  • INSPIRING VALUE CHAIN ADVANTAGE

    2013 OTM SIG CONFERENCE Performance Tuning/Monitoring

    Alex Chang

    alex.chang@inspirage.com

    July 30, 2013

  • Agenda

    Page 2 INSPIRING VALUE CHAIN ADVANTAGE

    General guidelines Effective tuning goal Tuning session Tuning life cycle

    Common tools Case studies & Common tuning problems Q&A

  • Effective Tuning Goal Specific Measurable Achievable Cost effective

    3 INSPIRING VALUE CHAIN ADVANTAGE

  • Tuning Session Define the problem and state the goal Collect current performance statistics Consider common performance errors Build a trial solution Implement and measure the change Decide: Did the solution meet the goal?

    No. Then go back to step 3 and repeat Yes. Then create a new baseline

    4 INSPIRING VALUE CHAIN ADVANTAGE

  • Tuning Life Cycle An OTM life cycle can be divided into different phases:

    Functional and technical design and implementation Testing Deployment Production: Troubleshooting and tuning

    Use a test instance to determine whether the solution eliminated the bottleneck Migration, upgrade, and environment changes

    Any change of OS, database and OTM requires thorough testing to avoid performance issues.

    5 INSPIRING VALUE CHAIN ADVANTAGE

  • Tuning Life Cycle Functional and technical design and implementation

    Proactive (make it better, so it will not break) Test scenarios Measure results Find the problem areas Resolve the problem

    Whenever possible, you should start tuning at this level. With a good design, many tuning problems do not occur

    It is less expensive to correct bugs and performance problems early in the life cycle than later

    6 INSPIRING VALUE CHAIN ADVANTAGE

  • Tuning Life Cycle Testing:

    More realistic test data The test case should exercise the application functions, expected loads,

    and stress tests of improbable loads Check physical layout Monitor for resource contention Test for resource exhaustion Incorporate the business requirements for recovery time and availability as

    much as possible

    7 INSPIRING VALUE CHAIN ADVANTAGE

  • Tuning During the Life Cycle Deployment:

    When OTM is initially deployed, the performance expectations are often different than reality

    Generate regular performance reports and save them as baselines Monitor growth and performance

    Compare new performance reports to the previous reports Tune before the performance degrades to an unacceptable level

    8 INSPIRING VALUE CHAIN ADVANTAGE

  • Design and Implementation Production

    You need to know: What has changed? Were is the baseline?

    9 INSPIRING VALUE CHAIN ADVANTAGE

  • Design and Implementation Migration, Upgrade, and Environment Changes

    Create a test system. Capture a representative workload Execute the workload against the test system. Collect statistics. Reset the test system, make a change. Execute the workload. Capture statistics and compare.

    10 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tools OTM diagnostics servlets Database monitoring tools

    AWR ADDM

    OS monitoring tools SAR/TOP

    JVM tools Console logs Thread dumps Heap dumps

    Network monitoring

    11 INSPIRING VALUE CHAIN ADVANTAGE

  • OTM Diagnostic Servlets Event diagnostics

    http://localhost/GC3/glog.webserver.event.EventDiagServlet

    Cache diagnostics http://localhost/GC3/glog.webserver.cache.CacheDiagServlet

    Object lock diagnostics http://localhost/GC3/glog.webserver.synch.object.ObjectLockDiagServlet

    Mediator diagnostics http://localhost/GC3/glog.webserver.mediator.MediatorDiagServlet

    Threads http://localhost/GC3/glog.webserver.thread.ThreadDiagServlet

    12 INSPIRING VALUE CHAIN ADVANTAGE

    http://localhost/GC3/glog.webserver.event.EventDiagServlethttp://localhost/GC3/glog.webserver.cache.CacheDiagServlethttp://localhost/GC3/glog.webserver.synch.object.ObjectLockDiagServlet

  • Event Diagnostics

    13 INSPIRING VALUE CHAIN ADVANTAGE

  • Event Diagnostics

    14 INSPIRING VALUE CHAIN ADVANTAGE

  • Cache Diagnostics

    15 INSPIRING VALUE CHAIN ADVANTAGE

  • Object Lock Diagnostics

    16 INSPIRING VALUE CHAIN ADVANTAGE

  • Oracle Enterprise Manager

    17 INSPIRING VALUE CHAIN ADVANTAGE

  • Oracle Enterprise Manager

    18 INSPIRING VALUE CHAIN ADVANTAGE

  • Oracle Enterprise Manager

    19 INSPIRING VALUE CHAIN ADVANTAGE

  • Case Study 1: Design Phase Business requirement: The client wants to manage its fleet resources

    for its operational units in OTM as follows. Driver: Available, Intransit, Unavailable Power unit: Available, Intransit, Unavailable Equipment: Intransit Empty, Intransit Loaded, Total intransit, Assigned, Out

    of Service, Loaded Available, Empty Availableetc.

    20 INSPIRING VALUE CHAIN ADVANTAGE

  • Case Study 1 : Design Phase Potential approach Location Asset Bucket Inventory

    Standard built-in inventory control and use SKU tables Buckets are setup by resource type (i.e. 48 Trailer,48 Flatbedetc.) 41 buckets proposed

    21 INSPIRING VALUE CHAIN ADVANTAGE

  • Case Study 1: Design Phase

    22 INSPIRING VALUE CHAIN ADVANTAGE

  • Case Study 1: Design Phase Location asset bucket inventory

    Pre-setup buckets for all operational units would result in the number of bucket records equal to # locations x bucket counts ( i.e. 100,000 locations x 41 buckets = 4.1 Million records)

    Daily shipments : 500,000 shipments 1,500,000 insert and update per day Serious performance bottleneck

    23 INSPIRING VALUE CHAIN ADVANTAGE

  • Case Study 1 : Design Phase Pros, Cons and Data Use Analysis

    24 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Logging

    The most frequent cause of performance problems Single thread on the log file each thread must wait its turn to write to the

    log file Create user logs for debugging and disable these when not in use

    25 INSPIRING VALUE CHAIN ADVANTAGE

  • Bulk Plan No Logging Bulk plan 500 orders without logging

    Start time : 23:38:58 End time: 23:39:45 Duration: 47 seconds

    26 INSPIRING VALUE CHAIN ADVANTAGE

  • Bulk Plan Logging Bulk plan 500 orders with logging

    Start time : 00:11:04 End time: 00:12:22 Duration: 78 seconds

    27 INSPIRING VALUE CHAIN ADVANTAGE

  • Bulk Plan No Logging Performance improved by 65%!!! These are simple test scenarios with very small data volume in my

    database. In reality, performance improve much more. Minimize logging!! NO Detail logs!! Disable logs for all domains!!

    28 INSPIRING VALUE CHAIN ADVANTAGE

  • Bulk Plan No Logging Use Logging Overview to check

    29 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Business Number Generator (BNG) contention

    Business number generator assigns serialized business numbers to relevant business objects.

    Single thread Eliminate unnecessary use of BNG

    30 INSPIRING VALUE CHAIN ADVANTAGE

  • BNG Impact Created 500 order releases without BNG

    Used Integration layer to control order release keys

    31 INSPIRING VALUE CHAIN ADVANTAGE

  • BNG Impact Created 500 order releases without BNG

    Start time: 01:17:40 End time: 01:18:19 Duration: 29 seconds

    32 INSPIRING VALUE CHAIN ADVANTAGE

  • BNG Impact Created 500 order releases with BNG

    BNG assigned unique keys to each order

    33 INSPIRING VALUE CHAIN ADVANTAGE

  • BNG Impact Created 500 order releases with BNG

    Start time: 01:15:44 End time: 01:16:27 Duration: 43 seconds Spent 48% more time!!

    34 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Inefficient or high-load SQL statements

    Long parse time Excessive I/O (physical reads and writes) Excessive buffer gets Excessive CPU time Excessive waits

    35 INSPIRING VALUE CHAIN ADVANTAGE

  • Top SQL Reports

    36 INSPIRING VALUE CHAIN ADVANTAGE

  • Explain Plan

    37 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Scalability

    Minimize the size of the object_lock table Clear as frequently as possible No need to keep data for more than one day even shorter

    38 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Scalability Object Lock Cleanup

    39 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Bulk Plan

    Query phase Spend extra time to fine tune SQL queries Keep data volume in mind

    Planning phase Itinerary, rate offering and rate record need to be as specific as possible Design them with zero or minimal overlap with each other Try not use global accessorial codes

    40 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Shipment Created Phase

    Bulk Plan 500 orders/2 shipment built No agent listens to shipment created event Duration: 58 seconds

    41 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Bulk Plan 500 orders/2 shipment built

    An agent listens to shipment created event Duration: 74 seconds 27% more time

    42 INSPIRING VALUE CHAIN ADVANTAGE

  • Common Tuning Problems Bulk Plan 500 orders/2 shipment built