Initial Environmental Examination This report has been submitted to ADB by the Urban Development Department, Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. This is an updated version of the report originally posted in July 2011 available on https://www.adb.org/projects/documents/uttarakhand-urban- sector-investment-program-tranche-2-roorkee-sewerage-subproject. This Initial Environment Examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area Project Number: 38272-033 November 2016 IND: Uttarakhand Urban Sector Development Investment Program - Project 2 Subproject : Roorkee Sewerage Submitted by: Urban Development Department, Government of Uttarakhand, Dehradun

Transcript of Initial Environmental Examination€¦ · loans, sector loans, sector development program loans,...

Page 1: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

Initial Environmental Examination

This report has been submitted to ADB by the Urban Development Department, Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. This is an updated version of the report originally posted in July 2011 available on https://www.adb.org/projects/documents/uttarakhand-urban-sector-investment-program-tranche-2-roorkee-sewerage-subproject.

This Initial Environment Examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Project Number: 38272-033 November 2016

IND: Uttarakhand Urban Sector Development Investment Program - Project 2

Subproject : Roorkee Sewerage

Submitted by:

Urban Development Department, Government of Uttarakhand, Dehradun

Page 2: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial
Page 3: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

1

Initial Environmental Examination

October 2016

IND: Uttarakhand Urban Sector Development Investment Program- Roorkee Sewerage Subproject Tranche II

Prepared by Government of Uttarakhand for the Asian Development Bank.

Page 4: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

i

CURRENCY EQUIVALENTS (As of October 2016)

Currency Unit = ndIndian rupee/s (Re/Rs) Rs1.00 = 015

$1.00 = 68.57

Abbreviations

ADB Asian Development Bank BOD Bio Chemical Oxygen Demand CO Carbon Mono Oxide CFE Consent for Establishment CH4 Methane CFO Consent for Operation DO Dissolve Oxygen dB Decibel DDN Roorkee Nagar Nigam IEE Initial Environmental Examination EA Executing Agency EIA Environmental Impact Assessment EC Environmental Clearance GoI Government of India GoU Government of Uttarakhand Ha Hectare H2S Hydrogen sulphide HDPE High Density Poly Ethylene HFL High Flood level Km Kilometer Leq Sound level Mg Milligram MFF Multitranche Financing Facility MoEFCC Ministry of Environment & Forests&Climate Change MLD Million Litter Per day Mn MDD

Million Maximum Dry Density

M Meter mm Millimeter mg/l Milligram per Liter m3 Cubic meter NAAQM National Ambient Air Quality Monitoring NOx Oxides of Nitrogen NA Not Applicable OUR oxygen uptake rate O & M OMC

Operation and maintenance Optimum Moisture Content

PMU Project Management Unit PVC Poly Vinyl Chloride PWD Public works Division

Page 5: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

ii

PIU Project Implementation Units RCC Reinforced Cement Concrete RoW Right of Way RSPM Respirable suspended particulate matter RP Rehabilitation Plan SEIAA State Environment Impact Assessment Authority SPCB State Pollution Control Board UEPPCB Uttaranchal Environmental Protection and Pollution

Control Board SS Suspended Solids SBR Sequential Batch Reactor SPM Suspended Particulate Matter SO2 Sulphur dioxides ST Scheduled Tribes SC Scheduled Castes SOP Standard Operational Procedures UDD Urban Development Department UPJN Uttaranchal Peya Jal Nigam UJS Uttaranchal Jal Sansthan U.P Uttar Pradesh UPCL Uttaranchal Power Corporation Limited g/m3 Micro Gram Per Cubic Meter % Percentage

Page 6: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

i

NOTES (i) The fiscal year (FY) of the Government of India ends on 31 March. FY before

a calendar year denotes the year in which the fiscal year ends, e.g., FY2008 ends on 31 March 2008.

(ii) In this report, "$" refers to US dollars unless otherwise stated.

This initial environmental examination is a document of the borrower. The views expressed herein

do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian Develop-ment Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 7: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

ii

Contents Executive Summary ........................................................................................... v-vii

I. Introduction .............................................................................................................. 1

A. Overview ....................................................................................................... 1

B. Environmental Compliance Requirement....................................................... 1

II. Description of Sub-project .............................................................................. 10

A. Need for the Sub-project ............................................................................ 10

B. Subproject Description ................................................................................ 10

C. Energy Efficiency Measures ....................................................................... 13

D. Implementation Schedule ...................................................................................... 13

III. Description of the Environment ............................................................................. 18

A. Physical Features ...................................................................................... 18

B. Ecological Resources ................................................................................. 25

C. Economic Development .............................................................................. 25

IV. Anticipated Impacts and Mitigation Measures .................................................. 27

A. Pre-construction - Location & Design .......................................................... 27

B. Construction Impacts .................................................................................. 31

C. Operational and Maintenance (O& M) Impacts ............................................ 36

D. Cumulative Impact Assessment .................................................................. 37

V. Institutional Arrangements .......................................................................... 41

VI. Grevances Redress Mechanism ..................................................................... 41

VII. Public Consultation and Information Disclosure.......................................... 43

A. Public Consultation Conducted .................................................................... 43

B. Future consultation and disclosure .............................................................. 45

VIII. Environmental Management Plan ........................................................................ 46

A. Environment Mitigation and Monitoring Program ......................................... 46

B. Safeguards Items Having Penalty Provision for Roorkee sewerage system.60

C. Environmental Management and Monitoring Costs ..................................... 61

IX Findings and Recommendations ..................................................................... 62

X. Conclusions .................................................................................................. 65

Page 8: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

iii

List of Tables

Table 1 : Applicable Environmental National and State Requirements for UUSDIP ...................... 6

Table 2 : Roorkee Sewerage Subproject Components ............................................................... 10

Table 3 : Description of Contract Sub-Package of Sewerage System of Roorkee. ...................... 11

Table 4 : Proposed length of distribution network package ......................................................... 11

Table 5 : Design Parameters of Sewage Treatment Plant .......................................................... 12

Table 6 : Implemntation schedule for 33MLD-STP and splitted contract Packages. .................... 13

Table 7 : Classification test results of soil samples collected from STP site. ............................... 19

Table 8 : Laboratory Proctor’s Compaction Test Results of Soil Samples ................................... 19

Table 9 : Organic and Inorganic constituents of soil at two locations of STP site. ....................... 19

Table 10 : Monthly and Annual Normal Rainfall in District Hardwar (mm) ................................... 20

Table 11 : Baseline of Ambient Air Quality of Sewerage Sub-Project at Roorkee ..................... 20

Table 12 : Baseline of Ambient Noise level of Sewerage Sub-Project in Roorkee ....................... 21

Table 13 : Water quality characterstics of 500m upstream and 500m downstream from the discharge point of treated sewage into Solani River. ........................................................... 22

Table 14 : Influent Characterstics of Rampur Chungi drain at Roorkee ....................................... 22

Table 15 : Quality of Ground Water of Roorkee .......................................................................... 23

Table 16 : Ground water quality at 33 MLD-STP site at Saliyar- Ibrahimpur. .............................. 24

Table 17 : Detail of Focus Group Discussions with General Public Group at Roorkee .............. 44

Table 18 : Details of public consultation by IPMU/IPIU for 33MLD-STP at Roorkee .................... 45

Table 19 : Issues and action plan discussed during public consultation ...................................... 45

Table 20 : Anticipated Impacts and Mitigation Measures – Pre-construction Environmental Mitigation Plan...................................................................................................................... 47

Table 21 : Anticipated Impacts and Mitigation Measures – Construction Environmental Mitigation Plan ...................................................................................................................................... 48

Table 22 : Anticipated Impacts and Mitigation Measures – Operations and Maintenance Environmental Mitigation Plan ............................................................................................ 54

Table 23 : Pre-construction Environmental Monitoring Program ................................................. 55

Table 24 : Construction Environmental Monitoring Program ....................................................... 56

Table 25 : Operation and Maintenance Environmental Monitoring Program ............................... 59

Table 26 : Preventive Measures of non-compliance of Safeguards ............................................. 60

Table 27 : Environmental management and monitoring cost. ...................................................... 62

Page 9: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

iv

List of Appendices

Appendix 1 : Central Pollution Control Board Applicable Environmental Standards .................... 66

Appendix 2 : Rapid Environmental Assessment(REA) Checklist ................................................. 72

Appendix 3 : Deatil of Public Conultation and focussed group discussion. .................................. 75

Appendix 4 :Recomeneded Construction Contractors Contract Clauses..................................... 83

Appendix 5 : Photographs of Public Consultation in Roorkee ..................................................... 87

Appendix 6 : Photographs of Public Consultation ....................................................................... 88

Appendix 7 : Land Transfer Certificate for 33MLD-STP at Roorkee ............................................ 90

List of Figures

Figure 1 :Map Showing Proposed Roorkee Sewerage System ................................................... 14

Figure 2 : Layout Plan of proposed Roorkee STP ....................................................................... 15

Figure 3 : Location and Layout Plan of proposed Ganeshpur SPS ............................................. 16

Figure 4 : Location Plan of STP and Two SPS along with Trunk Sewer Main ............................. 17

Figure 5 : Wind Rose Diagram of Roorkee Town ........................................................................ 39

Figure 6 : STP Location and Nearby Settlement on Google Image ............................................. 40

Page 10: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

v

Executive Summary

1. Uttarakhand Urban Sector Development Investment Program (UUSDIP) is intended to support the Government of India and Government of Uttarakhand in their policy of balanced re-gional socio-economic development and poverty reduction throughout the urban sector in Uttarakhand. This is being achieved through investments in the areas of infrastructure and ser-vice provision, institutional development and capacity building. Directly the UUSDIP will result in improved living conditions in the urban areas of Uttarakhand as a result of rehabilitation, up-grading and extension of key infrastructure, strengthened operation and maintenance, and im-proved local governance practices and locally-led pro-poor planning and project identification. The program will also improve the prospects for accelerated economic growth from the tourism and manufacturing industries and help create conditions for improved long-term service sus-tainability and greater private sector investment in infrastructure and service provision.

2. The UUSDIP is funded by ADB through Multitranche Financing Facility (MFF) and also by the central-sponsored Jawaharlal Nehru National Urban Renewal Mission (JNNURM) of the Government of India. This Program is being under implementation over a period of 10 years. The Executing Agency (EA) is the Urban Development Department (UDD) of Government of Uttarakhand (GoU), which has set up a state-level urban sector Project Management Unit (PMU) to execute the UUSDIP. Implementation Agencies (IA) are the respective urban local bodies, UPJN, UJS and PWD, which in collaboration with PMU will set-up 13 Project Implemen-tation Units (PIU) for implementing the Program. Dehradun, Roorkee, Ramnagar, Nainital, Almora, Pithoragarh and Haldwani are the towns chosen for investment under Tranche-II of UUSDIP.

3. ADB requires the consideration of environmental issues in all aspects of the Bank’s operations, and the requirements for Environmental Assessment are described in ADB’s SPS (2009). This states that ADB requires environmental assessment of all project loans, program loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans.

4. This Initial Environmental Examination (IEE) Report has been updated for the follow-ing components of Roorkee Sewerage Subproject to be undertaken in Tranche II: (i) Sewerage system of Roorkee (Contract Package No. WMM01RK) (ii) Construction of 33 MLD STP and two Sewage Pumping stations (Contract Package No. WMM02RK).Contractor for construction of STP and SPS has already been mobilized. While this IEE is being updated due to change in location of STP from Sati Mohalla to Saliyar-Ibrahimpur in Roorkee and further splitting of WWM01RK into, WWM03RK and WWM04 RK due to poor response from bidders side and timely completion of Project. Construction of 33MLD-STP is likely to commence after the rainy season and will completed by the end of 2017.

5. The subproject sites are located in existing Right of Way. There are no protected are-as, wetlands, mangroves, or estuaries. Trees, vegetation (mostly shrubs and grasses), and an-imals in the subproject site are those commonly found in built-up areas.

6. The process described in this document has assessed the environmental impacts of all elements of the infrastructure proposed under the Roorkee Sewerage Subproject. Potential negative impacts were identified in relation to both construction and operation of the improved infrastructure, but no impacts were identified as being due to either the project design or loca-tion. Mitigation measures have been developed in generic way to reduce all negative impacts to

Page 11: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

vi

acceptable levels. These were discussed with specialists responsible for the engineering as-pects, and as a result some measures have already been included in the outline designs for the infrastructure.

7. Locations and siting of the proposed infrastructures were considered to further re-duce impacts. These include:

(i) The STP site is selected at Saliar Ibrahimpur village belongs to Nagar Nigam of Roorkee and owned by Government of Uttarakhand. This avoids impacts of land ac-quisition, rehabilitation and resettlement of PAPs.

(ii) Locating the sewerage network in the ROW alongside a main road, to reduce impacts on livelihoods of public. The route of rising main is changed due to change in STP loca-tion. This change does instigate change of nature of environmental impact. The length of rising main has increased from 1200 meter to 3800 meters resulting change in quan-tum of work consequently increase in construction time and impact related to excava-tion for pipe laying along road side. There is change in social impact of temporary in nature due to temporary blockage of access to the shops. These impacts are taken care in Resettlement Plan separately.

8. Regardless of these and various other actions taken during the IEE process and in developing the project, there will still be impacts on the environment when the infrastructure is built and when it is operating. This is mainly because of the invasive nature of trenching and other excavation; and because the sewerage network is located in an inhabited town where there are densely populated areas. Because of these factors the significant impacts are on the physical environment and the human environment.

9. During the construction phase, impacts mainly arise from the need to dispose of large quantities of waste soil and import a similar amount of sand to support the pipes in the trenches; and from the disturbance of residents, businesses, traffic and important buildings by the con-struction work. These are common impacts of construction in urban areas, and there are well developed methods for their mitigation. These include:

(i) Finding beneficial uses for waste material;

(ii) Covering soil and sand during transportation and when stored on site;

(iii) Planning work to minimize disruption of traffic and communities;

(iv) Providing temporary structures to maintain access across trenches where required.

10. Specific impacts due to construction of STP adjacent to Solani river have been iden-tified and measures such as the following are suggested:

(i) No downstream impact (ii) No construction material storage/ancillary works nearby river bank (iii) No labour camps to be set up nearby river bank (iv) Protection bunds around construction area (v) Conducting awareness programs to workers (vi) Proper arrangement to arrest silt runoff from construction site to nearby river during

monsoon (vii) Use excavated soil for strengthening bunds; no waste shall be disposed in or near

river bank

Page 12: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

vii

(viii) The treated sewage effluent will be disposed to Solani River which will meet the CPCB standards

(ix) Site planning and design should consider the HFL; provided appropriate bunding around the facility.

11. There were limited opportunities to provide environmental enhancements, but cer-tain measures were included. For example it is proposed that the project will:

(i) Employ in the workforce to the extent possible, people who live in the vicinity of con-struction sites to provide them with a short-term economic gain;

(ii) Ensure that people employed in the longer term to maintain and operate the new fa-cilities are residents of nearby communities.

12. Once the sewerage system is operating, most facilities will operate with routine maintenance, which should not affect the environment. Leaks in the network will need to be re-paired from time to time, but environmental impacts will be much less than those of the con-struction period as the work will be infrequent, affecting small areas only. It will also be conduct-ed in areas that have already been excavated, so there will be no need to protect archaeologi-cal material. During operation of STP, there are chances of odor nuisance. The proper selec-tion of treatment process as well as regular O & M of STP will take care of this problem. There can be deterioration of quality of nearby river water due to disposal of treated sewage. Howev-er, regular quality monitoring of water will help in identifying the problem in earlier stage and re-mediation measures. There is occupational health and safety risk involved while working in STP however all the necessary precautionary measures are included. Necessary provisions for green buffer zone within STP premises as well as surrounding sewage pumping stations are considered in design.

13. The major impacts of the implementation of sewerage subproject will be beneficial to the citizens of Roorkee as it will provide proper collection network and treatment of sewage, which will serve a greater proportion of the population, including slum-dwellers. This will improve the quality of life of people as well as benefiting both individual and public health as the im-provements in hygiene should reduce the incidence of disease associated with poor sanitation. This should lead to economic gains as people will be away from work less and will spend less on healthcare, so their incomes should increase.

14. Mitigation will be assured by a program of environmental monitoring to be conducted during construction stages. The environmental monitoring program will ensure that all measures are implemented, and will determine whether the environment is protected as intended. It will include observations on- and off-site, document checks, and interviews with workers and bene-ficiaries. Any requirements for remedial action will be reported to the IPMU.

15. The stakeholders were involved in developing the updated IEE through discussions on site and public consultation after which views expressed were incorporated into the IEE and the planning and development of the project. The updated IEE report will be made available at public locations in the city and will be disclosed to a wider audience via the ADB website. The consultation process will be continued and expanded during project implementation to ensure that stakeholders are fully engaged in the project and have the opportunity to participate in its development and implementation.

Page 13: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

viii

16. Therefore the components proposed under Tranche-II of this sewerage subproject in Roorkee are unlikely to cause significant adverse impacts. The potential adverse impacts that are associated with design, construction, and operation can be mitigated to standard levels without much difficulty through proper engineering design and the incorporation or application of recommended mitigation measures and procedures.

17. Based on the findings of the IEE, the classification of the Project as Category “B” is confirmed, and no further special study or detailed EIA needs to be undertaken to comply with ADB SPS (2009) or GoI EIA Notification (2006). One component however requires con-sent/permission of regulatory agencies for implementation. The construction and operation of Sewage Treatment Plant (STP) requires consent for establishment (CFE) and consent for oper-ation (CFO) from the UEPPCB under the Water (Prevention and Control of Pollution) Act, 1974. However Consent to establish has been obtained from Uttarakhand Environment Protection and Pollution Control Board and the detail of which has been furnished in Table no-1.

Page 14: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

1

I. Introduction

A. Overview

1. Uttarakhand Urban Sector Development Investment Program (UUSDIP) is intended to support the Government of India and Government of Uttarakhand in their policy of balanced regional socio-economic development and poverty reduction throughout the urban sector in Uttarakhand. This is being achieved through investments in the areas of infrastructure and service provision, institutional development and capacity building. Directly the UUSDIP will result in improved living conditions in the urban areas of Uttarakhand as a result of rehabilita-tion, upgrading and extension of key infrastructure, strengthened operation and maintenance, and improved local governance practices and locally-led pro-poor planning and project identi-fication. The program will also improve the prospects for accelerated economic growth from the tourism and manufacturing industries and help create conditions for improved long-term service sustainability and greater private sector investment in infrastructure and service provi-sion. 2. The UUSDIP is funded by ADB through Multitranche Financing Facility (MFF) and also by the central-sponsored Jawaharlal Nehru National Urban Renewal Mission (JNNURM) of the Government of India. This Program is being under implementation over a period of 10 years. The Executing Agency (EA) is the Urban Development Department (UDD) of Govern-ment of Uttarakhand (GoU), which has set up a state-level urban sector Project Management Unit (PMU) to execute the UUSDIP. Implementation Agencies (IA) are the respective urban local bodies, UPJN, UJS and PWD, which in collaboration with PMU will set-up 13 Project Implementation Units (PIU) for implementing the Program. Dehradun, Roorkee, Ramnagar, Nainital, Almora, Pithoragarh and Haldwani are the towns chosen for investment under Tranche-II of the UUSDIP. 3. ADB classified the investment program as environment Category B and accordingly initial environmental examination (IEE) is required for all subprojects. This IEE has been pre-pared for Roorkee Sewerage Subproject which covers: (i) provision of sewerage network; (ii) construction of STP and two sewage pumping stations.

B. Environmental Compliance Requirement

1. ADB Policy

4. ADB requires the consideration of environmental issues in all aspects of ADB’s op-erations, and the requirements for Environmental Assessment are described in ADB SPS 2009. This states that ADB requires environmental assessment of all project loans, program loans, sector loans, sector development program loans, loans involving financial intermediar-ies, and private sector loans. 5. Screening and Categorization. The nature of the environmental assessment required for a project depends on the significance of its environmental impacts, which are related to the type and location of the project, the sensitivity, scale, nature and magnitude of its potential impacts, and the availability of cost-effective mitigation measures. Projects are screened for their expected environmental impacts are assigned to one of the following four categories:

(i) Category A. Projects could have significant adverse environmental impacts. An EIA is required to address significant impacts.

(ii) Category B. Projects could have some adverse environmental impacts, but of lesser degree or significance than those in category A. An IEE is required to de-termine whether significant environmental impacts warranting an EIA are likely. If an EIA is not needed, the IEE is regarded as the final environmental assessment report.

Page 15: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

2

(iii) Category C. Projects are unlikely to have adverse environmental impacts. No EIA or IEE is required, although environmental implications are reviewed.

(iv) Category FI. Projects involve a credit line through a financial intermediary or an equity investment in a financial intermediary. The financial intermediary must apply an environmental management system, unless all Projects will result in insignifi-cant impacts.

6. Environmental Management Plan. An EMP which addresses the potential impacts and risks identified by the environmental assessment shall be prepared. The level of detail and complexity of the EMP and the priority of the identified measures and actions will be commensurate with the Project’s impact and risks. 7. Public Disclosure. ADB will post the following safeguard documents on its website so affected people, other stakeholders, and the general public can provide meaningful inputs into the project design and implementation:

(i) For environmental category A projects, draft EIA report at least 120 days before Board consideration;

(ii) Final or updated EIA and/or IEE upon receipt; and (iii) Environmental Monitoring Reports submitted by IPMIU during project implementation

upon receipt. 2. Applicable Legislations

8. The implementation of the subprojects will be governed by the national government and state of Uttarakhand environmental acts, rules, regulations, and standards. These regula-tions impose restrictions on the activities to minimize and/or mitigate likely impacts on the environment. It is the responsibility of the project executing and implementing agencies to ensure subprojects are consistent with the legal framework, whether national, state or munici-pal and/or local. In addition, subprojects shall also be consistent with ADB SPS. The following legislations are applicable to the subproject:

(i) Environmental (Protection) Act of 1986 as amended in 1991;

(ii) Environmental (Protection) Rules of 1986 and amendments;

(iii) Environmental Impact Assessment Notification of 2006;

(iv) Water (Prevention and Control of Pollution) Act of 1974, Rules of 1975, and amend-ments;

(v) Air (Prevention and Control of Pollution) Act of 1981, Rules of 1982 and amend-ments;

(vi) Noise Pollution (Regulation and Control) Rules of 2000;

(vii) Wildlife (Protection) Act of 1972, Rules of 1995 and amendments;

(viii) Indian Forest Act of 1927;

(ix) Forest (Conservation) Act of 1980, Rules of 1981 and amendments;

(x) Guidelines for Diversion of Forest Lands for Non-Forest Purpose under the Forest (Conservation) Act of 1980;

(xi) Central Pollution Control Board (CPCB) Environmental Standards;

(xii) Ancient Monuments and Archaeological Sites and Remains Rules of 1959; and

(xiii) The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.

9. Key standards include those related to drinking water quality, air quality, effluent dis-charge, and protected areas. Compliance is required in all stages of the project including de-sign, construction, and O&M.

Page 16: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

3

3. Environmental Assessment Requirements

10. The new EIA Notification of 2006 of GoI (superseding the EIA Notification of 1994), requires environmental clearance for certain defined activities/projects. This Notification clas-sifies the projects/activities that require environmental clearance (EC) into ‘A’ and ‘B’ catego-ries depending on the impact potential and/or scale of the project. For both category projects, prior environmental clearance is mandatory before any construction work, or preparation of land except for securing the land, is started on such project or activity. Clearance provisions are as follows.

(i) The project/activities falling under Category ‘A’ require prior environmental clearance from the MoEFCC, Government of India1.

(ii) Category ‘B’ projects require prior environmental clearance from the State lev-el the State Environmental Impact Assessment Authority (SEIAA)2.

11. This notification provides that, any project or activity specified in Category ‘B’ will be treated as Category A, if located in whole or in part within 10 kilometers (km) from the bound-ary of:(i) protected areas notified under the Wild Life (Protection) Act, 1972, (ii) critically pol-luted areas as notified by the CPCB from time to time, (iii) notified eco-sensitive areas, and (iv) inter-state boundaries and international boundaries. Also, in the case where a SEIAA does not exist, Category B project will be reviewed by the MoEFCC and reclassified as Category A. 12. Consequently, the proposed Roorkee Sewerage Subproject is not listed in the EIA Notification of 2006 “Schedule of Projects Requiring Prior Environmental Clearance.” Thus, environmental clearance for this subproject is not required. 4. National Legal Requirements

13. Water (Prevention and Control of Pollution) Act (1974): Any component of urban in-frastructure project under UUSDIP having potential to generate sewage or trade effluent will come under the purview of the Water (Prevention and Control of Pollution) Act, 1974. Such projects have to obtain Consent for Establishment (CFE) under Section 25 of the Act from Uttaranchal Environmental Protection and Pollution Control Board before starting implementa-tion and Consent to Operate (CTO) before commissioning. The Water Act also requires the occupier of such subprojects to take measures for abating the possible pollution of receiving water bodies. CFE is required to be obtained for establishment of Roorkee Sewage Treatment Plant. 14. Air (Prevention and Control of Pollution) Act of 1981, Rules of 1982 and amend-ments. The subprojects having potential to emit air pollutants into the atmosphere have to obtain CFE under Section 21 of the Air (Prevention and Control of Pollution) Act of 1981 from SPCB before starting implementation and CTO before commissioning the project. The occu-pier of the project/facility has the responsibility to adopt necessary air pollution control measures for abating air pollution. The following require CFE and CTO from SPCB:

(i) Diesel generators; and

(ii) Hot mix plants, wet mix plants, stone crushers, etc., if installed for construction. 15. Emissions and discharges shall comply with standards notified by the CPCB. Appen-

dix 1 provides applicable standards for effluents, receiving water bodies, air quality, water quality and noise levels.

1 For Category A projects, based on the preliminary details provided by the project proponent as per Notification,

the Expert Appraisal Committee (EAC) of MoEFCC, determine comprehensive TOR for EIA studies. This TOR

will be finalized within 60 days. On the recommendation of the EAC based on EIA studies, MoEF provides the

EC. 2 The B category projects will be further divided by State Level EAC into B1 – that require EIA studies and B2 –

no EIA studies. The Sate Level EAC will determine TOR for EIA studies for B1 projects with in 60 days. On the

recommendation of the State level EAC based on EIA studies, SEIAA provides the EC.

Page 17: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

4

16. Forest Legislations. The government’s forest legislation dates back to enactment of the Indian Forest Act of 1927. This Act empowers State of Uttarakhand to declare “any forest land or waste-land, which is the property of government or over which the government has proprietary rights or to the whole or any part of the forest-produced of which the government is entitled,” a reserved forest or protected forest. The Act also allows government control over forest and lands not being the property of the government. 17. For reserved forests and village-forests, activities like clearing or breaking up of any land for cultivation or for any other purpose, damage to vegetation and/or trees and quarrying or removing any forest produce are prohibited. For protected forests, with the provision of the Act, State of Uttarakhand makes rules to regulate activities like cutting of trees and removal of forest produce; clearing or breaking up of land for cultivation or any other purpose; and for protection and management of any portion of protected forest. 18. According to the Act, State of Uttarakhand requires prior approval of MoEFCC for the use of forest land for non-forest purposes (means the breaking up or clearing of any forest land) or for assigning lease to any private person or agency not controlled by government. The Forest (Conservation) Rules of 2003 issued under this Act provide specific procedures to be followed for conversion of forest land for non-forest purposes. 19. Conversion of forest lands that are part of National Parks and/or Sanctuaries and Tiger Reserve areas (notified under Indian Wildlife [Protection] Act of 1972) is not permitted. In exceptional case, State of Uttarakhand requires consent of the Indian Board of Wildlife for obtaining approval of the State Legislature for de-notification of the area as a sanctuary. The State or National Wildlife Board under MoEFCC is the authority which will grant a “No Objec-tion Certificate” for any construction within a sensitive area. Every user agency, who proposes to use any forest land for non-forest purposes and use buffer zone of the wildlife protected areas for other purposes, must apply for forest and/or wildlife clearance. 20. Cutting of trees in non-forest land, irrespective of land ownership, also require per-mission from the State Forest and Environment Department. Afforestation to the extent of two trees per each tree felled is mandatory. Cutting of three numbers of trees is required for laying of sewer lines and permission has been obtained from the forest department and the detail of which is furnished in Table no.1. 21. Ancient Monuments and Archaeological Sites and Remains Rules, of 1959. The Rules designate areas within a radius of 100 meters (m) and 300 m from the “protected prop-erty” as “protected area” and “controlled area” respectively. No development activity (including mining operations and construction) is permitted in the “protected area” and all development activities likely to damage the protected property are not permitted in the “controlled area” without prior permission of the Archaeological Survey of India (ASI). Protected property in-cludes the site, remains, and monuments protected by ASI or the State Department of Ar-chaeology. 22. For the subproject, activities within Archaeologically Protected Areas will be avoided. If activities are to be done in the controlled area of protected properties, then the executing and implementing agencies and the line department will take the necessary No Objection Certificates from ASI. 23. Land Acquisition Act of 1894 (amended in 1985). Private land acquisition is guided by the provisions and procedures in this Act. The District Collector or any other officer designated will function as the Land Acquisition Officer on behalf of the government. There is a provision for consent award to reduce the time for processing if the land owners are willing to agree on the price fixed by the Land Acquisition Officer. The option of acquiring lands through private negotiations is also available. 24. For the subproject, permanent land acquisition is not required as all sites are gov-ernment-owned land and/or within existing right-of-ways (ROWs).

Page 18: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

5

5. Applicable International Environmental Agreements

25. In addition, international conventions such as the International Union for Conservation of Nature and Natural Resources (IUCN), Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES), Convention on Migratory Species of Wild Animals (CMS) and Ramsar Convention on Wetlands of International Importance are applicable for selection and screening of subprojects under restricted and/or sensitive areas. India is a party to these conventions. 26. International Union for Conservation of Nature and Natural Resources (IUCN). The IUCN Red List of Threatened Species (also known as the IUCN Red List or Red Data List), founded in 1963, is a comprehensive inventory of the global conservation status of plant and animal species. The IUCN is an authority on the conservation status of species. A series of Regional Red Lists are produced by countries or organizations, which assess the risk of extinction to species within a political management unit. The IUCN Red List is set upon pre-cise criteria to evaluate the extinction risk of thousands of species and subspecies. These criteria are relevant to all species and all regions of the world. The aim is to convey the urgen-cy of conservation issues to the public and policy makers, as well as help the international community to try to reduce species extinction. 27. Convention on Migratory Species of Wild Animals (CMS). CMS was adopted in 1979 and entered into force on 1 November 1983. CMS, also known as the Bonn Convention, recognizes that states must be the protectors of migratory species that live within or pass through their national jurisdictions, and aims to conserve terrestrial, marine and avian migrato-ry species throughout their ranges. 28. Convention on International Trade in Endangered Species of Wild Fauna and

Flora (CITES). It is an international agreement between governments. Its aim is to ensure that international trade in specimens of wild animals and plants does not threaten their survival. CITES were first formed, in the 1960s. Annually, international wildlife trade is estimated to be worth billions of dollars and to include hundreds of millions of plant and animal specimens. The trade is diverse, ranging from live animals and plants to a vast array of wildlife products derived from them, including food products, exotic leather goods, wooden musical instru-ments, timber, tourist curios and medicines. Levels of exploitation of some animal and plant species are high and the trade in them, together with other factors, such as habitat loss, is capable of heavily depleting their populations and even bringing some species close to extinc-tion. Many wildlife species in trade are not endangered, but the existence of an agreement to ensure the sustainability of the trade is important in order to safeguard these resources for the future. Because the trade in wild animals and plants crosses borders between countries, the effort to regulate it requires international cooperation to safeguard certain species from over-exploitation. 29. Ramsar Convention on Wetlands of International Importance, 1971. The Conven-tion on Wetlands of International Importance, called the Ramsar Convention, is an intergov-ernmental treaty that provides the framework for national action and international cooperation for the conservation and wise use of wetlands and their resources. The Ramsar Convention is an international treaty for the conservation and sustainable utilization of wetlands The Ramsar Convention is the only global environmental treaty that deals with a particular ecosys-tem. According to the Ramsar list of Wetlands of International Importance, there are 25 desig-nated wetlands in India which are required to be protected. Activities undertaken in the prox-imity of Ramsar wetlands shall follow the guidelines of the convention. 30. The legal framework of the country consists of several acts, notifications, rules and regulations to protect environment and wildlife. In 1976, the 42nd Constitutional Amendment created article 48A and 51A, placing an obligation on every citizen of the country to attempt to conserve the environment. Specifically for the UUSDIP (Uttarakhand Urban Sector Develop-

Page 19: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

6

ment Investment Program), the following environmental laws and regulations are applicable for sub-projects and require clearances or permissions as applicable and the details are given in Table no.1: Table 1 : Applicable Environmental National and State Requirements for UUSDIP

S. No.

Clearances

Acts/ Rules/Notifications/Guidelines and Application to proposed project

Concerned Agency

Applicable to Contract package

Re-sponsibility

Status of Compliance

A. Pre-construction Stage

1 Environmen-tal Clearance

EIA Notification, 2006 amended till date, promul-gated under Environment (Protection) Act 1986 This states that Environ-mental Clearance (EC) is required for specified ac-tivities/projects, and this must be obtained before any construction work or land preparation (except land acquisition) may commence. Projects are categorized as A or B de-pending on the scale of the project and the nature of its impacts. Categories A pro-jects require Environmental Clearance from the Na-tional Ministry of Environ-ment and Forests (MoEFCC). Category B projects require environ-mental clearance from the State Environment Impact Assessment Authority (SEIAA).

State Environ-mental Impact Assessment Authority (SEIAA). If not constitut-ed then MoEFCC.

No the sub-project is not included in schedule of environmental impact as-sessment notification 2006 and its subsequent amendments till date, so it is not categories as either Cate-gory A or Cat-egory B. As a result, envi-ronmental clearance is not required, either from the state or the central Gov-ernment.

IPMU / IPU Not required

2. Ground Wa-ter (Regula-tion, Devel-opment and Management) Rules, 2007

For withdrawal of ground water

Central Ground Water Board

Extraction of ground water is not re-quired

IPMU / IPIU Not required

3 Forest Clear-ance for felling of trees and acquisi-tion of forest land for wid-ening.

Forest Conservation Act (1980) and Rules 2003 & 2004: This act provides guide-lines for conservation of forests and diversion of forest land for non-forest use. The law also states guidelines on de-reservation of various cat-egories of forests for diver-sion of forest land. This law describes the penalty for contravention of the provi-sions of the Act. Restriction on the de-reservation of forests or use of forest land for non-forest purpose. i) If the forest land exceeds 20 hectare then prior per-mission of Central Gov-ernment is required; ii) if the forest land is between 5 to 20 hectare, then per-mission from the Regional

District Level Committee constituted by the State Govt.

Permission for cutting of tree is re-quired from Forest De-partment

IPMU / IPIU Permission for cutting of three numbers of trees has been obtained from forest depart-ment vide their letter no.4373/2-3 on dated 17/06/2015.

Page 20: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

7

S. No.

Clearances

Acts/ Rules/Notifications/Guidelines and Application to proposed project

Concerned Agency

Applicable to Contract package

Re-sponsibility

Status of Compliance

Office of Chief Conservator is required; iii) If the forest land is below or equal to 5 hectare the State Govern-ment can give permission. If the construction area is more than 40% forest, permission to undertake any work is needed from the Central Government, irrespective of the size of the area. MoEFCC issued specific guidelines in July 2013 for state of Uttarakhand for expediting forest clearanc-es to carry out the emer-gency work in forest areas (excluding works in nation-al parks and sanctuaries) vide no 11-298/2013-FC Dated 24.07.2013 .

4 Wildlife de-partment clearances

The Indian Wildlife (Pro-tection) Act, 1972, as amended till 2006 This Act provides guide-lines for protection of [Wild animals, birds and plants] and for matters connected therewith or ancillary or incidental thereto. It also states the norms for hunt-ing of wild animals, prohibi-tion of picking, uprooting, etc., of specified plants. The Act deals with the dec-laration of area as Sanctu-ary, National Park, and closed area and also states the restriction of entries in the sanctuary. The 2002 Amendment Act which came into force in January, 2003 have made punishment and penalty for offences under the Act more stringent.

National Board for Wildlife

Not Applica-ble to contract package (The wildlife pro-tection act is not applicable to the pro-posed sub-project. All activities of project are well outside from the boundary fence of the wildlife sanc-tuary.

IPMU / IPIU Not required

5 Clearances required for using biologi-cal resources

Biodiversity Act 2002 and Biodiversity Rules 2004: The Act essentially controls access to indigenous bio-diversity resources. No agency/person shall, with-out previous approval of the National Bio-diversity Authority, obtain any bio-logical resource occurring in India or knowledge as-sociated thereto for re-search or for commercial utilization or for bio-survey and bio-utilization.

Uttarakhand Biodiversity Board.

Not Applica-ble for the subproject

IPMU / IPIU Not required

6 Permission to carry out con-

The Ancient Monuments and

State Level Committee

Not Applica-ble for the

IPMU / IPIU Not required

Page 21: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

8

S. No.

Clearances

Acts/ Rules/Notifications/Guidelines and Application to proposed project

Concerned Agency

Applicable to Contract package

Re-sponsibility

Status of Compliance

struction ac-tivities in the sites of Ar-chaeological Importance

Archaeological Sites and Remains Act, 1958, and the rules, 1959: The Act provides guidance for carrying out activities, including conservation, construction and reuse in and around the protected monuments Permission from the Ar-chaeological Survey of India for carrying out any construction activities with-in the prohibited and regu-lated areas of the ancient monuments and archaeo-logically protected sites.

constituted by the Central Govt.

subproject

B. Construction Stage 7 Permission

for Sand Min-ing from river bed

Mines and Minerals (Regulation and Devel-opment) Act, 1957 as amended in 1972

River Board Authorities/ Department of Mining Govt. of Uttarakhand

Yes Contractor -

8 Consent to Establish (CTE) and Consent to Operate (CTO) from the UEPPCB is required for setting up STP

Water (Prevention and control of pollution) Act, 1974, as amended Air (prevention and con-trol of pollution) Act, 1981, as amended

UEPPCB Yes, it is ap-plicable for sewerage Treatment Plant of Roorkee.

IPMU/ IPIU Consent to es-tablish has been obtained from UEPPCB which is valid till December 2017.

Consent to Establish (CTE) and Consent to Operate (CTO) from the UEPPCB for setting up, stone crush-ers, quarries and diesel generators (if installed for construction)

9 Authorization for Disposal of Hazardous Waste

Hazardous Wastes (Man-agement, Handling and Trans boundary move-ment) Rules, 2008 and Hazardous Waste (Man-agement, Handling and Trans boundary Move-ment) Fourth Amend-ments Rules, 2010

Uttarakhand Environmental Protection and Pollution Con-trol Board – Dehradun

No Contractor -

10 Pollution Un-der Control Certificate for construction vehicles

Central Motor and Vehicle Act 1988 and Central Mo-tor and Vehicle Rules,1989 amended till 2013

Department of Transport, Govt. of Uttarakhand

Yes Contractor

11 Employing Labour/ workers - La-bour license

The Building and Other Construction Workers (Regulation of Employment and Conditions of Service)

District Labour Commissioner

Yes Contractor Contractor to obtain labor license and workmen com-

Page 22: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

9

S. No.

Clearances

Acts/ Rules/Notifications/Guidelines and Application to proposed project

Concerned Agency

Applicable to Contract package

Re-sponsibility

Status of Compliance

and Work-men’s Insur-ance and la-bour permits

Act, 1996 & The Building and Other Construction Workers Related Laws (Amendment) Bill, 2013

pensation in-surance.

12 License for Storing Diesel and other explosives

Petroleum Rules, 2011. Hazardous Wastes (Man-agement, Handling and Trans boundary move-ment) Rules, 2008 and Hazardous Waste (Man-agement, Handling and Trans boundary Move-ment) Fourth Amendments Rules, 2010

Commissioner of Explosives and Uttarakhand Environmental Protection and Pollution Con-trol Board – Dehradun

No Contractor

13 Child Labour Child Labour Act 1986 - Applicable Contractor No child below 18 years age shall be em-ployed or per-mitted to work in any of the scheduled oc-cupations

6. Extent of the IEE Study 31. This IEE report has been updated on the basis of detailed screening and analysis of all environmental parameters, field investigations and stakeholder consultations to meet the requirements for environmental assessment process and documentation per ADB’s Safe-guard Policy Statement (SPS, 2009) and Government of India Environmental Impact Assessment (EIA) Notification of 2006.

7. Scope of IEE 32. This is the updated IEE for the Sewerage system including Change of location of STP from Satti Mohalla to Saliyar Ibrahimpur and capacity enhancement from 28 MLD STP to 33MLD STP and further splitting of Contract Packages WWM01RK in WWM03K and WWM04RK due non response of bidders and timely completion of project. It discusses the environmental impacts and mitigation measures relating to the location, design, con-struction and operation of all physical works proposed under this sub-project. The IEE is based mainly on secondary sources of information and field reconnaissance surveys. Stakeholder consultation was an integral part of updated IEE.

8. Report Structure 33. This IEE report is prepared in accordance with the ADB SPS, 2009 and is documented accordingly. This Report contains eight (8) sections including this introductory section: (i) Introduction; (ii) Description of the subproject; (iii) Description of the environment;(iv) Anticipated impacts and mitigation measures; (v) Institutional arrangements; (vi) Grievance redress mechanism; (vii) Public consultation and information disclosure; (viii) Environmental management plan (ix) Finding and recommendation; and(x) Conclusion.

Page 23: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

10

II. Description of Sub-project

A. Need for the Sub-project

34. The Uttarakhand Urban Sector Development Investment Program (UUSDIP) is pro-posed in 18 towns of Garhwal Region with financial assistance from ADB. The major infra-structure development works include augmentation and improvement of water supply system, sewerage system, solid waste management, traffic management and road works, slum devel-opment works. Roorkee is one of the towns included under UUSDIP for augmentation and improvement of Sewerage system and establishment of STP. Figure 1 shows the proposed sewerage subproject of Roorkee. Figure 2 shows the location plan of STP. Figure 3 & 4 shows the location and layout plan of SPS.

B. Subproject Description

35. This Initial Environmental Examination (IEE) has been updated for the following com-ponents of Roorkee Sewerage Subproject to be undertaken in Tranche II which are (i) Sewer-age system of Roorkee (Contract Package No. WMM01RK) (ii) Construction of 33 MLD STP and two SPS (Contract Package No. WMM02RK). The detail of each component is given in Table no.2.WWM01RK has been splitted into three separate contract packages of WWM01RK, WWM03RK and WWM04RK due to non-response of bidders and timely comple-tion of sub-project and the description of Contract sub packages is given in Table no. 3

Table 2 : Roorkee Sewerage Subproject Components

S No. Subproject Component

Description Location

1. Sewage Network

- Proposed sewer network covering lateral, branch, main and trunk sewer will be laid hav-ing total length 95 km. The material of pipe proposed is HDPE up to 300 mm diameter and RCC pipe for more than 300 mm diame-ter. The pipe line for pumping mains from Ganeshpur (SPS) to BSM Chowk is DI-K9 of 400 mm diameter in the length of 1300m and 700 mm pumping main from Mahigram (SPS) to STP in the length of 3800 m. - Proposed manholes shall be constructed in the material of RCC, Brick masonry and Pre-cast about 5,000 nos. - Property chambers (Precast and Brick ma-sonry) will be connected with the nearest manhole using uPVC pipes of 110 & 160 mm dia. OD.

- Proposed sewer network will be laid in zone B cover-ing municipal area (western part) of Roorkee town, i.e., 4.53 sq. km, and peri-urban area. - Pipelines will be laid on or along the roads (within ROW)

2. House ser-vice con-nections

House service connections will be given from nearest property chamber to the con-sumer house. Total 30,256 house connec-tions will be provided.

House service connections will be laid from the property chamber to the household premises.

3. Sewage Pumping Station

For the entire sewerage system proposed under this subproject, two pumping stations are proposed. One SPS having capacity 74 MLD is proposed to replace existing defunct SPS. One new SPS having capacity 25 MLD is proposed.

74 MLD SPS at Mahigram and 25 MLD SPS at Ganeshpur area of Roorkee town

4. Sewage Treatment Plant

It is proposed to construct the STP of ca-pacity 33 MLD. The SBR technology for the sewage treatment plant is proposed.

Proposed STP location is adjacent to Solani river in Saliar- Ibrahimpur.

Page 24: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

11

Table 3 : Description of Contract Sub-Package of Sewerage System of Roorkee.

S. No Package Description of work

1 WWM01RK

Supplying, Laying, testing and commissioning of sewer network covers Ramnagar area, Krishna Nagar, Awas Vikas, Maqtool Puri, MathuraVihar, Prem Nagar and adjoin-ing areas (Zone 2 &3)

2

WWM02RK

Procurement of 33 MLD capacity sewage treatment plant based on sequential batch reactor technology and sewage pumping station at Mahigram and Ganeshpur on De-sign, Supply, Installation, O&M basis, trail run, testing and commissioning and operation and maintenance for 5 years and necessary rising main, trunk main and gravity main at Roorkee.

3 WWM03RK

Providing, Laying, testing and commissioning of sewer network in Ganeshpur (Zone 04) of Roorkee.

4 WWM04RK

Providing, Laying, Jointing, testing and commissioning of Sewer Network including replacement of existing sewers in Amber Talab, Purani tehsil, Matawala Bagh, Anaaj Mandi, purvi Deendayal, Old Railway Road, Chaw Mandi Sainik Colony of Roorkee.

36. Sewerage system in Roorkee (Package No. WMM01RK, WMM03K, and

WMM04RK): Total length of distribution network proposed is 105 km. Salient features of this package are given in Table no. 4. Table 4 : Proposed length of distribution network package

Total coverage area of city in this package 5.76 sq.km

Population to be benefited (by 2013) 129845 Population to be benefited (by 2043) 51413 Total length of sewer network (approximately) 105 kms Pipe material RCC- NP3 and NP4 Manhole material Brick, RCC Approximate cost estimate Rs. 6837 lacs

37. Construction of 33 MLD STP (Package No. WMM02RK): The strategy for wastewater treatment is adopted to provide appropriate cost treatment with a robust process that takes into account local conditions. Apart from construction and running costs, factors that need to be taken into account in selecting appropriate processes for Roorkee STP include: (i) Con-sistent Effluent Quality in compliance to regulatory and statutory requirements; (ii) Less Area Requirement; (iii) Process flexibility; (iv) Easy operation and maintenance; (IV) Economic Via-bility; (v) Aesthetics with Surroundings and (vi) Odor and Nuisance 38. The merits and demerits of various available treatment technologies were evaluated with respect to their economic viability and effectiveness in the local conditions. Based on the comparison, it was found out that Extended Aeration SBR Activated Sludge process was found to be more suitable for the present conditions. The most important reasons for selecting Extended Aeration SBR Activated Sludge process are:

(i) Area requirement for SBR is less than the conventional extended aeration process, and the complete SBR plant can be accommodated in the available land area.

(ii) No secondary settling tanks in SBR, no return sludge pumping, hence lesser opera-tion & maintenance

(iii) The SBR is a time-oriented, periodic process that can be designed and operated to simulate virtually all conventional continuous-flow extended aeration activated sludge systems.

(iv) Improved sludge settling: due to pre-react zone (biological selectors). Increased set-tling area without sludge scrapers provide perfectly quiescent settling environment.

(v) Expansion potential; Simplified expansion- Each unit forms a modular treatment unit.

(vi) Because of the flexibility of working in time rather than space, the operating policy can be modified to meet new effluent limits, handle changes in wastewater character-

Page 25: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

12

istics, and accommodate the fluctuations in seasonal flow rate, all without increasing the sizes of the physical plant.

(vii) As the SBR process is fully automatic, it constantly measures and monitors the “ oxy-gen uptake rate” (OUR) in the basin based on DO profiling, and ensures that optimum power is used by the process with respect to variation in flow variation and input BOD variation. This results in substantial savings in power consumption.

(viii) The process has inbuilt capability to remove Nitrogen and phosphorous (N, P) via process of nitrification and de nitrification. This results in far superior process treat-ment and ensures protection of water bodies and rivers against growth of algae, wa-ter hyacinths and other weeds which reduce DO level in the river bodies.

39. Proposed SBR based treatment plant comprises following major units: (i) Receiving Chamber; (ii) Mechanical Coarse Screen Channels; (iii) Mechanical Fine Screen Channels; (iv) Mechanical Grit removal facility; (v) SBR Process Units; (vi) Chlorination Unit; and (vii) Centrifuge for Sludge Dewatering 40. The proposed sewage treatment plant will have design capacity to treat 33 MLD sew-erage. The treatment starts with the collection of sewage at Inlet chamber, and then flows to coarse and fine screen chambers for the effective removal of solid particles from the plant Influent. Sewage from screen chamber flows to Mechanical grit chamber to remove grit parti-cles. The biological treatment section comprises of SBR for the effectively removal of BOD and SS as per the discharged regulatory norms. Chlorination has been provided to the Sew-age from SBR process. Centrifuge shall be provided for dewatering the Sludge generated from the SBR. Plant Layout for the proposed treatment plant is given in Table no- 5.

Table 5 : Design Parameters of Sewage Treatment Plant

Sewage Treatment Plant Design Formula : Manning’s Formula

Min. & Max. Vel. in Sewers

: Min. : 0.6 m/s Max. : 3.0 m/s

Max. d/D ratio : 80%

Min. & Max. Pipe Size

: Min. : 200 mm Max. : as per design

Clear Cover over Pipe Crest

: 1m. In case min. cover is not available, pipe shall be encased with RCC.

Manhole Spacing : Lateral & Branch : 30 m Trunk : 45 m Outfall : 60 m

STP Design Horizon : Intermediate Design Year (2024)

STP Design Capacity : 33 MLD

Peak Flow : 33,000 m3/day

Per capita BOD : 45 gpcd (Table 19.1, CPHEEO Manual, Page 304)

Per capita SS : 70 gpcd (Table 19.1, CPHEEO Manual, Page 304)

Incoming BOD : 45x103 mg * 1/112.4 * 0.5 = 200.1 mg/l (assuming 50% BOD degrada-tion in sewers), say, 200 mg/l

Incoming SS

: 70 x 103 mg * 1/112.4 * 0.5 = 311 mg/l (assuming 50% SS degradation in sewers), say, 350 mg/l

Treated Sewage Quality

: Parameter Influent Effluent Removal Ratio

BOD (mg/l) 200 10 85%

SS (mg/l) 350 50 Approx. 85%

Coliforms Influent 5x106 MPN/100ml, Effluent < 104 MPN / 100ml

Design period

Page 26: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

13

Sewer network : 30 years

Pumping station (civil work)

: 30 years

Pumping machinery : 15 years

Sewage treatment plant

: 30 years

Effluent disposal and utilization

: 30 years

BOD-biochemical oxygen demand; CPHEEO-Central public Health and environmental engi-neering organization; gpcd-gallons per capita per day; mg/l-milligram per litre;MPN-most probable numbers; SS-suspended solids.

C. Energy Efficiency Measures

41. The Sewerage subproject components have been designed with utmost considera-tion of energy efficiency in the whole system. The sewage through sewerage network will be conveyed by gravity. Sewage collected through gravity in western side will be pumped through pumping station to convey to STP. The pumping systems proposed for sewage pumping station as well as for STP are energy efficient. The equipment has been designed with the maximum efficiency to optimize the energy consumption. Best pumps with ideal spe-cific speeds have been considered. Attainable efficiency for procuring the pumps and motors are considered as 88 to 92 percent for pumps and 94 percent for motors. D. Implementation Schedule

42. Change of location of STP has caused significant change in schedule of work. This required changing the consent to establish from Uttarakhand State Pollution Control Board and the CTE has been obtained which is valid up to December-2017.Detail design of the work has been completed. The implementation schedule for 33 MLD-STP and splitted contract packages are given below. The sub-projects will be implemented as per the schedule given in Table no-6.

Table 6 : Implementation schedule for 33MLD-STP and splitted contract Packages. Construction Packages Start Completion

WWM01RK – Sewer network in Ramnagar, Krishna Nagar, Awas nagar, Maqtoolpuri, Mathura vihar, Prem Nagar (Zone 2&3) of Roorkee

March 2016 January 2018

WWM02RK – 33 MLD STP, SPS and rising main

March 2016 December 2017

WWM03RK –Providing laying, jointing, Testing and Commissioning of Sewer Net-work in Ganeshpur Area (Zone-4) of Roorkee

March 2016 January 2018

WWM04RK – Sewer network including re-placement of existing sewers in Amber, Talab, Purani Tehsil, Matawala Bagh, Anaaj Mandi, Purvi, Deendayal, Old Railway Road, Chaw mandi Sainik Colony of Roorkee

March 2016 January 2018

Implementation of the construction of 33MLD-STP shall be commence after the rainy season and will be completed by the end of December-2017.

Page 27: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

14

Figure 1 : Map Showing Proposed Roorkee Sewerage System

Page 28: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

15

Figure 2 : Layout Plan of proposed Roorkee STP

Page 29: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

16

Figure 3 : Location and Layout Plan of proposed Ganeshpur SPS

Page 30: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

17

Figure 4 : Location Plan of STP and Two SPS along with Trunk Sewer Main

Page 31: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

18

III. Description of the Environment

A. Physical Features

1. Location 43. Roorkee town is located at 29.87° North Latitude 77.88° East Longitude. It has an average elevation of 268 meters (879 feet). It is situated on National Highway (N.H.) 58 (Del-hi-Haridwar) and N.H. 73 (Haridwar-Panchkula), and is on Amritsar-Howrah main rail route. Roorkee is 175 km north of the Indian capital New Delhi and about 70 km from Dehradun the provisional capital of Uttarakhand and located between the rivers Ganga and Yamuna, close to the foot hills of Himalayas. Location of 33MLD-STP: The site for construction of 33MLD-STP is located adjacent to the bank Solani River on Nagar Nigam Land. It is barren Land and is topographically fit for Con-struction of 33 MLD-STP.

2. Topography and Geology

44. The town has a gently sloping topography, with slope from south to north towards River Solani, However the Ganga Canal slopes towards the southwest. The difference in the highest and lowest ground level of the town is of the order of 18.5 meters. Depth of Subsoil water in this area varies from 6.0 meters to 10.0 meters, with average depth of 8.0 meters. The town lies in the Tarai belt and has tropical climate. 45. Geologically the area may divided into three zones viz. Siwaliks, Bhabar and Gangetic Alluvial Plains from North to South:(1) Siwalik Range: This forms the outermost part of Himalaya and comprises Tertiary Group of rocks. In Bhagwanpur block only Upper and Middle Siwaliks are exposed. The Upper Siwaliks is constituted of boulders, pebbles, sand and clay. The boulders and pebbles are mostly of quartzite. Middle Siwaliks comprises main-ly grey micaceous sandstone and siltstone: (ii) Older Alluvium (Piedmont Plains or Bhabar): The Piedmont Plains are formed along the foothills of Siwaliks. It is formed by flooding hill torrents and nallahs (locally termed as ‘Rao’). Alluvial fans in the piedmont zones are wider and longer when formed along mature streams. The Older Alluvium consists of polycyclic sequence of brown to grey silt, clay with boulders and pebbles: Gangetic Alluvial Plains: The region south of the piedmont plains occupied by Gangetic Allu-vial Plains, forms major part of the Bhagwanpur block. Litho logically, the alluvium is formed of unconsolidated to semi-consolidated deposits of sand, silt, clay and kankar. 46. Due to the fragile eco-system and geo-dynamic terrain, Uttarakhand State is highly vulnerable to natural disasters like earthquakes, landslides, forest fires, and cloud burst etc. According to hazard zoning in the Vulnerability Atlas of India, the whole of Uttarakhand falls under “very high” to “high” category earthquake zone. The problems of landslides, subsid-ence, and erosion are quite common in the hilly regions of the State due to combination of several factors like geological movements, structure, lithology, water seepage, soil cover, vegetal cover, weather, and climatic changes. 47. The testing of representative soil samples at two locations of 33 MLD-STP at Saliyar-Ibrahimpur were conducted by Indian Institute of Technology at Roorkee to assess the val-ues of porosity, Soil texture, moisture content, organic and Inorganic constituents of soil and Soil classification. For the following parameters the laboratory test conducted were sieve and hydrometer analysis for soil classification as per IS: 1498-1987, natural moisture content determination, maximum dry density and optimum moisture content determination as per IS-2720(Part VII)-1980 for the determination of moisture content and dry density. The repre-

Page 32: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

19

sentative results at two locations are given in the Table no.7 & Table no.8. Organic and in-organic constituents of soil are given in Table no.9.

Table 7 : Classification test results of soil samples collected from STP site. Sam-

ple No.

Loca-

tion at

STP

Depth

below GL

(m)

Mechanical Analysis (%) Atterberg’s Limits

Sand Silt+Clay L,L,

%

P.L.

% Coarse Medium Fine Finer

<0.075 mm 4.75-2.0

mm

2.0 -4.75

mm

0.425-

0.075

mm

(1) (2) (3) (4) (5) (6) (7) (8) (9)

1 Near Admin Build

0.5 0 1.0 53 46 - -

2 Near SBR-3

0.5 0 3 23 74 24 18

Table 8 : Laboratory Proctor’s Compaction Test Results of Soil Samples

S.No

Sample No.

Compaction Test Results

IS :

Classification

MDD

(gm/cm3)

OMC

(%)

1 1(Near Admin Building) 1.81 12.2 -

2 2 (Near SBR-3) 1.82 14.6 - Table 9 : Organic and Inorganic constituents of soil at two locations of STP site.

S.

no.

Parameters/Test Result

Sample no. 1

Result

Sample no. 1

A-Physico-Chemical Value mg/l

(Except S.l. no-01)

Value mg/l

(Except S.l. no-01)

01 pH 7.55 6.10

02 Total Dissolved Solids 227.0 232.0

03 Chlorides as Cl 12.0 28.0 04 Sulphate as SO4-2 33.3 66.3

05 Organic Solids 180.0 175.0

It is evident from the Table no. 7 that the soil present at both the locations is not similar. The soil present at location-1 is SM i.e. silty sand whereas the soil present at site 2 is silt with clay (ML-CL). The maximum dry density varies from 1.81 to 1.82 t/m3 obtained by Proctor com-paction test as given in the Table no.-8. The chemical test results indicate that there is no deleterious compound present in the soil collected from both the locations as given in the Table no.9.The porosity of both the samples i.e. at loaction1 is 0.14 and location 2 is 0.16.

3. Climate and Rainfall

48. District Hardwar experiences moderate subtropical to humid climate with three dis-tinct season’s viz. summer followed by rainy and winter seasons. Temperature begins to rise from March (29.10C) and reaches to its maximum in May (39.20C), with the commencement

Page 33: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

20

of monsoon season by mid-June, the temperature begins to fall. During the winter season in the month of November to February the temperature ranges between 10.50C and 6.10 49. The relative humidity is highest in monsoon season (85% in the morning and 79% in the evening). The lowest humidity is observed during the month of April and May i.e. 24% (in evening) and 40% in May (in morning). 50. The average normal annual rainfall in Hardwar district is 1174.3 mm, out of which 84% is received during monsoon season and only 16% occurs during non-monsoon period. The district receives heaviest rainfall in northern part. The rainfall gradually decreases to-wards south. To study the recent trend of rainfall distribution over the district, monthly rainfall during monsoon has been given in Table 2. The monthly distribution of rainfall during the monsoon season over the district shows that July and August are the wettest month in the district having a rainfall 329.3 and 393.8 mm, respectively. The rainfall during the month of July and August is more or less the same. The monsoons retreat in the first fortnight of Octo-ber giving a meager rainfall of about 31 to 34 mm. Maximum rainfall occurs in the foothills of Himalayas and gradually decreases towards south. The detail of average annual rainfall of district Haridwar is given in Table no.10.

Table 10 : Monthly and Annual Normal Rainfall in District Hardwar (mm)

Month Rainfall in mm

Haridwar Roorkee

January 48.1 43.3

February 45.8 41.1

March 24.5 26.9 April 9.8 11.4

May 19.9 18.9 June 108.9 99

July 360.1 329.3

August 393.8 299.3 September 192.2 182

October 34.3 31.5

November 5.4 4.7 December 15.4 14.9

Annual rainfall 1256.2 1102 4. Air Quality

51. The proposed subproject does not cover industrialized areas, and hence the air pol-lution is not significant. The main sources of air pollution at present are due to emissions from mobile sources i.e. from minor vehicular traffic and windblown dust/sand. Thus, the air quality is considered to be good. The results of the baseline data of Ambient Air Quality is given in Table no. 11. Table 11 : Baseline of Ambient Air Quality of Sewerage Sub-Project at Roorkee

Parameter

Unit STP

Site

13.12.15

Mahigram

11.12.2015

Rampur

Chungi

11.12.15

Ganeshp

ur

12.12.15

Limit

PM2.5 24 Hour in µg/m3 31.1 20.3 38.3 32.8 60

PM10 24 Hour in µg/m3 47.3 40.2 57.8 48.9 100

Page 34: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

21

Parameter

Unit STP

Site

13.12.15

Mahigram

11.12.2015

Rampur

Chungi

11.12.15

Ganeshp

ur

12.12.15

Limit

SO2 24 Hour in µg/m3 4.5 5.8 12.8 9.8 80

NO2 24 Hour in µg/m3 6.4 8.5 19.4 17.2 80

CO 24 Hour in mg/m

3 <.5 <0.5 <0.5 <0.5

2000 (8Hr) 4000 (1Hr)

Ozone 24 Hour in µg/m3 <10 <10 <10 <10 100 (8Hr) 180 (1Hr)

Ammonia NH3 24 Hour in µg/m3 <20 <20 <20 <20 400

Lead( Pb) 24 Hour in ng/m3 <5 <5 <5 <5 1

Nickel 24 Hour in ng/m3 <1 <1 <1 <1 20 Arsenic 24 Hour in ng/m3 <0.05 <0.05 <0.05 <0.05 6

Banzo-a-pyrene(Bap) 24 Hour in ng/m3 <1 <1 <1 <1 1

5. Noise

52. The subproject area represents mostly urban area of Roorkee city. The ambient noise levels vary from very low to low in the urban, built-up areas. Near some congested areas of, the noise levels are moderate. The overall impact on the ambient noise level is not significant. The baseline data of Ambient Noise Level is given below in Table no.12.

Table 12 : Baseline of Ambient Noise level of Sewerage Sub-Project in Roorkee

Parameter Unit STP Location

12.12.2015

Ganeshpur

12.12.2015

Rampur Chungi

12.12.2015

Mahigram

12.12.2015

Leq 6.00 AM to 10.00 PM

dB(A) 51.9 56.7 64.8 52.6

Leq 10.00 PM to 06.00 AM

dB(A) 37.6 37.7 39.7 36.4

6. Surface Water

53. The Roorkee town is situated on the right bank of the Solani River, which is a tribu-tary of the Ganga River. The river flows north – east direction. The river is not being used as water sources because it carries water only during rainy season. Water is sometimes used for irrigation purpose and there are no domestic/industrial water extraction points on the downstream. The Upper Ganga Canal is passing through the center of Roorkee town. This canal although is always full of water however water is allocated for irrigation purpose only. River Ganga is flowing 25 Km away from the city and is towards north-east direction i.e. at Haridwar. The primary source data of Solani River from 500m upstream and 500m down-stream from the discharge point of treated sewage into Solani River is given in the Table

no.13.

Page 35: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

22

Table 13 : Water quality characteristics of 500m upstream and 500m downstream

from the discharge point of treated sewage into Solani River.

S. No

Parameters Test results from 500m upstream

t t Test results from

500m downstream Unit

1 pH 7.63 7.85 --

2 Total Suspended solids(TSS) 39.0 23.0 mg/l

3 Total Suspended Solid(TDS) 455.0 435.0 mg/l

4 Chlorides as CL 15.7 13.7 mg/l

5 Ca Hardness as CaCO3 173.5 115.0 mg/l

6 Mg Hardness as CaCO3 79.0 80.0 mg/l

7 Nitrates as NO3 19.0 26.3 mg/l

8 Free Ammonia Nil Nil mg/l

9 Phosphate as PO4 -3 .023 .015 mg/l

10 Lead,Pb Nil Nil mg/l

11 Mercury,Hg Nil Nil mg/l

12 COD 41 31 mg/l

13 BOD 16 12 mg/l

14 Total Residual Chlorine Nil Nil mg/l

B- Bacteriological

16 Total Coliform, MPN/100ml 3300 1400 MPN/100ml

17 Fecal Coliform, MPN/100ml 120 260 MPN/100ml

MPN- Index (coliforms) should be nil in drinking water

7. Influent Characteristics near Rampur Chungi Drain at Roorkee is given in Table no-

14.

Table 14 : Influent Characteristics of Rampur Chungi drain at Roorkee

S. No

Parameter Test methodologies Results Unit

1 pH APHA 22nd edition,4500H+ B:2012 6.04 --

2 Total Dissolve Solids APHA 22st edition,2540 B:2012 686 mg/l

3 Total Suspended Solid APHA 22nd edition,2540 D 23.6 mg/l

4 COD IS3025- Part 58, 2006 112.5 mg/l

5 BOD, 27°C 3 days IS3025- Part 44, 1993 Reaffirmed 2003 64.5 mg/l

6 Calcium as Ca APHA 22nd edition,3500 Ca B:2012 64.2 mg/l

7 Magnesium as Mg APHA 22nd edition,3500 Mg B:2012 37.4 mg/l

8 Sodium APHA 22nd edition,3500 Na B:2012 58 mg/l

9 Potassium APHA 22nd edition,3500 K- B:2012 19 mg/l

10 Chloride as Cl APHA 22nd edition,4500 Cl- B:2012 116.5 mg/l

11 Sulphate as SO4 APHA 22nd edition,4500 SO4--E:2012 124.2 mg/l

12 Nitrate as NO3 IS : 3025 (Part-34) 5.2 mg/l

Page 36: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

23

13 Fluoride as F APHA 22nd edition,4500 F- D:2012 1.40 mg/l

14 Cyanide IS : 3025 (Part-27) <0.01 mg/l

15 Aluminum IS : 3025 (Part-55) <0.03 mg/l

16 Arsenic IS : 3025 (Part-37) <0.1 mg/l

17 Cadmium IS : 3025 (Part-41) <0.01 mg/l

18 Chromium as Cr+6 IS : 3025 (Part-52) <0.05 mg/l

19 Iron APHA 22nd edition,3500 Fe- B:2012 0.25 mg/l

20 Copper IS : 3025 (Part-42) <0.5 mg/l

21 Lead IS : 3025 (Part-47) <0.05 mg/l

22 Manganese IS : 3025 (Part-59) <0.1 mg/l

23 Mercury IS : 3025 (Part-48) <0.001 mg/l

24 Zinc IS : 3025 (Part-49) 1.11 mg/l

25 Total Residual Chlorine IS : 3025 (Part-26) 0.48 mg/l

26 Boron IS : 3025 (Part -57) 0.70 mg/l

8. Groundwater

54. Hardwar district comes under Ganga river system. The main tributaries of Ganges like Solani, Ratmau Rao and Banganga and their feeding nallahs drain the area. These tribu-taries are ephemeral in nature. As far as canal irrigation is concerned, western part of the district is well covered with 300 km length canal network. Bhagwanpur block comes under non-command area. Hence, there is an immense pressure on ground water due to which water levels are declining at faster pace. There are 225 State Government tube wells and 32930 private tube wells. The ground water abstraction for drinking, domestic and agriculture purposes is higher in Bhagwanpur block as compared to other blocks. Most of the tube wells are drilled in central and southern part of the block. The northern part of the block has less number of tube wells.Roorkee area falls in the Gangetic alluvial plain and is underlain by recent to sub-recent fine grained sand, silt, Kankar, clay and occasional gravel and pebbles. This area is also characterized by high rate of infiltration because of being underlain by fine to medium grained sand and occasional unconsolidated and unsorted material of Gravels, having a high degree of porosity and permeability resulting in high rate of aquifer recharge. Ground water occurs in unconfined condition. And a water level generally varies from 6 me-ters to 10 meters below in pre-monsoon season. The aquifer mainly comprise of sand, silt, Kankar and occasional gravel and Pebbles. The baseline condition of ground water is given in Table no-15. However the ground water quality of 33 MLD-STP sites at Saliyar Ibrahimpur is given in Table no. 16

Source – Ground Water, Date of Sampling: 16 October 2015. Table 15 : Quality of Ground Water of Roorkee

Parameter Unit Roorkee (Maqtoolp

uri)

Requirement as per IS 10500-2012

Test Method

Desirable Limit

Permissible Limit

Color Hazen <5 5 Max 15 Max IS 3025 (P-4)-1983 Odour Agreeable Agreeable Agreeable IS 3025 (P-5)-1983 Taste Agreeable Agreeable Agreeable IS 3025 (P-7)-1984

Page 37: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

24

Parameter Unit Roorkee (Maqtoolp

uri)

Requirement as per IS 10500-2012

Test Method

Desirable Limit

Permissible Limit

Turbidity NTU <1 1 Max 5 Max IS 3025 (P-10)-1984 pH Value 7.29 6.5-8.5 6.5-8.5 IS 3025 (P-11)-1983 Total Hard-ness as CaCO3

mg/l 111 200 Max 600 Max IS 3025 (P-21)-2009

Iron as Fe mg/l <0.1 0.3 Max 0.3 Max IS 3025 (P-53)-2003 Chlorides as Cl

mg/l 49 250 Max 1000 Max IS 3025 (P-32)-1988

Residual Free Chlorine

mg/l Nil 0.2 Min (When

Chlorinat-ed)

1.0 Min (When Chlorinated)

IS 3025 (P-26)-1986

TDS mg/l 203 500 max 2000 max. IS 3025 (P-16)-1984 Fluoride (as F) mg/l <0.01 1.0 Max 1.5 Max IS 3025 (P-60)-1984 Total Coli-forms

per 100ml

Absent IS 1622 -1981

Source- Ground Water Date of sampling: 04.10.2016. Table 16 : Ground water quality at 33 MLD-STP site at Saliyar- Ibrahimpur.

S.No.

Parameters/Test Result BIS Limit IS 10500: 1991

(Drinking Water)

A- Physico-Chemical Value mg/l (Except S.no. 1 to 4)

Requirement (Desirable limits)

Permissible limit in the absence of al-ternate Source

1 Appearance Colourless Colourless -----

2 Odour Odourless Unobjectionable NS 3 pH 7.13 6.5-8.5 No relaxation

4 Turbidity(NTU) 0.412 5.0 NS

5 Total Solids 272 NS NS

6 Total Dissolved Solids 237 500.0 2000.0

7 Chlorides as Cl 14.7 250 1000

8 Total Hardness as Ca CO3 133.0 300.0 600.0

9 Sulphate as CaCO3 28.9 200.0 400.0

10 Sodium as Na

10.7 ---- ----

11 Nitrate as NO3 .566 45.0 100.0

12 Total Alkalinity as Ca CO3 265.0 200.0 600.0

B- BACTERIOLOGICAL

1 Total Coliform MPN/100ml Nil * *

2 Fecal Coliform MPN/100ml Nil * *

NS= Not specified. MPN index (Coliforms) should be nil in the drinking water.

Page 38: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

25

B. Ecological Resources

55. The hilly State of Uttarakhand has a forest cover of 65 % of its total geographical areas (slightly lower than the stipulated 66.6 % forest cover for hilly states). Roorkee City is an urban area surrounded by hilly forested areas. There is no remaining natural habitat within the developed area of the City. 56. The closet protected area is Rajaji National Park. Designated as National Park in 1964, it spreads over an area of 820 square kilometers (sq. km) and is endowed with pristine beauty and rich bio-diversity. This has over 23 species of mammals, including elephants and tigers, and 315 avifauna species. The other protected areas are: (i) Mussoorie wildlife sanc-tuary, north of Dehradun, and (ii) Asan wetland conservation reserve, northwest of Dehradun. However, none of the subproject component located in or near these protected areas.

C. Economic Development

57. Located close to the national capital Delhi and Haridwar and with its salubrious cli-mate and natural beauty, Roorkee is an educational and institutional Centre. Roorkee finds its importance by being the host of many prominent institutions and organizations. The city has contributed to the national development by producing the finest quality engineers from the renowned University of Roorkee, now called the Indian Institute of Technology, Roorkee. It is also the home of various government research institutes as Central Building Research Institute (CBRI), Irrigation Research Institute (IRI) and the National Institute of Hydrology (NIH). It also has an army base of Bengal Engineering Group & Centre (BEG&C).

1. Agriculture

58. Owing to its hilly topography, agricultural development in the state is also limited. Although limited, the State draws advantage from fertile lands availability of abundant water. Dehradun and surroundings were well known for production the famous “Basmati” rice crop. However, of late, the development pressure has conversed many of these agricultural lands. 2. Infrastructure

59. Transportation: Roorkee is located on National Highway (NH) - 58 (Delhi-Haridwar/Dehra Dun-Shri Badrinath-Mana Pass) and NH-73 (Panchkula/Chandigarh-Yamuna Nagar-Roorkee). Roorkee comes under Northern Railway and is well -connected by trains (Shatabdi, Jan-Shatabdi, Mail/Express and Shuttle/Passenger) with a number of im-portant Indian cities including Delhi, Mumbai, Kolkata, Chennai, Ahmadabad, Jaipur, Luckhnow, Bhopal, Gwalior, Agra, Ujjain, Indore, Dhanbad, Patna, Jammu, Puri, Amritsar, Dehra Dun etc. 60. Power supply: Hydro power is the main source of energy in Uttarakhand. Uttarakhand Jal Vidyut Nigam Limited (UJVNL) is responsible for power generation and Uttarakhand Power Corporation Limited (UPCL) is responsible for power transmission and distribution in the State. Power is supplied from the central grid by overhead cables carried on metal and concrete poles, mainly located in public areas alongside roads. The power supply is erratic and there are frequent outages in warmer months, and large fluctuations in voltage.

D. Social and Cultural Resources

1. Demography

61. Haridwar district is in the western part of Uttaranchal state of India covering an area of about 12,306 sq./km and has 6 blocks, population of which is 17% of the state population. The district is ringed by Saharanpur in the west, Dehradun in the north and east, Pauri

Page 39: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

26

Garhwal in the east, Muzzaffar Nagar and Bijnor in the south. The sex ratio of the district is 852 females per 1000 males which is lower than the state average of 964. Males constitute 53% of the population and females 47%. Haridwar has an average literacy rate of 56.7%, lower than the state average of 72.3 %. The male literacy rate is 64.9%, and female literacy rate is only 48.5%. Administratively district Haridwar is divided in 3 Tehsil, 6 Community De-velopment Blocks, 46 Nyaya Panchayats, 359 Grama Sabhas and 299 Gram Panchayats. 62. As of 2001 India census, Roorkee had a population of 2, 52,784. Males constituted 53% of the population and females 47%. Roorkee has an average literacy rate of 82%, high-er than the national average of 64%: male literacy is 87%, and female literacy is 81%. 11% of the population is under 6 years of age. The city has 61% Hindus, 28% Muslims, 9% Punja-bis/Sikhs, 0.3% Christians and 1.7% Jains. With a population of about 2, 52,784 inhabitants, it is the third largest Municipal Council in the state of Uttarakhand, after Haridwar & Haldwani. Languages spoken are Hindi, Urdu and Punjabi.

2. History, Culture and Tourism

63. Roorkee derives its name from Ruri, the wife of a Bargujar Rajput chieftain, and ear-lier it was even spelled as 'ruri ki'. Vernacular belief amongst villagers around Roorkee is that it got its name from "Roron ki" i.e a dwelling of Rors. 64. The Ganga Canal flowing through Roorkee was the brainchild of Sir Proby Cautley. Its construction began in 1840, and the canal was opened by Governor-General Lord Dal-housie in April 1854. Before 1840s, when the work on the Ganga Canal began under the aegis of Proby Cautley, according to an officer in British Army, Roorkee was a mere mud built village on the banks of the hill torrent, named Solani. Digging work on the Upper Ganga Canal formally began in April 1842, and soon this village started developing into a city. The canal was formally opened in April 8, 1854, irrigating over 767,000 acres (3,100 Sq.Km) in 5,000 villages. 65. Roorkee was the capital of a Moghul Mahal (similar to a present day Pargana) during the time of Akbar, as is referred in Ain-e-Akbari, authored by Abul Fazal. During the 18th century, it came under the rule of Landhaura state, till the death of its Bargujar king, Raja Ramdaval Dev in 1813 and later became a part of the territories of the British East India Company. 66. The municipality of Roorkee was created in 1868, when it was already home to the Bengal Sappers and Miners since 1853, and two artillery units were stationed here. Today, the Roorkee Cantonment has a large army base with headquarters for Bengal Engineering Group and Centre (BEG&C), also known as Bengal Sappers, established in 1803. Later in 1901, when the city had a population of 17,197, it was made headquarters of the Roorkee Tehsil, in Saharanpur district of the United Province of the British Raj; the tehsil included in it 426 villages (of the parganas of Jwalapur, Manglaur and Bhagwanpur) and six towns, most important among them being Haridwar and Manglaur. The Old Cemetery in the city is today a protected monument, by Archaeological Survey of India. 67. Roorkee is also famous for the shrine of 13th century, Sufi saint Alauddin Sabir Kaliyari - the dargah is also known as Sarkar Sabir Pak - situated in Piran Kaliyar village, where an annual 15-day spiritual fair (Urs) is held in his honour. 68. Before the creation of Uttarakhand on November 9, 2000, Roorkee was a part of the state of Uttar Pradesh.

Page 40: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

27

IV. Anticipated Impacts and Mitigation Measures

69. This section of the updated IEE reviews possible subproject-related impacts, in order to identify issues requiring further attention and screen out issues of no relevance. ADB SPS (2009) require that impacts and risks shall be analyzed during pre-construction, construction, and operational stages in the context of the subproject’s area of influence. As defined previ-ously, the primary impact areas are (i) distribution network sites; (ii) main routes and/or inter-sections which will be traversed by construction vehicles; and (iii) quarries and borrow pits as sources of construction materials. The secondary impact areas are: (i) entire Roorkee town area outside of the delineated primary impact area; and (ii) entire Haridwar district in terms of over-all environmental improvement. 70. The ADB Rapid Environmental Assessment Checklist for Sewerage in http://www.adb.org/documents/guidelines/environmental_assessment/eaguidelines002.asp was used to screen the subproject for environmental impacts and to determine the scope of the IEE investigation. The completed Checklist is found in Appendix 2. All the proposed sub-project components will interact physically with the environment. 71. In the case of this subproject (i) most of the individual elements are relatively small and involve straightforward construction and operation, so impacts will be mainly localized and not greatly significant; and (ii) most of the predicted impacts are associated with the con-struction process, and are produced because that process involves excavation and earth movements (iii) mostly being located in the built-up area of Roorkee town, will not cause di-rect impact on biodiversity values. The subproject will be in properties owned and acquired by the local government and access to the subproject locations is through public Right of Way and existing roads hence, land acquisition and encroachment on private property will not occur.

A. Pre-construction - Location & Design

72. Site Selection The site selected for establishment of 33 MLD-STP is Saliyar Ibrahimpur village and adjacent to Landfill site. The location is upstream of Roorkee. A site visit and focused group discus-sion was taken up to identify the downstream impacts of the STP. The potential impacts and its analysis are:

(i) Soil erosion due to discharge of STP in excess to the flow capacity of the river. Outlet structure will be constructed for smooth flow of treated water into river. So, soil erosion is not expected.

(ii) Any flooding risks downstream of the discharge point. River bed is more than 50 meter width and it remains dry in most part of the year and there is not contraction of river width so flooding is not anticipated.

(iii) Impact on riverine ecosystem or sensitive ecosystem if available on the downstream. The downstream is mostly agriculture and there is no sensitive ecosystem.

(iv) Impact on sensitive community asset if available on the bank of the river. There is no sensitive community ecosystem. There is a community crematorium in downstream at about 2.5 km from the proposed discharge point in Solani River. So there will not be any impact due to selection of STP site at Ibrahimpur Saliar.

(v) Acceptability of discharge of STP by the local people living in the downstream of the discharge point of the STP. Around 5 villages are in the downstream of the discharge point of STP. These are Saliyar, Ibrahimpur, Rampuri, Shankarpur, Brahampuri, and Khanjarpur. The Ibrahimpur is having population of about 3500.

Page 41: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

28

73. Design of the Proposed Components. The Central Public Health and Environment Engineering Organization manual suggests a design period of 15-30 years. The sewerage components were designed following the recommendations of the Central Public Health and Environment Engineering Organization Manual for Waste water. 74. Impacts arise from the design of the project including the technology used, scale of operation/throughput, waste production, discharge specification, pollution sources and ancil-lary services. Since this is only a rehabilitation project, no design impacts envisaged. 75. Impacts associated with the planning mainly depend on the site selection. Location impacts include on-site biophysical array and encroachment / impact either directly or indi-rectly on adjacent environments. It also includes the impacts on the people who might lose their homes or livelihoods due to the development of the proposed site. Impacts due to en-croachment into private properties, forest land and cutting of trees and damage to vegetation: 76. Sewerage Network Improvement Most subproject components involve simple construction and low operation and mainte-nance, so it is unlikely that there will be major impacts. The pipeline replacement works, the only component that involve considerable construction activity, are located in the City area where there are no sensitive natural habitats. The pipelines are aligned in the vacant land adjacent to the roads within the ROW, so there are unlikely to be any location impacts. 77. Sewage Treatment Plant It is estimated that the proposed sewage treatment plant requires about 3 ha of land includ-ing that for green buffer areas around the plant. The IPMU has identified a site adjoining the River Solani near the agricultural land at Roorkee. This site is owned by the Nagar Nigam Department and already transferred to Uttarakhand Urban Sector for construction of 33MLD- STP at Saliyar Ibrahimpur. The photographs of construction site are given in Appendix-5. The land transfer certificate from Nagar Nigam Department is given in Appendix-7. Site has been selected based on the availability of that much of land in an isolated area and availability of irrigation land adjacent to that site, which will be irrigated by the treated effluent of the STP’s in future. 78. Due to the following reasons, this site is considered technically most appropriate for STP:

(i) Topographically this site is most suitable and allows complete gravity flow system.

(ii) There is no vacant government land to the tune of 3 ha is available further down-stream of Solani River

(iii) In general land availability in Roorkee is very limited 79. The Roorkee town is situated on the right bank of the Solani River, which is a tribu-tary of the Ganga River. The river flows north – east direction. The river is not being used as water sources because it carries water only during rainy season. Water is sometimes used for irrigation purpose and there are no domestic/industrial water extraction points on the downstream. Therefore there will not be any impacts on the River due to disposal of treated water. Actually, the river will be improved due to prevention of raw sewage disposal and since the sewage will be treated to the applicable disposal standards of surface water there will not be any impacts.

Page 42: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

29

80. Sewage Pumping Station One SPS having capacity of 74 MLD is proposed at existing defunct SPS at Mahigram area of Roorkee. The existing SPS will be replaced with new one. This site is considered techni-cally most appropriate as topographically this site is most suitable and allows complete gravi-ty flow system. Site belongs to Uttarakhand Jal sansthan hence only transfer of land is re-quired. Dedicated power line will be provided for operation of SPS. For alternate supply, generator will be provided. Site is located in inhabited area hence green buffer zone is pro-posed to take care of nuisance. SPS will be equipped with deodorization devices to take care of nearby residential areas by preventing production of odor. Removal of Grit and Plastic in raw sewage will also be taken care at Pumping stations, with their cleaning and safe dispos-al. The orientation of SPS will be such that to avoid any odor emissions in prevailing wind direction. 81. The second SPS having capacity 25 MLD is proposed at Ganeshpur area of Roorkee. Currently the land is vacant and unused. Site is suitable for gravity flow system. Land belong to Uttarakhand Jal sansthan hence no requirement of private land acquisition. No tree cutting is required. Dedicated power line will be provided for operation of SPS. For alternate supply, generator will be provided. Site is located in inhabited areas hence green buffer zone is proposed to take care of nuisance. SPS will be equipped with deodorization devices to take care of nearby residential areas by preventing production of odor. Removal of Grit and Plastic in raw sewage will also be taken care at Pumping stations, with their cleaning and safe disposal. The orientation of SPS will be such that to avoid any odor emissions in prevailing wind direction. 82. Climatic Change Risk -Potential flooding of STP site: Although seasonal, Solani Riv-er flow is considerable during the rains. River is very shallow and the banks are not well de-fined. It is possible that the site is flooded during heavy rains. However, discussion with the local people indicates that the site was not flooded recently. Therefore there may not be any flood problem; however, it is important that this factor has been considered by studying the high flood level (HFL) of the river. 83. The STP has been designed considering the high flood level (HFL). However earth-en bund and necessary slope protection measures to be provided for flood protection to-wards river side. The detailed engineering aspects will be undertaken by Contractor with the competent authority’s approval. 84. Odor nuisance due to STP: STP will be located in the agricultural zone where no settlement is nearby. Figure 5 shows the Wind Rose diagram of Roorkee. As shown, the prominent wind direction is from west for 20.5 % of time, south for 14 % of time and South West for 12 % of time. Calm condition is for 47 % of time. Figure 6 shows the location of STP and nearby settlement on goggle image. As shown, nearby settlements around proposed STP site are located in mostly South and South West direction and more than 500m away. The prominent wind direction is towards East and North. Hence, the proposed STP is most suitable location considering odor nuisance as nearby settlement are unlikely to be affected. 85. The STP has been planned Extended Aeration-SBR process, odor generation will be minimal. In this technology, sludge production is minimal and quality is also not offensive. Only some storage is required and after that the sludge can be utilized as manure in the nearby agricultural fields. 86. Green buffer zone: Sewage Pumping Station units are located in inhabited area hence a green buffer zone has been proposed to be developed around the SPS units to tack-le the all nuisances and aesthetic aspect. The tree species will be local species having thick

Page 43: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

30

foliage. Also green buffer zone proposed around STP considering future development around premises. 87. Grit collection and disposal at STP: Mechanical course and fine screen will be pro-vided at STP to prevent the grit from entering into process unit. Scraping of deposited grit at regular interval is designed by providing rotating scrapper on the screen. The collected grit being of inert nature and having small quantity will be disposed at identified site within STP premises. There is no chance of other type of solid waste such as plastic; paper, glass etc. enter into the proposed sewerage system. 88. Impairment of downstream water quality due to inadequate sewage treatment or release of untreated sewage: The disposal of treated sewage will be to Solani River through proper outfall. The disposal of untreated/partially treated sewage may deteriorate the quality of receiving water body, the Solani River. Therefore it is imperative to treat the sewage to acceptable levels. Since the river is seasonal, minimum dilution will be available and there-fore requires stringent disposal standards. Further, as the Roorkee experiences large tem-perature fluctuations from low temperature during winters to high temperature in summers, the treatment efficiency may affect considerably. Malfunction/ overflow of units may cause flooding and nuisance. The following mitigation measures are therefore necessary to incorporate into the design:

(i) Selected treatment process is suitable and withstands to large temperature fluctua-tions

(ii) Selected treatment process involves simple operation and maintenance.

(iii) STP has been designed to meet prescribed CPCB disposal standards

(iv) Continues monitoring system will be developed to check the treatment efficiency. Develop laboratory facility within the STP.

(v) Operational manual will be prepared as a reference guide to maintain the discharge standards.

(vi) Bye-pass arrangement will be made on unit basis to avoid release of untreated sew-age, if any.

(vii) Uninterrupted power supply will be through dedicated power line. In case of power failure, provision of alternate power supply through generator is proposed.

(viii) System has been designed to provide for high flows/volumes. Bye-pass arrange-ments have been made to minimize unexpected overflows.

89. Site selection of sources of materials. Extraction of materials can disrupt natural land contours and vegetation resulting in accelerated erosion, disturbance in natural drainage patterns, pounding and water logging, and water pollution. To mitigate the potential environ-mental impacts, locations of quarry site/s and borrow pit/s (for loose material other than stones) would be included in the design specifications and on plan drawings. Priority would be sites already permitted by Mining Department. If other sites are necessary, these would to be located away from population centers, drinking water intakes and streams, cultivable lands, and natural drainage systems; and in structurally stable areas even if some distance from construction activities. It will be the construction contractor’s responsibility to verify the suitability of all material sources and to obtain the approval of the Roorkee Nagar palika. If additional quarries will be required after construction is started, then the Construction Con-tractor shall use the mentioned criteria to select new quarry sites, with written approval of municipal council.

Page 44: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

31

B. Construction Impacts

1. Construction Method

90. Sewerage Network Improvement: The proposed 120 km sewer network, consisting of branch, sub-main and main sewers of 200 mm to 1000 mm diameter RCC pipes, will be laid within the city area including the high density areas of the core city and low density areas in the outskirts. This network will convey sewage to proposed STP near Solani River. As earlier stated, sewers will be laid in the un-used area within the ROW. In narrower roads where there is no land available, the trenches will be dug into the edge of the road. Generally in narrow roads only branch sewers of 200 mm – 250 mm will be required and bigger main sewers are located along the main roads, where generally sufficient vacant land along the road will be available. 91. Sewers will be buried in trench of 1 to 5 m deep (average is about 3 m) and width between 400 mm for 200 mm dia sewer to 1000 mm for 600 mm dia sewer. The trenches will be excavated by a backhoe digger substantiated by manual digging. Excavation in CC roads and hard rock surfaces will be carried out by handheld pneumatic drill. Excavated soil will be placed nearby and a bed of sand or gravel - obtained from local quarries, will be prepared at the bottom of the trench. Sewers (brought to site on trucks and stored on unused land near-by) will be placed in the trench over the sand/gravel bed using a small rig or manually. Pipes will be joined by hand, after which excavated soil will be replaced around and on top of the sewers manually and the refilled material will be compacted by a vibrating compressor. In-spection manholes at regular intervals in the network will be constructed in brick masonry and provided with a steel cover for inspection purposes. 92. Sewage Treatment Plant: The STP will be constructed in units of RCC structures. Foundations dug by backhoe, and concrete and aggregate will be tipped in to create the foundations, walls and floor. Large quantities of sand and aggregate will be brought to the site by trucks. Concrete will then be mixed by batch-mixing plant to be installed at the site for construction purpose. The STP equipment and pipelines will be mostly of mild steel, DI pipes which will be arranged by cranes or laid manually. About 50 workers will be employed at the site and therefore tempo-rary labour camp may be required if workers are brought from outside. 93. Sewage Pumping Station: The SPS will be constructed in units of RCC structures. Foundations dug by back-hoe, and concrete and aggregate will be tipped in to create the foundations, walls and floor. Large quantities of sand and aggregate will be brought to the site by trucks. Concrete will then be mixed by batch-mixing plant to be installed at the site for construction purpose. The pumping sets and pipelines will be mostly of mild steel, DI pipes which will be arranged by cranes or laid manually. No temporary labor camp is required.

18. Construction Impacts

94. Construction impacts are associated with site cleaning, earth works, physical con-struction related materials movements and works, machinery, vehicles, and workers. It also includes erosion, dust, noise, traffic congestion and waste production associated with the construction activities. 95. Sources of Materials: Significant amount of gravel, sand, and cement will be required for this subproject. The construction contractor will be required to:

(i) Use material sources permitted by government;

Page 45: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

32

(ii) Verify suitability of all material sources and obtain approval of design and supervi-sion consultant (DSC); and

(iii) Submit to DSC on a monthly basis documentation of sources of materials.

96. Air Quality: Emissions from construction vehicles, equipment, and machinery used for excavation and construction will induce impacts on the air quality in the construction sites. Anticipated impacts include dusts and increase in concentration of vehicle-related pollutants such as carbon monoxide, sulfur oxides, particulate matter, nitrous oxides, and hydrocar-bons) but temporary and during construction activities only. To mitigate the impacts, con-struction contractors will be required to:

(i) Consult with DSC on the designated areas for stockpiling of clay, soils, gravel, and other construction materials;

(ii) Excavate the overhead storage reservoirs foundations at the same time as the ac-cess roads (if needed) are built so that dug material is used immediately, avoiding the need to stockpile on site;

(iii) Damp down exposed soil and any stockpiled on site by spraying with water when necessary during dry weather;

(iv) Use tarpaulins to cover sand and other loose material when transported by trucks; and

(v) Fit all heavy equipment and machinery with air pollution control devices which are operating correctly.

97. Earthwork involved in STP construction will also be significant. Large quantities of construction materials such as sand, cement, bricks, gravel etc will be transported, unloaded and handled at the site and therefore there is large potential to generate dust. Since the site is located in the outskirts with no major development, impact likely to be minimal. 98. Surface Water Quality: Roorkee receives high intensity rains during monsoons and there are a number of natural and man-made drainage channels criss-crossing the city to carry the runoff safely. Runoff from the excavated areas and material and waste soil stocks likely to contain silt, and this silt runoff will deteriorate the water bodies by silting. Since STP site is located adjacent to the River Solani, the runoff from the construction area likely to af-fect the water body. Large-scale silting is likely to lead to flooding. This impact will however be considered only during rainy season. These potential impacts are temporary and short-term duration only and to ensure these are mitigated, construction contractor will be required to:

(i) Avoid stockpiling of earth fill especially during the monsoon season unless covered by tarpaulins or plastic sheets;

99. The soil can be utilized for STP construction, where it appears that requires a large quantity of soil raise the level to HFL.

(i) Prioritize re-use of excess spoils and materials in the construction works. If spoils will be disposed, consult with DSC on designated disposal areas;

(ii) Install temporary silt traps or sedimentation basins along the drainage leading to the water bodies;

(iii) Place storage areas for fuels and lubricants away from any drainage leading to water bodies;

(iv) Dispose any wastes generated by construction activities in designated sites; and (v) Protection of STP site with interception drains

Page 46: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

33

(vi) Conduct surface quality inspection according to the Environmental Management Plan (EMP).

100. Noise Levels. There are no health facilities, scheduled or unscheduled historical, archaeological, paleontological, or architectural sites near the construction sites. However, construction works will be on settlements, along and near schools, and areas with small-scale businesses. The sensitive receptors are the general population in these areas. In-crease in noise level may be caused by excavation equipment, and the transportation of equipment, materials, and people. Impact is negative, short-term, and reversible by mitigation measures. The construction contractor will be required to:

(i) Plan activities in consultation with DSC so that activities with the greatest potential to generate noise are conducted during periods of the day which will result in least dis-turbance;

(ii) Require horns not be used unless it is necessary to warn other road users or animals of the vehicle’s approach;

(iii) Minimize noise from construction equipment by using vehicle silencers, fitting jack-hammers with noise-reducing mufflers, and portable street barriers the sound impact to surrounding sensitive receptor; and

(iv) Maintain maximum sound levels not exceeding 80 decibels when measured at a dis-tance of 10 m or more from the vehicle/s.

101. Existing Infrastructure and Facilities. Excavation works can damage existing in-frastructure located alongside roads, in particular water supply pipes. It will be particularly important to avoid damaging existing water pipes. It is therefore important that construction contractors will be required to:

(i) Obtain from DSC the list of affected utilities and operators; and

(ii) Prepare a contingency plan to include actions to be done in case of unintentional interruption of services

102. Landscape and Aesthetics:The construction works will produce excess excavated, excess construction materials, and solid waste such as removed concrete, wood, trees and plants, packaging materials, empty containers, spoils, oils, lubricants, and other similar items. These impacts are negative but short-term and reversible by mitigation measures. The con-struction contractor will be required to:

(i) Prepare and implement Waste Management List; (ii) Avoid stockpiling of excess excavated soils; (iii) Coordinate with UPJN for beneficial uses of excess excavated soils or immediately

dispose to designated areas; (iv) Recover used oil and lubricants and reuse or remove from the sites; (v) Manage solid waste according to the following preference hierarchy: reuse, recycling

and disposal to designated areas; (vi) Remove all wreckage, rubbish, or temporary structures which are no longer required;

and (vii) Request DSC to report in writing that the necessary environmental restoration work

has been adequately performed before acceptance of work. 103. Surface and Groundwater Quality: Another physical impact that is often associated with excavation is the effect on drainage and the local water table if groundwater and surface water collect in the voids. To ensure that water will not pond in pits and voids near subproject location, the construction contractor will be required to conduct excavation works on non-monsoon season.

Page 47: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

34

104. Roorkee receives high rains during the monsoon, and there are a number of natural and man-made drainage channels criss-crossing the City to carry runoff safely. Runoff from the excavated areas, and material and waste soil stocks likely to contain silt, and this silt run-off will deteriorate the water bodies by silting. Large-scale silting can lead to flooding. Since STP site is located adjacent to the River Solani, the runoff from the construction area likely to affect the water body. Large scale silting may affect the flow any cause flooding. The follow-ing measures are suggested to mitigate the impact:

(i) Avoid excavation activities during monsoon. Ensure that works complete before on-set of monsoon.

(ii) Minimize on-site storage of waste soil/material.

(iii) Provide interception drains to avoid submergence of trenches, and dispose the run-off quickly.

(iv) Protection of STP site with interception drains 105. Accessibility. Hauling of construction materials and operation of equipment on-site can cause traffic problems. Potential impact is negative but short term and reversible by miti-gation measures. The construction contractor will be required to:

(i) Plan transportation routes so that heavy vehicles do not use narrow local roads, ex-cept in the immediate vicinity of delivery sites;

(ii) Schedule transport and hauling activities during non-peak hours; (iii) Locate entry and exit points in areas where there is low potential for traffic conges-

tion; (iv) Keep the site free from all unnecessary obstructions; (v) Drive vehicles in a considerate manner; (vi) Coordinate with government’s traffic department for temporary road diversions and

with for provision of traffic aids if transportation activities cannot be avoided during peak hours; and

(vii) Notify affected sensitive receptors by providing sign boards informing nature and du-ration of construction works and contact numbers for concerns and/or complaints.

106. Socio-Economic – Income. The subproject components will be located in govern-ment land. Construction works will impede the access of residents to specific site in limited cases. The potential impacts are negative and moderate but short-term and temporary. The construction contractor will be required to:

(i) Leave spaces for access between mounds of soil; (ii) Provide walkways and metal sheets where required to maintain access across for

people and vehicles; (iii) Increase workforce in front of critical areas such as institutions, place of worship,

business establishment, hospitals, and schools; (iv) Consult businesses and institutions regarding operating hours and factoring this in

work schedules; and (v) Provide sign boards for pedestrians to inform nature and duration of construction

works and contact numbers for concerns and/or complaints. 107. Socio-Economic – Employment. Manpower will be required during the 18-months construction stage. This can result to generation of contractual employment and increase in local revenue. Thus potential impact is positive and long-term. The construction contractor will be required to:

(i) Employ majority of the labor force, or to the maximum extent, local persons within the 2-kms immediate area if manpower is available; and

Page 48: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

35

(ii) If available, secure construction materials from local market. 108. Occupational Health and Safety. Workers need to be mindful of the occupational hazards which can arise from working in height and excavation works. Potential impacts are negative and long-term but reversible by mitigation measures. The construction contractor will be required to:

(i) Develop and implement site-specific health and safety plan which will include measures such as: (a) excluding public from the site; (b) ensuring all workers are provided with and use Personal Protective Equipment; (c) health and safety training for all site personnel; (d) documented procedures to be followed for all site activities; and (e) documentation of work-related accidents;

(ii) Ensure that qualified first-aid can be provided at all times. Equipped first-aid stations shall be easily accessible throughout the site;

(iii) Provide medical insurance coverage for workers; (iv) Secure all installations from unauthorized intrusion and accident risks; (v) Provide supplies of potable drinking water; (vi) Provide clean eating areas where workers are not exposed to hazardous or noxious

substances; (vii) Provide health and safety orientation training to all new workers to ensure that they

are apprised of the basic site rules of work at the site, personal protective protection, and preventing injuring to fellow workers;

(viii) Provide visitor orientation if visitors to the site can gain access to areas where haz-ardous conditions or substances may be present. Ensure also that visitor/s do not enter hazard areas unescorted;

(ix) Ensure the visibility of workers through their use of high visibility vests when working in or walking through heavy equipment operating areas;

(x) Ensure moving equipment is outfitted with audible back-up alarms; (xi) Mark and provide sign boards for hazardous areas such as energized electrical de-

vices and lines, service rooms housing high voltage equipment, and areas for stor-age and disposal. Signage shall be in accordance with international standards and be well known to, and easily understood by workers, visitors, and the general public as appropriate; and

(xii) Disallow worker exposure to noise level greater than 85 decibels for a duration of more than 8 hours per day without hearing protection. The use of hearing protection shall be enforced actively.

109. Community Health and Safety. Hazards posed to the public, specifically in high-pedestrian areas may include traffic accidents and vehicle collision with pedestrians. In most of the cases location of project sites at isolated area, hence health and safety risk to commu-nity is minimum. Potential impact is negative but short-term and reversible by mitigation measures. The construction contractor will be required to:

(i) Plan routes to avoid times of peak-pedestrian activities; (ii) Liaise with DSC in identifying risk areas on route cards and/or maps; (iii) Maintain regularly the vehicles and use of manufacturer-approved parts to mini

mize potentially serious accidents caused by equipment malfunction or premature failure; and

(iv) Provide road signs and flag persons to warn of dangerous conditions, in case of location near the road.

Page 49: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

36

110. Work Camps: Operation of work camps can cause temporary air and noise pollution from machine operation, water pollution from storage and use of fuels, oils, solvents, and lubricants. Potential impacts are negative but short-term and reversible by mitigation measures. Consultation with DSC revealed that it is unlikely that work camps are required for this subproject. In the case that it will be needed, the construction contractor will be required to:

(i) Consult with DSC before locating project offices, sheds, and construction plants; (ii) Minimize removal of vegetation and disallow cutting of trees; (iii) Provide water and sanitation facilities for employees; (iv) Prohibit employees from cutting of trees for firewood; (v) Train employees in the storage and handling of materials which can potentially cause

soil contamination; (vi) Recover used oil and lubricants and reuse or remove from the site; (vii) Manage solid waste according to the following preference hierarchy: reuse, recy-

cling and disposal to designated areas; (viii) Remove all wreckage, rubbish, or temporary structures which are no longer required;

and (ix) Request DSC to report in writing that the camp has been vacated and restored to

pre-project conditions before acceptance of work. 111. Social and Cultural Resources: For this subproject, excavation will occur at specif-ic isolated location, so it could be that there is a low risk of such impacts. Nevertheless, the construction contractor will be required to:

(i) Stop work immediately to allow further investigation if any finds are suspected (ii) Inform DSC if a find is suspected, and take any action they require ensuring its re-

moval or protection in site; and (iii) Request DSC or any authorized person with archaeological and/or historical field

training to observe excavation.

C. Operational and Maintenance (O& M) Impacts

112. The main operation and maintenance activity involved in this subproject is sewage treatment to applicable standards and clearance of blockages and leaks in the sewer network in order to allow smooth sewage flow. Blockages in the sewers will be removed using sewer jetting equipment or manually. Sewers will be accessed through manholes. Leak repair work will be similar to the sewer laying work as earlier explained. Trenches will be dug to reveal the leaking area and the faulty sewer will be re-fitted, or the sewer will be removed and re-placed if necessary. 113. Recurrence of blockage and leakage problems: Although the impact is likely to be minimal due to new and well design efficient system, it should be ensured that leak detection and restoration time is minimized to the extent possible. 114. Degradation of environmental quality such as surface water and ground water: Deg-radation of treatment efficiency may deteriorate the quality of receiving water body, the Solani River. Therefore it must be ensured that treated water meets the set disposal stand-ards. Mitigation Measures are:

(i) Treated water should meet disposal standard for BOD, TSS, Fecal coli forms etc.

(ii) Conduct regular (daily) wastewater quality monitoring (at inlet and outlet of treatment plant)

Page 50: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

37

(iii) Conduct regular (monthly) quality monitoring of Solani River water on the down-stream side of disposal point

(iv) Conduct occasional (thrice-a-year) ambient air quality monitoring 115. Occupational Health and Safety of workmen engaged for operation of the plant: STP operation involves handling of large quantities of potentially hazardous sewage and sludge. Therefore workers involved in operation may at health risk, if appropriate precautions are not in place. Mitigation Measures are:

(i) Protective appropriate personal protective gear such as boots, gloves, masks at all the workers.

(ii) Eliminate manual handling of wastewater/sludge.

(iii) Provide training for workers in system operation and maintenance and safety related aspects

(iv) Ensure adequate emergency first-aid facilities in the facility. 116. Nuisance to the people living adjacent to the SPS & STP: Improper operation and breakdown will lead to the accumulation of untreated wastewater at the plant site that may cause malodorous conditions and nuisance to the surrounding population. To minimize this impact, Standard Operational Procedures (SOP) detailing the operational procedures, preventive maintenance of equipments etc. will be prepared. Regular training shall be pro-vided to the workmen and staff. Green buffer zone will help in reducing nuisances and will enhance aesthetic condition of area. Dedicated power line will be provided for operation of STP and SPS. For alternate supply, generator will be provided.

D. Cumulative Impact Assessment

117. The cumulative impact assessment examined the interaction between the subpro-ject’s residual effects (i.e., those effects that remain after mitigation measures have been applied) and those associated with other past, existing and reasonably foreseeable future projects or activities. The interaction of residual effects associated with multiple projects and/or activities can result in cumulative impacts, both positive and negative. The subpro-ject’s potential cumulative effects were considered with respect to valued components in the categories of environmental, socio-economic, and heritage resources in four areas:

(i) Any potential residual project effects that may occur incrementally over time; (ii) Consideration of other known relevant projects or activities within the specified study

area boundaries, even if not directly related to the subproject; (iii) Potential overlapping impacts that may occur due to other developments, even if not

directly related to the proposed project; and (iv) Future developments that is reasonably foreseeable and sufficiently certain to pro-

ceed. 118. In addition, the cumulative impact assessment considered the scope or influence of the subproject. Two boundaries, spatial and temporal, were used. Given there is no sewer-age system exists in Roorkee at present and proposed sewer system is designed consider-ing future population growth, there are no significant cumulative impacts expected on the future sewerage management. 119. The subproject updated IEE has identified the valued components as air quality, water (surface and groundwater) quality, noise, geophysical (hydro geological), traffic man-agement, social-economic and socio-community, and human health. There are no foreseea-ble projects that will overlap with the subproject. The spatial boundary of the subproject is the

Page 51: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

38

area along the alignment and the existing ROWs and STP & SPS locations. The temporal boundary can be considered as the whole Roorkee town. 120. Air quality effects will occur during construction. Consequently, although emissions of common air contaminants (CAC) and fugitive dust may be elevated in proximity to active work sites, this impact will be short-term and localized to the immediate vicinity of the align-ment. Greenhouse gas emissions may increase as a result of project activities (i.e., vehicle and equipment operation, concrete production, disposal of excavated material, land filling of residual wastes). Given the subproject’s relatively minor contribution to CAC and greenhouse gas emissions during construction, the overall significance rating of both these potential re-sidual effects is considered to be negligible during construction. 121. During construction noise levels in the immediate proximity of most work sites are expected to increase. The duration of this exposure will be relatively brief. This exposure represents a temporary, localized, adverse residual effect of low to moderate significance for affected receptors. While building damage due to ground vibrations is unlikely, there may annoyance to spatially located receptors during construction. Noise levels associated with the project operations will be largely imperceptible as the SPS are located in relatively small sites within the town proper. 122. Land use/traffic management concerns will occur spatially during construction. Dur-ing construction, site-specific mitigation measures will be implemented to address temporary disruptions to land use and access in the vicinity of the alignment such as road and sidewalk closures, traffic delays and detours, parking modifications, and increased volumes of con-struction–related traffic. There should be improved traffic movement along the alignment once construction is completed. Since the subproject will be built in undeveloped land ear-marked for this purposes, it will not conflict with existing or planned land use. However, fol-lowing improvement in infrastructures and services, added residential developments, com-mercial and business facilities and increased densities are expected to develop and enhance the subproject area. This can be considered a long-term cumulative benefit of the subproject. 123. Adverse impacts such as localized disruption of vehicle traffic and pedestrian move-ments in areas along the alignment, and elevated CAC and fugitive dust emissions in proxim-ity to work sites, elevated noise and vibration levels and visual impacts will occur during con-struction. These short-term effects will be mitigated by providing alternate travel routes or alternating traffic movements and, where possible, access to businesses, schools and resi-dences. However, upon completion of construction the socio-community will benefit from improved sewerage system. This is considered a long-term cumulative benefit. 124. Development at the pump houses sites and in the vicinity of the subproject may re-sult in similar impacts relative to water quality and soils, but each impact are independent of one another and are mitigated on a site-specific basis. Further, while water quality impacts have the ability to compound when taking into account regional water basins into considera-tion, the subproject will be required to adhere to the mandatory state and local laws, ordi-nances, regulations, and water quality standards. Regional geologic impacts do not generally compound, and are limited to the site at which they occur. 125. The subproject, when considered with other projects in the same watershed, may result in cumulative impacts to surface and groundwater quality from increased surface im-permeability and resultant runoff. Construction projects could result in increased erosion from exposed soil areas, which could contribute sediments into local drainage courses and other waterways. However, it is reasonably assumed that new construction associated with future projects will be required to meet national, state, and local construction and operation stand-

Page 52: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

39

ards at least as rigorous as those required at present. Therefore, the potential for cumulative impacts to water quality and soils is deemed to be less than significant. 126. No adverse residual effects to human health will occur as a result of subproject con-struction or operation. While exposure to elevated noise levels and fugitive dust and CAC emissions will occur in proximity to subproject work sites during construction, due to their short-term, localized nature, these effects are expected to be minor and insignificant with no measurable effects on human health. The subproject operations will benefit the general pub-lic by contributing to the long-term improvement of sewerage system and community livability in Roorkee.

Figure 5 : Wind Rose Diagram of Roorkee Town Source: Uttarakhand Environment Protection and Pollution Control Board, Dehradun

Page 53: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

40

Figure 6 : STP Location and Nearby Settlement on Google Image

Page 54: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

41

V. Institutional Arrangements

127. The Urban Development Department (UDD) is the Executing Agency (EA) of the In-vestment Program. The EA has set up a state-level Investment Program Management Unit (PMU).The Implementing Agencies (IAs) for the Investment Program are: the Uttarakhand Peya Jal Nigam (UPJN) for sewerage and sewerage sub-projects, and the Public Works Department (PWD) for roads and traffic management sub-projects. A special cell within the PMU, with assis-tance from Urban Local Bodies (ULBs), will be the IA for solid waste management and slum im-provement sub-projects. The IAs will set-up district-level Investment Program Implementation Units (PIUs) to manage implementation of sub-projects in their districts. The PMU is assisted by Investment Program Management Consultants (PMC) who provides program management sup-port, assure the technical quality of design and construction, and provide advice on policy reforms. PIUs will be assisted by Design and Supervision Consultants (DSC), who design the infrastruc-ture, manage tendering of Contractors and supervise the construction process. Construction Con-tractors (CC) are appointed to build elements of the infrastructure. The CCs are managed by the PIUs, and construction activities are supervised by the DSC. 128. An Environment and Social Management Cell (EMSC) has been set up within the PMU to address environmental and social issues of UUSDIP, and is staffed by an Environmental Spe-cialist and a Social Development Specialist. The EMSC is assisted by the PMC. The DSC through their environment specialists are conducting environmental assessments including the preparation of IEEs or EIAs and other assessments required for clearances. The DSC is also responsible for incorporation of mitigation measures in design and construction and construction-stage environ-mental monitoring. 129. The PMC reviews and approve IEEs, oversee disclosure and consultations, and will monitor the implementation of environmental monitoring plan and environmental management plan where required. The CC is responsible to implement mitigation measures in construction. Implementation of mitigation and monitoring measures during the operation and maintenance (O&M) is the responsibility of the respective IAs, which are also the O&M agencies. Government regulatory agencies such as the Uttarakhand Environmental Protection and Pollution Control Board (UEPPCB) are also monitor the environmental performance according to government regu-lations. 130. The Construction of 33MLD-STP and laying of sewer lines at Roorkee will be supervised by DSC and implemented and managed by IPIU and IPMU.

VI. Grevances Redress Mechanism

131. As the work is being done in inhabited areas, most of the impacts are construction-related, and therefore it is anticipated that improper or inadequate implementation of EMP may lead to disturbance and inconvenience to local people. In order to provide a direct channel to the affected persons for approaching project authorities and have their grievance recorded and re-dressed in an appropriate time frame, IPMU will establish a Grievance Redress Mechanism, which will be functioned throughout the construction period. 132. A Complaint receiving system will be put in place at each site with the help of CAPP NGO. A Complaint Register and Complaint Forms will be made available at the site office of each contractor, with a display board indicating availability of such facility. This will accept complaints regarding the environment safeguard issues in implementation of the subproject. The grievances received and actions taken will be included into the environmental monitoring reports submitted to ADB. The following 4-stage process will be followed in grievance redress:

Page 55: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

42

133. Stage 1: Complaints received (written or oral communication) will be registered in Com-plaint Register assigning complaint number with date of receipt

(i) The DSC/IPIU will review the complaint and direct the Contractor for necessary action; depending on the type/nature of complaint the Contractor will be given reasonable time for corrective action

(ii) CAPP NGO will inform the complainant, within 24 hours, the time frame in which the cor-rective action will be taken by e-mail or telephonically; if the grievance referred will not fall under the purview of the subproject/program, the same will be intimated to the complain-ant

(iii) Contractor will take corrective action or as directed by DSC

(iv) The CAPP NGO in coordination with DSC will conduct the site visit to check the action taken and its appropriateness

(v) The action taken will be documented in the Complaint Register, and the complaint will be closed if it is satisfactorily addressed, and the complainant will be informed through e-mail/telephonically

134. Stage 2: In case of no satisfactory action in Stage-1, the complainant can approach IPMU/IPMC for necessary action; CAPP NGO will assist the complainant in this:

(i) IPMU with the assistance of IPMC will initiate action and take the corrective measures as required, and CAPP NGO will intimate the complainant about the action taken

(ii) Upon satisfaction of complainant, the case will be closed and marked as resolved 135. Stage 3: if non-satisfied stage-2, the complainant can approach the Grievance Redress Committee. 136. Stage 4: If it is not resolved at GRC, the complainant can approach Court of Law. Howev-er, as none of the impacts are complex, long-term or significant, it is unlikely that there will be any unresolved issues after the first three stages. 137. Grievance Redress Committee: The City Level Committee (CLC) will act as a grievance redress committee (GRC) for both environment & social safeguard issues. The CLC is chaired by Mayor of Roorkee Nagar Palika and has member from civil society, elected representatives and government officials. Grievances related to environmental safeguards will be handling by CLC in its regular meetings. The IPMU Environment Officer and CAPP NGO will assist the CLC in these matters.

Page 56: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

43

VII. Public Consultation and Information Disclosure

A. Public Consultation Conducted

138. Most of the main stakeholders have already been identified and consulted during updation of this IEE, and any others that are identified during project implementation will be brought into the process in the future. Primary stakeholders are:

(i) IPMU (ii) IPIU (Central)

(iii) Residents, shopkeepers and businesspeople who live and work alongside the roads in which network improvements will be provided and near sites where facilities will be built

(iv) Other State and local authorities. 139. Secondary stakeholders are:

(i) Other concerned government institutions (utilities, regulators, etc) (ii) NGOs and CBOs working in the affected communities; (iii) Other community representatives (prominent citizens, elders, women’s groups); (iv) The beneficiary community in general; and (v) ADB as the funding agency

140. A series of public consultation meetings were conducted during the project preparation. Various forms of public consultations (consultation through ad hoc discussions on site and town-level consultation) have been used to discuss the project and involve the community in planning the project and mitigation measures. The consultation are carried out through out in the year 2010 and continued in the year 2011 also. Issues discussed were:

(i) Awareness and extent of the project and development components (ii) Benefits of Project for the economic and social Upliftment of Community (iii) Labor availability in the Project area or requirement of outside labor involvement (iv) Local disturbances due to Project Construction Work (v) Necessity of tree felling etc. at project sites (vi) Water logging and drainage problem if any (vii) Drinking water problem (viii) Forest and sensitive area nearby the project site

141. Local populations are very much interested on the project and they will help project au-thorities in all aspects. Public consultation and focus group discussion are carried out with Gen-eral Public, Minority group, Women group and Scheduled Cast group, detail of which is given in Table No. 17. The specific consultation where held with public for location of SPS at Ganeshpur and Mahigram area to make them aware the function and requirement of SPS and its potential O&M impacts and mitigation measures. The lists of participants are given in Appendix 3.

Major Issues discussed during Public consultation are

(i) Proposed sewerage project should cover all wards of city. (ii) Executing agency (EA) should give preference to engage reputed contractor like as

people do not faith about the local contractors in respect of quality of works as well as timely completion of work;

(iii) Livelihood affected households should be given assistance in the mode of cash compen-sation;

(iv) Local people should be employed by the contractor during construction work;

(v) Adequate safety measures should be taken during construction work;

Page 57: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

44

(vi) Local people have appreciated the sewerage proposal of the government and they have ensured that they will cooperate with the Executing Agency during project imple-mentation.

(vii) Location of sewage pumping station and potential O&M impacts.

Table 17 : Detail of Focus Group Discussions with General Public Group at Roorkee Target

Group Location Date No. of

Partici- Issues discussed & outcome

General Public

Ganeshpur, 18th April 2011 14 Program is good and acceptable to public No proper sewerage system in town Hand pump supplying bad quality of water Sewage treatment should be pro-vided No disruption should be to water supply during construction activity Access blockage during construc-tion is acceptable for short period. Perceived that water supply and quality will be improved after im-plementation of project Local people are to be consulted during all stages of project Vendors and shop keepers may be affected during construction time Hawkers are ready to shift during construction activity Adequate compensation for af-fected livelihood should be given

Awas Vikas West Amber Talab

20th April 2011 20

Subhash Nagar & Rajendra Nagar

20th April 2011 11

Ram Nagar 20th April 2011 10

Purani Tehsil 27th April 2011 12

Adarsh Nagar 27th April 2011 18

Civil Lines 27th April 2011 12

New Basti 19th April 2011 18

Sunehera Gaon 19th April 2011 14

Ward 3, Sekhpuri 19th April 2011 18

Chaw Mandi 18th April 2011 16

West Amber Talab 19th April 2011 11

Women Group

Bharat Nagar 19th April 2011 20

Minority Group

Gulab Nagar 20th April 2011 22

Mahi gran 19th April 2011 17

Scheduled Cast Group

rd 1, Valmiki Basti th April 2011 20

Hawker’s Group

Nagar (IIT Polaris Chowk)

th April 2011 11

142. Public Consultation for construction for 33MLD STP at Saliyar-Ibrahimpur at Roorkee: The Public consultation has been organized in Roorkee on 28 April 2016 at Roorkee Munici-pal Corporation Conference hall to discuss the proposed sub-projects of tube wells. The details of public consultation including attendance sheet and photographs are given in Ap-

pendix.3 & Appendix.6. People did not raise any objection of construction of 33MLD-STP at Roorkee. These concerns were recorded and will be attended by the contractors. The public consultation notice was published in daily newspaper. The updated IEE was disclosed to the local community. The description of proposed construction of 33MLD-STP at Saliyar Ibrahimpur and laying of sewer lines at Roorkee were explained during the public consulta-tion. The details of public consultation conducted by IPMU/IPIU are given in Table no.18 &

Table no.19.

Page 58: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

45

Table 18 : Details of public consultation by IPMU/IPIU for 33MLD-STP at Roorkee

Consultation Details Schedule Participants No. of

participants

Public Consultation for con-struction of 33 MLD-STP and laying of sewer lines at Roorkee

28 April 2016 People of Roorkee 23

Issues raised in the public consultation and its action plan

The issues and action plan are given in Table No.19

Table 19 : Issues and action plan discussed during public consultation

Issues Action Plan

No issue was raised for construction of 33 MLD-STP at Roorkee but the issue of Road restoration may be raised during laying of sewer line.

Mitigations measures of this IEE will prevail.

B. Future consultation and disclosure

143. The public consultation shall be a continuous process and will continue in the future. The IPMU will extend and expand the consultation and disclosure process during implemen-tation. An experienced NGO will be appointed to handle this key aspect of the programme, who will conduct a wide range of activities in relation to all subprojects in each town, to en-sure that the needs and concerns of stakeholders are registered, and are addressed in pro-ject design, construction or operation where appropriate. The programme of activities will be developed during the detailed design stage, and is likely to include the fo llowing:

1. Consultation during construction:

(i) Public meetings with affected communities to discuss and plan work programs and al-low issues to be raised and addressed once construction has started;

(ii) Smaller-scale meetings to discuss and plan construction work with individual communi-ties to reduce disturbance and other impacts, and provide a mechanism through which stakeholders can participate in subproject monitoring and evaluation;

2. Project disclosure:

(i) Public information campaigns to explain the project to the wider city population and prepare them for disruption they may experience once the construction pro-gramme is underway;

(ii) Public disclosure meetings at key project stages to inform the public of progress and future plans, and to provide copies of summary documents in Hindi;

(iii) Formal disclosure of completed project reports by making copies available at con-venient locations in the study towns, informing the public of their availability, and providing a mechanism through which comments can be made.

Page 59: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

46

VIII. Environmental Management Plan

A. Environment Mitigation and Monitoring Program

144. The potential impacts identified and assessed and the mitigation measures formulated to minimize those impacts to acceptable levels identified in the earlier sections are summarized in the following tables. The table also delegates the responsibility of implementing mitigation to vari-ous agencies involved in the program implemented as listed above. 145. The environmental impact mitigation plan has been prepared based on the mitigation hierarchy of avoidance, minimization, rehabilitation/ restoration and offsetting. Necessary measures have been suggested to take action in preconstruction stage to avoid and min i-mize the impacts. These preconstruction impacts and mitigation plan has been given in Ta-

ble no. 20. The construction stage impact and its mitigation plan have been provided in Ta-

ble no. 21. The operation stage impacts and its mitigation plan have been provided in Table

no. 22. 146. The environmental monitoring plans have been prepared for pre-construction, during construction and operation stage and are given in Table 23, Table 24 and Table 25 respec-tively.

Page 60: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

47

Table 20 : Anticipated Impacts and Mitigation Measures – Pre-construction Environmental Mitigation Plan Field Anticipated Impact Mitigation Measures Responsible

for Mitigation Monitoring of Mitigation

Utilities Telephone lines, electric poles and wires, water lines within proposed project area

(i) Identify and include locations and operators of these utilities in the detailed design documents to prevent unnecessary disrup-tion of services during construction phase; and

(ii) Require construction contractors to prepare a contingency plan to include actions to be done in case of unintentional interruption of services.

DSC (i) List of affected utilities and operators;

(ii) Bid document to include requirement for a contin-gency plan for service in-terruptions

Water Supply Health risk due to closure of water supply

(i) Plan the construction program to keep the cessation of water supplies to the minimum possible (in both area and duration);

(ii) In coordination with UPJN, provide alternative potable water to affected households and businesses for the duration of the shut-down; and

(iii) Liaise with affected persons to inform them of any cessation in advance, and to ensure that they are provided with an alternative supply.

IPIU (i) Schedule of closure; (ii) Delivery of potable water

to affected people by UPJN

Social and Cultural Resources

Ground disturbance can un-cover and damage archaeolog-ical and historical remains

(i) Consult ASI or concerned department of State government to obtain an expert assessment of the archaeological potential of the site;

(ii) Consider alternatives if the site is found to be of medium or high risk;

(iii) Develop a protocol for use by the construction contractors in conducting any excavation work, to ensure that any chance finds are recognized and measures are taken to ensure they are pro-tected and conserved.

IPIU & DSC Chance Finds Protocol

Construction work camps (if needed), hot mix plants, stockpile areas, stor-age areas, and dis-posal areas.

Disruption to traffic flow and sensitive receptors

(i) Prioritize areas within or nearest possible vacant space in the subproject location;

(ii) If it is deemed necessary to locate elsewhere, consider sites that will not promote instability and result in destruction of prop-erty, vegetation, irrigation, and drinking water supply systems;

(iii) Do not consider residential areas; (iv) Take extreme care in selecting sites to avoid direct disposal to

water body which will inconvenience the community.

IPIU and DSC to determine locations prior to award of construction contracts.

(i) List of selected sites for construction work camps, hot mix plants, stockpile areas, storage areas, and disposal areas.

Sources of Materials Extraction of materials can disrupt natural land contours and vegetation resulting in accelerated erosion, disturb-ance in natural drainage pat-

(v) Prioritize sites already permitted by the Mining Department; (vi) If other sites are necessary, inform construction contractor that it

is their responsibility to verify the suitability of all material sources and to obtain the approval of IPIU and

(vii) If additional quarries will be required after construction is start-

IPIU and DSC to prepare list of approved quarry sites and sources of

(ii) List of approved quarry sites and sources of ma-terials; Bid document to include requirement for verifica-

Page 61: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

48

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

terns, ponding and water log-ging, and water pollution.

ed, inform construction contractor to obtain a written approval from IPIU.

materials tion of suitability of sources and permit for additional quarry sites if necessary.

ASI = Archeological Survey of India, DSC = design supervision consultant, IPIU = Investment Program Implementation Units, UPJN = Uttarakhand Peya Jal Nigam.

Table 21 : Anticipated Impacts and Mitigation Measures – Construction Environmental Mitigation Plan Field Anticipated Impact Mitigation Measures Responsible for

Mitigation Monitoring of Mitigation

Sources of Materials Extraction of rocks and material may cause ground instability.

(i) Use quarry sites and sources permitted by government; (ii) Verify suitability of all material sources and obtain approv-

al of Investment IPIU; (iii) If additional quarries will be required after construction has

started, obtain written approval from IPIU; and (iv) Submit to DSC on a monthly basis documentation of

sources of materials.

Construction Con-tractor

Construction Contractor doc-umentation

Air Quality Emissions from construction vehicles, equipment, and ma-chinery used for excavation and construction resulting to dusts and increase in concentration of vehicle-related pollutants such as carbon monoxide, sulfur ox-ides, particulate matter, nitrous oxides, and hydrocarbons).

(i) Consult with IPIU/DSC on the designated areas for stock-piling of clay, soils, gravel, and other construction materi-als;

(ii) Damp down exposed soil and any stockpiled on site by spraying with water when necessary during dry weather;

(iii) Use tarpaulins to cover sand and other loose material when transported by trucks; and

(iv) Fit all heavy equipment and machinery with air pollution control devices which are operating correctly.

(v) Conduct Air quality monitoring for parameters PM2.5, PM10, Sulphur dioxide, Nitrogen dioxide on quarterly ba-sis throughout year except monsoons.

Construction Con-tractor

(i) Location of stockpiles; (ii) Complaints from sensi-

tive receptors; (iii) Heavy equipment and

machinery with air pollu-tion control devices;

(iv) Ambient air for parame-ters PM2.5, PM10, Sul-phur dioxide, Nitrogen dioxide.

(v) Vehicular emissions such as SO2, NO2, CO, and hydrocarbons

Surface water quality Mobilization of settled silt mate-rials, run-off from stockpiled ma-terials, and chemical contamina-tion from fuels and lubricants during construction works can contaminate nearby surface wa-ter quality.

(i) Avoid stockpiling of earth fill especially during the mon-soon season unless covered by tarpaulins or plastic sheets;

(ii) The soil can be utilized for STP construction, where it appears that it requires a large quantity of soil raise the level to HFL.

(iii) Prioritize re-use of excess spoils and materials in the construction works. If spoils will be disposed, consult with

Construction Con-tractor

(i) Areas for stockpiles, stor-age of fuels and lubricants and waste materials;

(ii) Number of silt traps in-stalled along drainages leading to water bodies;

(iii) Records of surface water quality inspection;

Page 62: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

49

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

IPIU/DSC on designated disposal areas; (iv) Install temporary silt traps or sedimentation basins along

the drainage leading to the water bodies; (v) Place storage areas for fuels and lubricants away from

any drainage leading to water bodies; (vi) Dispose any wastes generated by construction activities

in designated sites; and Protection of STP site with inter-ception drains.

(vii) Conduct surface quality monitoring on quarterly basis throughout year except monsoons..

(iv) Effectiveness of water management measures;

(v) For inland water: sus-pended solids, oil and grease, BOD, and coli-forms.

Noise Levels Increase in noise level due to earth-moving and excavation equipment, and the transporta-tion of equipment, materials, and people.

(i) Plan activities in consultation with IPIU/DSC so that facili-ties with the greatest potential to generate noise are con-ducted during periods of the day which will result in least disturbance;

(ii) Require horns not be used unless it is necessary to warn other road users or animals of the vehicle’s approach;

(iii) Minimize noise from construction equipment by using vehicle silencers, fitting jackhammers with noise-reducing mufflers, and portable street barriers the sound impact to surrounding sensitive receptor; and

(iv) Maintain maximum sound levels not exceeding 80 dBA when measured at a distance of 10 m or more from the vehicle/s.

(v) Conduct noise quality monitoring on quarterly basis throughout year except monsoons

Construction Con-tractor

(i) Complaints from sensitive receptors;

(ii) Use of silencers in noise-producing equipment and sound barriers; and

(iii) Equivalent day and night time noise levels

Existing Infrastructure and Facilities

Disruption of service and dam-age to existing infrastructure at specified project location.

(i) Obtain from IPIU/DSC the list of affected utilities and operators if any;

(ii) (ii) Prepare a contingency plan to include actions to be done in case of unintentional interruption of service

Construction Con-tractor

Existing Utilities Contin-gency Plan

Landscape and Aesthetics Solid wastes as well as excess construction materials.

(i) Prepare and implement Waste Management Plan; (ii) Avoid stockpiling of excess excavated soils; (iii) Coordinate with UPJN for beneficial uses of excess exca-

vated soils or immediately dispose to designated areas; (iv) Recover used oil and lubricants and reuse or remove

from the sites; (v) Manage solid waste according to the following preference

hierarchy: reuse, recycling and disposal to designated ar-

Construction Contractor

(i) Waste Management Plan; (ii) Complaints from sensitive

receptors; and (iii) IPIU/DSC to report in

writing that the necessary environmental restoration work has been adequately performed before ac-

Page 63: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

50

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

eas; (vi) Remove all wreckage, rubbish; and (vii) Request IPIU/DSC to report in writing that the necessary

environmental restoration work has been adequately per-formed before acceptance of work.

ceptance of work.

Surface and Ground water quality

Runoff from the excavated are-as, and material and waste soil stocks likely to contain silt, and this silt runoff will deteriorate the water bodies by silting.

(i) Avoid excavation activities during monsoon. Ensure that works complete before onset of monsoon.

(ii) Minimize on-site storage of waste soil/material. (iii) Provide interception drains to avoid submergence of

trenches, and dispose the runoff quickly. (iv) Protection of STP site with interception drains (v) Conduct surface water quality monitoring on quarterly

basis throughout year except monsoons.

Construction Contractor

(i) Waste Management Plan; (ii) Complaints from sensitive

receptors;

Accessibility Traffic problems and conflicts near project locations and haul road

(i) Plan transportation routes so that heavy vehicles do not use narrow local roads, except in the immediate vicinity of delivery sites;

(ii) Schedule transport and hauling activities during non-peak hours;

(iii) Locate entry and exit points in areas where there is low potential for traffic congestion;

(iv) Keep the site free from all unnecessary obstructions; (v) Drive vehicles in a considerate manner; (vi) Coordinate with Roorkee Municipal Traffic Office for tem-

porary road diversions and with for provision of traffic aids if transportation activities cannot be avoided during peak hours;

(vii) Notify affected sensitive receptors by providing sign boards informing nature and duration of construction works and contact numbers for concerns/complaints; and

(viii) Provide planks across trenches in front of businesses, and ensure works are completed quickly to avoid disrup-tion.

Construction Contractor

(i) Traffic Management Plan; (ii) Complaints from sensitive

receptors; and (iii) Number of signages

placed at subproject loca-tion.

Socio-Economic – In-come.

Impede the access of residents and customers to nearby shops.

(i) Leave spaces for access between mounds of soil; (ii) Provide walkways and metal sheets where required for

people; (iii) Increase workforce in front of critical areas such as insti-

tutions, place of worship, business establishment, hospi-

Construction Contractor

(i) Complaints from sensitive receptors; and

(ii) Number of walkways, signages, and metal sheets placed at subpro-

Page 64: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

51

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

tals, and schools; (iv) Consult businesses and institutions regarding operating

hours and factoring this in work schedules; and (v) Provide sign boards for pedestrians to inform nature and

duration of construction works and contact numbers for concerns/complaints.

ject location.

Socio-Economic – Em-ployment

Generation of contractual em-ployment and increase in local revenue

(i) Employ at least 50% of the labor force, or to the maxi-mum extent, local persons within the 2-km immediate ar-ea if manpower is available; and

(ii) Secure construction materials from local market.

Construction Contractor

(i) Records of sources of materials

Occupational Health and Safety

Occupational hazards which can arise during work

(ii) Develop and implement site-specific health and safety plan which will include measures such as: (a) excluding public from the site; (b) ensuring all workers are provided with and use Personal Protective Equipment like helmet, gumboot, safety belt, gloves, nose musk and ear plugs; (c) health and safety training for all site personnel; (d) documented procedures to be followed for all site activi-ties; and (e) documentation of work-related accidents;

(iii) Ensure that qualified first-aid can be provided at all times. Equipped first-aid stations shall be easily accessible throughout the site;

(iv) Provide medical insurance coverage for workers; (v) Secure all installations from unauthorized intrusion and

accident risks; (vi) Provide supplies of potable drinking water; (vii) Provide clean eating areas where workers are not ex-

posed to hazardous or noxious substances; (viii) Provide health and safety orientation training to all new

workers to ensure that they are apprised of the basic site rules of work at the site, personal protective protection, and preventing injuring to fellow workers;

(ix) Provide visitor orientation, if visitors to the site can gain access to areas where hazardous conditions or sub-stances may be present. Ensure also that visitor/s do not enter hazard areas unescorted;

(x) Ensure the visibility of workers through their use of high visibility vests when working in or walking through heavy

Construction Contractor

(i) Site-specific health and safety plan;

(ii) Equipped first-aid sta-tions;

(iii) Medical insurance cover-age for workers;

(iv) Number of accidents; (v) Supplies of potable drink-

ing water; (vi) Clean eating areas where

workers are not exposed to hazardous or noxious substances;

(vii) record of health and safe-ty orientation trainings

(viii) personal protective equipments;

(ix) % of moving equipment outfitted with audible back-up alarms;

(x) sign boards for hazardous areas such as energized electrical devices and lines, service rooms hous-ing high voltage equip-ment, and areas for stor-age and disposal.

Page 65: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

52

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

equipment operating areas; (xi) Ensure moving equipment is outfitted with audible back-

up alarms; (xii) Mark and provide sign boards for hazardous areas such

as energized electrical devices and lines, service rooms housing high voltage equipment, and areas for storage and disposal. Signage shall be in accordance with inter-national standards and be well known to, and easily un-derstood by workers, visitors, and the general public as appropriate; and

(xiii) Disallow worker exposure to noise level greater than 85 dB (A) for duration of more than 8 hours per day without hearing protection. The use of hearing protection shall be enforced actively.

Community Health and Safety.

Traffic accidents and vehicle collision with pedestrians during material and waste transporta-tion.

(i) Plan routes to avoid times of peak-pedestrian activities; (ii) Liaise with IPIU/DSC in identifying high-risk areas on

route cards/maps; (iii) Maintain regularly the vehicles and use of manufacturer-

approved parts to minimize potentially serious accidents caused by equipment malfunction or premature failure; and

(iv) Provide road signs and flag persons to warn.

Construction Contractor

(i) Traffic Management Plan; (ii) Complaints from sensitive

receptors

Work Camps (if needed) Temporary air and noise pollu-tion from machine operation, water pollution from storage and use of fuels, oils, solvents, and lubricants

(i) Consult with IPIU/DSC before locating project offices, sheds, and construction plants;

(ii) Minimize removal of vegetation and disallow cutting of trees;

(iii) Provide water and sanitation facilities for employees; (iv) Prohibit employees from poaching wildlife and cutting of

trees for firewood; (v) Train employees in the storage and handling of materials

which can potentially cause soil contamination; (vi) Recover used oil and lubricants and reuse or remove

from the site; (vii) Manage solid waste according to the following preference

hierarchy: reuse, recycling and disposal to designated ar-eas;

(viii) Remove all wreckage, rubbish, or temporary structures

Construction Contractor

(i) Complaints from sensitive receptors;

(ii) Water and sanitation facilities for employees; and

(iii) IPIU/DSC report in writing that the camp has been vacated and restored to pre-project conditions

Page 66: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

53

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitigation

(such as buildings, shelters, and latrines) which are no longer required; and

(ix) Request IPIU/DSC to report in writing that the camp has been vacated and restored to pre-project conditions be-fore acceptance of work.

(x) No labor camp to be set up nearby river bank.

Social and Cultural Re-sources

Risk of archaeological chance finds

(i) Strictly follow the protocol for chance finds in any excava-tion work;

(ii) Request IPIU/DSC or any authorized person with archae-ological field training to observe excavation;

(iii) Stop work immediately to allow further investigation if any finds are suspected; and

(iv) Inform IPIU/DSC if a find is suspected, and take any ac-tion they require ensuring its removal or protection in situ.

Construction Contractor

Records of chance finds

BOD = biological oxygen demand, CO = carbon monoxide, dBA = decibels, DSC = design and supervision consultant, IPIU = Investment Program Management Unit, km = kilometer, m = meter, Nox = nitrous oxide, RPM = Respirable particulate matter, SO2= Sulphur dioxide, PM2.5 = Particulate matter of size less than 2.5, PM10-Particulate matter whose size less than 10 microns, UPJN = Uttarakhand Peya Jal Nigam.

Page 67: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

54

Table 22 : Anticipated Impacts and Mitigation Measures – Operations and Maintenance Environmental Mitigation Plan Field Anticipated Impact Mitigation Measures Responsible for

Mitigation Monitoring of Mitiga-

tion

General General impact (i) Refill and re-compact trenches soil and backfilled sand will be removed to expose the leaking junction or pipe

(ii) Conduct work during non-monsoon period; and (iii) Cover or wet excavated material to prevent dusts.

UPJN and O&M Contractors

Complaints from sensi-tive receptors

Social and Cul-tural Resources

Temporary disruption of activities

(i) Consult the city authorities to identify any buildings at risk from vibration damage and avoiding any use of pneumatic drills or heavy vehicles in the vicinity;

(ii) Complete work in sensitive areas quickly; (iii) Consult municipal authorities, custodians of important buildings, cultural

and tourism authorities and local communities in advance of the work to identify and address key issues, and avoid working at sensitive times, such as religious and cultural festivals.

UPJN and O&M Contractors

Complaints from sensi-tive receptors

Water quality Degradation of treatment efficiency may deteriorate the quality of receiving water body, the Solani Riv-er.

(i) Treated water should meet disposal standard for BOD, TSS, Fecal coli form, COD, Nitrate and Phosphate etc.

(ii) Conduct regular (daily) wastewater quality monitoring (at inlet and outlet of treatment plant)

(iii) Conduct regular (monthly) quality monitoring of Solani River water on the downstream side of disposal point

(iv) Also conduct monitoring from third party twice a year for all the parameters as mentioned above.

UPJN and O&M Contractors

Complaints from sensi-tive receptors

Air quality During degradation pro-cess obnoxious gases from plant site will generate

(i) Conduct twice a year ambient air quality monitoring for parameters like PM2.5, PM10, SO2, NO2, H2S and CH4 for five years in O&M period.

O&M Contractors Complaints from sensi-tive receptors

Noise quality During operation phase lot of noise generate from decanting process

Conduct noise quality monitoring twice a year for five year. O&M Contractors Complaints from sensi-tive receptors

Occupational Health and safety

STP operation involves handling of large quantities of potentially hazardous sewage and sludge. There-fore workers involved in operation may at health risk

(i) Protective appropriate personal protective gear such as boots, gloves, masks at all the workers.

(ii) Eliminate manual handling of wastewater/sludge. (iii) Provide training for workers in system operation and maintenance and safe-

ty related aspects (iv) Ensure adequate emergency first-aid facilities in the facility.

UPJN and O&M Contractors

Complaints from sensi-tive receptors

Nuisance to Improper operation and (i) Standard Operational Procedures (SOP) detailing the operational proce- UPJN and O&M Complaints from sensi-

Page 68: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

55

Field Anticipated Impact Mitigation Measures Responsible for Mitigation

Monitoring of Mitiga-tion

people living adjacent to STP & SPS

breakdown will lead to the accumulation of untreated wastewater at the plant site that may cause malodor-ous conditions and nui-sance to the surrounding population.

dures, preventive maintenance of equipment etc. will be prepared. (ii) Regular training shall be provided to the workmen and staff. (iii) Green buffer zone will help in reducing nuisances and will enhance aesthetic

condition of area. (iv) Dedicated power line will be provided for operation of STP and SPS. For

alternate supply, generator will be provided.

Contractors tive receptors

Sludge gener-ated from STP

Dumping of Sludge within STP site can cause nui-sance to the adjacent are-as more than one month

(i) Proper collection, treatment and storage of Sludge within STP site. (ii) Proper care will be taken for drying of sludge and to ensure no epidemic will

be caused by storing of sludge within STP site. (iii) Sludge will be disposed off after proper treatment and conducting NPK test

UPJN and O&M Contractors

Complaints from sensi-tive receptors

O&M = operations and maintenance, UPJN = Uttarakhand Peya Jal Nigam

Table 23 : Pre-construction Environmental Monitoring Program Field Location Responsible for

Mitigation Monitoring of Mitiga-

tion Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitoring

Utilities As per site requirement

DSC (i) List of affected utilities if any and operators; (ii) Bid document to include requirement for a con-tingency plan for service interruptions.

Checking of records

(i) List of affected utilities and operators prepared;

(ii) Requirement for a contin-gency plan for service interrup-tions included in bid documents

Once IPIU

Water Supply Cessation

As per site requirement

UPJN (i) schedule of closure; (ii) delivery of UPJN of potable water to affected people

checking of records

(i) tentative schedule of closure made known to affective people 2 weeks prior to cessation of water supply; (ii) coordination with UPJN for supply of potable water to 100% affected people

Once IPIU, DSC

Social and Cul-tural Heritage

As per site requirement

IPIU and DSC Chance Finds Protocol Checking of records

Chance Finds Protocol provided to construction contractors prior to commencement of activities

Once IPIU

Construction work camps, hot mix plants, stockpile areas,

As per site requirement

IPIU and DSC to determine locations prior to award of construction con-

List of selected location for construction work camps, hot mix plants, stockpile areas, storage

Checking of records

List of selected sites for con-struction work camps, hot mix plants, stockpile areas, storage areas, and disposal areas pro-

Once IPIU

Page 69: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

56

Field Location Responsible for Mitigation

Monitoring of Mitiga-tion

Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitoring

storage areas, and disposal areas.

tracts. areas, and disposal are-as.

vided to construction contractors prior to commencement of works.

Sources of Ma-terials

As per site requirement

IPIU and DSC to prepare list of ap-proved quarry sites and sources of ma-terials

(i)List of approved quarry sites and sources of ma-terials; (ii) Bid document to in-clude requirement for verification of suitability of sources and permit for additional quarry sites if necessary.

Checking of records

(i) List of approved quarry sites and sources of materials pro-vided to construction contractors (ii) Bid document included re-quirement for verification of suitability of sources and permit for additional quarry sites if nec-essary.

Once IPIU

DSC = design and supervision consultants, IPIU = Investment Program Implementation Unit.

Table 24 : Construction Environmental Monitoring Program Field Location Responsible

for Mitiga-tion

Monitoring of Mitigation Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitor-

ing Sources of Materials

Quarries and sources of materials

Construction Contractor

Construction Contractor documentation (i) Checking of records; and (ii) visual in-spection of sites

(i) Sites are permitted; and (ii) Report submitted by construc-tion contractor monthly (until such time there is excavation work)

Monthly submission for construction con-tractor as needed for DSC

Air Quality (i) At Con-struction sites (ii) At STP site and (iii) Areas designated for stockpiling of materi-als

Construction Contractor

(i) Location of stockpiles; (ii) complaints from sensitive receptors; (iii) heavy equipment and machinery with air pollution control devices; (iv) ambient air for PM2.5 and PM10, SO2 & NO2; (v) vehicular emissions such as SO2, NO2, CO, and hydrocarbons

(i) Checking of records (ii) Environmen-tal Monitoring; and (ii) visual in-spection of sites

(i) Stockpiles on designated areas only; (ii) complaints from sensitive re-ceptors satisfactorily addressed; (iii) air pollution control devices working properly; (iv) The government’s Ambient Quality Standards for ambient air quality; and (v) The government’s Vehicular Emission Standards for SO2, NO2, CO and HC.

Quarterly for checking records except mon-soon

Construction Contractor

Page 70: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

57

Field Location Responsible for Mitiga-

tion

Monitoring of Mitigation Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitor-

ing Surface Wa-ter Quality

(i) At Con-struction sites; (ii) At STP site;

(iii) areas for stock-piles, storage of fuels and lubricants and waste materials;

Construction Contractor

(i) Areas for stockpiles, storage of fuels and lubricants and waste materials; (ii) number of silt traps installed along drain-ages leading to water bodies; (iii) records of surface water quality in-spection; (iv) effectiveness of water management measures; and (v) For inland water: suspended solids, oil and grease, BOD, and coliforms.

(i) Checking of records (ii) Environmen-tal Monitoring; and (iii) visual in-spection of sites

(i) Designated areas only; (ii) Silt traps installed and function-ing; (iii) no noticeable increase in sus-pended solids and silt from con-struction activities; and (iv) The government’s Standards for Water Discharges to Inland Waters and Land for Irrigation

Quarterly except monsoons

Construction Contractor

Noise Levels (i) At Construction sites;

(ii) At STP site (ii) areas for stock-piles, storage of fuels and lubricants and waste materi-als; (iii) work camps

Construction Contractor

(i) Complaints from sensitive receptors; (ii) use of silencers in noise-producing equipment and sound barriers; and (iii) Equivalent day and night time noise levels

(i) Checking of records; and (ii) visual in-spection (iii) Environmen-tal Monitoring

(i) Complaints from sensitive recep-tors satisfactorily addressed; (ii) silencers in noise-producing equipment functioning as design; and (iii) sound barriers installed where necessary

Quarterly except monsoons

Construction contractors

Existing Utili-ties and In-frastructure

Construction sites

Construction Contractor

(i) Existing Utilities Contingency Plan (i) Checking of records; and (ii) visual in-spection

Implementation according to Utili-ties Contingency Plan

As needed IPIU

Landscape and Aesthet-ics

(i) Construction sites;

(ii) At STP site (ii) areas for stock-piles, storage of fuels and lubricants and waste materi-als; (iii) work camps

Construction Contractor

(i) Waste Management Plan; (ii) complaints from sensitive receptors; and (iii) IPIU/DSC to report in writing that the necessary environmental restoration work has been adequately performed before acceptance of work.

(i) Checking of records; and (ii) visual in-spection

(i) No accumulation of solid wastes on-site; (ii) implementation of Waste Man-agement Plan; and (iii) Complaints from sensitive re-ceptors satisfactorily addressed.

Monthly IPIU

(i) Construction sites; (ii) traffic haul road

Construction Contractor

(i) Traffic Management Plan; (ii) complaints from sensitive receptors; and (iii) Number of signage placed at subpro-

Visual inspec-tion

(i) Implementation of Traffic Man-agement Plan, if required; (ii) Complaints from sensitive re-ceptors satisfactorily addressed;

Monthly DSC

Page 71: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

58

Field Location Responsible for Mitiga-

tion

Monitoring of Mitigation Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitor-

ing ject location. and

(iii) Signages visible and located in designated areas

Socio-Economic - Income

Construction sites Construction Contractor

(i) Complaints from sensitive receptors; and (ii) Number of walkways, signage, and metal sheets placed at subproject loca-tion.

Visual inspec-tion

(i) Complaints from sensitive re-ceptors satisfactorily addressed; (ii) walkways, ramps, and metal sheets provided; and (iii) signage visible and located in designated areas

Quarterly IPIU

Socio-Economic - employment

construction sites Construction Contractor

(i) Employment records; and (ii) records of sources of materials

Checking of records

Number of employees from Roorkee equal or greater than 50% of total workforce

Quarterly IPIU

Occupational Health and Safety

construction sites

Con-struction Contrac-tor

(i) Site-specific health and safety plan; (ii) Equipped first-aid stations; (iii) Medical insurance coverage for work-ers; (iv) Number of accidents; (v) Supplies of potable drinking water; (vi) Clean eating areas where workers are not exposed to hazardous or noxious substances; (vii) record of health and safety orienta-tion trainings (viii) personal protective equipment; (ix) Percentage of moving equipment outfitted with audible back-up alarms; and (x) sign boards for hazardous areas such as energized electrical devices and lines, service rooms housing high voltage equipment, and areas for storage and disposal.

(i) Checking of records; and (ii) visual in-spection

(i) Implementation of health and safety plan; (ii) number of work-related acci-dents; (iii) %age usage of personal pro-tective equipment; (iv) number of first-aid stations, frequency of potable water deliv-ery, provision of clean eating area, and number of sign boards are according to approved plan; and (v) %age of moving equipment outfitted with audible back-up alarms

Quarterly

Community Health and Safety

Construction sites Construction Contractor

(i) Traffic Management Plan; and (ii) complaints from sensitive receptors

Visual inspec-tion

(i) Implementation of Traffic Man-agement Plan; and (ii) Complaints from sensitive re-ceptors satisfactorily addressed.

Quarterly IPIU

Page 72: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

59

Field Location Responsible for Mitiga-

tion

Monitoring of Mitigation Method of Monitoring

Indicators/ Standards Frequency Responsible for Monitor-

ing Work Camps

Work camps Construction Contractor

(i) Complaints from sensitive receptors; (ii) water and sanitation facilities for em-ployees; and (iii) IPIU/DSC report in writing that the camp has been vacated and restored to pre-project conditions

Visual inspec-tion

(i) Designated areas only; (ii) complaints from sensitive re-ceptors satisfactorily addressed

Quarterly IPIU

Chance Finds

Construction sites Construction Contractor

Records of chance finds Checking of records

Implementation of Chance Finds Protocol

As needed IPIU

BOD = biological oxygen demand, CO = carbon monoxide, DSC = design supervision consultant, IPIU = Investment Program Implementation Unit, NOx = nitrous oxide, RPM = Respirable particulate matter, SO2 = sulphur dioxide, SPM = suspended particulate matter, UPJN = Uttarakhand Peya Jal Nigam.

Table 25 : Operation and Maintenance Environmental Monitoring Program Field Location Responsible for

Mitigation Monitoring of

Mitigation Method of Mon-

itoring Indicators/ Standards

Frequency Responsible for Monitor-

ing General Maintenance

work subproject

location UPJN and O&M

Contractors Complaints from

sensitive receptors Checking of

records Complaints from sensitive

receptors satisfactorily ad-dressed

As needed IPIU

Accessibility subproject location

UPJN and O&M Contractors

Complaints from sensitive receptors

Checking of records

Complaints from sensitive receptors satisfactorily ad-dressed

As needed IPIU

Degradation of environmental quality

UPJN and O&M Contractors

Complaints from sensitive receptors

Checking of records

Complaints from sensitive receptors satisfactorily ad-dressed

As needed IPIU

Occupational health and safety

STP & SPS UPJN and O&M Contractors

Complaints from sensitive receptors

Checking of records

Complaints from sensitive receptors satisfactorily ad-dressed

As needed IPIU

Nuisance to people STP & SPS UPJN and O&M Contractors

Complaints from sensitive receptors

Checking of records

Complaints from sensitive receptors satisfactorily ad-dressed

As needed IPIU

Environmental Monitoring

STP site O&M of contractors Conduct Air, Water and Noise quality monitoring at least twice a year

As per CPCB guidelines

Air quality:- PM2.5,PM10,SO2,NO2,Ch4,HS

Water quality:- PH,TSS,BOD5,COD,Fecal Coliforms

Noise quality: Leq in dB(A)

Twice a year Contractor

IPIU = Investment Program Implementation Unit, O&M = operation and maintenance, UPJN = Uttarakhand Peya Jal Nigam, PM2.5= Particulate matter whose size less than 2.5 microns,, PM10= Particulate matter whose size less than 10 microns, SO2= Sulphur dioxide,NO2=Nitrogen dioxide,CH4=Metane,H2S=Hydrogen Sulphide, TSS=Total Suspended Solids,BOD=Biochemical Oxygen demand, Leq in dBA=Noise quality in dBA.

Page 73: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

60

B. Safeguards Items Having Penalty Provision for Roorkee sewerage system.

147. DSC and PIU will make regular visit to the project site. In case safeguards practices including safety gears, PPE, statutory and regulatory requirements stipulated in Table No. 26 are found to be violated, a penalty will be imposed on contractor by the employer.

Table 26 : Preventive Measures of non-compliance of Safeguards

Sl. No Particulars of Item Monitoring Fre-

quency

Action in case of non-

compliance

A. Personnel Protective Equipment

1 Safety Shoes Worker/Staff/day Issue Notice and impose penalty

B. Facilities at Construction Site

1 Barricading RMT Issue Notice and impose penalty

2 Absence of First Aid at construction site

Box / month Issue Notice and impose penalty

3 Absence of Supervisor at Site Staff / day Issue Notice and impose penalty

4 Unauthorized Power Connection Per day Issue Notice and impose penalty

5 Light arrangement during night work Per day Issue Notice and impose penalty

6 Drinking water availability at construc-tion site

Per day Issue Notice and impose penalty

C. Labour Camp

1 Absence of Cot Per Shed / month Issue Notice and impose penalty

2 Roof without heat insulated Per Shed / month Issue Notice and impose penalty

3 Drinking Water Per Camp / month Issue Notice and impose penalty

4 Toilets & Bathroom for Male (Per 10 Labours)

Toilets / month Issue Notice and impose penalty

5 Toilets & Bathroom for Female (Per 10 Labors)

Toilets / month Issue Notice and impose penalty

6 Cleanliness of Toilets & Bathrooms Toilets / month Issue Notice and impose penalty

7 Fire extinguisher Per Camp / month Issue Notice and impose penalty

8 Absence of Crèche as per norms Per Camp / month Issue Notice and impose penalty

9 Absence of First Aid at construction site

Box Issue Notice and impose penalty

Facility for children

D. Construction Camp

1 Absence of First Aid at construction site

Box / month Issue Notice and impose penalty

2 Fire extinguisher Per Camp / month Issue Notice and impose penalty

3 Drinking Water Per Camp / month Issue Notice and impose penalty

Page 74: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

61

Sl. No Particulars of Item Monitoring Fre-

quency

Action in case of non-

compliance

4 Soil Contamination due to fuel, lubri-cant & material

Per Camp / month Issue Notice and impose penalty

5 Toilets & Bathroom for Male (Per 10 Labours)

Toilets / month Issue Notice and impose penalty

6 Toilets & Bathroom for Female (Per 10 Labors)

Toilets / month Issue Notice and impose penalty

E. Unauthorized Land Acquisition for allied facilities

Per camp / month Issue Notice and impose penalty

F. Air, Water and Noise Testing Per package / quar-ter

Issue Notice and impose penalty

G. Monthly Safeguard Report Per Month / month Issue Notice and impose penalty

C. Environmental Management and Monitoring Costs

148. There were many construction stage impacts but these are typical for the construc-tion activity and mitigation provided is mainly in terms of good construction practices like water sprinkling to arrest dust generation, and clearing of excess soil, which will be incorporated into the construction contractor’s contractual agreements, which will be binding for implementation. Therefore there will be no additional costs for environmental management. The operation phase mitigation measures are again for good operating practices, which will be the responsi-bility of operating agency; therefore there are no additional costs. 149. The monitoring proposed mainly includes site inspections and informal discussions with workers and local people, and this will be the responsibility of IPMU, costs of which are part of project management. The air quality, and noise level monitoring of construction phase will be conducted by Contractor, since this is an additional cost, it needs to be part of subpro-ject cost. 150. The environmental management and monitoring costs are summarized in Table below. The costs of environmental management and monitoring costs are estimates as Rs 8, 88,000 during the implementation (design and construction) and during operation and maintenance is given in Table no.27.

Page 75: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

62

Table 27 : Environmental management and monitoring cost.

Items Quantity Unit Cost INR

Total Cost INR

Source of Fund

Implementation of EMP (24 months)

A. Design and Supervision Consultant – DSC Environment Specialist

2 months 225,000 450,000 DSC (cost al-ready allotted)

Total (A) 450,000 B. Survey Expenses during Construc-tion for Construction (Specific sites will be provided to con-struction contractors after awarding of the project)

i Ambient air quality during con-struction

18 samples (1 sample for each 3 locations i.e. at construction site; at STP site and at stockpiling areas on quarterly basis exclud-ing monsoon for 2 Years)

12,000 2,16,000 Construction Contractor

ii Noise quality during construction 18 samples (1 sample for each 3 locations i.e. at construction site; at STP site and at stockpiling areas on quarterly basis exclud-ing monsoon for 2 Years)

4,000

72,000 Construction Contractor

iii Water Quality during construc-tion

18 samples (1 sample for each 3 locations i.e. at construction site; at STP site and at stockpiling areas on quarterly basis exclud-ing monsoon for 2 Years)

5,000 90,000 Construction Contractor

iv Ambient Air quality during oper-ation stage

10 samples ( 2 sam-ples in a year for 5-years at STP site

12000 1,20000 Construction Contractor

v Noise quality during operation stage

10 samples ( 2 sam-ples in a year for 5-years at STP site

4,000 40,000 Construction Contractor

vi Water quality during operation stage

10 samples ( 2 sam-ples in a year for 5-years at STP site

5,000 50,000 Construction Contractor

v Workshop/ Training and aware-ness program for workers and Management staffs

Once Lump sum 1,50,000 PIU

vi Public Consultation Three times Lump sum 1,50,000 PIU

Total (B) 8,88,000

Page 76: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

63

VII. Findings and Recommendations

151. The Initial Environmental Examination (IEE) process described in the earlier sections of this report has assessed the environmental impacts of all elements of the infrastructure pro-posed under the Roorkee Sewerage Subproject. Potential negative impacts were identified in relation to both construction and operation of the improved infrastructure, but no impacts were identified as being due to either the project design or location. Mitigation measures have been developed in generic way to reduce all negative impacts to acceptable levels. These were dis-cussed with specialists responsible for the engineering aspects, and as a result most measures have already been included in the outline designs for the infrastructure. 152. The potential adverse environmental impacts of the proposed Sewerage subproject are mainly related to the construction period, which can be minimized by the proposed mitigat-ing measures and environmentally sound engineering and construction practices. Mitigation measures have been developed to reduce all negative impacts to acceptable levels. 153. The change of site of STP does not incite the nature of environmental impact but the length of rising main increases from 1200 meters to 3800 meters. This results quantum of ex-cavation in terms of length. The excavated earth will be used for community purpose this will be done in consultation with community. 154. During the construction phase, impacts mainly arise from the need to dispose of large quantities of waste soil and import a similar amount of sand to support the pipes in the trench-es; and from the disturbance of residents, businesses, traffic and important buildings by the construction work. These are common impacts of construction in urban areas, and there are well developed methods for their mitigation. These include:

(i) Finding beneficial uses for waste material; (ii) Covering soil and sand during transportation and when stored on site; (iii) Planning work to minimize disruption of traffic and communities; (iv) Providing temporary structures to maintain access across trenches where required.

155. Specific impacts due to construction of 33-STP adjacent to Solani River has been iden-tified and measures such as the following are suggested:

(i) No construction material storage/ancillary works nearby river bank; (ii) No labour camps to be set up nearby river bank (iii) Protection bunds around construction area (iv) Conducting awareness programs to workers (v) Proper arrangement to arrest silt runoff from construction site to nearby river during

monsoon (vi) Use excavated soil for strengthening bunds; no waste shall be disposed in or near river

bank 156. Once the sewerage system is operating, most facilities will operate with routine maintenance, which should not affect the environment. Leaks in the network will need to be repaired from time to time, but environmental impacts will be much less than those of the con-struction period as the work will be infrequent, affecting small areas only. It will also be con-ducted in areas that have already been excavated, so there will be no need to protect archaeo-logical material. 157. During operation of STP, there are chances of odor nuisance. The proper selection of treatment process as well as regular O & M of STP will take care of this problem. There can be deterioration of quality of nearby river water due to disposal of treated sewage. However, regu-lar quality monitoring of water will help in identifying the problem in earlier stage and remedia-tion measures. There is occupational health and safety risk involved while working in STP however all the necessary precautionary measures are included. Necessary provisions for

Page 77: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

64

green buffer zone within STP premises as well as surrounding sewage pumping stations are considered in design. 158. The major impacts of the implementation of sewerage subproject will be beneficial to the citizens of Roorkee as it will provide proper collection network and treatment of sewage, which will serve a greater proportion of the population, including slum-dwellers. This will im-prove the quality of life of people as well as benefiting both individual and public health as the improvements in hygiene should reduce the incidence of disease associated with poor sanita-tion. This should lead to economic gains as people will be away from work less and will spend less on healthcare, so their incomes should increase. 159. An Environmental Management Plan(EMP) is proposed as a part of IEE which in-cludes (i) mitigation measures for significant environmental impacts during implementation, (ii) environmental monitoring programs, and the responsible entities for mitigation, monitoring and reporting; and (iii) public consultation and information disclosure. Mitigation measures have been developed to reduce all negative impacts to acceptable limits. A number of impacts and their significance have already been reduced by amending design. 160. The important recommendation of this IEE is that this sewerage distribution subproject can proceed for implementation provided all impacts are addressed through suggested mitiga-tion measures. The other important recommendation is that the involuntary resettlement issues, which are identified through a parallel process of resettlement planning, need to be addressed by RP implementation. The recommended clauses for the Construction Contractor’s Contract are attached as Appendix 4 to ensure that mitigation measures are implemented.

Page 78: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

65

X. Conclusion

161. The main objective of this sewerage subproject in Roorkee is to improve the sewerage network and to provide necessary treatment to sewage before final disposal. Thus ultimately this subproject aims to improve overall living conditions in the City. This initial environmental examination has been conducted to identify and assess the negative impacts, if any, of the subproject. 162. All components proposed under this sub-project involve straightforward construction and simple operation. Not many environmental issues were noted during this initial environ-mental examination. In most cases, environmental issues identified are typical for the type of component construction, and a range of proven mitigation strategies exists to address them. 163. This IEE has assessed all potential environmental impacts associated with the subpro-ject. There are no impacts that are significant or complex in nature, or that need an in-depth study to assess the impact or to develop the mitigation measures. The environmental impacts identified are manageable, and the PMU will monitor the implementation the mitigation measures as stated in IEE. The subproject, therefore, does not warrant environmental impact assessment (EIA). 164. Importantly, there are no uncertainties in the present IEE and no further or additional work is required to comply with the ADB Safeguard Policy Statement 2009. One component however requires consent/permission of regulatory agencies for implementation. The construc-tion and operation of 33 MLD Sewage Treatment Plant (STP) requires consent for establish-ment (CFE) and consent for operation (CFO) from the UEPPCB under the Water (Prevention and Control of Pollution) Act, 1974. The Consent to establish for 33MLD-STP has been ob-tained from Uttarakhand Environment Protection and pollution Control Board and consent to operate will be obtained after the completion of construction work. The detail of which has been furnished in Table no-1. 165. The construction and operation of 33MLD-STP at Roorkee will comply the conditions of stipulated in Consent to Establish which has been obtained from Uttarakhand Environment Pro-tection and Pollution Control Board and after completion of work, UUSDA will obtain Consent to Operate from UEPPCB and will comply all the conditions of Uttarakhand Environment Protection and Pollution Control Board consent to operate order.

Page 79: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

66

List of Appendices Appendix 1 : Central Pollution Control Board Applicable Environmental Standards

General Standards for Discharge of Environmental Pollutants: Effluents

Sl.no Parameter Standards

Inland surface water

Public sewers

Land of irrigation

Marine/coastal areas

(a) (b) (c) (d) 1. Color and odor remove as far as practicable 2. Suspended solids

mg/l, maximum. 100 600 200 (a) For process waste water

100 (b) For cooling water effluent 10% above total suspended matter of influent.

3. Particle size of suspended solids

shall pass 850 micron IS Sieve

(a) Floatable solids, maximum, 3 mm. (b) Settable solids (maximum 850 micron)

4. pH value 5.5. to 9.0 5.5 - 9.0 5.5 - 9.0 5.5 - 9.0 5. Temperature shall not

exceed 5 ºC above the receiv-ing water temperature

shall not exceed 5 ºC above the receiving water temperature

6. Oil and grease, mg/l, maximum.

10 20 10 20

7. Total residual chlo-rine, mg/l, maxi-mum.

1.0 1.0

8. Ammonical nitro-gen (as N.) mg/l, maximum.

50 50 50

9. Total Kjeldahl Ni-trogen (as NH3) mg/l, maximum.

100 100

10. Free ammonia (as NH3), mg/l, maxi-mum.

5.0 5.0

11. Biochemical oxy-gen demand (3 days at 27 º C), mg/l, maximum.

10 350 100 100

12. Chemical oxygen demand, mg/l, maximum.

250 250

13. Arsenic (as As) mg/l, maxi-

0.2 0.2 0.2 0.2

Page 80: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

67

Sl.no

Parameter Standards

Inland surface water

Public sewers

Land of irrigation

Marine/coastal areas

mum. 14. Mercury (As Hg),

mg/l, maximum. 0.01 0.01 0.01

15. Lead (as Pb) mg/l, maximum.

0.1 1.0 2.0

16. Cadmium (as Cd) mg/l. maximum.

2.0 1.0 2.0

17. Hexavalent chro-mium (as Cr. +6). mg/l, maximum.

0.1 2.0 1.0

18. Total Chromium (as Cr) mg/l, maxi-mum.

2.0 2.0 2.0

19. Copper (as Cu) mg/l, maximum.

3.0 3.0 3.0

20. Zinc (as Zn) mg/l, maximum.

5.0 15 15

21. Selenium (as Se) mg/l, maximum.

0.05 0.05 0.05

22. Nickel (as Ni) mg/l, maximum.

3.0 3.0 5.0

23. Cyanide (as CN) mg/l, maximum.

0.2 2.0 0.2 0.2

24. Fluoride (as F) mg/l, maximum.

2.0 15 15

25. Dissolved phos-phates (as P) mg/l, maximum.

5.0

26. Sulfide (as S) mg/l, maximum.

2.0 5.0

27. Phenolic com-pounds (as C6H5OH) mg/l, maximum.

1.0 5.0 5.0

28. Radioactive mate-rials: (a) Alfa emitter’s microcurie/ml, max-imum. (b) Beta emitters micro curie/ml, maximum.

10-7 10-6

10-7 10-6

10-8 10-7

10-7 10-6

29. Bio-assay test 90% Sur-vival of fish

90% sur-vival of

90% survival of fish after 96

90% survival of fish after 96 hours in 100% effluent

Page 81: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

68

Sl.no

Parameter Standards

Inland surface water

Public sewers

Land of irrigation

Marine/coastal areas

after 96 hours in 100% efflu-ent

fish after 96 hours in 100% effluent

hours in 100% effluent

30. Manganese (as Mn)

2 mg/l 2 mg/l 2 mg/l

31. Iron (as Fe) 3 mg/l 3 mg/l 3 mg/l 32. Vanadium (as V) 0.2 mg/l 0.2 mg/l 0.2 mg/l 33. Nitrate Nitrogen 10 mg/l 20 mg/l

mg/l = milligram per litre, mm = millimetre. Note: These standards shall be applicable for industries, operations or process other than those industries operations or

process for which standards have been specified in schedule of the Environment Protection Rules, 1989.

Central Pollution Control Board Primary Water Quality Criteria

Designated-Best-Use Class of Water

Criteria

Drinking Water Source without conventional treatment but after disinfection

A Total Coliform Organisms: MPN 50 per 100 Ml

6.5 pH 8.5

Dissolved Oxygen: 6 mg/l Biochemical Oxygen Demand (5

days @ 20 oC): 2 mg/L

Outdoor bathing (organized) B Total Coliform Organisms: MPN

500 per 100 ml

6.5 pH 8.5

Dissolved Oxygen: 5 mg/l Biochemical Oxygen Demand (5

days @ 20 ºC): 3 mg/l

Drinking water sources after conventional treatment and disinfection

C Total Coliform Organisms: MPN 5000 per 100 ml

6 pH 9

Dissolved Oxygen: 4 mg/l Biochemical Oxygen Demand (5

days @ 20 ºC): 3 mg/l

Propagation of wildlife and fisheries D 6.5 pH 8.5

Dissolved Oxygen: 4 mg/l

Free ammonia (as N): 1.2 mg/l

Irrigation, industrial cooling, controlled waste disposal

E pH 8.5 Electrical conductivity at 25 ºC:

2250 micro mhos/cm Sodium absorption ratio: Maximum 26 Boron: Maximum 2 mg/l

mg/l = milligram/litre, MPN = .Most Probable Number

Page 82: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

69

Indian Standards for Drinking Water - Specification (BIS 10500: 1991) No Substance or Characteristic Requirement (Desirable

Limit) Permissible Limit in the absence

of Alternate source

Essential characteristics 1. Color, ( Hazen units, maximum) 5 25 2. Odor Unobjectionable Unobjectionable 3. Taste Agreeable Agreeable 4. Turbidity ( NTU, maximum) 5 10 5. pH Value 6.5 - 8.5 No Relaxation 6. Total Hardness (as CaCo3)

mg/l, maximum 300 600

7. Iron (as Fe) mg/l, maxi-mum

0.3 1.0

8. Chlorides (as Cl) mg/l, maxi-mum.

250 1000

9. Residual, free chlorine, mg/l, minimum

0.2 --

Desirable Characteristics 10. Dissolved solids mg/l, maxi-

mum 500 2000

11. Calcium (as Ca) mg/l, maxi-mum

75 200

12. Magnesium (as Mg)mg/l, max-imum.

30 100

13. Copper (as Cu) mg/l, maxi-mum

0.05 1.5

14. Manganese (as Mn)mg/l, max-imum

0.10 0.3

15. Sulfate (as SO4) mg/l, maxi-mum

200 400

16. Nitrate (as NO3) mg/l, maxi-mum

45 100

17. Fluoride (as F) mg/l, maximum 1.0 1.5 18. Phenolic Compounds (as C6

H5OH) mg/l, maximum.

0.001 0.002

19. Mercury (as Hg)mg/l, maximum 0.001 No relaxation 20. Cadmiun (as Cd)mg/l, maxi-

mum 0.01 No relaxation

21. Selenium (as Se)mg/l,maximum

0.01 No relaxation

22. Arsenic (as As) mg/l, maximum 0.05 No relaxation 23. Cyanide (as CN) mg/l, maxi-

mum 0.05 No relaxation

24. Lead (as Pb) mg/l, maximum 0.05 No relaxation 25. Zinc (as Zn) mg/l, maximum 5 15 26. Anionic detergents (as MBAS)

mg/l, maximum 0.2 1.0

27. Chromium (as Cr6+) mg/l, max-imum

0.05 No relaxation

28. Polynuclear aromatic hydro carbons (as PAH) g/l, maximum

-- --

29. Mineral Oil mg/l, maximum 0.01 0.03 30. Pesticides mg/l, maximum Absent 0.001 31. Radioactive Materials 32. Alpha emitters Bq/l, maximum -- 0.1 33. Beta emitters pci/l,maximum -- 1.0 34 Alkalinity mg/l. maximum 200 600 35 Aluminium (as Al)

mg/l,maximum 0.03 0.2

36 Boron mg/l, maximum 1 5

Page 83: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

70

Ambient Air Quality Standards

Pollutant Time Weighted Average

Industrial, Resi-dential, Rural and Other Areas

Sensitive Area (Notified by Cen-tral Government)

Method of Measurement

Sulphur Dioxide (SO2)

Annual Averagea 24 hours Averageb

50 µg/m3 80 µg/m3

20 µg/m3 80 µg/m3

-Improved West & Gaeke method -Ultraviolet Fluorescence

Oxides of Nitrogen (NOX)

Annual Averagea 24 hours Average b

40 µg/m3 80 µg/m3

30 µg/m3 80 µg/m3

-Jacobs & Hochheiser modified (NaoH– NaAsO2) method -Gas Chemiluminiscence

Particulate Matter (PM10) (Size <10 µm)

Annual Averagea 24 hours Averageb

60 µg/m3 60 µg/m3

60 µg/m3 100 µg/m3

-Gravimetric -TOEM -Beta Attenuation

Particulate Matter (PM 2.5) (Size <2.5 µm)

Annual Averagea 24 hours Average b

40 µg/m3 60 µg/m3

40 µg/m3 60 µg/m3

-Gravimetric -TOEM -Beta Attenuation

Ozone (O3) 8 hours Averageb 1 hourb

100 µg/m3 180 µg/m3

100 µg/m3 180 µg/m3

-UV photometric -Chemiluminiscence -Chemical method

Lead (Pb) Annual Averagea 24 hours Averageb

0.5 µg/m3 1.0 µg/m3

0.5 µg/m3 1.0 µg/m3

-AAS method after sampling using EPM 2000 or equiva-lent filter paper

Carbon Monoxide (CO)

8 hours Averagea 1 hourb

2.0 mg/m3 4.0 mg/m3

2.0mg/m3 4.0mg/m3

-Non Dispersive Infrared Spectroscopy

Ammonia (NH3) Annual Averagea

24 hours Averageb

100 µg/m3 400 µg/m3

100 µg/m3 400 µg/m3

-Chemiluminiscence Indophenol blue method

Benzene (C6H6) Annual Averagea

5 ng/m3 5 ng/m3 -Gas Chromatography con-tinuous analyzer -Adsorption & desorption followed by GC analysis

Benzo(o)pyrene particulate phase only

Annual Averagea

1 ng/m3 1 ng/m3 -Solvent extraction followed by GC/HPLC analysis

Arsenic (As)

Annual Averagea

6 ng/m3 6 ng/m3 -AAS/ICP method after sampling using EPM 2000 or equivalent filter paper

Nickel (Ni) Annual Averagea

20 ng/m3 20 ng/m3 -AAS/ICP method after sampling using EPM 2000 or equivalent filter paper

a Indicate Annual Arithmetic Mean of Minimum 104 measurement in a year measured twice a week, 24 hourly at uniform intervals.

b 24 hourly / 8 hourly/1 hourly values should be met 98% of the time in a year. However, 2% of the time, it may exceed by not on two consecutive days.

Source: Central Pollution Control Board, New Delhi, Notification dated 18th November 2009.

Page 84: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

71

Standards for Diesel Generator Sets: Stack Height

The minimum height of stack to be provided with each generator set can be worked out using the following formula:

H = h+0.2x ÖKVA H = Total height of stack in meter h = Height of the building in meters where the generator set is installed KVA = Total generator capacity of the set in KVA Based on the above formula the minimum stack height to be provided with different

range of generator sets may be categorized as follows: For Generator Sets Total Height of stack in metre

50 KVA Height of the building + 1.5 metre 50-100 KVA Height of the building + 2.0 metre 100-150 KVA Height of the building + 2.5 metre 150-200 KVA Height of the building + 3.0 metre 200-250 KVA Height of the building + 3.5 metre 250-300 KVA Height of the building + 3.5 metre

Similarly for higher KVA ratings a stack height can be worked out using the above formula.

Noise Standards

Noise limits for domestic appliances and construction equipment’s at the

manufacturing stage in dB(A).

Window air conditioners of 1 -1.5 tons 68 Air coolers 60 Refrigerators 46 Diesel generator for domestic purposes 85 Compactors (rollers), front loaders, concentrate mixers, cranes (mov-able), vibrators and saws

75

National Ambient Noise Standards The Noise Pollution (Regulation and Control) Rules, 2000

Area

Code

Category of Area Limit in dB(A) Leqa

Day Time Night Time

A. Industrial area 75 70

B. Commercial area 65 55

C. Residential area 55 45

D. Silence zone 50 40 a dB(A) Leq denotes the time weighted average of the level of sound in decibels on scale A which is relatable to

human hearing. A “decibel” is a unit in which noise is measured. “A”, in dB (A) Leq, denotes the frequency weighting in the measurement of noise and corresponds to frequency response characteristics of the human ear. Leq is energy mean of the noise level over a specified period.

Notes: Day time is reckoned in between 6 a.m. and 10 p.m. Night time is reckoned in between 10 PM and 6 AM.

Silence zone is an area comprising not less than 100 m around hospitals, educational institutions, courts, religious places or any other area which is declared as such by the competent authority. Mixed categories of areas may be declared as one of the four above mentioned categories by the competent authority.

Page 85: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

72

Appendix 2 : Rapid Environmental Assessment (REA) for

Roorkee Sewerage Subproject, Construction of 33MLD-STP at Saliyar Ibrahimpur

Probable

Involuntary Resettlement Effects Current

Assessment Additional Information for

Substantiating Assessment

A. Project Siting Is the project are.

Densely populated? Yes Sewer network will be laid in most of the town, including densely populated areas; Sewage Treat-ment Plant will be located outside the town

No

Heavy with development activities? Yes

No

Adjacent to or within any environmentally sensitive areas?

Yes

No

Cultural heritage site Yes No

Protected Area Yes No

Wetland Yes There are no wetland or notable water bodies within the project area No

Mangrove Yes Not a coastal area No

Estuarine Yes Not a coastal area No

Buffer zone of protected area Yes No No

Special area for protecting biodiversity Yes No No

Bay Yes No No

Potential Environmental Impacts Will the Project cause?

Yes No

Impairment of historical/cultural monu-ments/areas and loss/damage to these sites?

No There are no such areas near the subproject sites No

Interference with other utilities and blocking of access to buildings; nuisance to neigh-boring areas due to noise, smell, and influx of insects, rodents, etc.?

Yes No blocking/interference with other utilities expected; necessary buffer around the sewage treatment plant and with appropriate technology and site specific layout design (considering the wind di-rection); no significant nuisance is envisaged from STP operations.

No

Dislocation or involuntary resettlement of people?

Yes Subproject does not involve land acquisition or displacement. No

Disproportionate impacts on the poor, women and children, Indigenous Peoples or other vulnerable groups?

Yes No such possibilities; .sewerage system will cover entire population including urban poor; In fact, it will have positive health impact due to improved sanita-tion condition.

No

Impairment of downstream water quality due to inadequate sewage treatment or re-lease of untreated sewage?

Yes Treatment process will be designed to meet the inland water disposal standards set by the Central Pollution Control Board (CPCB). Periodic water qual-ity monitoring will be conducted to ensure treated wastewater complies with the standards.

No

Overflows and flooding of neighboring properties with raw sewage?

Yes Sewerage system has been designed considering the population growth. It has been designed to ac-commodate sewage until year 2028. Design consid-ers standard peak factors and therefore no such im-pact envisaged.

No

Environmental pollution due to inadequate Yes Proper sludge collection, treatment and disposal

Page 86: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

73

Probable Involuntary Resettlement Effects

Current Assessment

Additional Information for Substantiating Assessment

sludge disposal or industrial waste dis-charges illegally disposed in sewers?

No systems are part of the STP. This sewerage sys-tem will cater only to domestic wastewater. The design of the subproject ensures no chance of mix-ing of industrial effluent.

Noise and vibration due to blasting and other civil works?

Yes No blasting activities envisaged. Temporary nuisance/disturbance due to construction activities will be minimized with appropriate mitigation measures.

No

Risks and vulnerabilities related to occupa-tional health and safety due to physical, chemical, and biological hazards during project construction and operation?

Yes In appropriate handling of sludge may have occupational health hazards. All necessary safety precautions will be taken to avoid any risk.

No

Discharge of hazardous materials into sewers, resulting in damage to sewer sys-tem and danger to workers?

Yes There are no sources of hazardous material that will find its way into the sewers. Wastewater other than municipal, i.e. industrial, entering the sewer-age system must meet the stipulated standards, and therefore it is unlikely that problematic waste will be discharged into the sewers.

No

Inadequate buffer zone around pumping and treatment plants to alleviate noise and other possible nuisances, and protect facili-ties?

Yes STP will be located with adequate buffer zone around. A Greenbelt composed of plants and trees included to minimize all nuisances.

No

Road blocking and temporary flooding due to land excavation during the rainy sea-son?

Yes All necessary precautions will be taken to prevent flooding during construction; flooding is unlikely as work will be mostly be conducted during dry sea-son.

No

Noise and dust from construction activi-ties?

Yes No major noise generating activities like rock blasting is envisaged. Dust will be temporary and will be controlled with proper measures.

No

Traffic disturbances due to construction material transport and wastes?

Yes Proper planning, such as selection of routes and scheduling to avoid peak traffic hours, will be car-ried out in consultation with concerned authorities

No

Temporary silt runoff due to construction? Yes In unavoidable cases of construction activity during rains, proper runoff/soil management activities will be carried out to minimize the silt runoff.

No

Hazards to public health due to overflow flooding, and groundwater pollution due to failure of sewerage system?

Yes A chance of failure of sewerage system is very remote No

Deterioration of water quality due to inade-quate sludge disposal or direct discharge of untreated sewage water?

Yes No such possibilities; treated wastewater will meet the disposal standards and proper sludge disposal methods are in place; regular monitoring will be conducted to check this.

No

Contamination of surface and ground wa-ters due to sludge disposal on land?

Yes Sludge will be treated/dried and ensured that it is harmless before its disposal on land. No

Health and safety hazards to workers from toxic gases and hazardous materials which may be contained in confined areas, sew-age flow and exposure to pathogens in un-treated sewage and unstablized sludge?

Yes All necessary health and safety training and necessary personal protection equipment will be given to workers and staff during operation of sew-erage system

No

Large population increase during project construction and operation that causes in-creased burden on social infrastructure (such as sanitation system)?

Yes No such impact anticipated; local communities in the vicinity of the project would be employed as much as possible.

No

Social conflicts between construction Yes No such impact anticipated; local communities in

Page 87: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

74

Probable Involuntary Resettlement Effects

Current Assessment

Additional Information for Substantiating Assessment

workers from other areas and community workers?

No the vicinity of the project would be employed as much as possible.

Risks to community health and safety due to the transport, storage, and use and/or disposal of materials such as explosives, fuel and other chemicals during construc-tion and operation?

Yes Not applicable. Construction/operation will not involve use of explosives and chemicals. No

Community safety risks due to both acci-dental and natural hazards, especially where the structural elements or compo-nents of the project are accessible to members of the affected community or where their failure could result in injury to the community throughout project con-struction, operation and decommissioning?

Yes Operational area will be clearly demarcated and access will be controlled. Only worker and project concerned members will be allowed to visit the construction sites.

During operation, entry into STP will be restricted.

No No

Climate Change and Disaster Risk Questions

The following questions are not for environmental categorization. They are included in this checklist to help identify potential climate and disaster risks.

Yes No Remarks

Is the Project area subject to hazards such as earth-quakes, floods, landslides, tropical cyclone winds, storm surges, tsunami or volcanic eruptions and climate chang-es (see Appendix I)?

√ According to hazard zoning in the Vulnerability Atlas of India, the whole of Uttarakhand falls under “very high” to “high” category earthquake zone. All newly developed facilities will re-quire compliance with gov-ernment rules for seismic design in hilly areas.

Could changes in temperature, precipitation, or extreme events patterns over the Project lifespan affect technical or financial sustainability (e.g., changes in rainfall patterns disrupt reliability of sewerage; sea level rise creates salin-ity intrusion into proposed sewerage source)?

√ No such possibility

Are there any demographic or socio-economic aspects of the Project area that are already vulnerable (e.g., high incidence of marginalized populations, rural-urban mi-grants, illegal settlements, ethnic minorities, women or children)?

√ Proposed project will not impact any marginalized population, rural-urban mi-grants, illegal settlement etc.

Could the Project potentially increase the climate or disaster vulnerability of the surrounding area (e.g., by us-ing water from a vulnerable source that is relied upon by many user groups, or encouraging settlement in earth-quake zones)?

√ No such possibility of vulnerability increase of the surrounding area.

Page 88: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

75

Appendix 3 : Details of Public Consultation and focused group discussion.

A. List of Participants during FGD at Gulab Nagar on 20th April 2011

S.no Islam Former

Signature

1 Irshad Ahemad Rtd

2 Israr Welding

3 M. Saleem Clinic

4 Zameel Ahemad Rtd

5 Akhtar Labour

6 Sageer Ahemad Labour

7 Mazhm Ali Business

8 S.I. Hussen Server

9 Mohd Gouri Business

10 Samoth Ali

11 Muhamad Murslim Survey Drawing

12 Saheed Ahemad Carpenter

13 Guddu Malik Doctor

14 Naseem Tailor

15 Narakat Clinic

16 Shamsher Labour

17 M. Afjal Engineer

18 Naseem Shopkeeper

19 Zulbikar Painter

20 Manzoor Khan Mott MacDonald

21 Dileep Kumar Singh HIRA

Page 89: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

76

B. List of Participants during FGD at West Amber Talab on 19th April 2011

1 Kuldeep Kapoor Ward Member

2 Pawan Kumar Shopkeeper

3 Bhupendra Electrician

4 Avinash Tyagi Accountant

5 Deepak Maurya Student

6 Vipin Thrkral Shopkeeper

7 Sudheer Jataw Sabhasad

8 Charu Chandra Press Reporter

9 Anil Sharma Rtd

10 Rejesh Kumar

11 Dileep Kumar Singh HIRA

C. List of Participants during FGD at Chaw Mandi on 18th April 2011

Sl. No

Name of the Participant Occupation Signature (If agreed by the

participants)

1 Rajesh Chanhan

Shopkeeper

2 Kamlesh Kumar

Shopkeeper

3 Keshav Ram

Rtd.

4 Rajiv Sharma

Business

5 Sarwan Goswani Contractor

6 Jagneshwar Goyal

Rtd

7 R.R. Sharma

Rtd

8 Karan Singh

Rtd

9 Rajendra Giri

ITT Service

10 Situ Goyal Sandeep

Business

11 Ghanshyam Singh

Rtd

12 Manoj Kumar Shopkeeper

13 Sachin Goswami Media 14 Aparna Pandey IPMU 15 Manzoor Khan Mott MacDonald 16 Rafia

Mott MacDonald

17 Dileep Kumar Singh

HIRA

Page 90: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

77

D. List of Participants during FGD at Adarsh Nagar on 27th April 2011

1 Yesh Singh G. Job

2 H. Varma Shopkeeper

3 Sanjay Goswami Business

4 B.P.Singh Service

5 Dr. R.K.Jain Doctor

6 Praveen Dhiman G. Job

7 Umesh Kumar Dhiman Private Job

8 Nitin Thakral Job

9 Ajay Job

10 Yogash Kumar Business

11 Narender Goyal Rtd

12 Jai Prakash Dhiman

13 Rajkumar Shopkeeper

14 Arvind Chomli Business

15 Pradeep Batra Chairman NPP

16 Tushar Pratap Singh Mott MacDonald

17 Dileep Kumar Singh HIRA

Page 91: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

78

E. List of Participants during FGD at New Basti on 19th April 2011

1 Dhisham Giri Business

2 Dharampal Dhimam Business

3 Mangta Shopkeeper

4 Sunder lal Shop Maker

5 Dherendra Kumar Pvt Job

6 Mithlesh House Wife

7 Rajendra Devi House Wife

8 Seema Devi House Wife

9 Dinesh House Wife

10 Deepa House Wife

11 Urmila Devi House Wife

12 Anita Devi House Wife

13 Rani Devi House Wife

14 Phadma House Wife

15 Jagwati Devi House Wife

16 Neetu Devi House Wife

17 Anil Prajapati Labour

18 Dileep Kumar Singh HIRA

Page 92: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

79

F. List of Participants during FGD at Ganeshpur on 18th April 2011

Sl. No Name of the Participant Occupation nature (If agreed by the

participants)

1 Kale Ji

Majdoori

2 Rangeela Yadav

Shopkeeper

3 Sitab Singh

Shopkeeper

4 Chandhary Bijendra

Govt. Job

5 Chandhary Rajpal Singh

Farmer

6 Azad Singh

Farmer

7 Jai Kumar

Farmer

8 Nand Singh

Farmer

9 Pushpender Singh

Farmer

10 Kehar Singh

Govt. Contractor

11 Aparna Panday

IPMU

12 Manzoor Khan

Mott MacDonald

13 Rafia

Mott MacDonald

14 Sanjay Rawat

HIRA

Page 93: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

80

G. List of Participants during FGD at Mahigram on 19th April 2011

1 M. Suleman Student

2 Ser Alli Business

3 Munna Master Property D

4 Shokat Alli Business

5 Furkan Private Job

6 M. Islam Business

7 M. Yaseen Shopkeeper

8 M. Aslam Teacher

9 M. Aslad G. Job

10 Dr. Jammal Clinic

11 Mo Abudin

12 Hazi Mo Asgar Sabhasad

13 Rafia Mott MacDon-ald

14 Aparna Pandey IPMU-UUSDIP

15 Manzoor Khan Mott MacDon-

ald

16 Dileep Kumar Singh HIRA

Page 94: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

81

H. List of Participants during Public Consultation in Roorkee for Construction of 33 MLD-STP at Saliyar-Ibrahimpur.

Page 95: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

82

Page 96: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

83

Appendix 4 : RECOMMENDED CONSTRUCTION CONTRACTORS CONTRACT CLAUSES A. Sources of Materials

(i) Use quarry sites and sources permitted by government; (ii) Verify suitability of all material sources and obtain approval of State Investment Program

Management and Implementation Unit, and design and supervision consultant (DSC); (iii) If additional quarries will be required after construction has started, obtain written approval

from State Investment Program Management and Implementation Unit; and (iv) Submit to DSC on a monthly basis documentation of sources of materials.

B. Air Quality

(i) Consult with DSC on the designated areas for stockpiling of clay, soils, gravel, and other

construction materials; (ii) Damp down exposed soil and any stockpiled on site by spraying with water when neces-

sary during dry weather; (iii) Use tarpaulins to cover sand and other loose material when transported by trucks; (iv) Carry out air quality monitoring as per environmental management plan (EMP); and (v) Fit all heavy equipment and machinery with air pollution control devices which are operat-

ing correctly.

C. Surface Water Quality (i) Avoid stockpiling of earth fill especially during the monsoon season unless covered by tar-

paulins or plastic sheets; (ii) Prioritize re-use of excess spoils and materials in the construction works. If spoils will be

disposed, consult with Investment Program Implementation Unit (IPIU)/DSC on designated disposal areas;

(iii) Install temporary silt traps or sedimentation basins along the drainage leading to the water bodies;

(iv) Place storage areas for fuels and lubricants away from any drainage leading to water bod-ies;

(v) Dispose any wastes generated by construction activities in designated sites; and (vi) Conduct surface quality inspection according to the EMP.

D. Noise Levels (i) Plan activities in consultation with IPIU/DSC so that activities with the greatest potential to

generate noise are conducted during periods of the day which will result in least disturb-ance;

(ii) Require horns not be used unless it is necessary to warn other road users or animals of the vehicle’s approach;

(iii) Minimize noise from construction equipment by using vehicle silencers, fitting jackhammers with noise-reducing mufflers, and portable street barriers the sound impact to surrounding sensitive receptor;

(iv) Measurement of noise level at construction site as per EMP, and (v) Maintain maximum sound levels not exceeding 80 decibels when measured at a distance

of 10 meters or more from the vehicles.

Page 97: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

84

E. Existing Infrastructure and Facilities

(i) Obtain from IPIU/DSC the list of affected utilities and operators; (ii) Prepare a contingency plan to include actions to be done in case of unintentional in

terruption of services.

F. Accessibility (i) Plan transportation routes so that heavy vehicles do not use narrow local roads, except in

the immediate vicinity of delivery sites; (ii) Schedule transport and hauling activities during non-peak hours; (iii) Locate entry and exit points in areas where there is low potential for traffic congestion; (iv) Keep the site free from all unnecessary obstructions; (v) Drive vehicles in a considerate manner; (vi) Coordinate with traffic police/concerned department for temporary road diversions and with

for provision of traffic aids if transportation activities cannot be avoided during peak hours; and

(vii) Notify affected sensitive receptors by providing sign boards informing nature and duration of construction works and contact numbers for concerns and/or complaints.

G. Landscape and Aesthetics

(i) Prepare and implement Waste Management Plan; (ii) Recover used oil and lubricants and reuse or remove from the sites; (iii) Manage solid waste according to the following preference hierarchy: reuse, recycling and

disposal to designated areas; (iv) Remove all wreckage, rubbish, or temporary structures (such as buildings, shelters, and la-

trines) which are no longer required; and (v) Request IPIU/DSC to report in writing that the necessary environmental restoration work

has been adequately performed before acceptance of work.

H. Socio-Economic – Income (i) Leave spaces for access between mounds of soil; (ii) Provide walkways and metal sheets where required to maintain access for people and ve-

hicles; (iii) Increase workforce in front of critical areas such as institutions, place of worship, business

establishment, hospitals, and schools; (iv) Consult businesses and institutions regarding operating hours and factoring this in work

schedules; and (v) Provide sign boards for pedestrians to inform nature and duration of construction works and

contact numbers for concerns and/or complaints.

I. Socio-Economic – Employment

(i) Employ at least 50% of the labor force, or to the maximum extent, local persons within the 2 kilometer immediate area if manpower is available; and

(ii) Secure construction materials from local market.

Page 98: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

85

J. Occupational Health and Safety

(i) Develop and implement site-specific health and safety plan which will include measures such as: (a) excluding public from the site; (b) ensuring all workers are pro-vided with and use Personal Protective Equipment; (c) health and safety training for all site personnel; (d) documented procedures to be followed for all site activities; and (e) documentation of work-related accidents;

(ii) Ensure that qualified first-aid can be provided at all times. Equipped first-aid stations shall be easily accessible throughout the site;

(iii) Provide medical insurance coverage for workers; (iv) Secure all installations from unauthorized intrusion and accident risks; (v) Provide supplies of potable drinking water; (vi) Provide clean eating areas where workers are not exposed to hazardous or noxious

substances; (vii) Provide health and safety orientation training to all new workers to ensure that they are

apprised of the basic site rules of work at the site, personal protective protection, and preventing injuring to fellow workers;

(viii) Provide visitor orientation if visitors to the site can gain access to areas where hazard-ous conditions or substances may be present. Ensure also that visitor/s do not enter hazard areas unescorted;

(ix) Ensure the visibility of workers through their use of high visibility vests when working in or walking through heavy equipment operating areas;

(x) Ensure moving equipment is outfitted with audible back-up alarms; (xi) Mark and provide sign boards for hazardous areas such as energized electrical devic-

es and lines, service rooms housing high voltage equipment, and areas for storage and disposal. Signage shall be in accordance with international standards and be well known to, and easily understood by workers, visitors, and the general public as appro-priate; and

(xii) Disallow worker exposure to noise level greater than 85 decibels for duration of more than 8 hours per day without hearing protection. The use of hearing protection shall be enforced actively.

K. Community Health and Safety

(i) Plan routes to avoid times of peak-pedestrian activities. (ii) Liaise with IPIU/DSC in identifying high-risk areas on route cards/maps. (iii) Maintain regularly the vehicles and use of manufacturer-approved parts to minimize

potentially serious accidents caused by equipment malfunction or premature failure. (iv) Provide road signs and flag persons to warn of dangerous conditions.

L. Work Camps

(i) Consult with IPIU/DSC before locating project offices, sheds, and construction plants; (ii) Minimize removal of vegetation and disallow cutting of trees; (iii) Provide water and sanitation facilities for employees; (iv) Prohibit employees from poaching wildlife and cutting of trees for firewood; (v) Train employees in the storage and handling of materials which can potentially cause

soil contamination;

Page 99: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

86

(vi) Recover used oil and lubricants and reuse or remove from the site; (vii) Manage solid waste according to the following preference hierarchy: reuse, recycling

and disposal to designated areas; (viii) Remove all wreckage, rubbish, or temporary structures (such as buildings, shelters,

and latrines) which are no longer required; and (ix) Request IPIU/DSC to report in writing that the camp has been vacated and restored to

pre-project conditions before acceptance of work. M. Social and Cultural Resources

(i) Strictly follow the protocol for chance finds of any historical remnants in any excavation work;

(ii) Request IPIU/DSC or any authorized person with field training to observe excavation; (iii) Stop work immediately to allow further investigation if any finds are suspected; and (iv) (iv)Inform IPIU/DSC if a find is suspected, and take any action they require ensuring its

removal or protection in site.

Page 100: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

87

Appendix 5 : PHOTOGRAPHS OF SUBPROJECT SITES

33 MLD-STP Site at Saliyar- Ibrahimpur at Roorkee

Construction of SPS at Mahigram

Page 101: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

88

Appendix 6 : Photographs of Public Consultation

Page 102: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

89

Photographs of public consultation at Roorkee

Page 103: Initial Environmental Examination€¦ · loans, sector loans, sector development program loans, loans involving financial intermediaries, and private sector loans. 4. This Initial

90

Appendix-7-