PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL MV SWITCH GEAR 6,6KV 042-SB031-D1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 042-SB031-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 043-SB031-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring LopACB TEST
V DRY TRANSFORMER N02 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N03 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VII DRY TRANSFORMER N07 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIII DRY TRANSFORMER N08 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER N12 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
X DRY TRANSFORMER N13 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
XI DRY TRANSFORMER E03 ESSENTIALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring LopInsulation / Megger Test
XII DRY TRANSFORMER E04 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB030-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL MV SWITCH GEAR 6,6KV 042-SB030-D1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL MV SWITCH GEAR 6,6KV 043-SB030-C1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 042-SB030-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB030-C1
1Visual Check2Ring LopACB TEST
V PANEL LV SWITCH BOARD 043-SB030-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
VI DRY TRANSFORMER N04 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIII DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER N12 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
X DRY TRANSFORMER N13 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XI DRY TRANSFORMER E10 ESSENTIALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB030-C1
1Visual Check2Ring LopInsulation / Megger Test
XII DRY TRANSFORMER E11 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XIII DRY TRANSFORMER E12 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XIV DRY TRANSFORMER E13 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XV DRY TRANSFORMER E14 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XVI DRY TRANSFORMER E15 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB103-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL LV SWITCH BOARD 142-SB103-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 142-SB103-N2Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 043-SB031-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB103-C1
1Visual Check2Ring LopACB TEST
V DRY TRANSFORMER N04 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VII DRY TRANSFORMER N06 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIII DRY TRANSFORMER N07 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER E04 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
X DRY TRANSFORMER E05 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XI DRY TRANSFORMER E06 ESSENTIALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB103-C1
1Visual Check2Ring LopInsulation / Megger Test
XII DRY TRANSFORMER E07 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XIII DRY TRANSFORMER E08 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB101-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL LV SWITCH BOARD 142-SB101-N2Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 142-SB101-N3Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 143-SB101-N3Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB101-C1
1Visual Check2Ring LopACB TEST
V DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N06 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VII DRY TRANSFORMER N07 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIII DRY TRANSFORMER N08 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER E02 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
X DRY TRANSFORMER E06 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XI DRY TRANSFORMER E07 ESSENTIALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 142-SB101-C1
1Visual Check2Ring LopInsulation / Megger Test
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL LV SWITCH BOARD 142-SB104-N2Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 143-SB104-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
V DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N06 NORMALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring LopInsulation / Megger Test
VII DRY TRANSFORMER E05 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
VIIIDRY TRANSFORMER E06 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER E07 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB031-C1
1Visual Check2Ring Lop
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB032-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL LV SWITCH BOARD 042-SB030-N2Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 042-SB032-N3Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 043-SB032-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB032-C1
1Visual Check2Ring LopACB TEST
V DRY TRANSFORMER N04 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VII DRY TRANSFORMER N06 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIIIDRY TRANSFORMER N07 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER E02 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 042-SB032-C1
1Visual Check2Ring Lop
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 642-SB600-C1
1Visual Check2Ring Lop3Continuity4 Insulation / Megger Test5Contact Resistance / Ducetrs Test6ZCT/VT/CT7ACB TEST
II PANEL LV SWITCH BOARD 642-SB600-N2Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
III PANEL LV SWITCH BOARD 642-SB600-N3Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
IV PANEL LV SWITCH BOARD 643-SB600-N1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CT
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 642-SB600-C1
1Visual Check2Ring LopACB TEST
V DRY TRANSFORMER N04 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VI DRY TRANSFORMER N05 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VII DRY TRANSFORMER N08 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
VIII DRY TRANSFORMER N09 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
IX DRY TRANSFORMER N10NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
X DRY TRANSFORMER N11 NORMALY ROOMVisual CheckContinuityInsulation / Megger Test
XI DRY TRANSFORMER E04 ESSENTIALY ROOMVisual CheckContinuity
PROJECT : YAMAL LNG BATCH#3LOCATION : BATAMLOCATION SITE : YAMAL LNG
ITEM DESCRIPTION
QUANTITY
UNIT
APRIL 2016
1 2 3 4 5
Fri Sat Sun Mon Tue
I PANEL MV SWITCH GEAR 10KV 642-SB600-C1
1Visual Check2Ring LopInsulation / Megger Test
XII DRY TRANSFORMER E05 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
XII DRY TRANSFORMER E06 ESSENTIALY ROOMVisual CheckContinuityInsulation / Megger Test
0.00%
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
APRIL 2016
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
0.00% 0.00% 0.00% 0.00%
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
APRIL 2016 MEI 2016
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
0.00% 0.00% 0.00% 0.00%
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
MEI 2016 JUNI 2016
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.0%
0.00% 0.00% 0.00% 0.00%
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
JUNI 2016 JULI 2016
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
0.00% 0.00% 0.00% #REF!
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
JULI 2016
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! 0.00% 0.00% 0.00%
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
JULI 2016
25 26 27 28 29 30 31Testing & SAT Testing & FAT Testing & FAT Testing & FAT
Mon Tue Wed Thu Fri Sat Sun
THIRD MONTH ACTUAL PROGRESS APRIL (in %)
THIRD MONTH ACTUAL PROGRESS MEI (in %)
THIRD MONTH ACTUAL PROGRESS JUNI (in %)
THIRD MONTH ACTUAL PROGRESS
JULI (in %)
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%0.00% #REF!
0.00% #REF! #REF!
REMARK
Testing & FAT
REMARK
Testing & FAT
REMARK
Testing & FAT
0.00%
#REF!
TESTING INSPECTION REPORTLocation : YAMAL LNG PAB031Equipment Tag Nr :Equipment Service :
No Description Drawing Number Quantity
K i n d o f W o r k
Ring Lop Installation Interconnection
L1 L2 L3 Grdg
1 2 3 4 13 15 16 17 19
I PANEL MV SWITCH GEAR 10KV 3300-165202001-C01-00329-01-D
1 042-SB031-C1-A01 - 1 OK DonePL PL PL PL
2 042-SB031-C1-A02 - 1 OK DonePL PL PL PL
3 042-SB031-C1-A03 - 1 OK Done PL PL PL PL
4 042-SB031-C1-A04 - 1 OK Done PL PL PL PL
5 042-SB031-C1-A05 - 1 OK Done PL PL PL PL
6 042-SB031-C1-A06 - 1 OK Done PL PL PL PL
7 042-SB031-C1-A07 - 1 OK Done PL PL PL PL
8 042-SB031-C1-AB/01 - 1 OK Done PL PL PL PL
9 042-SB031-C1-AB/02 - 1 OK Done PL PL PL PL
10 042-SB031-C1-B01 - 1 OK Done PL PL PL PL
11 042-SB031-C1-B02 - 1 OK Done PL PL PL PL
12 042-SB031-C1-B03 - 1 OK Done PL PL PL PL
13 042-SB031-C1-B04 - 1 OK Done PL PL PL PL
14 042-SB031-C1-B05 - 1 OK Done PL PL PL PL
15 042-SB031-C1-B06 - 1 OK Done PL PL PL PL
16 042-SB031-C1-B07 - 1 OK Done PL PL PL PL
17
20PANEL MV SWITCH GEAR 6,6KV 1 042-SB031-C1-A01 - 1 OK Done PL PL PL PL
2 042-SB031-C1-A02 - 1 OK Done PL PL PL PL
3 042-SB031-C1-A03 - 1 OK Done PL PL PL PL
4 042-SB031-C1-A04 - 1 OK Done PL PL PL PL
5 042-SB031-C1-A05 - 1 OK Done PL PL PL PL
6 042-SB031-C1-A06 - 1 OK Done PL PL PL PL
7 042-SB031-C1-A07 - 1 OK Done PL PL PL PL
8 042-SB031-C1-A08 - 1 OK Done PL PL PL PL
9 042-SB031-C1-AB/01 - 1 OK Done PL PL PL PL
10 042-SB031-C1-AB/02 - 1 OK Done PL PL PL PL
11 042-SB031-C1-B01 - 1 OK Done PL PL PL PL
12 042-SB031-C1-B02 - 1 OK Done PL PL PL PL
13 042-SB031-C1-B03 - 1 OK Done PL PL PL PL14 042-SB031-C1-B04 - 1 OK Done PL PL PL PL
Visual Check Before
Tightening Jointing Busbar to Busbar
15 042-SB031-C1-B05 - 1 OK Done PL PL PL PL16 042-SB031-C1-B06 - 1 OK Done PL PL PL PL
17 042-SB031-C1-B07 - 1 OK Done PL PL PL PL
18 042-SB031-C1-B07 - 1 OK Done PL PL PL PL
TESTING INSPECTION REPORT
Electrical Testing By Instrument Tools
1*
Sh
ort
ag
e
2*
Dam
ag
e
3*
Mis
sin
g
4*
Oth
ers
,Revis
ion
RemarksContinuity Hipot
Test
Rep
ort
Test Test
20 21 22 23 24 25 27 28 29 30 31 32
√ Done DoneNA NA
√ √ OK √ Test CT/VT, megger cable control, already done, but for tightening have problems with bolt & nut.
√ Done DoneNA NA NA
√ OK √ Before Jointing busbar to busbar must be cleaning with alcohol and give vaselline (greece contac)
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA NA √ NA OK √
√ Done Done NA NA NA NA OK √
√ Done Done NA NA √ √ OK √
√ Done Done NA NA NA √ OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done Done NA √ √ NA OK √
√ Done NA
√ Done NA
√ Done NA
√ Done NA
√ Done NA
√ Done NA
√ Done NA
√ Done NA√ Done NA√ Done NA√ Done NA√ Done NA√ Done NA√ Done NA
5*
Clo
se B
y V
en
dor
Insulation / Megger Test
Contact Resistance / Ducetrs Test
ZCT Test
CT Test
VT Test
ACB* - VCB**
Breaker
Relay Test
√ Done NA√ Done NA√ Done NA√ Done NA
TESTING INSPECTION REPORT
Remarks
Test CT/VT, megger cable control, already done, but for tightening have problems with bolt & nut.
Before Jointing busbar to busbar must be cleaning with alcohol and give vaselline (greece contac)
LocationEquipment Tag NrEquipment Service
No Description
PANEL MV SWITCH GEAR 10KV 042-SB031-C1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
PANEL MV SWITCH GEAR 6,6KV 042-SB031-D1Visual CheckRing LopContinuityInsulation / Megger TestContact Resistance / Ducetrs TestZCT/VT/CTACB TEST
: YAMAL LNG PAB031::
DescriptionAPRIL ( WEEK1 ) APRIL ( WEEK2 )
7 8 9 10 11
PANEL MV SWITCH GEAR 10KV 042-SB031-C1
Insulation / Megger TestContact Resistance / Ducetrs Test
PANEL MV SWITCH GEAR 6,6KV 042-SB031-D1
Insulation / Megger TestContact Resistance / Ducetrs Test
APRIL ( WEEK2 ) APRIL ( WEEK3 ) APRIL ( WEEK4 )
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
APRIL ( WEEK4 ) MEI ( WEEK1 ) MEI ( WEEK2 ) MEI ( WEEK3 )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MEI ( WEEK3 ) MEI ( WEEK3 ) REMARK
20 21 22 23 24 25 26 27 28 29