Page 1: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Ferdinand Schad KGSteigstraße 25-27

D-78600 KolbingenTelephone +49 (0) 74 63 - 980 - 0

Fax +49 (0) 74 63 - 980 - [email protected]

Installation, Mounting and Maintenance

Fan coil unit NBS 100/150

Page 2: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Contents

Construction subject to change. No return possible!

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Z11/21 - 2 12.11.2012Version:

Safety instructions ...............................................................................................................................3General information ................................................................................................................................................................... 3

Warranty ...........................................................................................................................................3Recycling ..........................................................................................................................................3General information ..............................................................................................................................4

Identification of the delivered model .......................................................................................................................................... 4Installation and commissioning ................................................................................................................5

Operating conditions .................................................................................................................................................................. 5Material reception ...................................................................................................................................................................... 5Transport, lifting and handling ................................................................................................................................................... 6Storage ...................................................................................................................................................................................... 6Installation ................................................................................................................................................................................. 6

Installation site ...................................................................................................................................7Connecting the sub-assemblies ................................................................................................................................................. 8Hydraulic connections ............................................................................................................................................................. 10Electric connections ................................................................................................................................................................. 11Mounting accessories .............................................................................................................................................................. 14Checks ..................................................................................................................................................................................... 15

Maintenance .................................................................................................................................... 16Disassembling the units ........................................................................................................................................................... 16Motorised fan ........................................................................................................................................................................... 16Registers .................................................................................................................................................................................. 17Condensate pan ....................................................................................................................................................................... 17Filter ......................................................................................................................................................................................... 18Spare parts list NBS 100 .......................................................................................................................................................... 19Spare parts list NBS 150 .......................................................................................................................................................... 20

Troubleshooting ................................................................................................................................ 22EC Declaration of Conformity ................................................................................................................. 23

Page 3: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Safety instructionsPrior to installation and commissioning of this device, pleaseread completely through this manual. Please observe in partic-ular the regulations and operating instructions containing thehazard symbols and safety signs. Their non-observance may re-sult not only in damage to the device but also in light and seri-ous personal injury. If, after reading through the manual, you have further questions,please contact the manufacturer or the local sales office.

General information

SCHAKO shall not give any warranty for damage resulting from:

WarrantyThe device warranty will be for two years starting from thehandover date and shall apply to all production faults. Electriccomponents are excluded from the device warranty. However,they are covered by the corresponding warranty of the relevantmanufacturerAlso excluded from the warranty is damage to thedevice unit caused by components that are not part of the deviceitself. The warranty only covers the return and replacement ofdefective materials.

Recycling

- The inspection, installation, connection and commission-ing of the device must be carried out by qualified skilledpersonnel only in compliance with the current regulations.

- Do not spray the device with liquids.- Do not operate the device with wet or moist hands.

- Do not change any control or safety elements without pri-or approval by the manufacturer or the local sales office.

- Electric and hydraulic connections and their correct func-tioning are the responsibility of the installer.

- Improper use caused by ignoring the instructions given inthis manual

- Non-observance of the operating conditions of the device.- Installation and maintenance by personnel without proper

qualification.- Improper use of the device or operation under conditions

not conforming to the manual.- Use of spare parts that are not original spare parts.

It is recommended recycling the device compo-nents at the end of service life of the device as muchas possible or reuse them.Components that cannot be recycled must be prop-erly disposed of by an authorized disposal companyin accordance with current legal regulations.

Hazard warning

Important information

Caution, electric power

Safety information

Recycling

It is recommended keeping this manual at a safelocation after installation and use it for futuremaintenance activities.

Z11/21 - 3

Construction subject to change. No return possible!

12.11.2012Version:

Page 4: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

General informationIdentification of the delivered modelThe NBS series of air-conditioning units consists of two modelseries: the modular NBS 100 and the compact NBS 150.Register (a): Option of installing a single register (cooling orheating) or two registers (cooling and heating). They consist ofcopper pipes, aluminium ribs, a manual diffuser system andsteel frame. The water connections are located on the right-hand or left-hand side. Electric register: for heating, an electricregister can be built in as an option. Motorised fan (b): Double-sided intake-operated dynamicallybalanced centrifugal blower with forward bent blades. With 5speed levels (NBS 100) and with 3 speed levels (NBS150).Filter (c): Has filter class G3 or G4 (EN 779) and consists of agalvanised steel frame and a synthetic filter medium. Housing of the 100 series (d): Made of of galvanised sheetsteel profiles and plates and heat and sound insulation 12 mmin thickness.Housing of the 150 series (e): Consists of aluminium profiles,galvanised sheet steel, plastic corner pieces and a circumferen-tial seal to guarantee tightness. The closing sheets in sandwichdesign have heat or sound insulation 25 mm in thickness.

Cooling: air (27°C/50%), water (7°C /12°C) - 4-pipe registerHeating: air (20°C/50%), water (70°C /60°C) - 4-pipe register

NBS 100 filter G3(available stat. pressure: 100)

NBS 150 filter G3(available stat. pressure: 150 Pa)

NBS 150 filter G4(available stat. pressure: 150 Pa)

1 2 3 1 2 3 1 2 3

Volumetric flow (m3/h) [l/s] 822 [228]

1699 [472]

2055 [571]

1975 [548]

3785 [1051]

5060 [1405]

1854 [515]

3686 [1024]

4825 [1340]

Sensible cooling capacity (kW) 3,76 7,68 9,76 8,67 16,07 21,69 8,27 15,76 20,95

Total cooling capacity (kW) 5,32 10,89 14,07 12,22 22,34 30,30 11,73 21,98 29,40

Heating capacity (kW) 7,35 14,59 19,63 16,05 29,76 41,33 15,40 29,26 40,10

Water throughput cooling (l/h) 915 1873 2420 2102 3843 5212 2018 3781 5057

Water throughput heating (l/h) 632 1255 1688 1380 2559 3554 1324 2516 3449

Z11/21 - 4

Construction subject to change. No return possible!

12.11.2012Version:

Page 5: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Dimensions Installation and commissioning

Operating conditionsPrior to installation or commissioning of the device, the follow-ing operating conditions must be observed:

Material receptionUpon reception of the materials, the components must be care-fully checked, in order to guarantee that no transport damagehas taken place. Moreover, the dimensions, composition andnumber of the identification sticker must be checked as towhether they are as ordered.

Identification sticker:

L(mm)

B(mm)

B1(mm)

H(mm)

H1(mm)

100/1600

680- 300 -100/2 1150

100/3 1660150/1

774874 800

480 406,5150/2 1374 1300150/3 1824 1750

B

50L

65H

1313

B

HL

7550

B1

H1

NBS 100

NBS 150

- Coolant or heating fluid: water or glycols (ethylene or pro-pylene) at a concentration below 60%.

- Water inlet temperature: from 5 to 95°C.- Air inlet temperature: from 2 to 45°C- Max. operating pressure: 8 bar / 95°C- Operating voltage: 230 V ± 6%, 50/60 Hz.- Protection class: IP20

To prevent deposits and corrosion, the quality of the water for filling the registers mustcomply with regulations VDI 2035 and DIN 50930.

Operating voltageCurrent consumption

Model Register Connection position Filter

Z11/21 - 5

Construction subject to change. No return possible!

12.11.2012Version:

Page 6: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

To prevent possible damage during transport, the devices willbe delivered ex works on pallets (that correspond to the partic-ular weight and dimensions) wrapped with tapes and transpar-ent plastic film. It is recommended leaving this protection inplace until the device is commissioned.

Transport, lifting and handlingTransport and handling of the unit shall take place in the posi-tion in which the unit is to be built in later on, unless expresslystated otherwise on the unit. Transport, unloading and lifting of the unit shall take place withthe necessary care and using tools that are appropriate for theweight and dimensions.

StorageIf the device is not installed immediately after its reception, itmust be stored according to the following instructions:

InstallationThe devices must not be installed in places with extreme mois-ture (e.g. laundries or swimming pools), with high dust forma-tion, outdoors or in places subject to explosion hazards. For correct installation, the following instructions must be fol-lowed:

Weights (kg)

Device unitPlenum boxes(Suction/blow unit) (L300)

Mixing unit

100/1 36 15,4 18,5

100/2 56 23 24

100/3 75 31 29,5

150/1 57 17 20

150/2 77 25 26

150/3 98 33 33

Should the delivered device exhibit visible produc-tion-related damage prior to mounting and com-missioning, please contact the local sales officeprior to mounting.

The unit shall only be kept in position or moved byholding on to the housing. The weight must notrest on the condensate pan or the water connec-tions.SCHAKO cannot be held liable for damage to theunit caused by improper handling or handling notmentioned here, loading or unloading.

- The device must be stored at a dry, clean, safe locationwhere no damage to the device can occur, i.e., outsidecorrosive atmospheric influences.

- Leave the protections attached ex works (film, tapes, pal-lets, etc.) on the device, unless they have already been re-moved beforehand.

- Cover the device with tarpaulins, in order to protect it fromdust, moisture and extreme temperatures.

- Rotate the fan rotor at regular intervals.- Protect the electric components appropriately. In case of

storage over a prolonged period of time, remove the elec-tric unit and store it at a dry location.

- Entries, openings and pipes must be hermetically sealedwith dust caps.

- Make sure that places that are intended as openings for airadmission and air discharge are free of pipes, electric ca-bles, crossbeams, stands, etc.

- Install the unit at a site that has good air quality.- Make sure that wall and ceiling correspond to the weight

of the device and also allow correct mounting of the fas-tening elements in the ceiling.

- Make sure that no obstacles are present on the outside ofthe wall that could impair optimum air circulation (plants,furniture, curtains, etc.).

- Install the device such that the air flow is not directed di-rectly at persons staying there.

- The installation site must have sufficient space and thenecessary resources for carrying out mounting and main-tenance activities of all device components.

Z11/21 - 6

Construction subject to change. No return possible!

12.11.2012Version:

Page 7: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Installation siteThe NBS units have been designed for mounting on the ceilingby means of anchoring elements (e.g. set screws), which arethen fastened to the holding devices at the topside of the unit bymeans of nuts. To avoid damage to the unit, it is also recommended using vi-bration dampers.The device must be mounted at an inclination of 15 mm per me-tre of device width, to ensure draining of the water of condensa-tion.

Installation of NBS 100

Installation of NBS 150

SCHAKO cannot be held liable for damage result-ing from faulty installation or the use of unsuitablefastening devices.Non-observance of the device inclination may re-sult in serious damage to the device and cause wa-ter to enter the air ducts.Before making electric or hydraulic connections,the power supply must be disconnected.For the installation of the device, use adequatetools, devices and materials and observe the safetyregulations and other current regulations.

Minimum distance to obstacles L>300 mm

Check whether the condensate pan iscompletely emptied by partly filling it.Condensat

e drain

Ø16 mm

Minimum distance to obstacles L>400 mm

Check whether the condensate pan iscompletely emptied by partly filling it.Condensat

e drain

Ø16 mm

Z11/21 - 7

Construction subject to change. No return possible!

12.11.2012Version:

Page 8: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Connecting the sub-assembliesBefore assembling the individual sub-assemblies, their condi-tion must first be checked. This is followed by arranging themodules in the same order in which they are to be assembled.This is followed by moving them next to each other, arrangingthem and finally joining them using the screws and nuts en-closed with the unit by passing them through the lateral or bot-tom openings of the modules. As standard, i.e., without expressorder, the assembly of the sub-assemblies takes place ex works.

Flexible connectionsFlexible connections that prevent atransmission of vibrations to thesystem can be additionally deliv-ered as an option.They are assembled by screwingthe frames of the connecting hos-es to the device unit.

Flange (-FL)

NBS 100

NBS 150

NBS 100

Joint

Suction box

Blow box Connecting plate with con-nection piece (optional)

Flexible connections

Flexible connections

Flange

Flange

NBS 150

Suction box

Blow box Connecting plate with con-nection piece (optional)

Flexible connections

Flexible connections Flange

Flange

Model SizeB1

(mm)B2

(mm)B3

(mm)Numberbores

NBS-100

1 290 680 720 10

2 350 1150 1190 12

3 312 1660 1700 16

NBS-150

1 832 794 854

42 1332 1294 1354

3 1782 1744 1804

NBS 100

NBS 150

Z11/21 - 8

Construction subject to change. No return possible!

12.11.2012Version:

Page 9: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Plenum boxes (-P)In the NBS 100, the plenum boxes are connected as follows:

In the NBS 150, the plenum boxes, after prior alignment, aremounted by screwing them to the metal frame of the main unit.Upon customer request, the plenum box of the NBS 100 andNBS 150 can be delivered pre-installed ex works.

Mixing unit (-ME)

Connecting the air ductsThe NBS (if speci-fied in the order) isequipped with amounting framefor attaching theair duct. For ple-num boxes withconnection pipe,the air ducts are

attached by means of clamps, fishplates or the like.

- Place the plenum box in front of the main element (flangeor flexible connection) it is supposed to be connected toand align them.

- Screw down both, making sure to obtain a firm connec-tion.

Model Size B(mm)

B1(mm)

B2(mm)

H(mm)

Numberbores

NBS-1001 762 290 680

30010

2 1232 350 1150 123 1742 312 1660 16

NBS-1501 865 832 794

318,5 42 1365 1332 12943 1815 1782 1744

Before connecting the plenum boxes, make surethat the insulation at the plenum box frame is ingood condition.

M6

B

H+42

7171

B2

H21 91 B1 11

11

31

B+42

L

Model Size L(mm)

Front damper Lateral damper

NBS-1001

370HKP 401 x 201

HKP 201x 2012 HKP 711 x 201

3 HKP 894 x 201

NBS-1501

1180HKP 503 x 252

HKP 252x 2522 HKP 797 x 252

3 HKP 1003 x 252

L

NBS 100

Mixing unit

Front damper

Lateraldamper

L

50

NBS 150Front damper

Lateraldamper

To give the system greater tightness, it is recom-mended using seals or hoses on the air ducts.

Z11/21 - 9

Construction subject to change. No return possible!

12.11.2012Version:

Page 10: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Silencer Hydraulic connections

RegistersUpon customer request, the wa-ter connection to the registerscan be established either on theleft-hand or right-hand side ofthe unit.The pipe for the supply of liq-uids is attached below the col-lector, and the return flowabove the same. The pipe con-nections of the device should beinsulated on-site to prevent the

formation of condensates.

The registers are equipped ex works with a manual bleed valve.Any further devices for ventilation must be provided on-site.If flexible hoses are to be used, observe the bend radius speci-fied by the manufacturer.

If the unit is to be installed at alocation having temperaturesbelow zero degrees, glycolmust be admixed to the coolantin a suitable ratio, to preventthe coolant from becoming fro-zen. Please note that the use of

an antifreeze results in a loss in efficiency of the register.

Model Size B(mm)

B1(mm)

H(mm)

H1(mm)

K(mm)

L(mm)

NBS100

1 675 713

340 377

100200

500750

1000125015001750200022503000

2 1145 1183

3 1655 1693

NBS150

1 794 832

405 4422 1294 1332

3 1744 1782

K

B

B+60

H

H+60

B1

H1

(30)

30

30 (30)

L

The register threads correspond to standard EN10226:Heating: external pipe thread EN 10226 R1/2Cooling: external pipe thread EN 10226 R 3/4

When making the hydraulic connections, suitabletools must be used, to avoid a rotation or othermovements of the collector and excessive tighten-ing of the connections.Avoid putting the register connections understress as a result of the weight of the connectionpipes.

Use the ventilation devices to ensure that no air re-mains in the water circuit.For operation with external air, appropriate meas-ures must be taken on-site to guarantee that theregisters cannot freeze.

Z11/21 - 10

Construction subject to change. No return possible!

12.11.2012Version:

Page 11: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Electric connectionsPrior to the electrical installation, you have to make sure that therated mains voltage is 230 V, 50/60 Hz and is single-phase. Thedelivered motors have insulation of type B and protection classIP20.SCHAKO recommends using exclusively copper cables, sincethe device connections have not been designed for accommo-dating other types of cables. If they are used nevertheless, gal-vanic corrosion or generation of heat could take place at theconnection point, thus resulting in damage to the unit. The elec-tric connections must be made by qualified electricians only, ob-serving the current standards and regulations as well as the low-voltage regulations.

NBS 100

NBS 150

Connect the NBS via an earthing cable.

SCHAKO cannot be held liable for faulty electricalconnections or if the power supply cable is re-placed with a different cable having different char-acteristics. According to DIN EN 60335-1, an all-pole discon-necting device must be provided by the customer.

Yellow / Green

Yellow

GreenBlueBrownGreyPurpleOrangeRed

Max.

Medium

Min.

1= Max. velocity5= Min. velocity

G

N12345G

Yellow / Green

Yellow

GreenBlueBrownGreyRed

Max.MediumMin.G

NN123G

C 15 µF

Z11/21 - 11

Construction subject to change. No return possible!

12.11.2012Version:

Page 12: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Wiring for parallel operationNBS 100

Yellow / Green

Yellow

GreenBlueBrownGreyPurpleOrangeRed

Max.

Medium

Min.

1= Max. velocity5= Min. velocity

G

N12345G

Yellow / Green

Yellow

GreenBlueBrownGreyPurpleOrangeRed

Max.

Medium

Min.

1= Max. velocity5= Min. velocity

G

N12345G

Wiring for parallel operationNBS 100

Speedselector

ON-SITE

Z11/21 - 12

Construction subject to change. No return possible!

12.11.2012Version:

Page 13: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

NBS 150

Wiring for parallel operationNBS 150

Speedselector

ON-SITE

Yellow / Green

Yellow

GreenBlueBrownGreyRed

Max.MediumMin.G

NN123G

C 15 µF

Yellow / Green

Yellow

GreenBlueBrownGreyRed

Max.MediumMin.G

NN123G

C 15 µF

Z11/21 - 13

Construction subject to change. No return possible!

12.11.2012Version:

Page 14: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Mounting accessoriesElectric heating registerThe electric register is equipped with a protection mechanismagainst overheating. No further safety devices have to bemounted.

Example of a connection circuit diagram

Model Capacity (W)

Operating voltage(V)

NBS 100-1 2500 3-400NBS 100-2 5000 3-400NBS 100-3 6750 3-400NBS 150-1 6000 3-400NBS 150-2 11500 3-400NBS 150-3 15000 3-400

ELEC

TRIC

HEAT

ING

REGI

STER

STAGE 1

STAGE 2 (optional)

STAGE 3 (optional)

Safety thermostats 85° C

Safety thermostats 60° C

Black

Black

Black

Black

Black

Black

Brown

Brown

Blue

Blue

SCHAKO scope of delivery:B1/B2/B3/B4: Terminals (in the terminal box of the de-vice)T1: Temperature control for autom. restartT2: Safety temperature control, recommended for manualrestartR: Electric registerNot included in the SCHAKO scope of delivery:M: Pushbutton for manual restartN: Restart from the control unitRA/RAB/RA1: Electrical transmitter for control, monitor-ing, switching onRA2: "Operation" auxiliary contact L1RA3: "Fault" auxiliary contact L2L1: Operation LEDL2: Fault LED(1): Connection option 1(2): Connection option 2(3): Switch(4): Control unit(5): Fuse(6): OFF(7): Automatic operation(8): ON / OFF

Z11/21 - 14

Construction subject to change. No return possible!

12.11.2012Version:

Page 15: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Temperature controlsThe temperature controls are mounted in accordance with theselected model. This is why the instructions enclosed with eachmodel must be followed. However, in order to achieve optimummeasurement by the sensors, the following basic informationshould be observed:

ValvesValves ordered as accessories are supplied loose. Please ob-serve the attached mounting instructions of the manufacturerregarding on-site insulation of valves and connections.

ActuatorsThe installation of the actuators depends on the selected model.Please follow the instructions enclosed with each model.

Condensate pumpThe installation of the actuators depends on the selected model.Please follow the instructions enclosed with each model. Upon customer request, the condensate pump can be installedex works.

ChecksPrior to commissioning, the following items must be checked orguaranteed:

During commissioning itself, the following items must be guar-anteed:

- Do not mount the temperature control close to or above aheat source (direct sunlight, lamps, television sets, radia-tors, etc.), in places with draught air or directly oppositeto an air diffuser grille.

- Temperature controls must be mounted at least 1.5 me-tres above the floor.

- Mounting temperature controls on walls toward the out-doors should be avoided.

Before drilling, make sure that no power, water orgas lines are present where the temperature con-trols are to be mounted.

- The air flow through the filters is not impaired by foreignmaterial (paper, packaging residues, etc.).

- The current consumption of the device is not higher thanthe power of the electric circuit it is connected to.

- The electrical properties of the device correspond to thoseof the electrical connection circuit.

- Electrical connections were made correctly.- Hydraulic connections were tightened properly and exhib-

it no leaks. - The drain pipe of the condensate pan is not clogged.- Connecting and fastening elements have been sufficiently

tightened.- There is a sufficient gradient for the condensate pan to be

emptied correctly. (Check whether it is completely emp-tied by partly filling it.)

- The connecting and fastening elements have been suffi-ciently tightened.

- The motorised fan does not exhibit any vibrations or exces-sive noise.

- The condensate pan is emptied correctly.- In heating mode, the temperature of the discharged sup-

ply air is not above 40°C.

Faulty mounting of the sub-assemblies and of the accessories of the unit can result in a substantialpower loss of the unit.If the main water drain is above the level of the NBSdrain, such a pump does not have to be mounted.

After carrying out the items described above, thecorrect installation of the unit must be checked.

Z11/21 - 15

Construction subject to change. No return possible!

12.11.2012Version:

Page 16: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

MaintenanceFor reasons of safety, the power supply and hydraulic circuitmust be disconnected prior to any maintenance activity. If the unit was operated in heating mode, you have to wait untilthe register has cooled down.

Disassembling the unitsNBS 100 If the distance between the unit and the ceiling is sufficient foraccess to the unit, maintenance is carried out as follows, with-out disassembling the unit:

If the distance between the ceiling and the topside of the unit isso small that the top cover cannot be taken off, the entire NBSmust be taken down. In this case, follow the above instructions.

NBS 150To perform maintenance activities on the registers and filters,the aluminium profiles and lateral unit covers must be taken off.If the unit has a suction module or is connected to an air duct,the filter (two-part with sizes 2 and 3) is removed by moving itlaterally. If the unit is not equipped with an additional module(suction box, mixing unit, etc.), the filter is unscrewed and re-moved.To gain access to the motorised fan, the same steps as with theregisters and filters must be followed. If this turns out to be eas-ier for the maintenance personnel, access to the motorised fanis also possible from the underside of the unit.

Motorised fanThe motorised fan does not require any special maintenance, asit is equipped with self-lubricating bearings. However, theblades and the rotor of the motor must be checked at regular in-tervals as to whether they are free of dirt. If required, they arecleaned with compressed air.

- Remove the connection screws of the top and bottomcovers of the entire unit.

- Take out the module due for maintenance.- After completing maintenance, reconnect the module to

the main unit. Attach the covers.

When performing maintenance activities, it is rec-ommended wearing personal protective equip-ment, in order to avoid cuts and other injuriesproduced by sharp and pointed parts.For maintenance, service, retrofitting, etc., inspec-tion openings in sufficient number and size mustbe provided on site.

If the operating conditions of the fan (speed, pres-sure, temperature, etc.) change,call the local sales office of SCHAKO to find outwhether the unit can be operated under such con-ditions.

Z11/21 - 16

Construction subject to change. No return possible!

12.11.2012Version:

Page 17: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

RegistersTo guarantee the technical characteristics of the device, the reg-isters and heat exchangers must be kept in good clean condi-tion. To ensure this, the following maintenance activities mustbe carried out:

Condensate pan Once a year, the condensate pan must be checked for formationof algae, to prevent possible clogging of the drain pipe. Checkwhether the pan is completely emptied by partly filling it.NBS 100To clean the condensate pan, remove the plate attached to thebottom side of the motorised fan unit.

NBS 150To clean the condensate pan, remove the lateral plate attachedto the opposite side of the register hydraulic connections.

- Check the condition of the register at least each time thefilter is changed.

- Should the register be soiled, clean it by spraying it withwater or with compressed air or by suction.

- If there are larger differences in distance between the ribs,they must be "combed".

- Ventilate the hydraulic circuits of the register. In doing so,watch out for possible leaks of the hydraulic system.

CAUTIONIt is not the manufacturer's strategy to give specialrecommendations for the water treatment (contacta company specialised in water treatment).However, this is a critical problem, and care mustbe taken in particular that the treatment, if re-quired, is effective.The use of untreated or unsuitable water may re-sult in excessive soiling of the register pipes (earthand mud deposits, corrosion, etc.), which mayhave a considerable effect on the heating capacityof the unit and cause material damage that cannotbe undone.When using untreated water or water that has beentreated improperly, the manufacturer or his repre-sentative cannot be held liable.

When decommissioning the unit or shutting itdown for a longer period in winter, the water mustbe drained from the unit, in order to avoid damageto the register due to the formation of ice. If youwant to use antifreezes, you must first determinethe freezing point.Any maintenance work and intervals depend on thevalid standards and guidelines, e.g.: VDI 6022.

Z11/21 - 17

Construction subject to change. No return possible!

12.11.2012Version:

Page 18: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

FilterTo prevent a pressure drop in the device, the filters must be re-placed at regular intervals. This is why you always should havereplacement filters ready, in order to avoid longer downtimes oroperation without filters.The service life of the filter depends on its efficiency and the dirtparticles deposited there. It is recommended replacing the filterwhen the maximum pressure drop is 150 Pa. (See descriptionin UNE EN 779).

Removal of the filters from the bottom side of the device: Firstturn the supporting elements (1) and then remove the filters us-ing the handles provided for this purpose in the filters.

Removal of the filters from the lateral or top side of the device:Remove the filters using the handles provided for this purposein the filters.

1 (x3)2

Model

Components filter sectionStandard filter Multi-part filter

St Dimensions (mm) St Dimensions

(mm)NBS 100-1 1 295x685x10 2 295x342.50x10NBS 100-2 2 295x577x10 3 295x384.60x10NBS 100-3 2 295x832x10 3 295x554.60x10NBS 150-1 1 797x395x10 2 398.5x395x10NBS 150-2 2 648x395x10 3 432x395x10NBS 150-3 2 873x395x10 3 582x395x10

This is why it is recommended to check the filtersonce every three months.

Z11/21 - 18

Construction subject to change. No return possible!

12.11.2012Version:

Page 19: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Spare parts list NBS 100

Z11/21 - 19

Construction subject to change. No return possible!

12.11.2012Version:

Page 20: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Spare parts list NBS 150

12

3

45

6

7

11 13

14

15

10

Z11/21 - 20

Construction subject to change. No return possible!

12.11.2012Version:

Page 21: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Nº Article Model Ref.

1

1.1

Motorised fan

100-1 104324100-2 104325100-3 104326150 104327

1.2Capacitor

100-1 104855100-2-3 104856

150 1048572 El. plenum box (all) 102714

3 Cooling register

100-1 104331100-2 104332100-3 104333150-1 104033150-2 104035150-3 104037

4 Heating register

100-1 104328100-2 104329100-3 104330150-1 104034150-2 104036150-3 104038

5 Filter

100-1 501813100-2 501640100-3 501641150-1 501814150-2 501642150-3 501643

6 Valve (all) (enquire)7 Drive (all) (enquire)

8 Flexible hose for supply air100-1 NBS_0033100-2 NBS_0034100-3 NBS_0035

9 Flexible hose for return air100-1 NBS_0033100-2 NBS_0034100-3 NBS_0035

10 Flange100-1 501621100-2 501622100-3 501623

11 Supply air box (all) (enquire)12 Return air box (all) (enquire)13 Silencer (all) (enquire)14 Mixing unit (all) (enquire)

15 Damper150-1 (enquire)150-2 (enquire)150-3 (enquire)

Z11/21 - 21

Construction subject to change. No return possible!

12.11.2012Version:

Page 22: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

Einbau, Montage und Wartung Klimakonvektor NBS 100/150

Troubleshooting

Problem Possible cause Solution

The unit is not working

Power supply missing Establish power supplyResidual current device switch was tripped Please inform the customer service

The unit does not cool or heat suf-ficiently

Air filter dirty or clogged Please clean the air filterAir or volumetric flow insufficient Select a higher speedMotorised fan is not working Please inform the installerAir inlet and outlet of the inner unit clogged Remove foreign material and clean the unit

Air in the interior of the register Ventilate the register Please inform the installer

Nominal value of the temperature control unit has not been set correctly

Change the nominal value

Unfavourable installation of the temperature controller Install the temperature controller in a different place

The unit is losing water

The unit has not been installed with the correct inclination Please inform the installerWater is draining from the condensate pan Please inform the installerCondensate pan flows over Check whether the drain is maybe cloggedThe water circuit of the register is leaking Please inform the installerRegister damaged Please inform the installer

Control unit ef-fects continuous starts and stops

Unfavourable installation of the temperature controller Install the temperature controller in a different place

Temperature deviations of the coolant or heating fluid Please inform the installer

There are different units with local control elements that use coolant or heating fluid of the same circuit

Please inform the installer

The control is connected incorrectlyInterrupt the power supply of the unit and inform the installer

The unitis working with too much noise

The air intake or air blow openings or the lines are clogged. Remove foreign material and clean the unit

Fan impeller imbalanced Please inform the installerFilter dirty or clogged Clean or replace the filter

Insufficient air throughput

Filter dirty or clogged Clean or replace the filter

Housing interior or air inlet cloggedRemove foreign material and clean theunit

Excessive air throughput

Filter badly installed Mount filter again (tighten fastening clamp)

Sheets poorly sealedSeal and insulate sheets Please informthe installer

Z11/21 - 22

Construction subject to change. No return possible!

12.11.2012Version:

Page 23: Installation, Mounting and Maintenance - schako.com connections ... Motorised fan ... device unit caused by components that are not part of the device itself.

FERDINAND SCHAD KG WITH THE COMPANY HEAD OFFICE INSteigstraße 25-27

D-78600 Kolbingen(GERMANY)

HEREBY DECLARES THAT THE DESIGN AND CONSTRUCTION OF THE AIR-CONDITIONING UNITS NBS:

Model: NBS 100 (modular) - NBS 150 (kompact)Type: 1, 2, 3Register type: 4, 4+2Position: HTModel: RR - LLYear of manufacture: 2012

COMPLY WITH THE FOLLOWING REGULATIONS:

- Machinery Directive 2006/42 EC- Low Voltage Directive: 2006/95/EC- Directive on Electromagnetic Compatibility: 2004/108/EC- Directive on General Product Safety: 2001/95/EC

APPLICABLE HARMONISED REGULATIONS

- DIN-EN-ISO 12100 SAFETY OF MACHINERY - Safety of Machinery - Basic terms, generalprinciples of design - Part 1: Basic terminology, methodology

- DIN-EN-ISO 12100 SAFETY OF MACHINERY - Safety of Machinery - Basic terms, generalprinciples of design - Part 2: Technical guiding principles

- EN-ISO 13857:2008 SAFETY OF MACHINERY - Safety distances to prevent hazard zones from being reached by upper and lower limbs

- EN 60204-1 SAFETY OF MACHINERY - Electrical Equipment of Machines - Part 1: Specifications for General Requirements- EN ISO 14121-1:2007 SAFETY OF MACHINERY - Risk assessment - Part 1: Guiding principles- DIN-EN 1886 VENTILATION FOR BUILDINGS - Ventilation for buildings - Air handling units - Mechanical performance, testing

Signed:

Dr. Marcus MüllerKolbingen, 2012