INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: ACS TEXTILES (BANGLADESH) LTD. Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh Assessor: Bureau Veritas Date: 27 May 2014 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/22

Transcript of INITIAL ELECTRICAL ASSESSMENT...

Page 1: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

INITIAL ELECTRICAL ASSESSMENT REPORT(EAR)

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj DhakaBangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/22

Page 2: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/22

Page 3: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

GENERAL INFORMATION

General Information

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Country: Bangladesh

Province: Dhaka

City: Rupgonj

Zip Code: 1464

Audit Duration: 2 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date : 05-31-2014

Final Report Date : 06-29-2014

Are all action items fromprevious assessmentcomplete? :

N/A

Buildings in Complex : There are 13 buildings in the factory premises out of which five are main production buildings and eight areancillary buildings. The buildings are named as: 1) Three story RCC Accessories Building, 2) Single story pre-fabricated Processing shed, 3) Three story pre-fabricated chemical godown shed, 4) Two story pre-fabricatedWeaving Shed Unit-2, 5) Two story RCC utility building with pre-fabricated shed at roof unit-1, 6)Three storyRCC office building, 7) Two story pre-fabricated utility shed unit-2, 8) Three story RCC staff quarter, 9) Singlestory Medical Center, Child Care and pump room pre-fabricated shed, 10) Single story pre-fabricated grey &yarn Shed, 11) Two story pre-fabricated weaving shed unit-1, 12) Two story pre-fabricated warping shed, 13)Two story pre-fabricated towel shed.

Is the building(s) ownedor rented by theFactory?:

Owned

Number of BuildingLevels (Stories) :

Information provided below as per following format: Highest occupied floor level [Height up to roof], Storiesabove grade, Stories below grade, Occupied levels. 1) Accessories Building: 45.92 ft [68.88 ft], 3, 0, 3. 2)Processing shed: 1 ft [14.76 ft], 1, 0, 1. 3) Chemical Godown shed: 45.92 ft [68.88 ft], 3, 0, 3. 4) Weaving ShedUnit-2: 14.76 ft [29.52 ft], 2, 0, 2. 5) Utility building Unit-1: 22.96 ft [32.80 ft], 3, 0, 3. 6) Office building: 45.92 ft[32.80 ft], 3, 0, 3. 7) Utility shed unit-2: 14.76 ft [29.52 ft], 2, 0, 2. 8) Staff quarter: 18.04 ft [36.08 ft], 3, 0, 3. 9)Medical Center shed: 1 ft [10.0 ft], 1, 0, 1. 10) Yarn Shed: 1 ft [14.76 ft], 1, 0, 1. 11) Weaving shed unit-1:14.76 ft [29.52 ft], 2, 0, 2. 12) Warping shed: 14.76 ft [29.52 ft], 2, 0, 2. 13) Towel shed with basement: 11.48 ft[22.96 ft], 2, 1, 3.

Approximate BuildingArea (SF) :

Total area of buildings in the factory premises: 1080054.00 SF. Building wise breakdown as follows: 1) Threestory RCC Accessories Building: 43980.00 SF, 2) Single story pre-fabricated Processing shed: 81000.00 SF,3) Three story pre-fabricated Chemical Godown shed: 24600.00 SF, 4) Two story pre-fabricated Weaving

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/22

Page 4: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Shed Unit-2: 232321.00 SF, 5) Two story RCC utility building with pre-fabricated shed at roof unit-1: 15942.00SF, 6) Three story RCC office building: 30813.00 SF, 7) Two story pre-fabricated utility shed unit-2: 32640.00SF, 8) Three story RCC staff quarter: 45000.00 SF, 9) Single story Medical Center, Child Care and pumproom pre-fabricated shed: 2175.00 SF, 10) Single story pre-fabricated grey & yarn Shed: 72546.00 SF, 11)Two story pre-fabricated weaving shed unit-1: 172000.00 SF, 12) Two story pre-fabricated warping shed:83928.00 SF, 13) Two story pre-fabricated towel shed with basement: 243109.00 SF.

Date of BuildingConstruction :

Factory personnel informed the date of construction as follows: 1) Accessories Building: Started in 2006 andfinished in 2008, 2) Processing shed: Started in 2005 and finished in 2006, 3) Chemical godown shed: Startedin 2007 and finished in 2008, 4) Weaving Shed Unit-2: Finished in 2007, 5) Utility building unit-1: Started in2005 and finished in 2007, 6) Office building: Started in 2006 and finished in 2007, 7) Utility shed unit-2:Started in 2007 and finished in 2009, 8) Staff quarter: Started in 2007 and finished in 2008, 9) Medical Centershed: Started in 2011 and finished in 2012, 10) Grey & yarn Shed: Started in 2011 and finished in 2012, 11)Weaving shed unit-1: Started in 2005 and finished in 2007, 12) Warping shed: Started in 2006 and finished in2007, 13) Towel shed with basement: Started in 2009 and finished in 2012.

Date of Last BuildingRenovation/Addition :

No record for date of building renovation or addition was found from factory personnel.

Ancillary Structures inComplex :

1) Three story RCC Accessories Building, 2) Three story pre-fabricated Chemical Godown shed, 3) Two storyRCC utility building with pre-fabricated shed at roof unit-1, 4) Three story RCC office building, 5) Two storypre-fabricated utility shed unit-2, 6) Three story RCC staff quarter, 7) Single story Medical Center, Child Careand pump room pre-fabricated shed, 8) Single story pre-fabricated grey & yarn Shed.

Approximate AncillaryStructures Area (SF) :

1) Three story RCC Accessories Building: 43980.00 SF (Ground floor: 14660.00 SF, 1st Floor: 14660.00 SF,2nd Floor: 14660.00 SF), 2) Three story pre-fabricated Chemical Godown shed: 24600.00 SF (Ground floor:8200.00 SF, 1st Floor: 8200.00 SF, 2nd floor: 8200.00 SF), 3) Two story RCC utility building with pre-fabricated shed at roof unit-1: 15942.00 SF (Ground floor: 6721.00 SF, 1st floor: 6721.00 SF, 2nd floor area:2500.00 SF), 4) Three story RCC office building: 30813.00 SF (Ground floor: 10271.00 SF, 1st floor: 10271.00SF, 2nd floor: 10271.00 SF), 5) Two story pre-fabricated utility shed unit-2: 32640.00 SF (Ground floor:16320.00 SF, 1st floor: 16320.00 SF), 6) Three story RCC staff quarter: 45000.00 SF (Ground floor: 15000.00SF, 1st Floor: 15000.00 SF, 2nd floor: 15000.00 SF), 7) Single story Medical Center, Child Care and pumproom pre-fabricated shed: 2175.00 SF, 8) Single story pre-fabricated grey & yarn Shed: 72546.00 SF.

Number of Occupants : Total number of occupants: 4883. 1) Three Story RCC Accessories Building: 45, 2) Single story pre-fabricatedProcessing shed: 920, 3) Three story pre-fabricated chemical godown shed: 25, 4) Two story pre-fabricatedWeaving Shed Unit-2: 1230, 5) Two story RCC utility building with pre-fabricated shed at roof unit-1: 14, 6)Three story storied RCC office building: 135, 7) Two story storied pre-fabricated utility shed unit-2: 7, 8) Threestory RCC staff quarter: 79, 9) Single story Medical Center, Child Care and pump room pre-fabricated shed:16, 10) Single story pre-fabricated grey & yarn Shed: 320, 11) Two story pre-fabricated weaving shed unit-1:1320, 12) Two story pre-fabricated warping shed: 225, 13) Two story pre-fabricated towel shed withbasement: 547.

Provide brief descriptionof the electrical systemfor each building.:

33 KV REB feed to a 1500 KVA 33 KV / 0.415 KV Oil type Transformer, Gas Generator 1125 KVA-5, GasGenerator 1175 KVA-1, Gas Generator 1752 KVA-1, Gas Generator 1770 KVA-1, Gas Generator 1330 KVA-3and Gas Generator 1295 KVA-2 connected with 3-phase 4-wire electrical distribution system and Distributionboards.

Physical location ofSubstation? :

Substations are located in Utility Building-1, Utility Building-2, Utility Building-3, Ground Floor.

What equipment/loadsdoes the UPS serve? :

Emergency Light, exit signage and fire alarm system.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/22

Page 5: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/22

Page 6: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

ASSESSMENT FINDINGS

Electrical System Maintenance

Question: Is a periodical Insulation Resistance Measurement Program established andrecorded?

Priority Level: Medium

Non-Compliance Level: 3

Description: No periodical Insulation Resistance Measurement Program has beenestablished.

Source of Findings: Document Review: No periodical Insulation Resistance MeasurementProgram.

Suggested Plan ofAction:

Develop an Insulation Resistance Measurement Program that ensuresdeterioration of insulation resistance will be identified quickly. Testing shouldbe in compliance with International Electrical Testing Association (NETA). Alltransformers, switchgears etc. shall be subject to an insulation resistancemeasurement test to ground after installation but before any wiring isconnected. Insulation tests shall be made between open contacts of circuitbreakers, switches etc. and between each phase and earth.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.13.4 Insulation Tests and 10.13.8Electrical Inspections

Question: Are thermographic scans of electrical equipment completed at least everythree years?

Priority Level: Medium

Non-Compliance Level: 3

Description: Thermographic scans of electrical equipment are not completed.

Source of Findings: Document Review: No thermographic scans for electrical equipment.

Suggested Plan ofAction:

Complete thermographic scans at least on a three year cycle. Thermographicscans should be completed in accordance with the Standard for InfraredInspection of Electrical Systems & Rotating Equipment and NFPA70B or acomparable standard

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Question: Transformers do not contain harmful substances such as PCBs.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/22

Page 7: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Priority Level: Medium

Non-Compliance Level: 3

Description: No documents were found to review, so it cannot be verified if the transformerdoes not contain harmful substances such as PCBs.

Source of Findings: Document Review: Oil test report (containing information of harmfulsubstances such as PCBs) was not found.

Suggested Plan ofAction:

Consider replacing transformer with harmful substances to reduce healthhazards.

Suggested DeadlineDate:

26 Jul 2014

Standard: Not Applicable

Question: A transformer oil analysis is routinely completed on main service transformers.

Priority Level: Low

Non-Compliance Level: 3

Description: Transformer oil analysis is not routinely completed on main servicetransformer.

Source of Findings: Document Review: Transformer oil analysis is not routinely completed.

Suggested Plan ofAction:

Complete an oil analysis on applicable transformers at appropriate intervalsbased on voltage and power.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.13.8 Electrical Inspections

Electrical System Conditions

Question: Are all switchboards and/or distribution boards metal enclosed with a deadfront construction?

Priority Level: High

Non-Compliance Level: 3

Description: Distribution boards are metal enclosed but don't have dead front construction.Location: All distribution boards.

Source of Findings: Photograph: Metal enclosure with no dead front construction.

Suggested Plan ofAction:

Ensure distribution boards are metal enclosed with a dead front construction.

Suggested DeadlineDate:

28 Jun 2014

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/22

Page 8: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Wet type transformers are not leaking and have appropriate levels.

Priority Level: High

Non-Compliance Level: 2

Description: Main incoming transformer is not leaking but the instrument transformer (415V/575 V) used to supply weaving machine is leaking. Oil level is appropriate.Location: Weaving-1, Ground Floor.

Source of Findings: Photograph: Transformer is leaking.

Suggested Plan ofAction:

Ensure that wet type transformer is not leaking and have appropriate oil levels.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.5 Substation

Question: Do switchboards and/or distribution boards have a minimum clearance of 1 m(39 in) in front?

Priority Level: High

Non-Compliance Level: 1

Description: Distribution boards are not provided with adequate clearance. Location: MDB-Warping-4-GF-Weaving-2, BOX-ETP-2-ETP-2nd Floor, BOX-ETP-1-ETP-2ndFloor, MDB-Towel (Sizing/Warping)-GF-Towel Building, SDB-Towel(Mending)-GF-Towel Building, DB-Towel-Dyeing (LDB-1)-GF-Towel Building,MDB-Towel Dyeing-Electrician Room-GF-Towel Building, MDB-IngravingProcessing-GF-Processing Section, DB-PI (Light)-GF-Processing.

Source of Findings: Photograph: Inadequate clearance in front of distribution boards.

Suggested Plan ofAction:

Provide clearance of at least 1 m (39 in) in front of distribution boards.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/22

Page 9: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Question: Switchboards and/or panelboards are not installed above gas stoves or sinksor within 2.5m of any washing unit in washing rooms or laundries.

Priority Level: High

Non-Compliance Level: 1

Description: Switchboards are installed near sinks. Location: General Store-1st Floor-Chemical godown building, Yarn & Fabrics mending.

Source of Findings: Photograph: Switchboard installed in an improper location.

Suggested Plan ofAction:

Ensure switchboards and panel boards are not installed above gas stoves orsinks or within 2.5m of any washing unit in washing rooms or laundries.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: No circuits are drawn for loads without the incorporation of a overcurrentprotection device (circuit breaker).

Priority Level: High

Non-Compliance Level: 1

Description: Circuits are drawn for panel indicators without the incorporation of an overcurrent protection device (circuit breaker). Location: DB-Lighting-2-GF-Weaving-2, DB-Fan-2 (Ist Floor)-Towel Building, MDB-Towel Stitching-1stFloor-Towel Building, DB-Towel (Stitching) (LDB-1)-1st Floor-Towel Building,MDB-WTP-Thermoboiler Room.

Source of Findings: Photograph: No protection device.

Suggested Plan ofAction:

Ensure over an current protection device (circuit breaker) is installed for eachand every load.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.9 Protection of Circuits

Question: Indications of overheating, overloading, or signs of burning were not observed.

Priority Level: High

Non-Compliance Level: 1

Description: Indications of overheating were observed. Location: LT PANEL 2.1 (lower)-GF-Utility-3 (72.9°C), LT PANEL 2.1 (upper)-GF-Utility-3 (76.2°C), MDB-5/3.1-GF-Utility-3 (77.4°C), MDB-Boiler-1-Boiler Room-1-Utility-1 (91.3°C), MDB-GF(8)-GF-Compressor Room-Utility-3 (109.7°C), MDB-GF (6) LEFT-GF-Utility-2-Pump room-1 (78.2°C), Box-Emergency light-GF Weaving-1 (92.5°C), MDB-Sizing (left) – GF-Weaving-2-X-former room (79.8°C).

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/22

Page 10: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Source of Findings: Photograph: Indications of overheating were observed.

Suggested Plan ofAction:

Find out the cause of overheating and take proper action.

Suggested DeadlineDate:

31 May 2014

Standard: Alliance Standard Part 10 Section 10.3.5

Question: Is electrical wiring/cables sized according to capacity of circuit breakers (Nohigher rated circuit breakers with lower rated wiring)?

Priority Level: High

Non-Compliance Level: 1

Description: Electrical wiring and cables are not sized according to capacity of circuitbreakers. Location: DB-GF-4-Weaving-1, DB-10 (GF)-Weaving-1, DB-14-GF-Weaving-1, DB -16-GF-Weaving-1, MDB-Stitching-2-1st Floor-Stitching-2, DB-Lighting-1-1st Floor-Stitching-2, MDB-Ingraving Processing-GF-ProcessingSection.

Source of Findings: Photograph: Higher rated circuit breakers with lower rated wiring.

Suggested Plan ofAction:

Consult with a qualified Electrical Engineer and ensure electrical wiring andcables are sized according to capacity of circuit breakers.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections.

Question: No multi looping of wiring/cables observed at circuit breakers withinswitchboards and/or distribution boards.

Priority Level: High

Non-Compliance Level: 1

Description: Multi looping of cables are observed at circuit breakers & busbar withinswitchboards and distribution boards. Location: DB-Loom-7-GF-Weaving-2,DB-Loom-4-GF-Weaving-2, DB-Loom-3-GF-Weaving-2, DB-Loom-1-GF-Weaving-2, DB-1st-3-Finishing Folder-1st Floor-Stitching-1, BOX-5-1st Floor-Stitching-1, BOX-ETP-3-ETP-2nd Floor, DB Towel Engraving, DB TowelSewing M/C-2, DB Towel Sewing M/C-1-Towel Building.

Source of Findings: Photograph: Multi looping of cables at circuit breakers and busbar.

Suggested Plan ofAction:

Remove multi looping of cables at circuit breakers & busbar withinswitchboards and distribution boards.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/22

Page 11: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Question: All metal in the building is connected to the building earthing/grounding systemsuch as metal rebar in concrete, metal frame of building, or metal water pipe.

Priority Level: High

Non-Compliance Level: 1

Description: Cable tray and MS stair in the building are not connected to the buildingearthing system. Location: Cable Tray-Thermoboiler Room, Generator Room-Utility-1, MS Stair (Beside Fire control room).

Source of Findings: Worker Interviews: Cable tray and MS stair in the building are not connected tothe building earthing system.

Suggested Plan ofAction:

Connect Cable trays and MS stairs to the building earthing system.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.10 Earthing

Question: Light fixtures without protective covers are not installed in storage areas or inany area where the Inspector of the Factories Rules (1.5.3.5) Part 53 disallowsthese fixtures.

Priority Level: High

Non-Compliance Level: 1

Description: Light fixtures without protective covers are installed in storage areas. Location:Accessories Store-GF-Weaving-1, Finished Goods Store-1st Floor-Weaving-1.

Source of Findings: Photograph: Naked light fixtures are installed in storage areas.

Suggested Plan ofAction:

Ensure light fixtures without protective covers are not installed in storage areasor in any area where the Inspector of the Factories Rules (1.5.3.5) Part 53disallows these fixtures.

Suggested DeadlineDate:

31 May 2014

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Wiring systems are selected and erected so that no damage is caused by theingress of water.

Priority Level: High

Non-Compliance Level: 1

Description: Wiring systems are not selected and erected considering the effect of damagecaused by ingress of water. Location: Near ETP drain-1st Floor-ETP Building,Roof Top-Foreign Staff Quarter.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/22

Page 12: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Source of Findings: Photograph: May damage due to ingress of water.

Suggested Plan ofAction:

Ensure wiring systems are selected and erected so that no damage is causedby the ingress of water.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.4.3 Presence of Water

Question: Do switchboards and/or distribution boards have clear identification markings?

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards do not have clear identification markings. Location: Alldistribution boards.

Source of Findings: Photograph: No clear identification markings.

Suggested Plan ofAction:

Ensure clear and permanent identification marks are painted in all distributionboards, switchboards, sub main boards and switches.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.7 BNBC Part 8 Section 2.11.5.4

Question: Do switchboards and/or distribution boards have capacity information labels?

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards do not have capacity information labels. Location: Alldistribution boards.

Source of Findings: Photograph: No DB capacity information labels.

Suggested Plan ofAction:

Provide capacity information labels (Maximum current rating, no of circuitbreakers etc.) for distribution boards.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards And MetalClad Switchgear and 10.13.7 Inspection of the Installation

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/22

Page 13: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Question: Are switchboards and/or distribution boards provided with physical means toprevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed.

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards are not provided with physical means to prevent theinstallation of more over current devices than that number for which the panelboard was designed, rated and listed. Location: All distribution boards.

Source of Findings: Photograph: No means to prevent the installation of more over currentdevices.

Suggested Plan ofAction:

Ensure proper rating for distribution boards and provide physical means toprevent the installation of more over current devices than that number forwhich the panel board is rated.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Power and telecommunication or antenna cables are led in separately.

Priority Level: Medium

Non-Compliance Level: 1

Description: Power and telecommunication cables are not led in separately. Location: ITdepartment-2nd Floor, Marketing-1st Floor, Finance department-Ground Floor,Office building.

Source of Findings: Photograph: Power and telecommunication cables are not separated.

Suggested Plan ofAction:

Lead telecommunication cables separately to the main point of service. Powerand telecommunications cables must have separate entrance.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Are all internal components of switchboards and/or distribution boards properlyconcealed (No missing circuit breaker or knockout covers)?

Priority Level: Medium

Non-Compliance Level: 1

Description: Internal components of switchboards are not properly concealed. Location:Switchboard-1st Floor-Utility-1 Building.

Source of Findings: Photograph: Internal components are not properly concealed.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/22

Page 14: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Suggested Plan ofAction:

Provide covers or blanks to conceal all live internal components ofswitchboards and distribution boards.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.9 Sub-Distribution Boards

Question: Are all switchboards and/or distribution boards properly grounded (earthed)?

Priority Level: Medium

Non-Compliance Level: 1

Description: Distribution boards are not grounded. Location: DB-GF-5-Weaving-1, MDB-Warping-4-GF-Weaving-2, BOX-EL-GF-Weaving-2.

Source of Findings: Photograph: No grounding of distribution boards.

Suggested Plan ofAction:

Provide grounding for switchboards and distribution boards as per BNBCsection 2.8.1.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 10 Section 10.10.2 Circuit and System Earthing

Question: Are switchboards and/or distribution boards free of dust and debris?

Priority Level: Medium

Non-Compliance Level: 1

Description: Distribution boards are not clean. Location: SDB-GF (5.1)-Weaving-1, SDB-GF(5.2)-Weaving-1, DB-Overhead-1-AC Plant-GF-Weaving-2, DB-Overhead-2-AC Plant-GF-Weaving-2 , BOX-ETP-3-ETP-2nd Floor, BOX-ETP-2-ETP-2ndFloor, BOX-ETP-1-ETP-2nd Floor, MDB-ETP-ETP-2nd Floor.

Source of Findings: Photograph: Dirt found in distribution boards.

Suggested Plan ofAction:

Ensure distribution boards free of dirt and debris.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.9.1 Enclosures

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/22

Page 15: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Question: Each circuit is provided with a dedicated neutral.

Priority Level: Medium

Non-Compliance Level: 1

Description: Each circuit is not provided with a dedicated neutral. Location: MDB-GF (5)-Weaving-1, DB-GF (22)-Weaving-1, MDB-GF-1-Weaving-1, DB-GF-1-Weaving-1, MDB-GF-3-Weaving-1, DB-GF-2-Weaving-1, DB-GF-8-Weaving-1, DB-GF-9-Weaving-1, SDB-GF (3)-Weaving-1, DB-GF-13-Weaving-1, DB -17-GF-Weaving-1, DB-GF-17-Weaving-1, SDB-GF (5.1)-Weaving-1, SDB-GF(5.2)-Weaving-1, MDB-Loom-Tx-Room-GF-weaving-2, DB-1st-2-FinishingFolder-1st Floor-Stitching-1, SDB-1-1st Floor-Stitching-1, SDB-2-1st Floor-Stitching-1, BOX-1-1st Floor-Stitching-1, DB-Lighting-2-1st Floor-Stitching-2,DB-Lighting-3-1st Floor-Stitching-2, DB-Lighting-4-1st Floor-Stitching-2, DB-Machine-1-1st Floor-Stitching-2, DB-Machine-2-1st Floor-Stitching-2, DB-Machine-3-1st Floor-Stitching-2, DB-5-Quilting-1st Floor-Stitching-2, SDB-Quilting-1st Floor-Stitching-2, DB-Towel (Sizing/Warping)-GF-Towel Building,MDB-Towel (Lighting)-GF-Towel Building, DB-Towel (Lighting-1)-GF-TowelBuilding, DB-Towel (Lighting-2)-GF-Towel Building, MDB-Towel(Loom-1)-GF-Towel Building, MDB-Towel (Loom-2)-GF-Towel Building, SDB-Towel(Mending)-GF-Towel Building, MDB-Towel-Dyeing-Anglada-GF-Towel Blgd,DB-Towel-Dyeing (LDB-2)-GF-Towel Building, DB-Colour Kitchen (LDB)-GF-Towel Building, MDB-Flat Belt-GF-Towel Building, DB-Flat Belt (LDB-1)-GF-Towel Building, DB-Flat Belt (LDB-2)-GF-Towel Building, DB-Towel(Ingraving)-GF-Towel Building, DB-Towel-Stitching-Office-1st Floor-TowelBuilding, DB-Fan-2 (Ist Floor)-Towel Building, DB-Towel (Stitching)-M/C-3-1stFloor-Towel Building, DB-Processing Ingraving-1-GF-Processing Section.

Source of Findings: Photograph: No dedicated neutral.

Suggested Plan ofAction:

Provide dedicated neutral for each circuit.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3 Electrical Wiring and Cabling

Question: Are electrical wiring/cables properly identified?

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical wiring and cables are not properly identified. Location: DB-11 (GF)-Weaving-1, SDB-Loom-Ground Floor-Weaving-1, MDB-Sizing-Tx Room-GF-Weaving-2, DB-Office-1st Floor-Stitching-2, DB-Towel (Ingraving)-GF-TowelBuilding, DB-PI (Light)-GF-Processing, SDB-Fabrics Godown-Ground Floor.

Source of Findings: Photograph: Electrical wiring and cables are not identified.

Suggested Plan ofAction:

Ensure the means of identification is obtained by separate color coding,marking tape, tagging or other approved means.

Suggested DeadlineDate:

26 Jul 2014

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/22

Page 16: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Standard: Bangladesh Electricity Rules 1937 Rule 51 and 56

Question: Electrical wiring and conduit is properly supported.

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical wiring and conduit is not properly supported. Location: Roof Top-Weaving-1 Building.

Source of Findings: Photograph: Inadequate cable support.

Suggested Plan ofAction:

Provide adequate supports for electrical wiring and conduit.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.2, 10.3.4.3, and 10.3.5

Question: Stranded conductors having a nominal cross-sectional area 6mm2 or greaterare provided with cable sockets. Conductors below 6 mm2 without cablesockets, all strands at the exposed ends are soldered together or are crimpedusing suitable sleeve or ferrules.

Priority Level: Medium

Non-Compliance Level: 1

Description: Cable sockets are not provided for stranded conductors. Location: DB-FireControl Room.

Source of Findings: Photograph: No cable socket used.

Suggested Plan ofAction:

Provide cable sockets for stranded conductors having a nominal cross-sectional area 6 mm2 or greater. For conductors below 6 mm2 without cablesockets, all strands at the exposed ends are soldered together or are crimpedusing suitable sleeve or ferrules.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.8.3 Cable Ends

Question: Cable joints are through porcelain/PVC connectors with PIB tape woundaround joint.

Priority Level: Medium

Non-Compliance Level: 1

Description: Improper cable joints were found. Location: Fire Control Room.

Source of Findings: Photograph: Improper cable joint.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/22

Page 17: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Suggested Plan ofAction:

Ensure cable joints are through porcelain or PVC connectors with PIB tapewound around joint.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.8.4 Cable Joints

Question: Electrical connections at equipment, fixtures, etc are properly secured.

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical connections at equipment are not properly secured. Location: Grey &Yarn Godown-Mending Section.

Source of Findings: Photograph: Electrical connections are not secured.

Suggested Plan ofAction:

Ensure electrical connections at equipment, fixtures etc. are properly secured.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.1 Electrical Connections

Question: Is all electrical wiring/cable properly terminated at its point of termination (Noun-terminated wires, lugs are provided at terminals, etc)?

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical wire is not properly terminated. Location: DB (Old)-Fire ControlRoom.

Source of Findings: Photograph: Un-terminated wire.

Suggested Plan ofAction:

Ensure all electrical wiring properly terminated at its point of termination.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.9.2 Wiring of Sub-distribution Boards

Question: Mechanical guards are provided for electrical equipment and wiring wherenecessary.

Priority Level: Medium

Non-Compliance Level: 1

Description: No mechanical guards are provided for electrical equipment where necessary.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/22

Page 18: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Location: Motor-Ground Floor-Warping-Utility-2 Building, Motor-In Front ofThermo boiler Room, Motor-Ground Floor-Mending Section-Fabrics & YarnStore.

Source of Findings: Photograph: No mechanical guards.

Suggested Plan ofAction:

Provide mechanical guards for electrical equipment where necessary.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling, 10.6.5Cables, and 10.7 Main Switch, Switchboards And Metal Clad Switchgear

Question: Signage indicating the prohibition of light fixtures without protective covers isinstalled at required locations.

Priority Level: Low

Non-Compliance Level: 3

Description: No signage indicating the prohibition of light fixtures without protective coversis installed at required locations. Location: Accessories Store-GF-Weaving-1,Finished Goods Store-1st Floor-Weaving-1, Garments accessories Store-2ndFloor-Weaving-1, Yarn Godown-Basement-Towel Bldg, Chemical Store-Basement-Towel Bldg, Chemical Sub Store-Dyeing-GF-Towel Bldg, WastageGodown-Basement-Towel Bldg.

Source of Findings: Photograph: No signage indicating the prohibition of installation of naked lightfixtures.

Suggested Plan ofAction:

Ensure signage indicating the prohibition of light fixtures without protectivecovers is installed at required locations.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Are electrical insulation mats provided in front of substation, switchboardsand/or distribution boards?

Priority Level: Low

Non-Compliance Level: 1

Description: Electrical insulation mats are not provided in front of switchboards anddistribution boards. Location: DB-GF-21-Weaving-1, MDB-AC Plant-AC Plant-GF-Weaving-2, MDB-Warping-4-GF-Weaving-2, DB-Loom-4-GF-Weaving-2,DB-Lighting-1-GF-Weaving-2, BX-Reed Cleaner-GF-Weaving-2, DB-1/7-1stFloor-Stitching-1, MDB-ETP-2nd Floor.

Source of Findings: Photograph: No mats are provided in front of switchboards and distributionboards.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/22

Page 19: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Suggested Plan ofAction:

Provide electrical insulation mats in front of switchboards and distributionboards.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation.

Question: Phase separators are provided between terminals on circuit breakers.

Priority Level: Low

Non-Compliance Level: 1

Description: Phase separators are not provided between terminals on circuit breakers.Location: MDB-GF (5)-Weaving-1, MDB-GF-1-Weaving-1, DB-GF-1-Weaving-1, DB-GF-2-Weaving-1, DB-GF-5-Weaving-1, DB-11(GF)-Weaving-1, DB-GF-13-Weaving-1, SDB-Loom-Ground Floor-Weaving-1, MDB-AC Plant-AC Plant-GF-Weaving-2, DB-Overhead-1-AC Plant-GF-Weaving-2, DB-Overhead-2-ACPlant-GF-Weaving-2, MDB-Warping-4-GF-Weaving-2, MDB-Sizing-Tx Room-GF-Weaving-2, MDB-Workshop-Tx Room-GF-Weaving-2, MDB-Workshop-Tx-Room-GF-Weaving-2, DB-Loom-7-GF-Weaving-2, DB-Loom-6-GF-Weaving-2,DB-Loom-5-GF-Weaving-2, DB-Loom-4-GF-Weaving-2, DB-Loom-3-GF-Weaving-2, DB-Loom-1-GF-Weaving-2, SDB-2-1st Floor-Stitching-1, SDB-3-1st Floor-Stitching-1, MDB-Stitching-2-1st Floor-Stitching-2, DB-Lighting-1-1stFloor-Stitching-2, DB-Lighting-2-1st Floor-Stitching-2, DB-Lighting-4-1st Floor-Stitching-2, DB-Machine-1-1st Floor-Stitching-2, DB-Machine-2-1st Floor-Stitching-2, DB-Machine-3-1st Floor-Stitching-2, DB-Office-1st Floor-Stitching-2, DB-5-Quilting-1st Floor-Stitching-2, MDB-ETP-ETP-2nd Floor, DB-ChemicalStore-Basement-Towel Building, MDB-Towel (Sizing/Warping)-GF-TowelBuilding, MDB-Towel-Dyeing-Anglada-GF-Towel Bldg, DB-Colour Kitchen(LDB)-GF-Towel Building, DB-Towel (Raising)-GF-Towel Building, MDB-FlatBelt-GF-Towel Building, DB-Towel (Ingraving)-GF-Towel Building, MDB-TowelStitching-1st Floor-Towel Building, DB-Towel (Stitching) (LDB-1)-1st Floor-Towel Building.

Source of Findings: Photograph: No phase separator.

Suggested Plan ofAction:

Install phase separators between terminal connections at the noted locations.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections

Emergency Power System

Question: Is the generator room properly rated and physically separated from theremainder of the building?

Priority Level: High

Non-Compliance Level: 1

Description: The generator room does not have the required fire rating but is physicallyseparated (approximately 4 m gap between two buildings) from the remainder

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/22

Page 20: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

of the building. Location: Utility-2 Building, Ground Floor.

Source of Findings: Photograph: No fire rating for generator room.

Suggested Plan ofAction:

Provide adequate fire rating for generator room.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Are cable trenches properly covered?

Priority Level: High

Non-Compliance Level: 1

Description: Cable trenches are not covered properly. Location: Cable Trench Utility-2Building.

Source of Findings: Photograph: Inadequate cable trench cover

Suggested Plan ofAction:

Provide adequate cover on cable trench.

Suggested DeadlineDate:

28 Jun 2014

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation

Question: Are emergency power switchboards, distribution boards, and circuits properlyidentified?

Priority Level: High

Non-Compliance Level: 1

Description: Emergency power distribution boards are not properly identified. Location: Allemergency distribution boards.

Source of Findings: Photograph: Improper identification of emergency distribution boards.

Suggested Plan ofAction:

Ensure proper identification of all emergency power distribution boards. It maybe color paint or metal sticker permanently affixed with door.

Suggested DeadlineDate:

28 Jun 2014

Standard: NFPA 70 Chapter 7 Article 700.10 Wiring, Emergency System

Question: Are inspection, maintenance, and testing procedures of the UPS beingcompleted and documented?

Priority Level: Low

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/22

Page 21: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Non-Compliance Level: 3

Description: Inspection, maintenance and testing procedures of the IPS are not beingcompleted.

Source of Findings: Visual Assessment: Inspection, maintenance and testing procedures of theIPS are not being completed.

Suggested Plan ofAction:

Establish an inspection testing and maintenance program for theUninterruptible Power Supply (UPS)and/or Instant Power Supply (IPS)associated components. The program must be based on the following: (1)Manufacturer's recommendations (2) Manufacturer's instruction manuals (3)Minimum Requirements of NFPA 111 Chapter 8 (4) Minimum Requirements ofNFPA 70B Chapter 28.

Suggested DeadlineDate:

26 Jul 2014

Standard: Alliance Standard Part 13 Section 13.11 NFPA 111 Chapter 8 NFPA 70BChapter 28

Question: Are inspection, maintenance, and testing procedures of the emergencygenerator being completed and documented?

Priority Level: Low

Non-Compliance Level: 1

Description: Inspection, maintenance and testing procedures of the emergency generatorsare being completed but not documented properly.

Source of Findings: Photograph: Inspection, maintenance and testing procedures of theemergency generators being completed but not documented properly.

Suggested Plan ofAction:

Ensure inspection, maintenance, and testing procedures of the emergencygenerator being completed and properly documented.

Suggested DeadlineDate:

25 Jul 2014

Standard: NFPA 110 Chapter 8

Lightning Protection System

Question: The air termination network vertical and horizontal conductors areappropriately spaced.

Priority Level: Medium

Non-Compliance Level: 3

Description: “As built” electrical drawing (SLD) for the lightning protection system was notavailable to review whether the air termination network vertical conductors areappropriately spaced or not.

Source of Findings: Document Review: No as-built drawing is found.

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/22

Page 22: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/AllianceAuditReports/... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory ... the Bangladesh National

Suggested Plan ofAction:

Consult with an Expert Electrical Engineer and ensure the system is securedagainst lightning.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection

Question: The appropriate number of down conductors are installed based on thebuilding size.

Priority Level: Medium

Non-Compliance Level: 3

Description: The “as built” electrical drawing (SLD) for the lightning protection system wasnot available to review, so appropriate number of down conductors neededcan not be verified.

Source of Findings: Document Review: No as-built drawing was found.

Suggested Plan ofAction:

Consult with an Expert Electrical Engineer and ensure your system is securedagainst lightning.

Suggested DeadlineDate:

12 Jul 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection

Factory Name: ACS TEXTILES (BANGLADESH) LTD.

Address: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/22