Transcript of Initial Load Test Procedure-Test Set Up-Design
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
1/26
Cut off level 2.0 Mts. w.r.to FGL
Double under reamed 500 mm dia. pile having working load capacity as uner………
50 M.T. Compressive Load
5.4 M.T. Lateral Load
Diameter and Length of Pile has been proposed as per POWER GRID / Approved soil investigation report
REV NIL DATE OWNER
REV 0 19.04.2016 EMPLOYER
PROJECT
NOA NO. SUPPLY
SERVICE
CONTRACTOR
TITLE
Total Sheet
26
PACKAGE -A UNDER INTEGRATED POWER
DEVELOPMENT SCHEME ( IPDS ) WORKS
IN OLD KASHI AREA OF VARANASI TOWN
OF UP UNDER DEPOSIT WORK OF PUVVNL.
PURVANCHAAL VIDYUT VITARAN NIGAM
LIMITED
POWER GRID CORPORATION OF INDIA
LTD.
CC-CS/713-NR1/CBL-3266/3/G7/NOA-
I/5607,Dated 12-12-2015CC-CS/713-NR1/CBL-3266/3/G7/NOA-
I/5608,Dated 12-12-2015
Initial Load Test Procedure, Test Set up and
desing of Test Pile
REMARK
FOR APPROVAL
KEI/VNS/2016/SS/CIVIL DSN-01
Initial Load Test Procedure, Test Set up and desing of Test Pile
Doc.No.
KEI INDUSTRIES LIMITED
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
2/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
PILE FOUNDATIONS
Types of Piles
Concrete Piles o Under Reamed Piles as per I.S.2911-Part 3.o Bored-cast in-situ pileso Driven Cast-in-situ Pileso Pre-cast Piles
Steel Piles
Pipe piles
Rolled steel H-section piles
Timber Piles
Composite Piles
Under reamed concrete piles
From above list, most widely adopted piles in firm grounds due to higher load capacity
requirement of foundations are under reamed pile concrete piles as per IS 2911 : Part 3.
Type and depth of Piles are based on following factors:
1. Strata of soil available at site
2. Load carrying capacity requirements (Horizontal and vertical)
3. Ground water condition
4. Type of structure to be supported
Double Under Reamed cast in-situ concrete piles:
1. Mark the position of pile bore at site as per drawing coordinates.
2. Align the drill rig/ bore machine on position.
3. Attach proper diameter tool of drilling as per pile diameter (bore tool is slightly
less in dimension if piles are cased/liner is used).
Page 1 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
3/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
4. Drill the bore up to design pile depth.
5. Control the alignment. If pile is design as vertical pile, it should not deviate
more than 1.5% (1.5cm per 100cm bore depth). More details as in IS 2911 part
2, cl 7.1.2.
6. If piles are drilled in stabilized soil, bentonite mud, permanent liner (for marine
situation) or casing up to required depth is to be provided to protect the sides of
bore wall from collapse.
7. During drilling operations, site Engineer has to take care that soil augured /
drilled from pile bore is matching with soil investigation bore logs as per visual
identification and pile is drilled and terminated in same strata assumed in pile
design as per bore logs.
8. After completion of drilling/boring of pile, lower the cage immediately and pour
the concrete.9. To do the concrete in fresh bore as possible as is very good practice of pile
foundation.
10. Concrete in pile foundations are done with trimie method suggested in IS 2911
Part 2 cl 7.5.
11. All precaution are to be taken mentioned in cl 7.5 (IS 2911 Part 2).
12. Pour the concrete at least up to 0.6m above cutoff level.
13. Record all the data necessary for pile log and pour card. (formats attached).
Concrete for Pile
:
Minimum grade of concrete for pile: M25 with minimum cement 400 kg/cu m. Slump requirement: 150 – 180 mm for trimie method concrete.
Page 2 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
4/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Pile test: (IS 2911: Part 4 - 2013 Load test on piles)
Initial load test
Scope: For determination of ultimate capacity of pile foundation done on
separate pile foundation drilled in same strata of project area. Generally
load is increased up to 2.5 times of design load or max allowable
settlement.
Routine load test
Scope: For confirmation of working capacity of pile foundations done on working
pile foundation of project. Generally load is increased up to 1.5 times of
design load.
o Static method
Maintained load method
Cyclic method
o Dynamic method (high strain integrity test method)
Non destructive test
o Low strain integrity test method
Static test
o Kentledge method
o Anchor reaction method
Maintained load method: for compression load test (IS 2911 part 4 cl 6.0)
1. Kentledge load method2. Anchor reaction method.
Load application: The test load was applied in a series of vertically down
ward incremental loads by means of a set of hydraulic jack connected to
hydraulic pump
Page 3 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
5/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Each increment should not more than 20% of design load.
Maintain each increment till pile displacement is less than or equal to 0.1mm
for first 30minutes or 0.2mm for first one hour or till 2hour whichever occurs
first.
Load increments are given up to test load is achieved.
Measurement of displacement/settlement: 2 strain gauges were used to
record settlements for single pile.
Maintain the test load for next 24 hours and take readings of displacement at
every 1 hour interval till end of 24th hour.
Unloading: After completion of 24 hrs with test load, load is decreased in
equivalent each increment loads after every 15 min. Rebounds reading were
taken immediately after unloading and 15 min later for each stage of
decrement. Safe load on single pile = least of following (As per IS 2911 Part 4)
o 2/3rd load at which the total displacement attains value of 12mm
o ½ load at which the total displacement attains equal to 10% pile
diameter.
o ½ load at which the total displacement attains equal to 7.5% pile bulb
diameter for under reamed piles.
Maintained load method: for lateral load test (IS 2911 part 4 Cl. 7.0)
Open pit was excavated to expose pile up to cutoff level.
The pile overflow concrete was dismantled and dressed with GP2 mortar to
smooth and horizontal top surface.
Hydraulic jack 1No, datum bar and other test assembly were erected as per
sketch attached.
Page 4 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
6/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Datum bar resting on immovable supports, fixed at a distance of 3.0 times the
diameter of pile from the center of pile.
1 No Strain gauge was installed against pile surface as shown in figure 1 with
the help of datum bar (Least count = 0.01mm).
Load application: The test load was applied in a series of lateral incremental
loads by means of a set of hydraulic jack connected to hydraulic pump
Each increment should not more than 20% of design load.
Maintain each increment till pile displacement is less than or equal to 0.1mm
for first 30minutes
Displacement: 2 strain gauges fixed on immovable datum bar support to
record settlements placed at 30cm spacing on pile stem face.
Unloading: After completion of 12 hrs with test load was decreased equivalenteach increment loads after every 15 min. Rebounds reading were taken
immediately after unloading and 15 min later for each stage of decrement.
Safe lateral load on single pile = least of following (As per IS 2911 Part 4)
o 50% of final load at which the total displacement attains value of 12mm
o Final load at which total displacement corresponds to 5mm
o Load corresponding to any other specified displacement as
performance requirement.
No of routine test required:
1. 0.5% of total piles to be installed increased up to 2% of total piles to be installed
depend on type of structure and variation in soil strata among total no of piles in
pile depth zone. (as per IS 2911 part 4 Cl 4.2)
2. 1 test per 200 piles.
Page 5 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
7/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
No of Initial pile load test required:
1. one test per 1km stretch
RELAVENT CODES:
IS 2911 : Part 1 : Sec 1 : 1979 Driven cast in-situ concrete piles
IS 2911 : Part 1 : Sec 2 : 1979 Bored cast-in-situ piles
IS 2911 : Part 1 : Sec 3 : 1979 Driven precast concrete piles
IS 2911 : Part 1 : Sec 4 : 1984 Bored precast concrete piles
IS 2911 : Part 2 : 1980 Timber piles
IS 2911 : Part 3 : 1980 Under reamed piles
IS 2911 : Part 4 : 1985 Load test on piles
IS 5121 : 1969 Safety code for piling and other deep foundations
IS 6426 : 1972 Specification for pile driving hammer
IS 6427 : 1972 Glossary of Terms Relating to Pile Driving Equipment
IS 6428 : 1972 Specification for pile frame
IS 9716 : 1981 Guide for lateral dynamic load test on piles
IS 14362 : 1996 Pile boring equipment - General requirements
IS 14593 : 1998 Bored cast-in-situ piles founded on rocks – Guidelines
Page 6 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
8/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
INITIAL / ROUTINE PILE LOAD TEST ON PILE FOUDNATION BY
ANCHOR REACTION METHOD
LOAD TEST ARRANGEMENT PROCEDURE
The load test was conducted as per IS 2911 (part 4). The pile shall be tested for initial
and routine test as under.
Test / method Initial Routine
Compression 2.5 x estimated design
capacity 125 M.T.
1.5 x design load – max. 75
equivalent static.
Pull out 2.5 x design load 1.5 x design load
Lateral 2.5 x estimated design
capacity 13.5 M.T.
1.0 x estimated design
capacity 5.40 M.T.
Pile foundation is proposed for Building as main unit and there is no pull out force in any
of these piles. In view of this, it is proposed to eliminate / not to conduct Initial Load Test
for Pullout Load.
PREPARATION OF TEST PILE AND ANCHOR PILES
Grade of pile foundation shall be minimum M30 grade with minimum cement
content 400kg/cu m.
Page 7 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
9/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
The pile top concrete shall be chipped off till sound concrete is met and dressed
up to test level/Cut off level.
The pile top is prepared smooth and in spirit level with GP2/any other non shrink
grout/ mortar/concrete (thickness not more than 30mm) and cured for at least 3-5
days such that it attains strength equal to or more than pile concrete.
Centre to center spacing between test pile and anchor piles shall not be less than
3 times pile shaft diameter or 2m whichever is less.
For compression load test, anchor piles shall be capable to take pullout load
generated during compression load testing. If anchor piles are working piles, care
shall be taken that uplift in anchor pile is within permissible limit.
PILE COMPRESSION TEST:
INSTALLATION OF TEST SET UP
MS plate of 25 mm thickness shall be placed over the pile top surface.
Datum bars resting on immovable supports, fixed at-least at a distance of 3.0
times the diameter of pile shaft from the center of pile on either side with
minimum 2m from center of test pile.
Displacement gauges (at least 4 nos. with valid calibration) shall be installed
against MS base plate placed on pile top with the help of datum bars (Least
count = 0.01mm).
Page 8 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
10/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Hydraulic jack is connected with hydraulic power pack motor operated/manual
operated pump.
Calibrated hydraulic pressure gauge shall be attached to hydraulic pump system
for reading the applied load.
Test set up – reference sketch is given in sketch for setup preparation. However
testing agency may adopt their set up.
PILES PULL OUT LOAD TEST: Not Applicable
Test set up – reference sketch is given in sketch for setup preparation. However testing agency may
adopt their set up.
Datum bars resting on immovable supports, fixed at-least at a distance of 3.0 times the diameter of pile
shaft from the center of pile on either side with minimum 2m from centre of test pile.
Displacement gauges (at least 4 nos. with valid calibration) shall be installed against MS base plate placedon pile top with the help of datum bars (Least count = 0.01mm).
Hydraulic jack is connected with hydraulic power pack motor operated/manual operated pump.
Calibrated hydraulic pressure gauge shall be attached to hydraulic pump system for reading the applied
load.
PILES LATERAL LOAD TEST:
Reaction pile shall be of ample capacity to resist the lateral thrust.
Routine lateral load test shall be carried out for a test load equal to the working
load; the maximum deflection of test loading in position shall not exceed 5 mm.
Page 9 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
11/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
TEST LOAD APPLICATION (Compression, Pullout Lateral Load Test)
Load application: The test load shall be applied in a series of vertically down
ward incremental loads by means of a set of hydraulic jack connected to
hydraulic pump.
Test load:
For Initial load test it shall be 2.5 times design ( working ) load.
For Routine load test it shall be 1.5 times design ( working ) load.
Settlement: At least 4 strain gauges were used to record settlements.
Load increment: each load increment shall equal to 20% of design load.Settlement readings were noted on each displacement gauge immediately after
loading and after every 60 minutes for each stage. Next load increment was
applied after satisfying following criteria. Of maintained load method.
Each stage of loading is maintained till rate of displacement of pile is less than or
equal to 0.2mm/hr or 2 hr has elapsed whichever is earlier. Then next increment
shall be given. This is repeated till max test load attained or pile exceeds
permissible displacement. The test load shall be maintained for 24 hours. If
permissible displacement exceeds in test pile, test is discontinued at respective
loading and gradual unloading is carried out as under.
Page 10 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
12/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Unloading: After completion of 24 hrs with test load/achieving permissible
settlement decrease the load equivalent each increment loads after every 15
minutes. Rebounds reading were taken immediately after unloading and beforenext decrement up to full decrement (Nil load).
Safe compression and pull out load on single pile
o least of following (As per IS 2911 (Part 4): 2013)
2/3rd load at which the total displacement attains value of 12mm for
diameter of pile equal to or less than 600mm.
2/3rd load at which the total displacement attains value of 18mm or 2% or
pile diameter which is less for diameter of pile more than 600mm.
50% of load at which the total displacement attains equal to 10% pile
diameter in uniform pile shaft diameter and 7.5% of bulb diameter in case
of under reamed piles.
Safe Lateral load on single pile
Fifty percent of the final load at which the total displacement increases to
12 mm
Final load at which the total displacement corresponds to 5 mm
Load corresponding to any other specified displacement as per
performance or design requirements.
Page 11 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
13/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
OTHER DETAILS REQ TO BE NOTED
PILE DETAILS
Pile No :
Type of pile :
Date of casting :
Depth of pile from test level :
Diameter of pile :
Grade of concrete :
Date of Testing :
REACTION ANCHOR DETAILS
No of anchors used :
Type of anchor :
HYDRAULLIC JACK DETAILS
Capacity of jack :
No of jack used :
Ram dia of jack :
Area of one jack ram :
HYDRAULLIC PRESSURE GAUGE DETAILS
Make :
Least count of pressure gauge :
Maximum range :
Page 12 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
14/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
DISPLACEMENT GAUGES DETAILS
Make :
Least count :
Max Range :
No. of dial gauge used :
OBSERVATIONS
Load increment = 20% of design load = __ x 0.2 = XXX Tonne
Pressure req = LD INCREMENT*1000/RAM AREA
= (xxx *1000)/ram area = _____ kg/sq cm
Observation table
DATE
/TIME
Load
(Tonne)
Pressure
Gauge
reading
Dial Gauge ReadingsNet Average
Rdg
Settlement
(mm)
A B C D Average
FINDINGS / RESULTS
Page 13 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
15/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
PROCEDURES FOR INITIAL COMPRESSION PILE LOAD TEST:
PREPARATION OF PILE HEAD BEFORE TEST
The pile top concrete shall be chipped off till sound concrete is met and dressedup to test level.
The pile top is prepared smooth and in spirit level with GP2/any other non-shrinkgrout/ mortar (thickness not more than 20mm).
Kentledge load calculation and setup details are to be approved by client in prior.
If test is carried out with anchor piles, Anchor piles shall be capable to take thepullout load generated during compression load testing on test pile.
Centre to center spacing between test pile and kentledge supports/anchor pilesGrade of concrete and other design requirements shall be as per IS2911 part 1Section 2.
Test shall be conducted after 28 days of casting of anchor piles and test pile andat least 7days of preparation of pile head top.
INSTALLATION OF TEST SET UP:
MS plate of 25 mm thickness shall be placed over the pile top surface.
Datum bars resting on immovable supports, fixed at-least at a distance of 3.0times the diameter of pile shaft from the center of pile on either side.
Displacement gauges (at least 4 nos. with valid calibration) shall be installedagainst MS base plate placed on pile top with the help of datum bars (Least
count = 0.01mm). Hydraulic jack is connected with hydraulic motor/manual operated pump.
Calibrated hydraulic pressure gauge shall be attached to hydraulic pump systemfor reading the applied load.
Page 14 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
16/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Centre to center spacing between test pile and anchor piles should not less than3 times pile shaft diameter. If anchor piles are working piles, care shall be takenthat uplift in anchor pile is within limit.
TEST LOAD APPLICATION:
Load application: The test load shall be applied in a series of vertically downward incremental loads by means of a set of hydraulic jack connected tohydraulic pump.
Test load: It should be 2.0 times design load. Settlement: At least 2 strain gauges were used to record settlements. Load increment: each load increment shall equal to 20% of design load.
Settlement readings were noted on each displacement gauge immediately after
loading and after every 30 minutes for each stage. Next load increment wasapplied after satisfying following criteria.
Maintained load Method: Application of increment of test load and taking of measurement or displacement
in each stage of loading is maintained till rate of displacement of pile top is either
0.1mm in first 30 minutes or 0.2 mm in first one hour or till 2 hours which ever
occur first. If the limit of permissible displacement is not exceeded, testing of pile
is not required to be continued further. The test load shall be maintained for 24
hours.
Unloading: After completion of 24 hrs with test load, decrease the load equivalenteach increment loads after every 15 minutes. Rebounds reading were takenimmediately after unloading and before next decrement up to full decrement (Nilload).
Safe load on single pile = least of following (As per IS 2911 Part 4) 2/3rd load at which the total displacement attains value of 12mm
Page 15 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
17/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
½ load at which the total displacement attains equal to 10% pile diameterin uniform pile shaft diameter and 7.5% of bulb diameter in case of underreamed piles.
OTHER DETAILS
PILE DETAILS:
Pile No :
Type of pile : Straight Bored cast in situ
Date of casting :
Depth of pile from test level : ____m
Diameter of pile : ____ mm
Grade of concrete : M ___
Date of Testing : __________ to ________
REACTION ANCHOR DETAILS / KENTLEDGE DETAILS
No of soil anchors used : ___Nos.
Type of anchor : _______________
Or Kentledge plateform details : _______________
HYDRAULLIC JACK DETAILS:
Capacity of jack : __ MT
No of jack used : 1 No
Ram dia of jack : ___ cm
Area of one jack ram : _____ sq cm
Page 16 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
18/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
HYDRAULLIC PRESSURE GAUGE DETAILS:
Make : _______
Least count of pressure gauge : ____ kg/sq cm
Maximum range : ____ kg/sq cm
DISPLACEMENT GAUGES DETAILS:
Make : _________
Least count : 0.01mm
Max Range : ___mm
No. of dial gauge used : 2 Nos.
OBSERVATIONS:
Load increment = 20% of design load
Pressure req = (____tonne x 1000)/ram area = _____ kg/sq cm
Load
increment /
decrement
Load PG RDGINDI PG
RDGActual load
Avg
Settlement
20% each tonne kg/sqcm kg/sqcm Tonne -mm
0
20
40
60
80
Page 17 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
19/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Load
increment /
decrement
Load PG RDGINDI PG
RDGActual load
Avg
Settlement
120
140
20% each tonne kg/sqcm kg/sqcm Tonne -mm
160
180
200
180
160
140
120
100
80
60
40
20
0
Page 18 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
20/26
OWNER PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
D e s i g n
C o n
s u l t a n t t o K E I -
S h a h
&
T a l a t i
EMPLOYER POWER GRID CORPORATION OF INDIA LTD.
PROJECTPACKAGE -A UNDER INTEGRATED POWER DEVELOPMENTSCHEME ( IPDS ) WORKS IN OLD KASHI AREA OF VARANASITOWN OF UP UNDER DEPOSIT WORK OF PUVVNL.
NOA NO. SUPPLYCC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
SERVICECC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
CONTRACTOR KEI INDUSTRIES LIMITED
TITLE Initial Load Test procedure and test pile design fordouble bulb under reamed piles.
Varansi Initial Load Test Procedure and Test Pile Design
Load V/S settlement graph plot
Page 19 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
21/26
Page 20 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
22/26
Page 21 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
23/26
Page 22 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
24/26
NOA NO. SUPPLY
SERVICE
PILE DETAILS Under Reamed Pile M-25
Pile Diameter 500 mm Fe-500
Cut off level w.r.to FGL 2.0 Mts.
Length of pile
Safe
working
load per
ile
Test load
per pile
50 125 M.T.
31.5 78.75 M.T.
5.4 13.50 M.T.
As per IS:2911 (Part-I section-2) - Clause-5.11.1
785 mm^2
Test load for Initial load test for compression = 125 M.T.
For a partial safety factor equal to = 1.1
Acmin = Pu / 0.4 x Fck =
Pu = 0.4 fck * Ac + 0.67 fy * Asc
Pu = 1375000 = 1963500 + Asc min = 785 mm^2
Asc min. for direct compression = 5280 Sq.mm.i.e. 52.8 cm^2
Mom.for min.eccentricity = 20 mm 2.750 T-Mt. i.e. 2750 Kg-Mt. Lim
1375000 / (25x 0.220
27500000 / (25x 0.009
0
Ast = 0 Sq.mm
785 mm^2 i.e. 7.85 cm^2
Provide
4 No. of nos i.e. 12.57 cm^2
4.91 8 No. of nos i.e. 40.23 cm^2
Actual % of vertical reinf. Provided = 2.69 % 52.80 cm^2
20 mm Dia +
25 mm Dia +
Ties 8 mm Tor Reinf. @ 250 mm c/c
Pu/fck.D2 = 250000 ) =
Mu/fck*D3 = 125000000 ) =
Refer Chart 60 of SP16 p/fck =
Thus Ast =
Ast min. 0.4 % of pile area i.e.
Design Calculations for Free Head Piles
Compression load Test pile Free Head Pile
137500 mm^2
0.67*500*Asc
Pull out
Lateral
Grade of Pile concrete
Reinforcing Steel
PACKAGE -A UNDER INTEGRATED POWER DEVELOPMENT SCHEME
( IPDS ) WORKS IN OLD KASHI AREA OF VARANASI TOWN OF UP
UNDER DEPOSIT WORK OF PUVVNL.
PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
POWER GRID CORPORATION OF INDIA LTD.
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
Compression
D e s i g n C
o n s u l t a n t t o K E I -
S h
a h
&
T a l a t i
Min. length of pile shall be as per Soil Investigation Agency's
( POWER GRID Approved ) length for below mentioned working
load capacity.
KEI INDUSTRIES LIMITED
DESIGN CALCULATION FOR REINFORCEMENT
EVALUATION OF ( TEST PILES ) - DOUBLE UNDER
REAMED PILE for Initial Load Test
EMPLOYER
CONTRACTOR
TITLE
PROJECT
OWNER
Page 23 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
25/26
NOA NO. SUPPLY
SERVICE
PACKAGE -A UNDER INTEGRATED POWER DEVELOPMENT SCHEME
( IPDS ) WORKS IN OLD KASHI AREA OF VARANASI TOWN OF UP
UNDER DEPOSIT WORK OF PUVVNL.
PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
POWER GRID CORPORATION OF INDIA LTD.
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
D e s i g n C
o n s u l t a n t t o K E I -
S h
a h
&
T a l a t i
KEI INDUSTRIES LIMITED
DESIGN CALCULATION FOR REINFORCEMENT
EVALUATION OF ( TEST PILES ) - DOUBLE UNDER
REAMED PILE for Initial Load Test
EMPLOYER
CONTRACTOR
TITLE
PROJECT
OWNER
Test load for Initial load test for Pullout load = 78.75 M.T.
For a partial safety factor equal to = 1.1
Direct tensile stress in concrete = 866250/ 196350 = 4.41 N/mm^2
Ast vertical = 866250/ / 2753150 mm^2 i.e. 31.50 cm^2
Provide
4 No. of nos i.e. 12.57 cm^2
4 No. of nos i.e. 12.57 cm^2
Actual % of vertical reinf. Provided = 1.28 % 25.13 cm^2
Thus Ast =
20 mm Dia +
20 mm Dia +
Ties 8 mm Tor Reinf. @ 250 mm c/c
Pullout load Test pile Free Head Pile
Page 24 of 25
-
8/18/2019 Initial Load Test Procedure-Test Set Up-Design
26/26
NOA NO. SUPPLY
SERVICE
PACKAGE -A UNDER INTEGRATED POWER DEVELOPMENT SCHEME
( IPDS ) WORKS IN OLD KASHI AREA OF VARANASI TOWN OF UP
UNDER DEPOSIT WORK OF PUVVNL.
PURVANCHAAL VIDYUT VITARAN NIGAM LIMITED
POWER GRID CORPORATION OF INDIA LTD.
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5607,Dated 12-12-2015
CC-CS/713-NR1/CBL-3266/3/G7/NOA-I/5608,Dated 12-12-2015
D e s i g n C
o n s u l t a n t t o K E I -
S h
a h
&
T a l a t i
KEI INDUSTRIES LIMITED
DESIGN CALCULATION FOR REINFORCEMENT
EVALUATION OF ( TEST PILES ) - DOUBLE UNDER
REAMED PILE for Initial Load Test
EMPLOYER
CONTRACTOR
TITLE
PROJECT
OWNER
Test load for Initial load test for Lateral load = 8.60 M.T.
For a partial safety factor equal to = 1.1
Lever arm for pile Design (Free head) = 3.8 Mts.
Lim. Design Moment for Compression with bending = 9.5 x 3.80 = 35.948 T-Mt.
Reduction factor m = 0.4Lim. Design Moment = = 0.400 x 35.9 = 14.379 T-Mt.
(25x 0.046
0.038
Ast = 1865 Sq.mm
1865 mm^2 i.e. 18.65 cm^2
Provide
4 No. of nos i.e. 12.57 cm^2
4 No. of nos i.e. 8.04 cm^2
Actual % of vertical reinf. Provided = 1.05 % 20.61 cm^2
20 mm 4 nos. 20 mm 4 nos. 20 mm 4 nos.
25 mm 8 nos. 20 mm 4 nos. 16 mm 4 nos.
8 mm 250 mm c/c 8 mm -250 mm c/c 8 mm -250 mm c/c
Vertical
Reinforcement
Ties
125000000 ) =143792000 /
Test load 125 MT 79 MT 13.50 MT
16 mm Dia +
Ties 8 mm Tor Reinf. @ 250 mm c/c
Reinforcement in Test Pile - 500 mm dia. piles
Test Pile Compression load Test Pullout loadTest Lateral load Test
Mu/fck*D3 =
Refer Chart 61 of SP16 p/fck =
Thus Ast =
20 mm Dia +
Lateral load Test pile Free Head Pile
H:\2016\1619-GIS at Varansi for KEI-PGCIL\DESIGN\Pile test related\[TEST PILE DESIGN -Varansi.xls]Varansi-Initial Test Pile