Innovative liquid vaporizing and gas mixing solutions ZIMMER

48
1 ZIMMER Dry Electric Vaporizer Operations & Maintenance Manual 151 S. Michigan Street, Seattle, Washington, USA 98108 Tel: +1 206-789-5410 Fax: 206-789-5414 Web: www.algas-sdi.com FILE: MANUAL PN 54399 REV 3-10-2021 ZIMMER ELECTRIC VAPORIZER.doc ...Innovative liquid vaporizing and gas mixing solutions

Transcript of Innovative liquid vaporizing and gas mixing solutions ZIMMER

Page 1: Innovative liquid vaporizing and gas mixing solutions ZIMMER

1

ZIMMER Dry Electric Vaporizer

Operations & Maintenance Manual

151 S. Michigan Street, Seattle, Washington, USA 98108 Tel: +1 206-789-5410 Fax: 206-789-5414 Web: www.algas-sdi.com

FILE: MANUAL PN 54399 REV 3-10-2021 ZIMMER ELECTRIC VAPORIZER.doc

...Innovative liquid vaporizing and gas mixing solutions

Page 2: Innovative liquid vaporizing and gas mixing solutions ZIMMER
Page 3: Innovative liquid vaporizing and gas mixing solutions ZIMMER

2

DISCLAIMER and COPYRIGHT

DISCLAIMER

Read this Operations and Maintenance Manual before operating the ZIMMER!

Algas-SDI International, LLC shall not be liable for technical and/or editorial errors or omissions in this manual. Algas-SDI makes no warranties, express or implied, including the implied warranties of merchantability and fitness for a particular purpose with respect to this manual. In no event shall Algas-SDI be liable for any special or consequential damages including, but not limited to, loss of production time or loss of profits.

Product names used in this manual are for the manufacturer or supplier identification only and may be trademarks, or registered trademarks, of these companies.

In accordance with the manufacturer’s policy of continual product improvement, Algas-SDI reserves the right to use alternate manufacturer’s components as vendor availability dictates. For further information please contact Algas-SDI.

COPYRIGHT

Copyright 2021 by Algas-SDI International, LLC

Seattle, Washington, USA 98108

All rights reserved. No part of this manual may be reproduced or copied in any form or by any means, photographic, electronic, or mechanical without the prior express written consent from Algas-SDI International, LLC.

PATENTS

For patent information go to: www.algas-sdi.com/patents

Page 4: Innovative liquid vaporizing and gas mixing solutions ZIMMER

3

WARRANTY and CONTACT INFORMATION

WARRANTY REGISTRATION

Fill out the Warranty Registration information on the last page of this manual. Refer to the nameplate on the vaporizer to fill out the product registration. Then make a photocopy and mail to the address shown at the bottom, or scan and email alternatively.

WARRANTY

Algas-SDI International, LLC (ASDI) warrants that the equipment is free from defects in materials and workmanship under normal use and service. ASDI agrees to repair or replace, at its option, without charge F.O.B. factory, any part which has proven defective to the satisfaction of ASDI within one (1) year from the date of the original installation or with 18 months from the date of shipment, whichever is earlier. Equipment, which in the opinion of ASDI, has been damaged in shipment or by improper installation or operation, or has been abused or tampered with in any way, will not be accepted for return under warranty.

ASDI will not accept back charges for work performed by others upon or in conjunction with ASDI equipment unless prior authorization is given by means of an ASDI purchase order. ASDI will not be liable by reason of shutdown, non-operation or increased expense of operation of other equipment, or any other loss or damage of any nature, whether direct or consequential, arising from any cause whatsoever.

ASDI makes NO other warranty of any kind, whatsoever expressed or implied; and all warranties of merchantability and fitness for a particular purpose are hereby disclaimed by ASDI and excluded from these terms of sale. No person has any authority to bind ASDI to any representation or warranty other than this warranty.

ASDI CONTACT INFORMATION

If you have questions or need help with your equipment, or want information on other products, contact your distributor or Algas-SDI at:

Telephone: +1.206.789.5410 Facsimile: +1.206.789.5414 E-mail: [email protected] Internet: www.algas-sdi.com

Page 5: Innovative liquid vaporizing and gas mixing solutions ZIMMER

4

TECHNICAL SPECIFICATIONS Pressure Relief Valve Set point: 17.24 barg (250 psig) Heat Exchanger: MAWP: 17.24 barg @ 149 ºC (250 psig @ 300 ºF) MDMT: -29 ºC @ 17.24 barg (-20 ºF @ 250 psig) Hydrostatic Test Pressure: 25.86 barg (375 psig) PED: SEP (Sound Engineering Practice) for models Z25 - Z50 Category I for models Z100 - Z150 Electrical: Voltage: 100 – 277 VAC 1PH (All models) Voltage: 240 – 480 VAC 3PH Wye (Z100 and Z150 only) Frequency: 50/60Hz Circuit breaker: See Electrical Specifications in the Appendix Ambient temperature -4 ºF to +122 ºF (-20 ºC to +50 ºC) rating: Hazardous Area Rating:

2460 II 2 G DEMKO 19 ATEX 2083X II 2 G Ex db IIA T3 Gb IECEx UL 19.0034X Ex db IIA T3 Gb Class I, Division 1, Group D, T3 Enclosure Rating: Type 4 (shell not required) Fasteners: M10 x 50 mm CLASS 8.8, Min. Yield strength 640 MPa Seal-off: ¾” Male NPT Thread

LPG VAPORIZER FOR HAZARDOUS LOCATIONS 2PA5

Page 6: Innovative liquid vaporizing and gas mixing solutions ZIMMER

5

TABLE of CONTENTS

1. INTRODUCTION 7

Description/Overview 7 How the Vaporizer Works 7 Basic Features 8 Model Selection 9 Propane version (P valve) 9 Propane version (P valve) – Table 1 9 LPG version (L valve) 9 LPG version (L valve) – Table 2 9 50/50 version (S valve) 10 50/50 version (S valve) – Table 3 10 Available Options 10

2. INSTALLATION 12

Preparing the Site 13 Materials you may need for Installation 13 Mounting the ZIMMER 14 Piping 15 Relief valve 16 Filtaire 17 Installing Multiple Vaporizers 17 Common Piping Problems 17 Electrical Service 18 Wire length chart (#4 AWG – 21.1 mm2) 19 Wire length chart (#6 AWG – 13.3 mm2) 19 Wire length chart (#8 AWG – 8.36 mm2) 20 Wire length chart (#10 AWG – 5.26 mm2) 20

3. OPERATION 21

Putting Your Vaporizer into Service 21 Shutting Down the System 22

4. MAINTENANCE 23

General 23

Page 7: Innovative liquid vaporizing and gas mixing solutions ZIMMER

6

Servicing your ZIMMER 24

5. TROUBLESHOOTING 25

Possible problems 25 Inlet valve does not open – Tree #1 25 Inlet valve closes during operation – Tree #2 26

6. REPLACEMENT PARTS 27

7. FREQUENTLY ASKED QUESTIONS 28

8. APPENDIX 32

ELECTRICAL SPECIFICATIONS TABLE

ZIMMER 25/40/50 1PH EQUIPMENT DRAWING

ZIMMER 100/150 3PH EQUIPMENT DRAWING

ZIMMER 25/40/50 WIRING SCHEMATIC

ZIMMER 100/150 WIRING SCHEMATIC

ZIMMER SINGLE UNIT HORIZONTAL INSTALLATION DRAWING

ZIMMER MULTI UNIT HORIZONTAL INSTALLATION DRAWING

ZIMMER SINGLE UNIT VERTICAL INSTALLATION DRAWING

ZIMMER WALL MOUNTING DETAIL DRAWING

ZIMMER DRAIN KIT INSTALLATION DRAWING

Warranty Registration - Refer to the nameplate on the vaporizer to fill out the product registration. Then photocopy and mail to address shown.

Page 8: Innovative liquid vaporizing and gas mixing solutions ZIMMER

7

INTRODUCTION 1 Description / Overview

Your new ZIMMER is a dry-electric LPG or Propane vaporizer that adds energy to vaporize liquid fuel when the amount of energy available from the natural environment is insufficient for vaporization. A primary benefit of this device is that it allows greater capacities from smaller amounts of stored LPG. Often code restrictions limit the number and size of cylinders which can be stored next to a building or in a small space. The ZIMMER overcomes this problem and can be supplied by as few as one cylinder or tank of any size, or as many as can be manifolded together according to local codes.

All ZIMMER vaporizers are manufactured under a certified ISO 9001 quality system. The inlet control valve and heat exchanger have been proof tested to 1600 psig (110 bar).

How the Vaporizer Works

ELECTRICAL CONDUIT

1 2 3

4 5 6

7

CROSS OVER

CROSS OVER

Page 9: Innovative liquid vaporizing and gas mixing solutions ZIMMER

8

Ref. 1 – Liquid LPG enters the inlet valve where the inlet valve screen prevents debris from entering.

Ref. 2 – Liquid flows through the inlet valve where it is controlled by a metal-to-metal seat and ball. The infinite seating positions of the ball provide long life.

Ref. 3 – As liquid passes through the tubes, the energy is transferred, causing the liquid to boil. Tubes provide a secure pressure boundary and exceptional heat transfer.

Ref. 4 – Energy drawn from the heat sink is replenished by self-regulating heaters without the need for switches, temperature sensors, relays, or other controls. The heaters cannot overheat by nature of their design and they consume only as much energy as is needed for vaporization.

Ref. 5 – Power is supplied to the heaters by a wide range of voltages through a factory-mounted explosion-proof seal.

Ref. 6 – As LPG vapor exits the vaporizer, it heats or cools the temperature-sensitive bulb, providing feedback to the inlet valve.

Ref. 7 – The inlet valve receives feedback from the temperature-sensitive bulb and combines it with pressure feedback to ensure only superheated LPG vapor (superheat is the amount of temperature above the dew point) leaves the vaporizer. The valve modulates the inlet flow to control the process.

In the event of a power failure, the vaporizer will continue to operate until all available energy has been used. If the power comes back on before all the energy has been used, the heat process served by the LPG should remain engaged. Otherwise, the inlet valve will close as the heat stored in the heat exchanger is transferred to the passing fluid. When the power comes back on, the vaporizer will automatically re-energize and begin operation.

Basic Features

The heaters are self-temperature-regulating and therefore do not have (or need) an external temperature sensor. The heat generating material in the heaters also acts as a high-temperature limit by breaking down if it reaches its critical point.

Because of its unique design features, the ZIMMER can be operated on power supplies ranging from 100 - 480 volts (480 VAC Wye connection or 277VAC per phase to neutral) depending on the model. When operated at 110V, the maximum continuous capacity rating is reduced by 25%.

Page 10: Innovative liquid vaporizing and gas mixing solutions ZIMMER

9

Model Selection

The ZIMMER is available in three versions – One propane Model (e.g. Z40P) and two LPG models (e.g. Z40L and Z40S).

The difference between the L, P and the S models are the

inlet valves. The inlet valve operates on the thermodynamic properties of the specific gas (either LPG or commercial propane). The valve expects to see the vapor exit the vaporizer at 8 °C (15 °F) warmer than the boiling point of the respective gas. The unique function of the valve is that it senses both pressure and temperature to truly predict the boiling point.

The valve is clearly marked with a sticker indicating whether it is to be used with LPG (70/30), Propane or 50/50 (LPG).

Propane version (e.g. Z40P) – See Table 1 • Use with 85% or greater commercial Propane. • Never use propane which exceeds 15% Butane.

Table 1 - Propane version 100% Butane

Never use in this range 0% Propane

15% Butane Full capacity

85% Propane

0% Butane 100% Propane LPG version (e.g. Z40L) – See Table 2

• Full capacity is based on LPG containing 60-80% Butane. • Never use LPG which contains more than 80% Butane. • Using the LPG version with LPG containing more than 40-

60% Propane will decrease the capacity of the vaporizer. *Especially in warmer environments.

Table 2 - LPG version 100% Butane

Never use in this range 0% Propane

80% Butane Full capacity

20% Propane

60% Butane *Reduced capacity

40% Propane

40% Butane 60% Propane

0% Butane Never use in this range

100% Propane

Page 11: Innovative liquid vaporizing and gas mixing solutions ZIMMER

10

50/50 version (e.g. Z40S) – See Table 3 • Full capacity is based on LPG containing 40-60% Butane. • Never use LPG which contains more than 60% Butane. • Using the 50/50 version with LPG containing more than 60%

Propane will decrease the capacity of the vaporizer. *Especially in warmer environments.

Table 3 - 50/50 version

100% Butane Never use in this range

0% Propane

60% Butane Full capacity

40% Propane

40% Butane 60% Propane

0% Butane *Reduced capacity

100% Propane

Available Options

Your ZIMMER vaporizer may be equipped with one or several factory options. All options can be integrated into the ZIMMER vaporizer and are designed to enhance convenience to the end user.

Ask for the following items from your local Algas-SDI dealer:

Models Z25, Z40 and Z50

Algas-SDI P/N: 80887 Tank Mount Kit for mounting ZIMMER to any horizontal tank up to 48” (1,250 mm) diameter.

Algas-SDI P/N: 80888 (includes Kit P/N: 80890) Piping Kit for use with Tank Mount Kit

Algas-SDI P/N: 80885 Wall Mount kit Algas-SDI P/N: 80892 Strainer with 40 mesh and piping kit Algas-SDI P/N: 80890 Outlet regulator/gauge kit with

Fluorocarbon elastomer for high temperature gas Algas-SDI P/N: 82288 FILT-EZE - Vapor filter for filtering out

heavier hydrocarbons Algas-SDI P/N: 80895 Seal off and terminal box kit Div 1 or

80896 Seal off and terminal box kit Ex. Algas-SDI P/N: 40835 Mobile application end cap latch kit Algas-SDI P/N: 80770 Drain kit for easy removal of heavy ends Algas-SDI P/N: 82288 FILT-EZE - Vapor filter for filtering out

heavier hydrocarbons or P/N 20536-ASME Filtaire F4

Page 12: Innovative liquid vaporizing and gas mixing solutions ZIMMER

11

Algas-SDI P/N: 80770 Drain Valve kit Models Z100 and Z150

Algas-SDI P/N: 80771 Free standing kit, floor mount Algas-SDI P/N: 81633 Wall Mount kit Algas-SDI P/N: 81634 Strainer and piping kit Algas-SDI P/N: 81635 Regulator and gauge kit Algas-SDI P/N: P/N 20536-ASME Filtaire F4 - Vapor filter for

filtering out heavier hydrocarbons Algas-SDI P/N: 54294 4-Pole 40AMP 3PH Circuit Breaker Algas-SDI P/N: 80770 Drain Valve kit

Page 13: Innovative liquid vaporizing and gas mixing solutions ZIMMER

12

INSTALLATION 2 WARNING

The equipment described in this manual is designed to operate with LP-gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment.

NOTE

Prior to installing your new ZIMMER, check all relevant codes and standards that apply in your local area to ensure compliance!

CAUTION

To prevent ignition of hazardous atmospheres: 1. Any repairs internal to the flameproof enclosure must be made by the

manufacturer or its authorized service center. 2. Keep flameproof enclosure tight, torque to 40,6 Nm (30 ft. lbs.) while in service

and disconnect power before installing or removing vaporizer from service.

NOTE

Installer must install a terminal box (connection facility).

Metal Terminal Box (3/4”): Use a suitably certified metal terminal box (3/4”) for the area classification, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical wiring must be rated for -20ºC (-4ºF) to 130°C (266°F).

CAUTION

Vaporizer may be hot during or after use.

CAUTION

To provide grounding, connect only metal electrical conduit or armored cable to the Metal Terminal Box.

CAUTION

Do not install vaporizer in corrosive environments or expose to corrosive chemicals.

CAUTION

If flameproof joint dimensions are required by the end user, please contact Algas-SDI.

CAUTION

Propane odor can fade.

Page 14: Innovative liquid vaporizing and gas mixing solutions ZIMMER

13

Preparing the site

When preparing your site, consider local setback limitations for your desired storage container(s). Also, consider points of ingress/egress and other openings into buildings, including any air intakes. The ZIMMER vaporizer is explosion-proof, which means that it can be mounted next to, on, or near the storage container(s).

For portable applications, the ZIMMER (up to 50 kg/hr model) can be mounted on the storage container. Make sure the mount touches the vessel in as small an area as possible to avoid corrosion on the vessel surface.

For stationary applications mount the ZIMMER on a wall or support near the container(s) or on the container (up to 50 kg/hr model) by using the tank mount kit.

Materials you may need for installation

♦ Storage tank, or cylinder(s) with liquid withdrawal valve(s) also called “dip tube(s)”, are required.

♦ Excess flow valve(s).

♦ Manifold piping if using multiple cylinders.

♦ Inlet isolation valve with hydrostatic relief valve approved for liquid LP Gas service (included with Algas-SDI P/N 80892).

♦ Piping components including forged steel union or removable compression/flare fittings.

♦ SCH 80 pipe for liquid service, or approved tubing and fittings.

♦ Inlet strainer with No.40 mesh screen (in Algas-SDI P/N 80892)

♦ Outlet regulator with high temperature Fluorocarbon elastomer (Viton) seat, (Algas-SDI P/N 80890) (Outlet Range 0.21 – 2.10 bar [3-30 psig]).

♦ Outlet isolation valve approved for LP Gas vapor service (included with Algas-SDI P/N 80892).

♦ Wall mount kit up to model Z50. (Algas-SDI P/N 80885).

♦ Electrical disconnect switch (See Electrical Specifications in Appendix).

♦ Metal Terminal box use Algas-SDI P/N 80895 (Div 1) and P/N 80896 (Ex) for models up to 50kg/hr.

♦ Wire to connect your ZIMMER. Wire type will be determined by your specific voltage, current and wiring conditions.

Page 15: Innovative liquid vaporizing and gas mixing solutions ZIMMER

14

Mounting the ZIMMER

Z25/40/50 model shown

Z100/150 model shown

If mounted outdoors, the ZIMMER must be mounted horizontally or vertically on a vertical surface to maintain its enclosure rating. Use Algas-SDI Mounting Kit P/N 80885, or equivalent components, when mounting the ZIMMER to a concrete, masonry, or wood construction wall. For mounting options see Available Options.

MOUNTING CHANNEL

3/8" WASHER

SLEEVE ANCHOR

Page 16: Innovative liquid vaporizing and gas mixing solutions ZIMMER

15

Piping

CAUTION

Teflon tape can clog orifices if not properly used. If a removed fitting has Teflon tape, make sure to clean all threads and remove all tape debris before re-installing.

The ZIMMER is designed for feed-through operation. If you are using cylinders to store the LPG, you will need liquid withdrawal valves in each cylinder. It is best to use valves that have both vapor and liquid withdrawal ports – this allows you to use vapor when your load is small or when the temperature is high, and then use your vaporizer when the ambient conditions are insufficient.

Typical Piping Installation – Dip Tube

If you are using a tank to store the LPG, you will need to connect to the bottom of the tank or to a connection that has a “dip tube” extending into the tank for liquid withdrawal.

♦ Install an approved isolation valve at the outlet of the tank or

use the existing tank valve. If you are using cylinders you should install an isolation valve after the cylinders have been manifolded together. The isolation valve should have a hydrostatic relief valve installed to protect the pipe section between the valves.

♦ After the isolation valve, install a ½” or ¾” NPT strainer with a size 40 or smaller mesh screen.

♦ Connect the strainer to the inlet of the ZIMMER using ½” or ¾” pipe, Schedule 80, depending on the model.

NOTE

Do not install a check valve between the ZIMMER and the tank or cylinders! Liquid must be able to back-flow if necessary.

♦ At the outlet of the ZIMMER install an isolation valve approved

for LPG vapor service.

Page 17: Innovative liquid vaporizing and gas mixing solutions ZIMMER

16

♦ Next, install a pressure regulator with a high temperature Fluorocarbon elastomer (Viton) seat no more than 1 meter (3 feet) after the vaporizer outlet. Install this regulator as close to the outlet of the vaporizer as possible and always at a higher elevation than the vaporizer outlet to allow any condensed liquid to travel back to the vaporizer. Never install the regulator more than 1 meter (3 feet) from the vaporizer. If you are using PE pipe after the regulator, ensure that it is connected at a minimum 2 meters (6 feet) after the vaporizer.

♦ Install a pressure gauge in the regulator or at the regulator outlet.

♦ After the regulator, install a “drip-leg” in the piping or a vapor filter to collect any residue or heavy-ends from the LPG. The drip leg should terminate with a valve and a plug for draining.

LPG liquid line size chart (Minimum Pipe Size)

Relief valve

For horizontal installation, no modifications to the relief valve orientation are required. For vertical installation, ensure that the relief valve vent is piped in a vertical orientation. This may be achieved by using a pipe away adapter with a ½” NPT pipe nipple and ½” NPT F x F elbow, or by switching the LPG outlet adapter with the pressure relief valve to ensure the pressure relief valve vents upwards. Leak test new piping connections during commissioning.

Note: When mounting vertically, always ensure that the LPG inlet and the outlet end of the vaporizer are on top.

Capacity of units Distance from storage to vaporizer - feet (meters)

MMBtu (Kcal) Kg LBS

(GPH) 25 (8)

50 (15)

75 (23)

100 (31)

150 (36)

200 (61)

300 (92)

400 (122)

1.1 (288,792) 25 55

(12.5) ½”

(DN15) ½”

(DN15) ½”

(DN15) ½”

(DN15) ½”

(DN15) ¾”

(DN20) ¾”

(DN20) ¾”

(DN20) 1.8

(446,069) 40 88 (20)

½” (DN15)

½” (DN15)

½” (DN15)

¾” (DN20)

¾” (DN20)

1” (DN25)

1” (DN25)

1” (DN25)

2.3 (557,584) 50 110

(25) ½”

(DN15) ½”

(DN15) ½”

(DN15) ¾”

(DN20) ¾”

(DN20) 1”

(DN25) 1”

(DN25) 1”

(DN25) 4.6

(1,155,168) 100 220 (50)

½” (DN15)

¾” (DN20)

¾” (DN20)

¾” (DN20)

1” (DN25)

1” (DN25)

1” (DN25)

1¼” (DN32)

6,8 (1,722,690) 150 352

(80) ¾”

(DN20) ¾”

(DN20) 1”

(DN25) 1”

(DN25) 1”

(DN25) 1¼”

(DN32) 1¼”

(DN32) 1¼”

(DN32)

Page 18: Innovative liquid vaporizing and gas mixing solutions ZIMMER

17

Filtaire

In areas where LPG quality is poor it may be necessary to install FILTAIRE or FILT-EZE Gas trap at the outlet of your vaporizer.

♦ For model Z150 use FILTAIRE model F4 P/N 20536-ASME. ♦ For model Z100 above 14ºF (-10ºC) ambient temperature (35

psig (2.4 bar) saturation pressure) use FILT-EZE P/N 82288. Below 14ºF (-10ºC), use FILTAIRE model F4 P/N 20536-ASME.

♦ For models Z25, Z40 and Z50 use FILT-EZE P/N 82288.

Installing Multiple Vaporizers

Multiple ZIMMER vaporizers can be manifolded together to increase the total system capacity.

♦ Manifold the inlets and outlets together using similar length piping runs. It is best to keep the piping as short as possible.

♦ Install an isolation valve at the inlet and outlet of each vaporizer.

♦ Install an appropriately sized regulator with Fluorocarbon elastomer (Viton) seat after the outlets have been manifolded together. For more than two vaporizers use one adequately sized regulator with a Fluorocarbon elastomer (Viton) seat.

Common piping problems

Problem: Frost or condensation on the liquid LPG piping. Cause: Vaporizer installed with undersized piping from

storage container to vaporizer. Reason: Liquid LPG boils in the pipe before the vaporizer

causing a reduction in vaporization capacity. Problem: Moisture or water droplets on the piping before the

regulator. Frosting of the regulator. Cause: Outlet regulator installed too far from vaporizer or

below vaporizer outlet. Reason: High pressure LPG vapor condenses between the

vaporizer outlet and the regulator. Problem: Downstream component failure. Cause: Drip leg or filter is not installed or is too small. Reason: Oils or heavy ends collect in downstream regulators

and other components.

Page 19: Innovative liquid vaporizing and gas mixing solutions ZIMMER

18

Electrical Service

The ZIMMER vaporizer is manufactured as an explosion proof device suitable for hazardous locations. Do not separate the heat exchanger to access the electrical enclosure – separating the enclosure will void warranty!

♦ When connecting the electrical service for the ZIMMER you will need a circuit breaker appropriate for the application. See Electrical Specifications in the Appendix.

♦ You will also need a disconnect switch located within sight of the vaporizer (refer to Electrical Specification in Appendix).

♦ Select the appropriate size conductors based on the current draw (refer to Electrical Specification in Appendix) and conductor run distance (see reference charts below).

♦ Install metal terminal box to the ¾” MNPT seal-off to make the wiring connections in accordance with the local electrical codes. Ensure the terminal box is connected to seal-off before vaporizer is mounted to wall. Metal Terminal Box (3/4”) for 50kg/hr and Smaller models Use a suitably certified metal terminal box for the area classification, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical components must be rated for 130°C (266°F). (ASDI P/N 80895 (CLASS I DIV 1) OR 80896 (ATEX Ex d) Metal Terminal Box (1-1/4”) for 100kg/hr and 150kg/hr models Ex db IIA Gb or Ex eb IIA Gb, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical components must be rated for 130°C (266°F). (KILLARK P/N GESLT-4 or equivalent)

♦ Do not separate vaporizer sections to access the wiring. Use conductor assembly provided.

♦ Connect the green conductor to ground. See appropriate wiring schematic in Appendix based on your desired installation. Do not pull on, twist, or bend the wires.

CAUTION________________________________________

When installing the metal terminal box, use an open-end wrench to securely hold the factory provided seal-off to prevent twisting! ___________________________________________________

Page 20: Innovative liquid vaporizing and gas mixing solutions ZIMMER

19

Wire Length Chart [#4 AWG – 21.1 mm2]

Wire Length Chart [#6 AWG – 13.3 mm2]

Page 21: Innovative liquid vaporizing and gas mixing solutions ZIMMER

20

Wire Length Chart [#8 AWG – 8.36 mm2]

Wire Length Chart [10 AWG – 5.26 mm2]

Page 22: Innovative liquid vaporizing and gas mixing solutions ZIMMER

21

OPERATION 3

WARNING

The equipment described in this manual is designed to operate with LP-gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment.

_____________________________________________________________

Putting your vaporizer into service

After completing the piping work, leak test all connections with a soap solution and pressure from the tank or cylinders, or from a pressure tap and compressed air bottle.

To initiate operation of the ZIMMER vaporizer, engage the electrical supply at the disconnect and open all valves in the liquid supply line to the vaporizer.

Depending on the conditions, it could take up to 2-5 minutes for the vaporizer to be ready for full use, though around 1 minute is more typical.

Open the isolation valve located at the outlet of the vaporizer.

If starting the system for the first time, set the first stage regulator at the outlet of the vaporizer to 5 psig (0.35 barg) or at the desired pressure. This pressure should be kept as low as possible to reduce the risk of vapor re-liquification.

The system should now be ready for use. The vaporizer is designed to be used continuously and can also idle for long periods of time when not in use.

NOTE

During the first few days of use it is a good practice to blow-down the drip leg and strainer to remove any debris which may be left over from installation.

Page 23: Innovative liquid vaporizing and gas mixing solutions ZIMMER

22

Shutting down the system

For overnight or short time periods:

♦ Because the ZIMMER uses only a small amount of electricity (e.g. approximately 300 - 600 watts in 1 PH operation for Z50) when there is no load, it is suitable to leave the power engaged even during periods of non-use. If desired, close the vaporizer outlet isolation valve when the vaporizer is not being used.

For extended periods:

♦ Close the vaporizer outlet isolation valve.

♦ Open the disconnect switch to power off the vaporizer.

♦ Close the inlet valve or tank valve(s) only after the vaporizer has expanded the remaining gas and pushed it back toward the tank (approximately 5 minutes). Trapped liquid can expand when heated causing damage or possible rupture to pipes and components. Always install hydrostatic relief valves between isolation valves.

Page 24: Innovative liquid vaporizing and gas mixing solutions ZIMMER

23

MAINTENANCE 4 CAUTION

To prevent ignition of hazardous atmospheres, 1. Any repairs internal to the flameproof enclosure must be made

by the manufacturer. 2. Keep flameproof enclosure tight, torque to 40.6 Nm (30 ft. lbs.)

while in service and disconnect power before installing or removing vaporizer from service.

GENERAL

The ZIMMER vaporizer is designed for long-term trouble-free operation. Because of the nature of its use, and the severe duty it receives, it is important to provide scheduled maintenance. The maintenance schedule, type, and frequency provided in this manual is the minimum maintenance required for proper operation of the vaporizer. Ambient conditions surrounding the vaporizer installation and LPG quality may require a more frequent maintenance schedule. A list of REPLACEMENT PARTS is in Section 6 of this manual.

Initial Installation & Operation Inspections:

Required 30-60 days after initial installation Component Action Required Inlet Strainer Inspect strainer and remove accumulated debris. Note: if debris

accumulation is heavy check every 3 - 6 months. Electronic wiring and connections

Check junction/terminal box electrical connections. Inspect electrical connections for loose conductors and any indication of heat build-up or damage.

Heat exchanger and drip legs

Check all drip legs and vaporizer for heavy ends and oil build-up. If present, first ensure there are no sources of ignition within 25 feet (8 meters), then drain heavy ends. NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and the heat exchanger to be checked for heavy ends more frequently (monthly or bi-monthly depending on LPG quality). Once it is verified that no significant quantity of heavy ends is accumulating during vaporizer operation, this maintenance can be performed on an annual basis.

Page 25: Innovative liquid vaporizing and gas mixing solutions ZIMMER

24

Servicing your ZIMMER

ZIMMER vaporizers are designed to require very little maintenance. The amount and frequency of maintenance depends on the quality of the LPG. The main servicing points for the system are the drip leg or heavy ends trap, vaporizer gas passages, the inlet strainer, and the inlet valve screen.

Annual Maintenance Requirements:

Component Action Required Inlet strainer Remove plug and clean the screen. Replace screen if gaps or

holes are present in the screen. If oils or contaminants are present, it may be necessary to use a cleaning solution to remove them.

Inlet valve Check for accumulation of heavy ends. Remove the inlet valve, allow heavy ends to drain. Alternatively blow out the oils through the holes in the valve body. Do not disassemble the valve! Ensure thermal probe is sufficiently coated in thermal grease and pushed all the way into the thermowell. Recommend replacing the valve after 7 years in service.

Relief Valve Visually check and replace if leaks are observed. Check for excessive corrosion and ensure the relief valve is covered with the appropriate rain cap to prevent rain and debris from entering the valve. Replace rain cap if damaged or missing. Relief valve should be replaced per the manufacturers’ recommended replacement schedule or if it relieves during normal operation.

Electronic wiring and connections

Visually inspect all connections for corrosion, loose conductors, heat build-up and/or charring. Tighten or replace if necessary.

Heat exchanger & system drip legs

Check the system drip legs and vaporizer for heavy ends and oil build-ups. If present, first ensure there are no sources of ignition within 25 feet (8 meters), then drain heavy ends to a safe area. If necessary, the heat exchanger gas passages can be cleaned by removing end caps, plugs, and adapters. Use compressed air or a non-metallic brush to clean gas passages. Visually inspect plug, adapter and valve o-rings and always perform a leak test after re-installing. When reinstalling plugs, torque to 44 ft-lbs (60 Nm). After cleaning ensure that the gas passage inserts are installed back in the same passages they were removed from! NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and heat exchanger to be checked for heavy ends more frequently (monthly or bi-monthly depending on LPG quality).

Mounting bracket Visually inspect mounting brackets for cracks or damage.

CAUTION – HOT!

When servicing the vaporizer, always make sure the vaporizer has cooled prior to touching!

Page 26: Innovative liquid vaporizing and gas mixing solutions ZIMMER

25

TROUBLESHOOTING 5

The ZIMMER is a very simple device with few areas for problems to occur. The main areas of the vaporizer are the inlet valve and the heat exchanger. The heaters used are not ordinary wire filament resistance heating elements that are susceptible to burn-out.

Possible problems

TREE #1 INLET VALVE DOES NOT OPEN AFTER POWER IS APPLIED

Is vaporizer

warm?

Is power applied?

Input voltage

OK?

Is the capillary

tube between bulb and actuator broken?*

Is circuit breaker opening at power

start?

Are high inrush circuit

protection devices

used and sized

properly?

Apply power and wait 2 min. for valve to

open

Heater system not functioning.

Contact ASDI

Fix wiring

Heater system not functioning. Contact ASDI

Change to high inrush

circuit protection

Replace actuator

YES

YES YES

YES

YES

YES

NO

NO NO

NO

NO

*Note: May need to replace actuator with known functioning one to determine if broken.

NO

If pump is used lower

pump pressure

Page 27: Innovative liquid vaporizing and gas mixing solutions ZIMMER

26

TREE #2 INLET VALVE CLOSES DURING OPERATION

Is current per table values?

Is vaporizer warm as

outlet pressure drops?

Clean inlet screen debris

Measure current as pressure drops

YES

YES

YES

NO

NO

NO

1. Exceeding vaporizer capacity. Lower capacity or add additional vaporizers. 2. Thermal valve probe not pushed all the way in the thermowell. Check for probe insertion depth.

Allow ZIMMER to completely cool for 5-6

hours. Apply power and measure current

after 20 seconds.

Is there frosting or water

condensation on any of the inlet piping?

Correct pressure

losses in liquid piping

Current per El. Specification

table in Appendix?

Heater system not functioning.

Contact ASDI

NO YES

Debris on inlet screen?

Check fuel composition meets valve

limits

YES NO

Page 28: Innovative liquid vaporizing and gas mixing solutions ZIMMER

27

REPLACEMENT PARTS 6

Item Description ASDI P/N Recommended

replacement interval 50/50 LPG 70/30 LPG PROPANE 1 Valve actuator replacement kit 40815 40816 40817 only required if damaged

2 Valve replacement kit 40946 40944 40945 only required if damaged

3 Replacement vaporizer gas passage plugs (includes o-rings) 60564 N/A

4 3/4” Replacement vaporizer adapter fitting (on inlet, outlet and relief valve connection)

60565 N/A

1” Replacement vaporizer adapter fitting (used on Z100 and Z150 outlet)

60898 N/A

5 Relief valve UL/CE approved 8074-101 N/A

6 End cap with magnets – front end 80041 N/A

7 End cap with magnets – back end 80042 N/A

Page 29: Innovative liquid vaporizing and gas mixing solutions ZIMMER

28

FAQ’s 7 Q1: What voltages can the ZIMMER operate on? A1: The UL/CE listing is valid for any voltage between:

100 - 277 VAC, single phase for sizes up to 50 kg/hr. 100 - 277 VAC, single phase; or up to 480 VAC, three phase, 4 wire (wye) for

100 - 150 kg/hr sizes. Q2: At which voltage are the capacities calculated at? A2: Capacities are rated based on 220 VAC.

Q3: What is the capacity rating based on? A3: The capacity is based on using a 220V power supply and with LPG having a maximum butane percentage allowed for specific valve Model Selection at an ambient temperature of 104 ºF (40 ºC) for models Z25, Z40 and Z50 and at an ambient temperature of 80ºF (27 ºC) for models Z100 and Z150.

Q4: Can the ZIMMER use any mixture of propane and or butane? A4: There are three versions of the ZIMMER – one for commercial propane (e.g. Z40P), one

for standard LPG 70% Butane/ 30% Propane (e.g. Z40L), and one for 50% Butane/ 50% Propane (e.g. Z40S). The ZIMMER is not designed for use with commercial butanes. • The P valve is designed to operate with a maximum of 15% Butane • The L valve is designed to operate with a maximum of 80% Butane and ideally with

60-80% Butane. Using less than 60% Butane will result in a reduced capacity. • The S valve is designed to operate with a maximum of 60% Butane and ideally with

40-60% Butane. Using less than 40% Butane will result in a reduced capacity.

Specific vapor pressure curves are available upon request.

Q5: What is the operating temperature? A5: The ZIMMER uses self-regulating heaters that are not fixed resistance. This means the ZIMMER does not have a fixed temperature setting. The ZIMMER will reach its peak temperature at idle, at which point it will consume the least amount of energy. As the flow rate increases, heat is drawn from the heaters by the LPG causing the resistance to decrease and allowing them to produce more energy.

Q6: What is the pressure drop at maximum flow? A6: This depends on the tank pressure and ambient temperature. At 100 psig (6.9 bar) the pressure drop is about 1-2 psig (0.07 – 0.14 bar) for 50 kg/hr model or less flow. For the 100 kg/hr or 150 kg/hr models, pressure drop is about 6 psig (0.04 bar). If using 100 or 150 kg/hr models in cold climates below 0ºF (-18ºC), visit ASDI website or contact factory for additional information.

Page 30: Innovative liquid vaporizing and gas mixing solutions ZIMMER

29

Q7: What prevents liquid from passing downstream? A7: The vapor temperature at the exit of the vaporizer, in combination with the LPG pressure exerts a specific force against a preset spring and ball assembly. As the temperature drops the resulting decrease in force on the spring causes the ball to modulate closed against the valve seat. The temperature and pressure curves are matched based on your specific Butane/Propane content.

Q8: Can liquid pass downstream when the electricity fails? A8: No. Because the inlet control valve does not require electricity to operate, it is fail-safe. The valve operates as stated in A7 to ensure that no liquid passes downstream.

Q9: Because there are no switches, what prevents the heaters from overheating? A9: The ZIMMER heaters are not traditional filament-type resistance heaters. Instead, the heaters are made from a special ceramic-like silicon material that cannot exceed a certain temperature. If the heaters are subjected to a higher temperature during use the molecular structure will degrade into an infinite resistance form yielding no heat output.

Q10: Can I leave my ZIMMER on overnight while it is not in use? A10: Yes. Your ZIMMER is designed for continuous use. Additionally, the ZIMMER consumes very little energy while not in use (e.g. approximately 300 - 600 watts in 1 PH operation for 50 kg/hr model).

Q11: If the power goes out for a brief period of time, will it shut down the gas supply to my burners or pilots? A11: Generally, no. For short power outages the ZIMMER will continue operating – even without power. Although no additional heat will be added, the heat exchanger’s aluminum body generally will have enough reserve energy to sustain a short power outage. When the power comes back on, the heatsink will be replenished. Since the inlet control valve does not require electricity for operation, its function is independent of the power supply.

Q12: Does the ZIMMER have to be horizontally mounted on a wall? A12: Horizontal mounting is the preferred mounting, but vertical mounting is possible. If mounting vertically, local codes may require an elbow to be mounted between the ZIMMER and pressure relief valve to direct released LPG upward instead of outward or you may swap the inlet adapter with the relief valve to ensure relief valve points upward. If mounting vertically, always ensure the inlet and outlet are at the top.

Q13: What is the recommended first-stage regulator? A13: Regulator must be sized adequately for flow and must have high temperature Fluorocarbon elastomer seat (Viton). If unable to acquire high temperature regulator in your area, Algas-SDI stocks a 5-20 psig (0.14 – 1.4 bar) high temperature regulator.

Q14: Can the ZIMMER be used in an economy configuration like the XP vaporizers? A14: With Propane models, but at present an economy kit is not offered for the ZIMMER.

Q15: What is the minimum temperature rating for the ZIMMER? A15: The UL/CE approval is valid for -4ºF (-20 ºC).

Q16: Is the capacity de-rated at certain ambient conditions? A16: In general, no. In fact, the ZIMMER vaporizes more at lower temperatures. At extreme low temperatures and at extreme high temperatures, the 100 and 150 kg/hr capacities are de-rated somewhat. Contact factory for application related questions.

Page 31: Innovative liquid vaporizing and gas mixing solutions ZIMMER

30

Q17: What is the "maximum current draw"* from the ZIMMER and under what conditions does this occur? A17: The maximum current occurs at the maximum capacity, the lowest temperature, and the lowest voltage. The maximum power output occurs at the same conditions, except additionally at the highest voltage. Please see electrical table in Appendix.

* Maximum current draw is defined as anything after the first five seconds preceding a cold start.

Q18: Can the ZIMMER be used with DC voltage? A18: Yes, the ZIMMER can be used with both AC and DC voltage. All respective Electrical specifications such as breaker type and sizing remain the same. Q19: What is the outer shell material, and is it “hot to the touch”? A19: The outer shell material is made from anodized aluminum. Under normal operating conditions, the shell should be safe to touch. However, in idle conditions and depending on your installation, it may be too hot to touch. Depending on your installation, you may want to consider mounting in a way to reduce risk of touching the vaporizer on idle. Q20: Are common spare parts the same as the first- generation ZIMMER? A20: The ZIMMER requires very few spare parts. Of those required, some are common between ZIMMER revisions however some are not. Most notably, the inlet valve is different between ZIMMER families and are ordered under separate part numbers.

Q21: Why do I require special circuit breakers for ZIMMER vaporizers? A21: Because of the high initial current of the ZIMMER, Type D or TYPE J breakers are required. Please see electrical specifications in the Appendix.

Q22: Can multiple ZIMMER vaporizers be installed together? If so, do they require balancing orifices? A22: Multiple ZIMMER vaporizers can be installed in parallel. Due to the self-balancing nature of the ZIMMER, no balancing orifices are required. Additionally, you can parallel install ZIMMER vaporizers of different sizes, again without the need for balancing orifices.

Q23: Can first generation and second-generation ZIMMER vaporizers be used together? If so, do they require balancing orifices? A23: First and second-generation ZIMMER vaporizers can be installed together in parallel, again without the need for balancing orifices. Note: The system start-up time is based upon the first-generation ZIMMER.

Q24: Can a propane version of the ZIMMER be converted to an LPG model? A24: Yes, with replacement of the inlet valve. If using the wrong valve, you may experience capacity de-rate or passing liquid. Contact the factory for the correct inlet valve for your application.

Q25: What is the start-up time for the ZIMMER? A25: The ZIMMER is ready to flow LPG within one minute.

Page 32: Innovative liquid vaporizing and gas mixing solutions ZIMMER

31

Q26: What is the recommended pipe-away method for the third-generation ZIMMER? A26: To pipe-away REGO 3129G used on the third-generation ZIMMER, use the REGO pipe-away adapter, ASDI P/N 8079-107.

Q27: Is it possible to clean the new ZIMMER without removing from service? A27: Yes. The innovative design of the ZIMMER allows tubes to be cleaned in place, and for the inlet valve to be removed from service without disconnecting the remaining LPG connections or electrical connections. See Maintenance section.

Page 33: Innovative liquid vaporizing and gas mixing solutions ZIMMER

32

Appendix 8 ELECTRICAL SPECIFICATIONS

Single phase wiring

Z25 (25 kg/hr nominal)*** Voltage L1 to Neutral [V] 100 120 208 220 240 277 Power [kW] * 2.2 2.2 3.0 3.0 3.0 3.0 Current at rated capacity [A] * 22.3 18.6 14.3 13.5 12.4 10.7 Breaker - D/J type [A] (125%) * 30 25 20 20 15 15

Z40 (40kg/hr nominal)*** Voltage L1 to Neutral [V] 100 120 208 220 240 277 Power [kW] * 3.6 3.6 4.8 4.8 4.8 4.8 Current at rated capacity [A] * 35.7 29.8 22.9 21.6 19.8 17.2 Breaker - D/J type [A] (125%) * 45 40 30 30 25 25

Z50 (50 kg/hr nominal)*** Voltage L1 to Neutral [V] 100 120 208 220 240 277 Power [kW] * 4.5 4.5 6.0 6.0 6.0 6.0 Current at rated capacity [A] * 44.6 37.2 28.6 27.0 24.8 21.5 Breaker - D/J type [A] (125%) * 60 50 40 35 35 30

Z100 (100 kg/hr nominal)**/*** Voltage L1, L2 or L3 to Neutral [V] 100 120 208 220 240 277 Power [kW] * 8.9 8.9 11.9 11.9 11.9 11.9 Current at rated capacity [A] * 29.8 24.8 22.9 21.6 19.8 17.2 Breaker - D/J type [A] (125%) * 40 35 30 30 25 25

Z150 (150 kg/hr nominal)**/*** Voltage L1, L2 or L3 to Neutral [V] 100 120 208 220 240 277 Power [kW] * 13.4 13.4 17.9 17.9 17.9 17.9 Current at rated capacity [A] * 44.6 37.2 28.6 27.0 24.8 21.5 Breaker - D/J type [A] (125%) * 60 50 40 35 35 30

Three phase wiring

Z100 (100 kg/hr nominal)***

4-Wire Wye Configuration (4 pole breaker)

3-Phase Delta Configuration (3 pole breaker)

Three Phase Line to Line voltage [V] 173 208 360 380 415 480 100 120 208 220 240 277 Voltage L1, L2 or L3 to Neutral [V] 100 120 208 220 240 277 100 120 208 220 240 277 Power [kW] * 8.9 8.9 11.9 11.9 11.9 11.9 8.9 8.9 11.9 11.9 11.9 11.9 Current at rated capacity [A] * 29.8 24.8 22.9 21.6 19.8 17.2 51.5 42.9 39.6 37.5 34.4 29.8 Breaker - D/J type [A] (125%) * 40 35 30 30 25 25 65 55 50 50 45 40

Z150 (150 kg/hr nominal)*** Three Phase Line to Line voltage [V] 173 208 360 380 415 480 100 120 208 220 240 277 Voltage L1, L2 or L3 to Neutral [V] 100 120 208 220 240 277 100 120 208 220 240 277 Power [kW] * 13.4 13.4 17.9 17.9 17.9 17.9 13.4 13.4 17.9 17.9 17.9 17.9 Current at rated capacity [A] * 44.6 37.2 28.6 27.0 24.8 21.5 77.3 64.4 49.5 46.8 42.9 37.2 Breaker - D/J type [A] (125%) * 60 50 40 35 35 30 100 85 65 60 55 50

*Your exact conditions may result in differing power and current. **Requires three (3) single phase breakers, one for each leg (L1, L2, L3) ***25% capacity derate with 100-120V line to line voltage

Page 34: Innovative liquid vaporizing and gas mixing solutions ZIMMER

"7

6

8 175

"

346

1

35 8

6.

215

8

8.

321

0

9.

524

1

5.

814

8

NO

TES: EL

ECTR

ICA

L: 1

20-2

77 V

AC

, 1PH

, 50/

60Hz

1.C

ON

FORM

S TO

HA

ZARD

OUS

ARE

A R

ATIN

G:

2.A

TEX/

IEC

Ex E

x d

b IIA

T3

Gb

1.UL

CLA

SS I,

DIV

1, G

ROUP

D T

32. EN

CLO

SURE

: TY

PE 4

, HO

RIZO

NTA

L O

R V

ERTIC

AL

MO

UNT

3.RE

LIEF

VA

LVE

SET:

250

PSI

G [1

7,24

BA

R]4.

MA

WP:

250

PSI

G A

T 30

0°F

[17,

24 B

AR

AT

149°

C]

5.M

DM

T: -2

0°F

AT

250

PSIG

[17,

24 B

AR

AT

-29°

C]

WEI

GHT

: 50

LB [2

3 KG

]6.

DIM

ENSI

ON

S SH

OW

N IN

INC

HES

[MM

]7.

FRO

NT

VIE

W

END

VIE

W

END

VIE

WX

12 G

A [3

.3m

m²]

POW

ER W

IRE

24" [

610]

LG

.

W/P

IPE

AW

AY

OPT

ION

PRES

SURE

REL

IEF

VA

LVE

3/4"

-14

MN

PTEL

ECTR

ICA

L C

ON

NEC

TION

POIN

T

PRO

JEC

TION

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Dra

wn

By:

Ch

ecke

d B

y:

App

rove

d B

y:

Dat

e:

Sca

le:

Job

#P

art

#

Titl

e:

Dw

g. #

Siz

e:S

ht.

No.

:R

ev.:

TOLE

RAN

CES

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

SPEC

IFIE

D

B

UN

LESS

OTH

ERW

ISE

1/4

"D

RAW

ING

AA

S

ASD

I STD

1of

1

N/A

0903

-600

1B

1/29

/201

81:

8 A

ND

NO

TED

SCA

LE

WITH

AN

SI/A

SME

Y14.

5-20

09

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

DO

NO

T0.

030

ALL

RIG

HTS

RESE

RVED

.© C

OPY

RIG

HT A

LGA

S-SD

I

.XX

MA

NN

ER D

ETRI

MEN

TAL

TO A

LGA

S-SD

I'S IN

TERE

STS.

AN

D S

HALL

NO

T BE

REP

ROD

UCED

OR

USED

IN A

NY

THIS

DRA

WIN

G IS

PRO

PRIE

TARY

AN

D C

ON

FID

ENTIA

L

0.1

0

.XXX

0.

010

.X

AN

GLE

1

FRA

CTIO

NS

THIR

D A

NG

LE

ZIM

MER

1PH

, EQ

UIPM

ENT

DRA

WIN

G

TOP

VIE

W

VA

POR

OUT

LET

1/2"

-14

FNPT

2.7

69

68

426

.9

3.3 83

LIQ

UID

INLE

T1/

2"-1

4 FN

PT BOTT

OM

VIE

W

3.3

83

3.3

84

5.

6

141

4.

210

8

VA

POR

OUT

LET

1/2"

-14

FNPT

2.7 69

Page 35: Innovative liquid vaporizing and gas mixing solutions ZIMMER

678

"

175

5418

"

1375

8.3210

6.2158

VA

POR O

UTLET3/4"-14 FN

PT

2.769

2419.5

5.8148

PROJEC

TION

Tel: (206) 789-5410 Fax: (206) 789-5414

Draw

n B

y:

Ch

ecked By:

Approved B

y:

Date:

Scale:

Job #P

art #

Title:

Dw

g. #S

ize:S

ht. N

o.:R

ev.:

TOLERA

NC

ES

151 S. Michigan St., Seattle, W

ashington. USA 98108

SPECIFIED

B

UN

LESS OTH

ERW

ISE

1/4"D

RAW

ING

AA

S

ASD

I STD

1of1

N/A

0903-6002B

1/31/20181:16 A

ND

NO

TEDSC

ALE

WITH A

NSI/A

SME Y14.5-2009

DN

INTERPRET THIS D

RAW

ING

IN A

CC

ORD

AN

CE

DO

NO

T0.030

ALL RIG

HTS RESERVED

.© C

OPYRIG

HT ALG

AS-SD

I

.XX

MA

NN

ER DETRIM

ENTA

L TO A

LGA

S-SDI'S IN

TERESTS.A

ND

SHALL N

OT BE REPRO

DUC

ED O

R USED IN

AN

YTHIS D

RAW

ING

IS PROPRIETA

RY AN

D C

ON

FIDEN

TIAL

0.10

.XXX 0.010

.X

AN

GLE

1FRA

CTIO

NS

THIRD

AN

GLE

ZIMM

ER 3PH, EQUIPM

ENT DRA

WIN

G

NO

TES:ELEC

TRICA

L: 1PH 110-277VA

C, 3PH 4 W

IRE WYE 240-480 V

AC

, 50/60Hz1.

CO

NFO

RMS TO

HAZA

RDO

US AREA

RATIN

G:

2.IEC

Ex/ATEX Ex d

b IIA T3 G

b1.

UL: CLA

SS I, DIV

1, GRO

UP D T3

2.ENC

LOSURE: TYPE 4, HO

RIZON

TAL O

R VERTIC

AL M

OUN

T3.

RELIEF VA

LVE SET: 250 PSIG

[17,24 BAR]

4.M

AW

P: 250PSIG A

T 300°F [17,24 BARG

AT 149°C

] 5.

MD

MT: -20°F [-29°C

] AT 250 PSIG

[17,24 BAR]

WEIG

HT: 170 LB [77 KG]

6.D

IMEN

SION

S SHOW

N IN

INC

HES [MM

]7.

END

VIEW

END

VIEW

PRESSURE RELIEF VA

LVE

W/PIPE A

WA

Y OPTIO

N

3/4"-14 MN

PTELEC

TRICA

L C

ON

NEC

TION

POIN

T

FRON

T VIEW

24" [610] LG X

12 GA

[3.3mm

²]PO

WER W

IRES

VA

POR O

UTLET3/4"-14 FN

PT

TOP V

IEW

3.383

2.7

69

67.41712

LIQUID

INLET

3/4"-14 FNPT

BOTTO

M V

IEW

4.2

108

5.6141

843.3

3.383

Page 36: Innovative liquid vaporizing and gas mixing solutions ZIMMER

GRN

/GRE

ENL1

NEU

TRA

L

GRO

UND L1

NEU

TRA

L

ZIM

MER

VA

PORI

ZER

SEA

L-O

FF

DO

NO

T TW

IST

CO

ND

UIT

BOX

BY O

THER

S

ELEC

TRIC

AL

SERV

ICE

DIS

CO

NN

ECT

BY O

THER

S

NO

TES: FO

R BR

EAKE

R SI

ZE, P

LEA

SE R

EFER

ENC

E TH

E EL

ECTR

ICA

L SP

ECIF

ICA

TION

1.IN

THE

OPE

RATIO

NS

MA

NUA

L.L1

TO

NEU

TRA

L V

OLT

AG

E: 1

00V

AC

- 27

7VA

C2.

FOR

JUN

CTIO

N B

OX

SIZI

NG

PLE

ASE

REF

EREN

CE

THE

ELEC

TRIC

AL

SERV

ICE

3SE

CTIO

N O

F TH

E M

AN

UAL.

BREA

KER

TYPE

"D"

1-PH

ASE

WIR

ING

SC

HEM

ATIC

3

REV

ISIO

NS

REV

.D

ESC

RIPT

ION

DA

TEN

AM

EEC

N #

AIN

ITIA

L RE

LEA

SE9/

18/2

018

AA

S

ZIM

MER

25/

40/5

0KG

WIR

ING

SC

HEM

ATIC

THIR

D A

NG

LEPR

OJE

CTIO

N

AN

GLE

1

FRA

CTIO

NS

1/1

6"

.X

0.0

30.X

X 0.

010

.XXX

0.

005

THIS

DRA

WIN

G IS

PRO

PRIE

TARY

AN

D C

ON

FID

ENTIA

LA

ND

SHA

LL N

OT

BE R

EPRO

DUC

ED O

R US

ED IN

AN

YM

AN

NER

DET

RIM

ENTA

L TO

ALG

AS-

SDI'S

INTE

REST

S.A

LL R

IGHT

S RE

SERV

ED.©

CO

PYRI

GHT

ALG

AS-

SDI

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH

AN

SI/A

SME

Y14.

5-20

09

1:4

AN

D N

OTE

D9/

18/2

018 A

0903

-700

1

N/A

1of1A

SDI S

TD

AA

S

DO

NO

TSC

ALE

DRA

WIN

G

B

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D

TOLE

RAN

CES

Rev

.:S

ht.

No.

:S

ize:

Dw

g. #

Titl

e:

Par

t #

Job

#

Sca

le:

Dat

e:

App

rove

d B

y:

Ch

ecke

d B

y:

Dra

wn

By:

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Page 37: Innovative liquid vaporizing and gas mixing solutions ZIMMER

3-PHASE W

IRING

SCHEM

ATIC

WYE C

ON

FIGURA

TION

BREAKER

TYPE "D"

NEUTRA

L L1G

ROUN

D

ELECTRIC

AL SERV

ICE

DISC

ON

NEC

TBY O

THERS

SEAL-O

FFD

O N

OT TW

IST

ZIMM

ER VA

PORIZER

N3

L3N2

L2N1

L1

GRN

/GREEN

L2L3

NO

TE:FOR BREA

KER SIZE, PLEASE REFEREN

CE THE ELEC

TRICA

L SPECIFIC

ATIO

N1.

IN THE O

PERATIO

NS M

AN

UAL

L1, L2, L3 TO N

EUTRAL V

OLTA

GE: 100V

AC

- 277VA

C2.

FOR JUN

CTIO

N BO

X SIZING

PLEASE REFEREN

CE THE ELEC

TRICA

L SERVIC

E 3

SECTIO

N O

F THE MA

NUA

L.

3 C

ON

DUIT BO

X BY OTHERS

REVISIO

NS

REV.

DESC

RIPTION

DA

TEN

AM

EEC

R/ECN

AIN

ITIAL RELEA

SE9/7/2018

AA

S

BUPD

ATED

WIRE N

AM

ESEN

LARG

ED IM

AG

E AN

D C

ENTERED

AD

DED

SING

LE PHASE TRIPLE BREA

KER SHT 39/17/2018

AA

S

CFIXED

SPELLING

ERRORS IN

NO

TESA

DD

ED PA

GE 4 D

ETAILIN

G 3-PHA

SE DELTA

WIRIN

G

CO

NFIG

URATIO

N10/21/2020

BDZ

DELIM

INA

TED 1-PHA

SE, 1- BREAKER C

ON

FIGURA

TION

2/15/2021RW

P

151 S. Michigan St., Seattle, W

ashington. USA 98108

Tel: (206) 789-5410 Fax: (206) 789-5414

Draw

n B

y:

Ch

ecked By:

Approved B

y:

Date:

Scale:

Job #P

art #

Title:

Dw

g. #S

ize:S

ht. N

o.:R

ev.:

TOLERA

NC

ESU

NLESS O

THER

WISE

SPECIFIED

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

1of3

N/A

0903-7002D

9/7/20181:4 A

ND

NO

TED

INTERPRET THIS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH A

NSI/A

SME Y14.5-2009

BDZ

THIS DRA

WIN

G IS PRO

PRIETARY A

ND

CO

NFID

ENTIA

LA

ND

SHALL N

OT BE REPRO

DUC

ED O

R USED IN

AN

YM

AN

NER D

ETRIMEN

TAL TO

ALG

AS-SD

I'S INTERESTS.

ALL RIG

HTS RESERVED

.© C

OPYRIG

HT ALG

AS-SD

I

.X 0.10

.XX 0.030

.XXX 0.010

AN

GLE

1FRA

CTIO

NS

1/4"

THIRD A

NG

LEPRO

JECTIO

N

ZIMM

ER 100/150KG W

IRING

SCHEM

ATIC

,3 PHA

SE, 4-WIRE (W

ye)

Page 38: Innovative liquid vaporizing and gas mixing solutions ZIMMER

GRN

/GRE

EN

L1 N1

L2 N2

L3 N3

ZIM

MER

VA

PORI

ZER

SEA

L-O

FFD

O N

OT

TWIS

T

ELEC

TRIC

AL

SERV

ICE

DIS

CO

NN

ECT

BY O

THER

S

1-PH

ASE

WIR

ING

SC

HEM

ATIC

TRIP

LE-B

REA

KER

GRO

UND L1

NEU

TRA

L

3X B

REA

KER

TYPE

"D"

L1 L1

NO

TE: FO

R BR

EAKE

R SI

ZIN

G, P

LEA

SE R

EFER

TO

ELE

CTR

ICA

L SP

ECIF

ICA

TION

1.IN

THE

OPE

RATIN

G M

AN

UAL.

L1 T

O N

EUTR

AL

VO

LTA

GE:

100

VA

C -

277

VA

C2.

FOR

JUN

CTIO

N B

OX

SIZI

NG

PLE

ASE

REF

EREC

NE

THE

ELEC

TRIC

AL

SERV

ICE

3SE

CTIO

N O

F TH

E M

AN

UAL.

3 C

ON

DUI

T BO

X BY

OTH

ERS

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Dra

wn

By:

Ch

ecke

d B

y:

App

rove

d B

y:

Dat

e:

Sca

le:

Job

#P

art

#

Titl

e:

Dw

g. #

Siz

e:S

ht.

No.

:R

ev.:

TOLE

RAN

CES

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

2of

3

N/A

0903

-700

2D

9/7/

2018

1:4

AN

D N

OTE

D

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH

AN

SI/A

SME

Y14.

5-20

09

BDZ

THIS

DRA

WIN

G S

HALL

NO

T BE

REP

ROD

UCED

OR

USED

IN A

NY

MA

NN

ER D

ETRI

MEN

TAL

TO IT

S IN

TERE

STS.

ALL

RIG

HTS

RESE

RVED

CO

PYRI

GHT

ALG

AS-

SDI.X

0.

1 .X

X 0.

03.X

XX

0.01

AN

GLE

0

30'

FRA

CTIO

NS

1/4

"

THIR

D A

NG

LEPR

OJE

CTIO

N

ZIM

MER

100

/150

KG W

IRIN

G S

CHE

MA

TIC1-

PHA

SE, 3

BRE

AKE

R

Page 39: Innovative liquid vaporizing and gas mixing solutions ZIMMER

GRN

/GREEN

L1N1

L2N2

L3N3

ZIMM

ER VA

PORIZER

SEAL-O

FFD

O N

OT TW

IST

ELECTRIC

AL SERV

ICE

DISC

ON

NEC

TBY O

THERS

3-PHASE W

IRING

SCHEM

ATIC

DELTA C

ON

FIGURA

TION

GRO

UNDL1

BREAKER

TYPE "D"

L2L3

NO

TE:FOR BREA

KER SIZING

, PLEASE REFER TO

ELECTRIC

AL SPEC

IFICA

TION

1.IN

THE OPERA

TING

MA

NUA

L.L1, L2, L3 TO

NEUTRA

L VO

LTAG

E: 100VA

C - 277 V

AC

2.FO

R JUNC

TION

BOX SIZIN

G PLEA

SE REFERENC

E THE ELECTRIC

AL SERV

ICE

3SEC

TION

OF THE M

AN

UAL.

3 C

ON

DUIT BO

X BY OTHERS

151 S. Michigan St., Seattle, W

ashington. USA 98108

Tel: (206) 789-5410 Fax: (206) 789-5414

Draw

n B

y:

Ch

ecked By:

Approved B

y:

Date:

Scale:

Job #P

art #

Title:

Dw

g. #S

ize:S

ht. N

o.:R

ev.:

TOLERA

NC

ESU

NLESS O

THER

WISE

SPECIFIED

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

3of3

N/A

0903-7002D

9/7/20181:4 A

ND

NO

TED

INTERPRET THIS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH A

NSI/A

SME Y14.5-2009

BDZ

THIS DRA

WIN

G SHA

LL NO

T BE REPROD

UCED

OR

USED IN

AN

Y MA

NN

ER DETRIM

ENTA

L TO ITS

INTERESTS. A

LL RIGHTS RESERV

ED.

© C

OPYRIG

HT ALG

AS-SD

I .X 0.1

.XX 0.03

.XXX 0.01

AN

GLE

030'

FRAC

TION

S 1/4"

THIRD A

NG

LEPRO

JECTIO

N

ZIMM

ER 100/150KG W

IRING

SCHEM

ATIC

3-PHASE DELTA

Page 40: Innovative liquid vaporizing and gas mixing solutions ZIMMER

PSI

PSI

NO

MIN

IMUM

D

ISTA

NC

E RE

QUI

RED

A

PRO

JEC

TION

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Dra

wn

By:

Ch

ecke

d B

y:

App

rove

d B

y:

Dat

e:

Sca

le:

Job

#P

art

#

Titl

e:

Dw

g. #

Siz

e:S

ht.

No.

:R

ev.:

TOLE

RAN

CES

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

SPEC

IFIE

D

B

UN

LESS

OTH

ERW

ISE

WITH

AN

SI/A

SME

Y14.

5-20

09

DRA

WIN

G

1ASD

I STD

1

N/A

0903

-800

1of

ZIM

MER

1PH

SIN

GLE

UN

IT IN

STA

LLA

TION

DRA

WIN

G

1:8

AN

D N

OTE

DSC

ALE

1/15

/201

8

DN

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

DO

NO

T

1/4

"

ALL

RIG

HTS

RESE

RVED

.© C

OPY

RIG

HT A

LGA

S-SD

I

.XXX

MA

NN

ER D

ETRI

MEN

TAL

TO A

LGA

S-SD

I'S IN

TERE

STS.

AN

D S

HALL

NO

T BE

REP

ROD

UCED

OR

USED

IN A

NY

.XX

THIS

DRA

WIN

G IS

PRO

PRIE

TARY

AN

D C

ON

FID

ENTIA

L

0.03

0 0

.10

0.01

0

.X

AN

GLE

1

FRA

CTIO

NS

THIR

D A

NG

LEA

AS

REV

ISIO

NS

REV

.D

ESC

RIPT

ION

DA

TEN

AM

EEC

R/EC

N

AIN

ITIA

L RE

LEA

SE1/

15/2

018

AA

S

NO

TES: FO

LLO

W A

LL L

OC

AL

CO

DES

& R

EGUL

ATIO

N F

OR

INST

ALL

ATIO

N1.

LEA

K TE

ST A

LL C

ON

NEC

TION

AFT

ER IN

STA

LLA

TION

.2.

AD

DITI

ON

AL

UNIO

NS

MA

Y BE

REQ

UIRE

D A

ND

ARE

RES

PON

SIBI

LITY

3.

OF

THE

CUS

TOM

ER

OPT

ION

AL

BY-P

ASS IS

OLA

TION

VA

LVE

WITH

HYD

ROST

ATIC

REL

IEF

LPG

IN

LPG

OUT

DRI

P LE

G W

/SHU

TO

FF V

ALV

E A

ND

PLU

G

OUT

LET

REG

ULA

TOR

SET

BELO

W V

APO

RIZE

RO

UTLE

T RE

GUL

ATO

RFI

LTA

IRE

GA

S TR

AP

OUT

LET

REG

ULA

TOR

WITH

FLU

ORC

ARB

ON

ELA

STO

MER

SLP

G V

APO

R O

UT

IF U

SIN

G P

E PI

PIN

G P

LAC

E O

UTLE

TV

ALV

E 2

MET

ERS

(6'-7

') A

FTER

VA

PORI

ZER

OUT

LET.

PE

PIPI

NG

CA

N B

E US

ED F

ROM

THI

S PO

INT

ON

.

FAC

TORY

INST

ALL

EDEX

PLO

SIO

N P

ROO

FSSE

AL

3/4"

CO

ND

UIT

BOX

CA

BLE

OR

CO

ND

UIT

SUITA

BLE

FOR

LOC

ATIO

N

FILT

AIR

E G

AS

TRA

P

Page 41: Innovative liquid vaporizing and gas mixing solutions ZIMMER

678

"

NO

MIN

IMUM

DISTA

NC

E REQUIRED

PSI

PSI

CA

BLE OR C

ON

DUIT

SUITABLE FO

R LO

CA

TION

NO

TES:FO

LLOW

ALL LO

CA

L CO

DES &

REGULA

TION

S FOR IN

STALLA

TION

.1.

LEAK TEST A

LL CO

NN

ECTIO

N A

FTER INSTA

LLATIO

N.

2.A

DD

ITION

AL UN

ION

S MA

Y BE REQUIRED

AN

D A

RE RESPON

SIBILITY OF

3.THE C

USTOM

ER

LPG VA

POR O

UT

LPG IN LPG

OUT

IF USING

PE PIPING

PLAC

E OUTLET V

ALV

E 2 M

ETERS (6'-7') AFTER V

APO

RIZER OUTLET.

PE PIPING

CA

N BE USED

FROM

THIS POIN

T ON

3/4"C

ON

DUIT BO

X

DRIP LEG

W

/SHUT OFF

VA

LVE A

ND

PLUG

ISOLA

TION

VA

LVE W

ITHHYD

ROSTA

TIC RELIFE

OUTLET REG

ULATO

RW

ITH FLUORC

ARBO

NELA

STOM

ERS

FAC

TORY IN

STALLED

EXPLOSIO

N PRO

OF

SEALS

OUTLET REG

ULATO

RSET BELO

W V

APO

RIZERO

UTLET REGULA

TOR

OPTIO

NA

LBY-PA

SS

FILTAIRE G

AS TRA

P

REVISIO

NS

REV.

DESC

RIPTION

DA

TEN

AM

EEC

R/ECN

AIN

ITIAL RELEA

SE1/16/2018

AA

S

678

"

NO

MIN

IMUM

DISTA

NC

E REQUIRED

151 S. Michigan St., Seattle, W

ashington. USA 98108

Tel: (206) 789-5410 Fax: (206) 789-5414

Draw

n B

y:

Ch

ecked By:

Approved B

y:

Date:

Scale:

Job #P

art #

Title:

Dw

g. #S

ize:S

ht. N

o.:R

ev.:

TOLERA

NC

ESU

NLESS O

THER

WISE

SPECIFIED

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

1of1

N/A

0903-8002A

1/16/20181:4 A

ND

NO

TED

INTERPRET THIS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH A

NSI/A

SME Y14.5-2009

DN

THIS DRA

WIN

G IS PRO

PRIETARY A

ND

CO

NFID

ENTIA

LA

ND

SHALL N

OT BE REPRO

DUC

ED O

R USED IN

AN

YM

AN

NER D

ETRIMEN

TAL TO

ALG

AS-SD

I'S INTERESTS.

ALL RIG

HTS RESERVED

.© C

OPYRIG

HT ALG

AS-SD

I

.X 0.10

.XX 0.030

.XXX 0.010

AN

GLE

1FRA

CTIO

NS

1/4"

THIRD A

NG

LEPRO

JECTIO

N

ZIMM

ER 1PH MULTI-UN

IT INSTA

LLATIO

N DRA

WIN

G

Page 42: Innovative liquid vaporizing and gas mixing solutions ZIMMER

NO

MIN

IMUM

DIS

TAN

CE

REQ

UIRE

D

PSI

PSI OPT

ION

AL

BY-P

ASS

ISO

LATIO

N V

ALV

EW

ITH H

YDRO

STA

TIC

RELI

EF

OUT

LET

REG

ULA

TOR

SET

BELO

W V

APO

RIZE

RO

UTLE

T RE

GUL

ATO

R

OUT

LET

REG

ULA

TOR

WITH

FLU

ROC

ARB

ON

ELA

STO

MER

S

DRI

P LE

G W

/SHU

TO

FF V

ALV

E A

ND

PLU

G

FILT

AIR

E G

AS

TRA

P

IF U

SIN

G P

E PI

PIN

G P

LAC

E O

UTLE

TVA

LVE

2 M

ETER

S (6

'-7')

AFT

ER V

APO

RIZE

R O

UTLE

T PE

PIPI

NG

CA

N B

E US

ED F

ROM

TH

IS P

OIN

T O

N LPG

VA

POR

OUT

LPG

OUT

LPG

IN

FAC

TORY

INST

ALL

ED

EXPL

OSI

ON

PRO

OF

SEA

L

3/4"

CO

ND

UIT

BOX

CA

BLE

OR

CO

ND

UIT

SUITA

BLE

FOR

LOC

ATIO

N

NOTES: FO

LLO

W A

LL L

OC

AL

CO

DES

&1.

REG

ULA

TION

S FO

R IN

STA

LLA

TION

.LE

AK

TEST

ALL

CO

NN

ECTIO

NS

AFT

ER2.

INST

ALL

ATIO

N.

AD

DITI

ON

AL

UNIO

NS

MA

Y BE

3.

REQ

UIRE

D A

ND

ARE

RES

PON

SIBI

LITY

OF

THE

CUS

TOM

ER.

LOC

AL

CO

DE

MA

YRE

QUI

RE A

N E

LBO

WTO

PIP

E PR

ESSU

RERE

LIEF

VA

LVE

VER

TICA

L

REV

ISIO

NS

REV

.D

ESC

RIPT

ION

DA

TEN

AM

EEC

R/EC

N

AIN

ITIA

L RE

LEA

SE1/

29/2

018

AA

S

NO

MIN

IMUM

DIS

TAN

CE

REQ

UIRE

D

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Dra

wn

By:

Ch

ecke

d B

y:

App

rove

d B

y:

Dat

e:

Sca

le:

Job

#P

art

#

Titl

e:

Dw

g. #

Siz

e:S

ht.

No.

:R

ev.:

TOLE

RAN

CES

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

1of

1

N/A

0903

-800

3A

1/29

/201

81:

4 A

ND

NO

TED

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH

AN

SI/A

SME

Y14.

5-20

09

DN

THIS

DRA

WIN

G IS

PRO

PRIE

TARY

AN

D C

ON

FID

ENTIA

LA

ND

SHA

LL N

OT

BE R

EPRO

DUC

ED O

R US

ED IN

AN

YM

AN

NER

DET

RIM

ENTA

L TO

ALG

AS-

SDI'S

INTE

REST

S.A

LL R

IGHT

S RE

SERV

ED.©

CO

PYRI

GHT

ALG

AS-

SDI

.X

0.1

0.X

X 0.

030

.XXX

0.

010

AN

GLE

1

FRA

CTIO

NS

1/4

"

THIR

D A

NG

LEPR

OJE

CTIO

N

ZIM

MER

1PH

SIN

GLE

UN

IT, V

ERTIC

AL

INST

ALL

TION

Page 43: Innovative liquid vaporizing and gas mixing solutions ZIMMER

LAG

BOLT

678

"

175

1358

"

346

NO

TE: DIM

ENSIO

NS SHO

WN

INC

HES [MM

]1.

MO

UNTIN

G C

HAN

NEL

3/8" MO

UNTIN

G STUD

W/ SPRIN

G

SQUA

RE WA

SHER

1/2" X 1-1/4" FEND

ER WA

SHERPRO

VID

ED W

ITH KIT MUST BE USED

LOC

KING

NUT

AN

CHO

RING

METHO

DS FO

R RECO

MM

END

ED M

OUN

TING

KIT A.S.D

.I PART N

O 80885

MO

UNTIN

G C

HAN

NEL IN

STALLA

TION

FOR

CO

NC

RETE WA

LLSM

OUN

TING

CHA

NN

EL INSTA

LLATIO

N FO

R SO

FT (WO

OD

) WA

LLS

3/8" WA

SHER

MO

UNTIN

G C

HAN

NEL

SLEEVE A

NC

HOR

3/8" WA

SHER

MO

UNTIN

G C

HAN

NEL

REVISIO

NS

REV.

DESC

RIPTION

DA

TEN

AM

EEC

R/ECN

AIN

ITIAL RELEA

SE5/21/2018

AA

S

151 S. Michigan St., Seattle, W

ashington. USA 98108

Tel: (206) 789-5410 Fax: (206) 789-5414

Draw

n B

y:

Ch

ecked By:

Approved B

y:

Date:

Scale:

Job #P

art #

Title:

Dw

g. #S

ize:S

ht. N

o.:R

ev.:

TOLERA

NC

ESU

NLESS O

THER

WISE

SPECIFIED

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

1of1

N/A

0903-8004A

5/21/20181:8 A

ND

NO

TED

INTERPRET THIS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH A

NSI/A

SME Y14.5-2009

DN

THIS DRA

WIN

G SHA

LL NO

T BE REPROD

UCED

OR

USED IN

AN

Y MA

NN

ER DETRIM

ENTA

L TO ITS

INTERESTS. A

LL RIGHTS RESERV

ED.

© C

OPYRIG

HT ALG

AS-SD

I .X 0.10

.XX 0.030

.XXX 0.010

AN

GLE

1FRA

CTIO

NS

1/4"

THIRD A

NG

LEPRO

JECTIO

N

ZIMM

ER ELECTRIC

LP-GA

S VAPO

RIZERM

OUN

TING

DETAILS

Page 44: Innovative liquid vaporizing and gas mixing solutions ZIMMER

DRI

LL A

T C

ENTE

R O

F PR

OV

IDED

DIM

PLES

TO C

REA

TE 1

-1/4

" HO

LE

BAC

K EN

DC

AP

B

DET

AIL

BSC

ALE

1 :

25/8

ORB

TO

1/2

" NPT

AD

APT

ER

1/2"

NIP

PLE

90° E

LBO

W

M-F

1/2

" NPT

BA

LL V

ALV

E

1/2"

NPT

PLU

G

151

S. M

ichi

gan

St.,

Seat

tle, W

ashi

ngto

n. U

SA 9

8108

Tel:

(206

) 789

-541

0 Fa

x: (2

06) 7

89-5

414

Dra

wn

By:

Ch

ecke

d B

y:

App

rove

d B

y:

Dat

e:

Sca

le:

Job

#P

art

#

Titl

e:

Dw

g. #

Siz

e:S

ht.

No.

:R

ev.:

TOLE

RAN

CES

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D

B

DO

NO

TSC

ALE

DRA

WIN

G

AA

S

ASD

I STD

1of

1

8077

0

0903

-800

5A

5/23

/201

81:

4 A

ND

NO

TED

INTE

RPRE

T TH

IS D

RAW

ING

IN A

CC

ORD

AN

CE

WITH

AN

SI/A

SME

Y14.

5-20

09

DN

THIS

DRA

WIN

G S

HALL

NO

T BE

REP

ROD

UCED

OR

USED

IN A

NY

MA

NN

ER D

ETRI

MEN

TAL

TO IT

S IN

TERE

STS.

ALL

RIG

HTS

RESE

RVED

CO

PYRI

GHT

ALG

AS-

SDI.X

0

.10

.XX

0.0

3.X

XX

0.0

1A

NG

LE

1FR

AC

TION

S 1

/4"

THIR

D A

NG

LEPR

OJE

CTIO

N

ZIM

MER

DRA

IN K

IT IN

STA

LLA

TION

Page 45: Innovative liquid vaporizing and gas mixing solutions ZIMMER
Page 46: Innovative liquid vaporizing and gas mixing solutions ZIMMER
Page 47: Innovative liquid vaporizing and gas mixing solutions ZIMMER

32

Page 48: Innovative liquid vaporizing and gas mixing solutions ZIMMER

 

Algas-SDI International, LLC 151 S. Michigan Street Seattle, Washington 98108 USA Ph.: 1.206.789.5410 Fax.: 1.206.789.5414 www.algas-sdi.com