Installation Readiness Report - Controls
-
Upload
ferdinand-curtis -
Category
Documents
-
view
33 -
download
2
description
Transcript of Installation Readiness Report - Controls
![Page 1: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/1.jpg)
1
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT Claude DEHAVAY - CERN/AB/CO/HT
Installation Readiness Report - Controls
![Page 2: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/2.jpg)
2
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 3: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/3.jpg)
3
Our target schedule
The TS/IC Master schedule The HWC dates Plannings from users:
- PO- Cryo- QPS- PIC- SU- BDI- RadMon
From: Stephen Page7-8 05/09/20058-1 05/12/20054-5 09/01/20063-4 05/06/20065-6 17/07/20066-7 18/09/20061-2 20/11/20062-3 15/01/2007
![Page 4: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/4.jpg)
4
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 5: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/5.jpg)
5
AB/CO Components (1/2)
For Hardware Commissioning:
General services (Ethernet, Power network)
WorldFip fieldbus
Specific hardware designs, furniture, delivery for Timing, WorldFip, PIC.
WorldFip gateways, Technical consoles, Remote reboot
![Page 6: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/6.jpg)
6
AB/CO Components (2/2)
For beam commissioning:
LHC Beam Interlock (24 VME syst.)
LHC RF (50 VME syst.)
LHC Beam instrumentation (200 VME syst.)
LHC Beam transfert (5 VME syst.)
![Page 7: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/7.jpg)
7
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Which components and how far are we ?
Timing WorldFip gateways Remote reboot, technical consoles Powering Interlock Controller Cryo Control
![Page 8: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/8.jpg)
LHC timing
![Page 9: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/9.jpg)
Status of Timing installation (1/2)
New designs Ordered(Units)
Delivered
VME Receiver modules for BDI crates 320 68%
PCI Receiver modules for Gateways 150 100%
GMT : FO driver and FO receiver 25 100%
GMT : Cable driver & Cable receiver 25 100%
Timing crates (Europa) 20 100%
![Page 10: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/10.jpg)
10
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTStatus of Timing installation (2/2)
Cables and Optical fibers : DIC and installation on schedule
Planning : Timing in place in November for PO - LHC MTG -> OK since june 2005- Pt 8 -> Old HW until July 2005- Pt 1 -> New HW on Week 25- Pt 8 -> New HW on Week 30
-> Installation is in progress according to the planning.
![Page 11: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/11.jpg)
11
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Which components and how far are we ?
Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control
![Page 12: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/12.jpg)
Node
Tap Tap Tap Tap FipDiag
Gateway
Passive component (Connector)
Active component (User interface)
Surface = SR
Underground = UA, RR, Tunnel
Cu/CuRepeater
RemoteReboot
A segment in the WorldFip infrastructureSome figures
220 segments (7064 cables) 280 km 8000 nodes4980 taps7300 connectors
Segment backbone
Node Node Node Node Node Node Node
![Page 13: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/13.jpg)
Surface = SR
Underground = UA, RR, Tunnel
Installation schedule for Power Converters
Time
Gateway
RemoteReboot
Tap Tap Tap Tap
NodeNodeNodeNode NodeNode NodeNode
1 2 6 74
1 : TS/EL Cables and Taps2 : AB/CO/IS Elec.Qualif. 3 : IT/CS Ethernet/Fibers4 : AB/CO/HTGateway5 : TS/EL Power6 : AB/PO Node interfaces7 : TS/EL Drop cables8 : AB/CO Final test
FipDiag
Cu/CuRepeater
8
……
3
……5 5
![Page 14: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/14.jpg)
14
WorldFip Gateways – Burn in
![Page 15: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/15.jpg)
15
WorldFip Gateways – Installed
![Page 16: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/16.jpg)
16
WFIP Gateways installation planning for Point1
QPS
![Page 17: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/17.jpg)
17
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTStatus of WFIP installation (1/3)
LHC: All WorldFip cables are installed (except the drop cables for Power Converters & Point 7 Left)
IP 8 (LSS8L, Arc 7-8, LSS8R, Arc 8-1): = 16% LHC
19 WorldFip gateways All gateways and taps are in place All backbones electrically qualified
-> A 3 weeks job completed mid-may 2005
![Page 18: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/18.jpg)
18
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTStatus of WFIP installation (2/3)
To be done for Point 8 (LSS8L, Arc 7-8, LSS8R, Arc 8-1):
1. Equipment interfaces and drop cables installation -> To be done by the Equipment groups and TS/EL -> during June 2005 for PO (LSS8L)
2. Installation of FipDiag and Repeaters
3. Final test of the complete segments (½ day per segment)-> June 30th for PO (LSS8L)
![Page 19: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/19.jpg)
19
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTStatus of WFIP installation (3/3)
Short term planning:
All gateways for Point1 -> July 4th , 2005 QPS for Arc 8-1 (WFIP test) -> July 8th , 2005 QPS for Arc 7-8 (WFIP test) -> September 1st 2005 Cryo for Arc 8-1 (WFIP test) -> October 3rd 2005
![Page 20: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/20.jpg)
20
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Which components and how far are we ?
Timing WorldFip gateways Remote reboot, technical consoles Powering Interlock Controller Cryo Control
![Page 21: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/21.jpg)
Remote reboot, Local stations (Pt8)
![Page 22: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/22.jpg)
22
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Which components and how far are we ?
Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control
![Page 23: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/23.jpg)
36 PICs for 28 Powering Subsectors,managing ~1600 electrical circuits,
using more than 1000 cables, &
handling ~2400 interlock signals
LSS8L + Arc 7-8
![Page 24: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/24.jpg)
PIC PICPIC for A.L8 for X.L8 for M.L8
PIC Racks in UA83
![Page 25: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/25.jpg)
25
PIC Planning
2 PICs are going to commissioned in Sep.05
2 others PICs for the Arc 7-8 in Dec.05: One more in UA83 One in UJ76. Radiation issues => system moved in TZ gallery?
The units will be fully tested in the lab in August => dismounted and re-mounted in the undergrounded area by the interlock Team.
For the time being, we are optimistic to be on time! For the time being, we are optimistic to be on time!
![Page 26: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/26.jpg)
26
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Which components and how far are we ?
Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control
![Page 27: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/27.jpg)
27
Cryo Control Architecture
[Contribution : Ph.Gayet – AB/CO/IS]
Similar architecture for:
Refrigerators
QRL
-> Industrial technology (PLC and PVSS)
![Page 28: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/28.jpg)
Local Cryogenic control room
Central Cryogenic control room
S7-400 as gateway
S7-400 Siemens
QuantumPCUs
PROFIBUS DP networks (3)
PROFIBUS PA networksWFIP Networks (4)
WFIP Gateways
Data server
ET200 I/O for Valves & sensors
CCC
Hardware Architecture for Cryo (1/2)
[Contribution : Ph.Gayet – AB/CO/IS]
LocalCryogenic
Control room
![Page 29: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/29.jpg)
Local Cryogenic control room
Central Cryogenic control room
S7-400 as gateway
S7-400 Siemens
QuantumPCUs
PROFIBUS DP networks (3)
PROFIBUS PA networks
WFIP Networks (4)
WFIP Gateways
Data server
ET200 I/O for QV & sensors
Hardware Architecture for QRL (2/2)
CCC
[Contribution : Ph.Gayet – AB/CO/IS]
LocalCryogenic
Control room
Dedicated OWS/DS
ACR responsibility
QRL test setup
ET200 I/O temperature
sensors
Until October 2005 for QRL testsThenWFIP for LSS8L test
![Page 30: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/30.jpg)
30
Status of Hardware for QRL
Infrastructure required for:
1) Cryo instrumentation tests for IP8: All done (arcs 7-8 and 8-1)
2) LSS8L tests in 2005 (Q4): To be done
GW WFIP to provide (CO) -> Almost ready Profibus WFIP slave installation (ACR) Reconnection WFIP after QRL test (ACR) To requalify WFIP network (CO)
-> see Short term planning
![Page 31: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/31.jpg)
31
Status of Hardware for Cryo Plant
17 PLC installed, 3 PLC coming
PVSS Data Server:- based on Windows XP for commissioning- migration to final Linux version foreseen this summer
All PLC systems & components declared in AB/CO asset management system (ABCAM).
OK with Cryo planning
[Contribution : Ph.Gayet – AB/CO/IS]
![Page 32: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/32.jpg)
32
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 33: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/33.jpg)
33
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTTechnical difficulties (1/2)
WorldFip : Synchro problem in the arbiter firmware -> Waiting for ALSTOM action (July !)
Cryo controls: Necessity to qualify twice the fieldbus (Profibus to WorldFip) but only for IP8
![Page 34: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/34.jpg)
34
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT‘Technical’ difficulties (2/2)
Problem of communication between people from different groups and/or departments probably due to ‘CEIWG replaced by NOTHING’ during 1 year!
-> Better situation with the AB/CO periodical coordination meetings (twice a month).
TS/EL : ‘Mise en service’ for outlets -> see Enhancements chapter
![Page 35: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/35.jpg)
35
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 36: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/36.jpg)
36
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTWhat we’ve learnt (1/2)
The functional test of the WorldFip infrastructure was not possible as foreseen
The final tests are now organised in partnership with the equipment groups and TS/IC
Gateway Nodes Drop Cab.
Finaltest
![Page 37: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/37.jpg)
Scheduling of WFIP Final test
Power converters
QPS
![Page 38: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/38.jpg)
38
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTWhat we’ve learnt (2/2)
Thanks to the WFIP validation procedures and the Dry run PC short circuit tests: We know that the Controls infrastructure works fine.
We are confident that we can operate the converters during the Short Circuit Tests.
We are in phase and with the right speed with the installation schedule.
![Page 39: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/39.jpg)
39
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 40: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/40.jpg)
40
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTEnhancement(s)
Closer collaboration and better communication with TS/EL
(see next slide)
![Page 41: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/41.jpg)
Enhancements from TS/EL
![Page 42: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/42.jpg)
42
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTPresentation layout
Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions
![Page 43: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/43.jpg)
43
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTMessages in the bottle
BDI : It’s time to organise the installation (assembly, configuration, test) for the 200 VME crates
RF, PO, … : Please, request your WorldFip connection on time
![Page 44: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/44.jpg)
44
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HTConclusions
Installation : Point 8 is done & Point 1 is progressing well
BUT we continue:
To follow up the clock synchro problem on WorldFip firmware (AB/CO and ALSTOM)
To keep close collaboration with other groups and the coordinators.
![Page 45: Installation Readiness Report - Controls](https://reader035.fdocuments.net/reader035/viewer/2022070402/568137da550346895d9f7968/html5/thumbnails/45.jpg)
45
Rep
ort o
n C
ontr
ols,
TC
C m
eetin
g 2
3th J
une
2005
– C
l.Deh
avay
& C
o -
AB
/CO
/HT
Contribution from AB/CO people especially from:
R.Brun, Ph.Gayet, R.Lauckner,P.Le Roux, B.Puccio, M.Vanden Eynden,Z.Zaharieva,M.Zerlauth
Thank you
Comments or questions?