1 The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved. growth team membership™ guidebook summary Firm: Dow AgroSciences LLC Industry: Chemicals, food ingredients, and biotechnology Headquarters: Indianapolis, Indiana, United States Geographic Footprint: Global Ownership: Public—A wholly owned subsidiary of Dow Chemical Revenue (2009): $4.5 billion USD Innovation Portfolio Management Process Problem: Due to the size and scale of its innovation portfolio, Dow AgroSciences (DAS) finds it challenging to consistently assess project risks, compare projects, and measure portfolio value. Solution: Dow AgroSciences employs a portfolio management system that uses standardized project data to evaluate, manage, and compare projects individually and across the entire portfolio. Business Results: Dow AgroSciences surpassed its 2001–2010 Compound Annual Growth Rate (CAGR) goals by 8% by the end of 2008 and increased the percentage of realized expected value by 50%. Resources Required: Full-time process leader and one half- or full-time administrator Network infrastructure commensurate with size and scale of the business Portfolio management consultant* and web-based software* system totalling: $150–$300,000 USD start-up cost - $150–$500,000 annual operating costs - Applicability of Best Practice to Executive Functions: Function Applicability R&D/Innovation Corporate Strategy Best Practice Guidebook * Dow consulted with SmartOrg for its software solution.

Transcript of Innovation Portfolio Management Process - SmartOrg

Page 1: Innovation Portfolio Management Process - SmartOrg

1

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

growth team m e m b e r s h i p™

guidebook summary

Firm: Dow AgroSciences LLC

Industry: Chemicals, food ingredients, and biotechnology

Headquarters: Indianapolis, Indiana, United States

Geographic Footprint: Global

Ownership: Public—A wholly owned subsidiary of Dow Chemical

Revenue (2009): $4.5 billion USD

Innovation Portfolio Management Process

Problem: Due to the size and scale of its innovation portfolio, Dow AgroSciences (DAS) finds it challenging to consistently assess project risks, compare projects, and measure portfolio value.

Solution: Dow AgroSciences employs a portfolio management system that uses standardized project data to evaluate, manage, and compare projects individually and across the entire portfolio.

Business Results:Dow AgroSciences surpassed its 2001–2010 Compound Annual Growth Rate (CAGR) goals by 8% by the end of 2008 and increased the percentage of realized expected value by 50%.

Resources Required: Full-time process leader and one half- or full-time administrator•Network infrastructure commensurate with size and scale of the •businessPortfolio management consultant* and web-based software* •system totalling:

$150–$300,000 USD start-up cost -$150–$500,000 annual operating costs -

Applicability of Best Practice to Executive Functions:

Function Applicability

R&D/Innovation

Corporate Strategy

Best Practice Guidebook

* Dow consulted with SmartOrg for its software solution.

Page 2: Innovation Portfolio Management Process - SmartOrg

2

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

The portfolio management process prioritizes, monitors, and evaluates the entire innovation portfolioThe Portfolio Management Process

Make Project and Portfolio Investment

Decisions

Assess Project Progress

Eliminate Project Risks and Improve Value

Establish Baseline Project Values

Use Strategy and Investment Criteria to Screen Projects

what is an innovation project?

Dow AgroSciences (DAS) uses a web-based, integrated portfolio management system to track all innovation projects that qualify for funding. DAS’ innovation projects are either entirely new or extend an existing product line and can run multiple years. For the purposes of this guidebook we have simplified DAS’ multi-tiered innovation portfolio to the following three levels:

Projects • —a single innovation based on a specific technology for a specific purpose (e.g., a rice insecticide)Product Line • —all projects (new innovations and line extensions) in the same product family (e.g., all rice insecticides)Business Unit • —all product lines that fall under one of Dow’s market segments (e.g., pest management)

Objective Set strategy and investment needs for innovation projects.

ObjectiveDevelop commercial assumptions for each project and enter them into the portfolio management system.

ObjectiveIdentify the indicators with the greatest impact on project value and mitigate those uncertainties.

ObjectiveEvaluate performance and strategic fit of individual projects and across business units.

ObjectivePerform annual project prioritization and funding allocation.

Key ParticipantsPortfolio Management Forum (PMF):The executive team, comprised of the R&D leader and Global Business Line leaders, meets annually to evaluate the portfolio’s strategic fit and funding allocation.

Key ParticipantsGlobal Business Line Management Teams (GBLMT):The management team for each business unit (BU) sets innovation strategy and manages its product portfolio.

Key ParticipantsPortfolio Management Forum (PMF)

Key ParticipantsLocal Market Teams:Cross-functional, local market teams enter information into the portfolio management system and perform tactical project work.

Project Success Leaders:These global project owners direct the activities of local market teams and cross-functional project core teams comprised of biology, regulatory, supply, and finance representatives. Project Success Leaders report to their respective Global Business Line Management Teams (see step 4).

Page 3: Innovation Portfolio Management Process - SmartOrg

3

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

key takeaway: Establish strategy requirements and investment hurdles for innovations entering the portfolioDAS’ Portfolio Management Forum (PMF) uses three screening criteria to determine whether a project should enter the portfolio management system and receive funding

Qualifying for the Portfolio Management System

INVEST GROW DEFEND MANAGE FOR CASH

Productivity Rate (NPV/ Cost)

>5 >10 >15 >20

IRR% (Internal Rate of Return) >25% >40% >60% >75%

Payback Years <10 years <8 years <6 years <4 years

INVEST GROW DEFEND MANAGE FOR CASH

RENEW

Product Line Life Cycle Stages

Project “X” Illustrative Example

Classification and Hurdles

Market Attractiveness Factors

Growth rate•Size•Political/social factors•Technology factors•

Due to these projects’ high growth and profit potential, their investment hurdles are relatively low.

Because these projects have a low potential for future growth and their profits are more at risk, their investment hurdles are relatively high.

Competitive Strength Factors

Market share•Brand equity•Distribution reach•Profitability•

Market Attractiveness Matrix (Illustrative)

DAS Competitive Strength

Weak

Market Attractiveness

L

H

HL

Is the project in one of DAS’ strategic markets?

What is the project’s life cycle stage?

Does the project meet the minimum investment hurdles for

its life cycle classification?

The Market Attractiveness Matrix helps determine DAS’ ability to achieve a profitable long-term market position. The PMF updates the Matrix every two years to analyze its portfolio, identify attractive markets, and determine where to increase or decrease investments.

To ensure an optimal blend of new and mature products, the PMF gauges the life cycle stage of any new product under consideration. Entirely new innovations are automatically classified as “invest” projects, while all other innovations are classified based on the their life cycle stage and market’s attractiveness (per the Matrix).

PMF follows predetermined investment hurdles to determine innovation eligibility in the current budget cycle. The classification system removes the least strategic projects and gives insight to the expected value DAS should realize from its investments.

Idea: Project X is a rice insecticide line extension replacing an existing product in three years. Rice is a large but weak market for DAS, given its many competitors, low prices, and low margins.

A rice line extension project falls into the “defend” product life cycle stage. However, given DAS’ weak competitive position in the rice market, the PMF downgrades it to “Manage for Cash.”

As a “Manage for Cash” investment, Project X meets the required investment hurdles—Productivity (22:1 per $ spent), IRR (76%), and Years to Payback (2 years)—and therefore enters the portfolio management process.

Sales

Profit

Rice

Strong

LateEarly

Page 4: Innovation Portfolio Management Process - SmartOrg

4

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

TitleProject “X”

Background InformationProject “X” is a line extension of Project “XYZ” for managed rice crops

ObjectiveProject “X” will replace existing product in the Southern U.S. managed rice crop insect protection product line when it sundowns in 3 years

Probability of Technical Success 0.6 Probability that all technical requirements

will be achieved

Define

Review Guidelines

Background Information

Assess Inputs

Manage Data sets

Technical Success

Review Evaluation

Uncertainty Diagram

Comparison and Tracking

Commercial Assumptions

10 Indicators Units Low Base High Last Change

Price at maturity

Local currency per unit

7.5 9 10.5 6/3/2008

Volume at maturity

1,000s of units 100 150 200 6/3/2008

Cost at maturity

Local currency per unit

2 3 4 7/15/2008

Impact of cannibalization

Compendium of measures -7.5 -13.5 -21.0

Development costs $1,000s USD 0 1 2

Capital investment $1,000s USD 2 3 3

Impact of technical failure Compendium none average high 7/15/2008

Product life cycle shape Compendium short medium long

Incremental Selling Manpower

$1,000s of local currency

3 10 15

Promotion Costs

$1,000s of local currency

12 20 30

key takeaway: Create commercial market assumptions based off predetermined indicators of projects’ value

ten indicators of project value

Price at maturity 1. Volume at maturity 2. Cost at maturity 3. Impact of cannibalization (by market and by 4. new product) Development costs for project 5. Capital investment required 6. Impact on maturity sales of technical failure 7. Shape of product life cycle 8. Incremental selling manpower9. Promotion costs10.

predicting innovation success

DAS evaluated 15 years of financial data to reduce 100+ data points used in innovation assessments to the 10 indicators listed above. These indicators ensure project teams focus on factors most likely to determine project success. Additionally, these ten indicators enable apples-to-apples comparisons across all projects.

DAS identifies ten key indicators of a project’s value

Generate Commercial Assumptions

Project teams then establish assumptions around each indicator and input the information into the portfolio management system

Ranges save time spent on “perfecting” the numbers.

Project “X

Local Market Team

Project Success Leader

Project X Homework Meeting1–2 hour discussion led by the •Project Success Leader Cross-functional representatives •from key areas of accountability: Commercial, Biology, Regulatory, FinanceDiscussion of factors influencing •each indicator’s low- and high-value assumptions

Document rationale for the range -and revisit annually

Assumptions are estimates for each indicator based on market research and industry/market experience.

Input Commercial Assumptions

Portfolio Management System

Page 5: Innovation Portfolio Management Process - SmartOrg

5

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

key takeaway: Evaluate assumptions to identify the indicators with the greatest impact on a project’s commercial value

The tornado diagram depicts the impact of uncertainty on the assumptions governing each of the ten key indicators; it calculates the NPV for each of its high, base, and low values; the longer the bar, the greater the uncertainty and its impact on project NPV

0 1 2 3 4 5 6

0 1 2 3 4 5 6Volume at Maturity

Price at Maturity Price at MaturityUnit Cost at Maturity

Unit Cost at MaturityImpact of Cannibalization

Development Costs

Capital Investment

Impact of Technical Failure on Sales

Product Life Cycle Shape

Incremental Selling Manpower

Combined Uncertainty Combined Uncertainty

NPV ($ Millions)

NPV ($ Millions)

10 Indicators

10 Indicators200,000100,000

$10.5$7.5

Base Case NPV ($3.3M)

Base Case NPV Before

Action ($3.3M)

Base Case NPV After

Action ($4.0M)

Before Action (Illustrative) After Action (Illustrative)

Combined Uncertainty depicts the range of NPV values based on a statistical analysis of all the uncertainties. The longer the bar, the greater the team’s uncertainty about its assumptions, and the lower the expected value of the project.

Uncertainty for Volume at Maturity narrows from $4.1 M to $2.0 M NPV…

…The Combined Uncertainty decreases… …and the expected project value

improves from $3.3 M to $4.0 M.

Local Market Teams reduce “Volume at Maturity” uncertainty by strengthening their assumptions. They conduct a customer satisfaction and willingness-to-pay survey for the new product. Based on this information, the team can narrow its assumptions, thereby reducing uncertainty and improving project net present value (NPV).

200,000175,000

100,000150,000

$10.5$10.5

$7.5$7.5

Volume at Maturity

Impact of Cannibalization

Promotion Costs

Tornado Diagram Analysis

Page 6: Innovation Portfolio Management Process - SmartOrg

6

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

Project X

Baseline Submission

Current Submission

2010 PMF Submission

Project

Expected Value (NPV—$ Millions) 4.34 6.11 7.01

Expected Cost (total costs $ millions) 0.34 0.43 0.27

Productivity (NPV/expected cost)—The greater the value, the greater the profit margin for the product

12.65 14.30 25.43

IRR (Internal Rate of Return—Yield of the investment) 0.73 1.01 4.68

Years to PayBack (# of years) 3.7 3.1 1.3

Cost Budget 2010 (Annual $ spent —millions) 0.06 0.21 0.17

Cost Budget 2011 0.01 0.15 0.15

Cost Budget 2012 0.00 0.14 0.15

Average Products

Number of Products 2 2 3

Expected Products Values 2.17 3.05 2.34

Expected Commercial Value Given Technical Success 3.91 3.44 2.55

Probability of Technical Success 0.60 0.95 0.95

Expected Products Cost 0.17 0.21 0.09

Cost Budget 2010 0.03 0.11 0.06

Cost Budget 2011 0.00 0.08 0.05

Cost Budget 2012 0.00 0.07 0.05

0 6 12 180

6

12

18

Project XProject Y

key takeaway: Continuously assess individual project values to validate progress

Project XAbove annual target line •Performing better than •its project planChange is positive; •changes less than 10% are; not out of scope

Annual Target Line

Baseline Project Value (NPV $ million)

Current Project Value

(NPV $ million)

Baseline values are the input values from when a project is approved. The baseline values also incorporate any approved changes.

Financials should improve as uncertainties are reduced and projects move to completion.

The Global Business Line Management Team uses project financial statements to monitor year-on-year performance…

Project Financial Statement

Illustrative

…and value-tracking charts to provide visibility into projects’ expected performance over time

Project Value-Tracking Chart

Illustrative

global business line management team

Global Business Line Management Teams evaluate project performance on three levels: project, product line, and portfolio. The GBLMT evaluates Global Project Success leaders’ progress in managing the value and uncertainties of their individual projects.

6.11

4.34

Project Y falls far below its annual target line and is performing beneath the minimum standardGreater than 10% decrease in value•Requires in-depth project review•

In-Depth Project Y ReviewThe GBLMT focuses on projects with a 10% +/- change •in NPV. Local Market Teams root cause the change in project •value (e.g., invalid assumptions, technical issues, cost overruns, competitor action) and determine whether performance can improve by the next annual review.The GBLMT prescribes next steps ranging from risk •mitigation to project termination.

Page 7: Innovation Portfolio Management Process - SmartOrg

7

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.0 1 2

0

20

40

60

80

100

0 1 2 3 4 5 60

20

40

60

80

100 Cumulative Project Value

key takeaway: Assess each business unit’s portfolio by value and risk to allocate further fundingGlobal Business Line Management Teams use the CFO charts, Commercial Uncertainty charts, and other considerations

to conduct annual portfolio assessments and submit a prioritized project list to the Portfolio Management Forum

additional assessment tools

The portfolio management system allows DAS to easily assemble projects into portfolios and compare across all BU’s. The value and risk tools are the primary considerations along with:

Market timing •Probability of Technical Success chart •Expected Project Value chart •Cash Flow •

The Commercial Uncertainty chart complements the CFO chart by illustrating the risks associated with each project. Based off this analysis, teams can adjust projects’ prioritization in the funding queue.

Interpreting the CFO ChartHigh Productivity Projects (X, A, C) create the most value per unit cost.

Project X has an NPV of ~$28 M, with costs of $200K, resulting in a •productivity ratio of 140:1.

Marginal Projects (Y and F) are still productive projects, but may not stack up when compared across all business units.Low Productivity Projects (D and Z) produce the least value per unit cost and are at risk of losing funding.

-20 0 20 40 60 80Range of Uncertainty—NPV ($ Million)

CFO Chart

Illustrative

Commercial Uncertainty Chart

Illustrative

Risk PrioritizationProject prioritizations are adjusted based on considerations such as risk versus return.

Project X

Project A

Project C

Project Y

Project F

Project D

Productivity PrioritizationProjects are prioritized based on investment productivity, from most to least productive, and plotted in the CFO chart.

High Value

Low Value

Cumulative Project Value (NPV $Million)

Cumulative Project Cost (NPV $Million)

Project Z

Project D

Project F

Project C

Project A

Project X

Project Y

Page 8: Innovation Portfolio Management Process - SmartOrg

8

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

key takeaway: Focus budget allocation on high-value, strategically aligned projectsA two-pass funding process first funds high productivity, strategically aligned projects and then “the best of the rest”

Two-Pass Annual Portfolio Funding Process

Still-unfunded projects from all BU’s are pooled and compete for the remaining budget.

BU Line 1

BU Line 2

BU Line 3

BU Line 4

Low Value

High Value

+ + + = $160M

The PMF approves a predetermined percentage of the projects each business unit prioritizes as most valuable (represented by the green bars below).

The Portfolio Management Forum (PMF) meets annually to evaluate the complete innovation portfolio and make cross-business unit funding decisions. The PMF compares the available budget to the requested funding and determines which projects to fund on the first pass.

Decisions are finalized and communicated to the business units within 48 hours of the meeting. The PMF also puts 10 projects on a waiting list for possible off-cycle funding. Should spending or viability of a funded project change resulting in a budget gain, the PMF selects the next feasible project.

Requested project funding:$200 M

The PMF determines it will fund 80% ($160M) of the project requests. This “first pass” quickly turns the funding conversation to the projects on the margin. In doing so, the PMF can examine these projects more closely and make decisions to maximize value.

Innovation Budget:$175 M

Hold Annual Funding Meeting Fund the Best Projects Fund the “Best of the

Rest” Projects Finalize Project List

The Portfolio Management Forum From: The PMF

To: Business UnitSubject: Alternates

From: The PMFTo: Business UnitSubject: Approved Projects

Approved Projects:Project X•Project A•Project C•Project Y•

Rejected Projects:Project F•Project D•Project Z•

($15M still to be allocated)

Best of the Rest

Illustrative

Project BU Cost

ZZ Rice $2 M

Z Small Grains $2 M

Q Insect Control $3.5 M

AA Corn Herbicides $2.5 M

B Pest Mgmt. $2.5M

K Small Grains $2.5 M

L Corn Herbicides

AD Turf$15 M

Page 9: Innovation Portfolio Management Process - SmartOrg

9

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

Business ResultsDow AgroSciences has increased project management efficiency and value capture…

Improved Project Success

Sales

MarginThe portfolio management system enables Project Success Leaders to make accurate forecasts and increase captured value from each project.

* Non-GAAP financial measure; excludes certain items.

0%

5%

10%

15%

20%

25%Sales CAGR

CAGR Actual2001–2007

CAGR Goal2001–2010

0%

5%

10%

15%

20%

25%Sales CAGR

CAGR Actual2001–2007

CAGR Goal2001–2010

Sales CAGR EBIT* CAGR

…leading to greater sustained value in its portfolio over time, as well as the attainment of its growth goals

Average % Captured of

Forecasted Sales and Margin

0%

50%

100%Margin

Sales

Post-PortfolioManagement System

Pre-PortfolioManagement System

Page 10: Innovation Portfolio Management Process - SmartOrg

10

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

Key Lessons Learned

Profiled Company Perspective

Successfully combining portfolio and project management requires the right balance of people, process, and •systems. The appropriate balance depends on your situation, but over or under resourcing any one of these areas tends to undermine the success of the others.

Data modeling is an effective way to reduce effort and save time without a corresponding loss in information. •Less can be more when you avoid focus on a single, “perfect” number.

Allowing users to reflect uncertainty in their inputs generates more realistic values and data ownership. -The inputs also show project teams where they should try to reduce project uncertainty and improve project value.

A system that is transparent to all stakeholders provides tremendous benefits. •

Clear project metrics provide team members immediate feedback on their projects. Paired with investment -guidelines, teams gain a frame of reference for the difference between marginal and acceptable projects.

A straightforward project approval process and clear prioritization criteria build trust for the process among -stakeholders. Consensus on which projects should be funded, rejected, or discontinued is much easier to achieve when everyone is referencing the same information.

Strategy should be set at a corporate (i.e., global) level, and local market teams should own execution. That •said, the global team should not handle decision-making for local market projects. Local teams’ appreciation for region-specific nuances is critical to accurately predicting how a project might sell within a given market.

Not all portfolio management technology solutions are created equal. Finding the right software designed for •the task is important. Dow AgroSciences was looking for tools to aid in portfolio and project management; tracking project value, identifying uncertainties, and presenting alternatives through quantitative modeling. Dow chose Portfolio Navigator by SmartOrg because of this.

Page 11: Innovation Portfolio Management Process - SmartOrg

11

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

Supporting Tools & Resources Example: Project Financial Statement

Illustrative

Project X

Baseline Project Value

Current Project Value Submission

Project

Expected Value (NPV—$ Millions) 4.34 6.11

Expected Cost (total costs $ millions) 0.34 0.43

Productivity (NPV/expected cost)—The greater the value, the greater the profit margin for the product 12.65 14.30

IRR (Internal Rate of Return—Yield of the investment) 0.73 1.01

Years to PayBack (# of years) 3.7 3.1

Cost Budget 2010 (Annual $ spent —millions) 0.06 0.21

Cost Budget 2011 0.01 0.15

Cost Budget 2012 0.00 0.14

Average Products

Number of Products 2 2

Expected Products Values 2.17 3.05

Expected Commercial Value Given Technical Success 3.91 3.44

Probability of Technical Success 0.60 0.95

Expected Products Cost 0.17 0.21

Cost Budget 2010 0.03 0.11

Cost Budget 2011 0.00 0.08

Cost Budget 2012 0.00 0.07

Page 12: Innovation Portfolio Management Process - SmartOrg

12

The contents of these pages are copyright © 2010 Frost & Sullivan. All rights reserved.

best practice guidebookgrowth team m e m b e r s h i p™

Source: Dow AgroSciences LLC; SmartOrg; Growth Team Membership™ research.

Supporting Tools & Resources SmartOrg

SmartOrg Inc.

SmartOrg, Inc. is a leading provider of decision support software that optimizes project/portfolio economic value—from concept to commercialization. Customers include Boeing Commercial Airplanes, Chevron Technology Company, Dow AgroSciences, Bayer CropScience, Hewlett-Packard and like companies in the U.S. and Europe. The flagship application, Portfolio Navigator™, is installed on company servers or hosted by SmartOrg. The system stands alone or is integrated with resource management applications such as SAP PPM.

For additional information, please visit www.smartorg.com or send email to [email protected]