Installation Instructions - 4" Post To Beam (51775 56675)
-
Upload
ozco-building-products -
Category
Documents
-
view
214 -
download
0
description
Transcript of Installation Instructions - 4" Post To Beam (51775 56675)
Typical InstallationLaredo Sunset shown
double beam installation requires connectors on
both sides of post
Installation Instructions,56675 4” Post to Beam (P2B-LS-4)51775 4” Post to Beam (P2B-IW-4)
updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current informationInstallation Instructions, 56675 V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is 1
One Page Process #:
Printing Documents from ISSUU
Unfortunately, there is currently no way to print content directly through issuu. To print a publication, you will need to download it and print it from your computer.
4002
One of Two Access Points for ISSUU
You MUST create an account with Issuu or log in with Facebook or Google+
Select the “Download” Option & Save the File to an easily accessed location.
“Open” the downloaded file, View and/or Print as you want.
Below the publication is a word “Share” click it Below the publication is an icon click it
WEBSITE DIRECT
Laredo Sunsetvs.
Ironwood
Installation Instructions, 56675 2V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
Ironwood(517XX series)
choose your connection lifestyle
both styles available for most products
2 great stylessame functionality
Laredo Sunset(566XX series)
56675updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current informationInstallation Instructions, 56675 V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is 3
kit includes 2 assemblies
7.99
3.25 1.45 MIN2.00 MAX
1.45 MIN2.00 MAX
83
3.25
2037.99
51775Installation Instructions, 56675 updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is 4
kit includes 2 assemblies
Suggested Tools(others may be required)Installation Instructions, 56675 updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is 5
step 1updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current informationInstallation Instructions, 56675 V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is 6
beam width
mark location to mount ledge
step 2updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information 7V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is Installation Instructions, 56675
(Hex Cap Nut) provided
3/8" DriverTool Required
(OWT Screw) provided
step 3updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information 8V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is Installation Instructions, 56675
beam rests on ledge
(Hex Cap Nut) provided
3/8" DriverTool Required
(OWT Screw) provided