Inland Port VII

8
± 952,956 SF Modern Warehouse Distribution Space Available 30901 W. 185th Street, Edgerton, KS Inland Port VII AT LOGISTICS PARK KANSAS CITY

Transcript of Inland Port VII

Page 1: Inland Port VII

± 952,956 SF Modern WarehouseDistribution Space Available

30901 W. 185th Street, Edgerton, KS

Inland Port VIIAT LOGISTICS PARK KANSAS CITY

Page 2: Inland Port VII

Overview

Logistics Park Kansas Citylogisticsparkkc.com

INLAND PORT VII

NorthPoint Development has recently completed a 952,956 square foot state-of-the-art distribution center at Logistics Park Kansas City (LPKC). Located in Edgerton, Kansas, a suburb southwest of Kansas City, LPKC is a 3,000+ acre masterplanned development served by BNSF Railway’s newest intermodal facility.

Inland Port VII, located at the southeast corner of 185th and Waverly Road, can accommodate manufacturing, warehouse and distribution tenants of varying size. Inland Port VII is also located near the entrance of BNSF’s intermodal facility, which offers access to international and domestic container service along with heavy haul corridor access.

Project Advantages

• Strategically and centrally located• Master-planned distribution and

warehouse development• Efficient movement of global goods• Reduced transportation costs• Optimize your supply chain• 3,000+ developable acres• 45+ million square feet of building

capacity• Access to heavy-haul corridor

KUBO

TA

Inland XI

IP XXIII1,064,000

S.F.

406,426 S.F.

IP VII160,314

S.F.

PerformanceTeam

IP VII160,314

S.F.

CLICK ORANGE CIRCLES FOR VIRTUAL TOUR

Page 3: Inland Port VII

��

��

������

��

��

��

���

���

���

��

��

���

��

��

��

��

��

SpecificationsINLAND PORT VII

Logistics Park Kansas Citylogisticsparkkc.com

Future Trailer Storage Up to 254 Stalls

Electric Service 3,000 Amps @ 480V 3P

Lighting LED

Heat High E Gas Fired MAU’s

Parking ± 449 Stalls

Zoning Logistics Park

Year Built 2020

Water JC WD 7

Sewer Edgerton - New Treatment Facility

Electricity Evergy

Gas Kansas Gas Energy

Fire Protection JC-1

Intermodal Access 2 Miles to BNSF Gate

I-35 3 Miles

Building Size ± 952,956 SF

Availability / Divisibility ± 952,956 SF / down to ± 300,000 SF

Taxes $0.62 / SF (fixed)

Insurance Estimated $0.06 / SF

CAM Estimated $0.19 / SF

Dimensions ± 520’ x 2,152’

Office Space Build-to-Suit

Construction Concrete Tilt-up

Clear Height 36’ + Outside Speed Bay

Floor 7” Concrete Slab

Bay Spacing 52’ x 50’ (Typical), 52’ x 60’ (Loading Bay)

Fire Protection ESFR

Loading 96 Dock-high (expandable); 4 Drive-in

Truck Court 60’ Concrete Aprons, 8” Concrete

KANSASCITY

Overland Park

Olathe

Leavenworth

Independence

EdgertonLPKC

Centrally & Strategically Located

Efficient Movement of Global Goods

LPKC

BNSF Track

BNSF Transcontinental Rail Line

Logistics Park Kansas City

KANSAS

MISSOURI

Page 4: Inland Port VII

EAST

48'-2

"

10 5 123414 67891112131516171819202122232426 2527

48'-2

"

92 3 5 6 7 8 10 11 12 13 1514 16 17 18 19 201 21 22 23 24 25 26 274

A1.08OVERALL FLOOR PLAN

Scale: 1:50

OVERALL EAST ELEVATION1

Scale: 1:50

OVERALL WEST ELEVATION3

DescriptionDateNo.

Issued For: Final Development Plan

Date: 09.30.16

Project No. 2016-32

Revisions:

CIVIL

LANDSCAPE

FOUNDATIONS

STRUCTURAL

PLUMBING

MECHANICAL

ELECTRICAL

FIRE PROTECTION

CONTRACTOR

5015 NW Canal Street | Suite 200 | Riverside, MO 64150816 | 888 | 7380

RENAISSANCE INFRASTRUCTURECONSULTING

RENAISSANCE INFRASTRUCTURECONSULTING

NorthPoint Development, LLCKansas Certificate of Authorization No. A-1099

30900 W 185th St · Edgerton, KS

Inland Port VIII

Robert H. Waters III - ArchitectKansas License No. 4297

Inland VII Floor Plan

EAST

48'-2

"

10 5 123414 67891112131516171819202122232426 2527

48'-2

"

92 3 5 6 7 8 10 11 12 13 1514 16 17 18 19 201 21 22 23 24 25 26 274

A1.08OVERALL FLOOR PLAN

Scale: 1:50

OVERALL EAST ELEVATION1

Scale: 1:50

OVERALL WEST ELEVATION3

DescriptionDateNo.

Issued For: Final Development Plan

Date: 09.30.16

Project No. 2016-32

Revisions:

CIVIL

LANDSCAPE

FOUNDATIONS

STRUCTURAL

PLUMBING

MECHANICAL

ELECTRICAL

FIRE PROTECTION

CONTRACTOR

5015 NW Canal Street | Suite 200 | Riverside, MO 64150816 | 888 | 7380

RENAISSANCE INFRASTRUCTURECONSULTING

RENAISSANCE INFRASTRUCTURECONSULTING

NorthPoint Development, LLCKansas Certificate of Authorization No. A-1099

30900 W 185th St · Edgerton, KS

Inland Port VIII

Robert H. Waters III - ArchitectKansas License No. 4297

Inland VII Floor Plan

EAST

48'-2

"

10 5 123414 67891112131516171819202122232426 2527

48'-2

"

92 3 5 6 7 8 10 11 12 13 1514 16 17 18 19 201 21 22 23 24 25 26 274

A1.08OVERALL FLOOR PLAN

Scale: 1:50

OVERALL EAST ELEVATION1

Scale: 1:50

OVERALL WEST ELEVATION3

DescriptionDateNo.

Issued For: Final Development Plan

Date: 09.30.16

Project No. 2016-32

Revisions:

CIVIL

LANDSCAPE

FOUNDATIONS

STRUCTURAL

PLUMBING

MECHANICAL

ELECTRICAL

FIRE PROTECTION

CONTRACTOR

5015 NW Canal Street | Suite 200 | Riverside, MO 64150816 | 888 | 7380

RENAISSANCE INFRASTRUCTURECONSULTING

RENAISSANCE INFRASTRUCTURECONSULTING

NorthPoint Development, LLCKansas Certificate of Authorization No. A-1099

30900 W 185th St · Edgerton, KS

Inland Port VIII

Robert H. Waters III - ArchitectKansas License No. 4297

Inland VII Floor PlanFloor Plan

Logistics Park Kansas Citylogisticsparkkc.com

INLAND PORT VII

Page 5: Inland Port VII

EAST

48'-2

"

10

51234

14

6789111213

1516171819202122232426 25

27

48'-2

"

9

2 35 6 7 8

10 11 12 131514

16 17 18 19 20

1

21 22 23 24 25 26 27

4

A1.08OVERALL FLOOR PLAN

Scale: 1:50

OVERALL EAST ELEVATION1

Scale: 1:50

OVERALL WEST ELEVATION3

DescriptionDateNo.

Issued For: Final Development Plan

Date: 09.30.16

Project No. 2016-32

Revisions:

CIVIL

LANDSCAPE

FOUNDATIONS

STRUCTURAL

PLUMBING

MECHANICAL

ELECTRICAL

FIRE PROTECTION

CONTRACTOR

5015 NW Canal Street | Suite 200 | Riverside, MO 64150816 | 888 | 7380

RENAISSANCE INFRASTRUCTURECONSULTING

RENAISSANCE INFRASTRUCTURECONSULTING

NorthPoint Development, LLCKansas Certificate of Authorization No. A-1099

30900 W 185th St · Edgerton, KS

Inland Port VIII

Robert H. Waters III - ArchitectKansas License No. 4297

Inland VII Site Plan

Logistics Park Kansas Citylogisticsparkkc.com

Site PlanINLAND PORT VII

Page 6: Inland Port VII

Drive Time MapINLAND PORT VII

Logistics Park Kansas Citylogisticsparkkc.com

35 70 KCICBD

5 mins 30 mins 35 mins 40 mins

Page 7: Inland Port VII

Logistics Park Kansas Citylogisticsparkkc.com

Demographics*INLAND PORT VII

Total Population3 miles5 miles10 miles

18,63627,27288,194

Number of Households10 miles5 miles3 miles

30,2829,2446,515

Median Household Income3 miles5 miles10 miles

$74,216$73,914$78,166

Median Home Value10 miles5 miles3 miles

$215,223$185,948$183,873

*2019 Statistics**Within 5 Miles

Population by Age**25-3435-4445-54

16.1%16.5%12.4%

Population by Race/Ethnicity**BlackHispanicWhite

3.3%5.8%89.9%

Educational Attainment**High School DegreeBachelor’s DegreeGraduate Degree

20.4%26.0%10.2%

Employed by Industry**Retail TradeManufacturingServices

10.7%10.9%43.4%

Page 8: Inland Port VII

CONTACT

913.469.4600jll.com/kansas-city

For leasing opportunities at Inland Port VII or LPKC, contact the exclusive commercial real estate agents Phil Algrim and Kevin Wilkerson at JLL.

LPKC is a cost-efficient solution for logistics-oriented companies focused on development.

Benefits include:• Competitive lease rates• Low net expenses• Affordable utilities• Immediate access to BNSF Railway’s Intermodal Facility• Financial incentives• Significant savings on drayage rates• A strong, reliable workforce• Convenient interstate highway access• Eligible for a Foreign Trade Zone

For more information about the benefits of co-locating a facility at LPKC, visit logisticsparkkc.com.