INSTALLATION INSTRUCTIONS - DECO › newlive › pdf › Vector-Installation...INSTALLATION...
Transcript of INSTALLATION INSTRUCTIONS - DECO › newlive › pdf › Vector-Installation...INSTALLATION...
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
INSTALLATION INSTRUCTIONS
This document explains mount ing for pendant, recessed, and wal l
™
VECTOR
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
PENDANT - STEP ONE INSTALL MOUNTING POINTS
• Recommended that mounting point be positioned within 12 inches of end cap for support
Non-power feed mounting points may be positioned 1” to 12” or 12” to 18” from the end of the luminaire.
• Reference Continuous Run Guide at www.getdeco.com for additional information.
= Power Feed Canopy
= Non-Power Feed Canopy
95.35” MAX71.35” MIN
71.68” MAX51.68” MIN
8ft
6ft
35.68” MAX25.675” MIN
23.35” MAX17.35” MIN
47.68” MAX33.68” MIN
3ft
2ft
4ft
1/9
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
Tapped 1/4 - 20
Threaded Stud
• All electrical circuits should be turned off before starting work.
• Please follow local and national electrical codes.
A - Install junction box (not included) at appropriate location.
B - Feed power wires into junction box and ground appropriately.
C - Install Bracket Bar to junction box using ground screws.
D - Install Threaded Stud into Bracket Bar.
E - Feed Aircraft Cable and through Terminals and Threaded Stud.
F - Thread Canopy on to aircraft cable.
Power Cable
JunctionBox
Bracket Bar
1/16” Aircraft Cable
Strain ReliefBushing2 piece
Terminals
Power FeedCanopy
PENDANT - STEP TWO INSTALL POWER FEED MOUNT
Gripper
2/9
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
PENDANT - STEP THREE INSTALL NON-POWER FEED MOUNT
A - Install threaded stud (not included) into ceiling.
B - Install non-power feed canopy onto threaded stud.
C - Install aircraft cable and terminal to hold canopy in place.
Terminal
1/16” Aircraft Cable
Tapped 1/4 - 20
Threaded Stud
Gripper
Non-Power Feed Canopy
3/9
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
PENDANT - STEP FOUR HANG LUMINAIRE
A - Lift luminaire into place, and insert aircraft cables into cable grippers
B - Adjust height of luminaire and level. Luminaire can be raised by pulling cable through the gripper and can be lowered by depressing the top cylinder on the gripper which pulls the luminaire down.
C - Make sure all parts are tightened and insert strain relief into canopy.
D - Snap cable clip on top of housing making sure it clicks completely.
Snap cable clip on rails of top of the housingmaking sure it clicks all the way at both sides
Adjust cables by gliding along the housing.
4/9
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
PENDANT CONTINUOUS RUNS
A - Perform Steps 1 through 4 installing as many mounting points as required.
B - Remove lens and light engines.
C - Hang 2nd luminaire by feeding aircraft cable into cable gripper on the end of the 2nd luminaire section.
D - Use provided Quick Connects to create electrical connections to 1st and 2nd sections.
E - Slide joiner/aligner from 2nd section into 1st section.
F - Use Connection Bracket to connect luminaire sections together. DO NOT TIGHTEN COMPLETELY.
G - Level 2nd section.
H - Insert lens and light engines.
I - Tighten Connection Bracket completely.
• Reference Continuous Run Guide at www.getdeco.com for additional information.
Cut 2.60 inches wide hole slot in the sheet rock ceiling with the matching length of the recessed fixture.
Remove lens by using a small flat head screw driver or a blade to prie open at the end of the fixture
Squeeze clips to release tray
Cut 2.60 inches wide hole slot in the sheet rock ceiling with the matching length of the recessed fixture.
Remove lens by using a small flat head screw driver or a blade to prie open at the end of the fixture
Pull out light engine tray
Squeeze clips to release tray
Cut 2.60 inches wide hole slot in the sheet rock ceiling with the matching length of the recessed fixture.
Remove lens by using a small flat head screw driver or a blade to prie open at the end of the fixture
1. Use small flat head screw driver or blade to pop lens out at ends of the fixture.
2. Squeeze clips to release tray. 3. Pull out light engine.
5/9
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
THREADED ROD
RECESSED BRACKETS
FASTENERS
2.44”
2.75”
Slot Width
Fixture Width
RECESSED FLANGED MOUNTING OPTIONS
• Reference Surface Installation Instructions for Recessed Flangeless mounting instructions
• Dimensions and illustrations shown on this page are for Vector 2 only.
6/9
© Copyright Deco Lighting, Inc. 2017f : 310.366.6855
www.getdeco.com800.613.DECO (3326)t : 310.366.6866
TM
Architectural LED Luminaire• Make sure path of bracket location is free of obstacles
A. Cut out slot for housing.B. Follow directions below:
RECESSED FLANGED RECESSED BRACKETS
1/211.02.2017
1. Take out knock out plate and install power whip.
4. Pull out light engine.
2. Use small flat head screw driver or blade to pop lens out at ends of the fixture.
5. Set brackets on back of housing and insert 10/24 screws from INSIDE the housing.
3. Squeeze clips to release tray.
6. Screw in knock out plate.
© Copyright Deco Lighting, Inc. 2017f : 310.366.6855
www.getdeco.com800.613.DECO (3326)t : 310.366.6866
TM
Architectural LED Luminaire• Make sure path of bracket location is free of obstaclesRECESSED FLANGED RECESSED BRACKETS
2/211.02.2017
C. Use provided Quick Connects to create electrical connections.D. Insert lens and light engines back into fixture.
7. Insert fixture into ceiling. 8. Tighten screws inside fixture to tighten brackets9. Recessed brackets will tighten automatically to
secure in place.
Insert recessed housings and slide aligner bracket into place between housings. This piece will float.
© Copyright Deco Enterprises, Inc. 2016f : 310 . 366 . 6855
www.getdeco.com
1 . 800 . 613 . DECO (3326)t : 310 . 366 . 6866
™
VECTOR
2017.07.21
WALL MOUNTING BRACKETS
A - Install Bracket #1 with screws provided.
B - Feed power wires and ground appropriately.
C - Hook in Bracket #2 which arrives pre-installed.
D - Screw in additional screws at bottom of bracket if desired.
• Make sure path of bracket locations are free of obstaclesVECTOR 1
VECTOR 2
VECTOR 3
A
B
C
A
B
D
A
B
C
2 x 4 Switch Box
2 x 4 Switch Box
4” Octagonal Junction Box
2 ft 4 ft 8 ft3 ft 6 ft
2.50” 2.50” 2.50”2.50” 2.50” 63.5mm 63.5mm 63.5mm63.5mm
16.00” 32.00”16.00” 32.00”406.4mm 812.8mm406.4mm 812.8mm
63.5mm
4.00”101.6mm
10.00”254.0mm
8.00”203.2mm
20.00”508.0mm
16.00”406.4mm
3.10”78.74mm
3.10”78.74mm
3.10”78.74mm
3.10”78.74mm
3.10”78.74mm
64.00”1625.6mmA
B
C
D
4.00” 4.00”
4.00”
A A
BB
4”
4”
1
2
4.00”4”
2.125”2
1
9/9