Innovative gas compression, gas upgrade and hydrogen ...
Transcript of Innovative gas compression, gas upgrade and hydrogen ...
[email protected], www.rehydrogen.com 1
Innovative gas compression, gas upgrade
and hydrogen production
RE Hydrogen Ltd Clean and Cool Mission winner company
http://www.youtube.com/watch?v=mjr0z_oWuio http://vimeo.com/39006903
November 2012
[email protected], www.rehydrogen.com 2 2 2
Dunsfold Park, Surrey-RE Hydrogen
BBC's Top
Gear Studio
Runway
CFS
over 1 mile
RE Hydrogen
150kW solar PV 2MW solar PV
[email protected], www.rehydrogen.com 3 3 3
FSE Group,
£120K
Sep11
Aug 11
Patents
H2 Refueller, 350 bar
July 2014
Dec 2012
£100m Trade sale
IPO, exit
• Electrolyser
• Compressor
• Biogas Upgrade
• CO2 capture
July 2012
ALKH2
Project, TSB
£208K
Nov 11
100kW electrolyser
July 2013
Private
investment
Our History & Growth Plan
Launch Biogas upgrade Unit
Launch Electrolyser
Launch 200bar CNG refueller
Historical records:
delivery of projects
Revenue
investment
By Dr Roy
Jan 10
Integration
Project, TSB
£296K, Nov 12
[email protected], www.rehydrogen.com 4
Our ongoing projects
The hatched box shows the technology demonstration/ milestone.
Beginning of the revenue.
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Finance South East (£120,000) Build 5kW electrolyser prototype
RABH2 (£414,870) Install 5kW electrolyser at BOC
ALKH2 (£415,000)
Use 5kW for grid balancing by
Flexitricity
Total system Integration (£596,000) Install 50kW electrolyser & H2 refueller,
Compressor & Biogas upgrade commercial
order:
Build Compressor and Bio-methane
upgrade unit
CNG Refueller Develop 250 bar CNG refueller
Revenue- biogas-upgrade-CHP
Revenue- compressor
Revenue - refueller (CNG, H2)
Revenue - electrolyser
Revenue- Green H2, O2, CO2
2014 2015ObjectivesProjects 2012 2013
[email protected], www.rehydrogen.com 5 5
Working with
Solar PV
Catalyst
Fuel Cell Cars
Refuelling, H2, CNG
Refuelling, billing,
servicing
Smart Grid
Membrane
Hydrogen ICE-CHP
[email protected], www.rehydrogen.com 6 6 6
Competitive Grants, Awards, investment
1. £298,000 from the Technology Strategy Board (July 2012): Total cost=£596,000.
2. £207,500 from the Technology Strategy Board (Nov 2011): Total project cost =£415,000.
3. £207,000 from the Technology Strategy Board (March 2011): Total project cost =£414,000.
4. Investment: £120,000 Commercialisation fund from Finance South East (August 2011): to undertake third party field trials by BOC & Flexitricity.
5. £25,000 from the Technology Strategy Board (October 2009): Total spent= £36,000.
6. £25,000 in the “Innovate10” competition of the TSB (October 2010): Total spent = £30,000.
7. £3,000 from the Intellectual Property Office (November 2010): to undertake IP Audit.
8. The Carbon Trust (UK) on independent market due diligence for RE Hydrogen (June 2011).
9. Rushlight Awards Commended (March 2011).
10. Beginning of EIS- investments.
RE Hydrogen has won competitive grants for projects worth £1,618,000.
Selected as the top 16 cleantech start up under the Clean and Cool Mission by the TSB & UKTI.
[email protected], www.rehydrogen.com 7 7 7 7 7
USP across three divisions in the company
2. Compressor Silent, safer and rapid compressor, suitable for H2, natural gas.
Refueller for CNG and hydrogen at 70% lower cost at higher
efficiency.
3. Biogas upgrade and CO2 capture Convert raw biogas into pure methane fuel at 70% lower price, and 50% more efficiency for electricity generation and transport fuel.
1. Electrolyser Hydrogen at £3.6/kg H2 by an advanced electrolyser.
Market price of hydrogen = £11 – 25 /kg H2.
For each 1kg H2, 7.8kg oxygen is also produced as by-product.
[email protected], www.rehydrogen.com 8
Biogas Challenges and our Solution
Impure Biogas Bio-waste
8
Pure Biogas
RE Hydrogen’s solution
Our technology is simpler, smarter, 50% more efficient at 70% lower cost.
[email protected], www.rehydrogen.com 9
Conventional Scrubbing biogas upgrade process
100m3/h: Costly, bulky, visually intrusive Ref: Chesterfield biogas
Ours is compact,
containerised
[email protected], www.rehydrogen.com 10
Features Conventional Technology RE Hydrogen Technology
Energy consumption
0.5 -1 kWh / Nm3 Up to 7.5% to 15% loss of energy contained in biogas.
0.17 kWh / Nm3
3% loss of energy/ 50% more efficient
CH4 lost in the clean-up process 5-10% 2% (predicted) Capital cost, 100Nm3/h plant £700,000 70% lower (expected)
Explosion Safety Must be ATEX Rated Inherently Safer Waste disposal Chemical disposal No chemical used Maintenance cycle Every ~500 hours
(Compressor) ~8500 hours
(anticipated)
Construction time to build plants 2-3 man weeks Hours/Days (projected) Plant size >100 Nm3/h 1-10,000Nm3/h
Biogas upgrade- our USP
[email protected], www.rehydrogen.com 11
Biogas upgrade market size Biogas upgrade market is significant.
Biogas Market to Nearly Double in Size to $33 Billion by 2022. http://www.pikeresearch.com/newsroom/global-biogas-market-to-nearly-double-in-size-to-33-billion-by-2022
Germany’s targets 10% electricity from biogas by 2030; and 6% by 2020. http://www.crossborderbioenergy.eu/fileadmin/user_upload/Stolpp.pdf
Biogas could deliver between 3–5 Terawatt hours (TWh) of electricity by 2020 in
the UK. http://www.defra.gov.uk/publications/files/anaerobic-digestion-strat-action-plan.pdf
10% of UK’s domestic customer gas supply by 2020 is a reasonable target from
biogas. http://www.cngservices.co.uk/assets/Presentations-2/GB-Biogsas-Market-Developments.pdf.
10 million biogas plants are in India and 30 millions are in China in operation. RE
Hydrogen aims 1% of this market to produce pure methane for electricity
generation. The value of this 1% target market is $600 million/year.
[email protected], www.rehydrogen.com 14
Hydrogen can replace petrol 1kg H2= 1 US gallon petrol = 3.78lt
14
2012 2014 2020 2018 2016
£3.6/kg H2
£5.7/ US gallon
petrol
Country Y
Country X
[email protected], www.rehydrogen.com 15
Smart
Grid
balancing
Hydrogen
Engine
Compressor
Electricity
Heat Fuel cells
camera/lights
Green Hydrogen
Electrolyser stacks RE Hydrogen’s office
solar
PV
CNG/
Biomethane Hydrogen
Our total integration project using hydrogen
[email protected], www.rehydrogen.com 16
Cost breakdown of Hydrogen
Our cost
£3.60/ kg
Current cost
£10.90/ kg
£0.00
£2.00
£4.00
£6.00
£8.00
£10.00
£12.00
Total cost of
hydrogen, £/kg
Capital cost Electricity cost Maintenance
cost
Co
st,
£/
kg
RE Hydrogen Conventional Electrolyser
[email protected], www.rehydrogen.com 17
UK’s first green hydrogen supply chain
http://www.boconline.co.uk/en/news-and-media/press_releases/news2011-10-10.html
www.rabh2.co.uk
[email protected], www.rehydrogen.com
Online data acquisition for performance monitoring of the rooftop solar panel
19
[email protected], www.rehydrogen.com 20
RE Hydrogen divisions
Electrolyser Compressor-
refueller
Bio-methane
upgrade
Our market prioritisation
Growth rate Low High
Market size
High 1. Bio-methane
upgrade
3. REH
Electrolysers
2. Compressor-
refueller (CNG, H2)
Conventional
Electrolysers
[email protected], www.rehydrogen.com 21
Ma
rke
t E
mp
ha
sis
Product Emphasis
EXISTING NEW
EX
IST
ING
N
EW
Market Penetration
- Hydrogen and oxygen gas sale
- Compressor (air)
Product Development
- Biogas upgrade
- Refueller (CNG, H2)
- Electrolyser
Diversification
- Crude natural gas cleaning unit
- Syngas cleaning unit
- Waste treatment using oxygen
- CO2 capture
Market Development
B2B
- Energy storage
- Hythane
- Smart grid
Strategic Planning
[email protected], www.rehydrogen.com
Management Team
• Dr Amitava Roy (CEO): 17 years experience; Chief Scientist-Manager at AFC Energy Plc to AIM
listing (2006-2010); Director at Bryte Energy providing consultancy services to E.On, RDAs, International Energy Agency. Designed & installed 8MWh Wind-Hydrogen energy storage scheme in 2002-2006 in Loughborough; Honorary Research fellow at Strathclyde University; MBA (part time ongoing), PhD (Loughborough 2006). Invited Author (Elsevier Publications); Lecturer in India (7 years).
• Jeff Slade (Business Development Director):
20 years experience in cleantech sector at the Managing Director level in large companies.
• Bharat Thakrar (Financial Advisor):
Qualified accountant, taxation, forecasting, financial controller in $Billion turnover companies.
• Julian Tolley (Commercial Advisor):
Qualified electronics engineer, Over 20 years experience in the City on both the buy and sell side. IPO.
• David Weaver (Strategic Advisor):
Involvement in mergers, acquisitions, floatations. Ex Managing Director at BP Gas and renewable.
• Shampi Roy, (Director):
3D Studio Max, AutoCAD, for 2D & 3D-modelling and animation); SAGE, Accountancy.
[email protected], www.rehydrogen.com
Thanks
Dr Amitava Roy
078 388 72 678
+44-(0) 1483-275398
www.rehydrogen.com
23