Installed Magnetometer Planned Magnetometer

5
1 Installed Magnetometer Planned Magnetometer FM-CW radar Magnetic Equator ILR LKW AAB WAD GLY ASB HLN TGG DAV TIR ASW CXI MAGDAS Project at SERC, Kyushu Univ.

description

WAD. GLY. ASB. ASW. HLN. TGG. ILR. TIR. LKW. AAB. CXI. Magnetic Equator. Installed Magnetometer Planned Magnetometer. FM-CW radar. DAV. MAGDAS Project at SERC, Kyushu Univ. List of Stations. - PowerPoint PPT Presentation

Transcript of Installed Magnetometer Planned Magnetometer

Page 1: Installed Magnetometer Planned Magnetometer

1

Installed MagnetometerPlanned MagnetometerFM-CW radar

Magnetic Equator

ILR LKWAAB

WAD

GLYASB

HLN

TGG

DAV

TIR

ASW

CXI

MAGDAS Project at SERC, Kyushu Univ.

Page 2: Installed Magnetometer Planned Magnetometer

2

List of Stations• The continuously updated list of operational MAGDAS stations is

available at the SERC homepage of www.serc.kyushu-u.ac.jp• First, click on “About MAGDAS”• Next, click on “MAGDAS Cross Reference Table”• You will see the full list of MAGDAS stations with geographic and

geomagnetic coordinates – and with installation dates

MachineData S/N S/N LOC Installed G.LAT G.LONG M.LAT M.LONG======== ====== ================== ======== ============== =============SN01 STD-001 MND Manado, Indonesia 05/07/26 1.44 124.84 -6.91 196.06SN02 STD-002 MUT Muntinlupa, PH 05/05/15 14.37 121.02 6.79 192.25SN03 STD-003SN04 STD-004 TIR Trivandrum, India 07/09/28 8.40 77.50 0.20 149.31SN05 STD-005 HER Hermanus, South Africa 07/09/14 -34.34 19.24 -42.29 82.20SN06 STD-006SN07 STD-007 DAW Darwin, AU 05/09/19 -12.41 130.92 -21.91 202.81SN08 STD-008SN09 STD-009 GLY Glyndon, MN, USA 06/10/20 46.50 -96.30 57.07 330.02SN10 STD-010 ILR Ilorin, Nigeria 06/08/24 8.50 4.68 -1.82 76.80

….. Etc ……

Page 3: Installed Magnetometer Planned Magnetometer

3

MAGDASデータ校正情報(月間) Last  update

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12AABABJAMAANCASBCEBCGRCKTCMDDAVDAWEUSGLYHERHLNHOBILRKPGKUJLKWMCQMLBMNDMUTONWPRPPTKROCTIRTWVWADYAP

凡例 データあり・校正済み データあり・未校正 データ欠損

2007STN Date\

2007/ 10/ 23

2005 2006

MAGDAS Correct Data Information

Corrected Data Raw Data No Data

Available Data (Y/M)

2005 2006 2007

Page 4: Installed Magnetometer Planned Magnetometer

4

Installed MagnetometerPlanned Magnetometer

FM-CW radar

Magnetic Equator

ILR LKWAAB

WAD

GLYASB

HLN

TGG

DAV

TIR

ASW

CXI

EUS

ANC

PIU TJL  CBT

CNT  ICA  ARC

CYN MCP   BLM      SLZ

TRS       NTL

  SVD

RDJ

BDPSFY  IZM

CIR

PSD ASM

DKR

MRV 

YBLNRB

  DES KAS

BTY

 BIR

MPT

DBN

MAGDAS II (Planning)

MAGDAS II Project

Page 5: Installed Magnetometer Planned Magnetometer

5MAGDAS-II Magnetometer

CPMN-Sensor

CPMN-Amplifier

A/D + Logger

CPU BOX for Internet

Data Acquisition Server

Analog

Specifiedcable

Serial

Internet(FTP or SSH)

Field Site SERC

(200x230x160 mm)

(130x180x30 mm)

(100x100x21 mm)

(200x200 mm)

(W x D x H mm) or(φ x H mm)