Inside Passage Electric Cooperative, Inc
February 20, 2014
FERC P-14066Hoonah, Alaska
GARTINA FALLS HYDRO PROJECT
![Page 2: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/2.jpg)
Hoonah, Alaska
Hydro Project
Gartina Falls Hydro Project: 4.5 Miles Outside of Hoonah
Hoonah: 20 min Flight Time from Juneau
Juneau, AK
Hoonah, AK
![Page 3: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/3.jpg)
Project Success
2010 thru 2011—Collected Information
Official Project Start—October, 2011
FERC License January, 2013
Road Construction in 2013
Project Construction in 2014
$1.3 Million to License
$6.9 Million to Build
FERC License in
1-yr-3 mo
![Page 4: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/4.jpg)
Why Gartina Falls is GOOD! Reasonable Expectations
100% Grant Funded Elevation Change over
Short Distance Close to Existing Road
System/Grid Local Construction Year-Round Flow Community/Agency Support
![Page 5: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/5.jpg)
Project Performance
Run-of-River
450KW Peak Output
Diesel Cost = 31¢ a Kwh
Annual Diesel Fuel Use= 331,000 gal.
Hydro reduces Fuel Use ~100,000 gal.
Annual Fuel Savings of $400,000
![Page 6: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/6.jpg)
2013 Construction
New ½ Mile Access Road to Intake Area
![Page 7: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/7.jpg)
2013 Construction
![Page 8: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/8.jpg)
2014 Construction
•Construct Intake •Construct Powerhouse•Install Penstock•Install Electric Controls•Build 4.5 Mi. Powerline.
May-Nov.
• Complete Road to Powerhouse
Feb.-
May
![Page 9: Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska.](https://reader030.fdocuments.net/reader030/viewer/2022032803/56649e225503460f94b0f962/html5/thumbnails/9.jpg)
9
Project plan
Intake Diversion
Powerhouse
Gartina Falls Hydroelectric Project, Hoonah, FERC P-14066