest House
A servo-stabilizer installed Woodland Guest House lighting load.
Date: 24th February 2012 Capacity: 30 KVA Company: Muskaan’s
History: Servo was initially in line but after
loading AC’s it was bye-passed. Load Analysis of connected load was
done.
Reason: Installing AC’s in Woodland-boys
could result in the over-loading servo, hence resulting in a flash.
2
SLD of Previous Arrangement of Woodland Supply
Charged Bus-bar
Bus-bar charged
Boys lighting + geyser
Girls lighting + geyser
Servo-stabilizer
3
Load Analysis of Woodland Guest House
Items Number Load (Watts) Total Load (Watts)
TV 18 120 2160
Fan 32 75 2400
Tubelights 32 40 1280
Cooler 16 150 2400
Total Load 8240
Lighting load is under 30 KVA
A new cable was dug in and geysers and AC’s would be fed by it. This cable would not be under Servo-stabilizer’s load. Now only the lighting load of Woodland would be fed under a stabilizer.
Load Analysis
4
SLD of New Arrangement of Woodland Supply
Charged Bus-bar
Bus-bar charged
Boys lighting Girls lighting
Servo-stabilizer
Girls + Boys geyser/AC
5
Comparison on behalf of 3 Day Load Manager Study
Consumption Before Stabilizer 52 Units/day
Consumption After Stabilizer 47 Units/day
Savings :
30 INR per Day
930 INR per Month
10,980 INR per Year
Units Comparison44
45
46
47
48
49
50
51
52
53
BeforeAfter
Savings Calculations