IN.gov | The Official Website of the State of Indiana SAFETY... · James McWhorter Citizens Gas...
Transcript of IN.gov | The Official Website of the State of Indiana SAFETY... · James McWhorter Citizens Gas...
STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26.
) ) ) )
APPROVED: AUG 2 1 2019
ORDER OF THE COMMISSION
Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.
The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.
Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is directed to prepare and send notice to the parties advising them of the determination.
Any approved civil penalties are due within 90 days of the date of this Order unless payment arrangements are made with the Secretary of the Commission.
Any approved trainings must be completed no later than 180 days from the date of this Order or the alternative civil penalty noted in the attached recommendation is due.
IT IS SO ORDERED.
HUSTON, FREEMAN, KREVDA, OBER, AND ZIEGNER CONCUR; KREVDA ABSENT:
APPROVED: AUG 2 1 2019
I hereby certify that the above is a true and correct copy of the Order as approved.
~~ MaryM~ Secretary of the Commission
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Comer Contractor, Inc. Sycamore Gas Company 17507 6/18/2019 12/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
. D Damaging Lines D Potholing
· ·□ Dig Tickets □ Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan \
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
Rice Construction LLC (Noblesville) 18593
Date of Advisory Meeting: 6/18/2019 Date of Damage: 7/13/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Temple & Temple Excavating & Paving Midwest Natural Gas Corporation 18933
Date of Advisory Meeting: 6/18/2019 Date of Damage: 8/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
l0- Civil penalty of$ ---=3~...::5"'--0_0 ______________ _ □ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
:V:aughu Isenhower Fivt "S+av- LLC.. Midwest Natural Gas Corporation 18934
Date of Advisory Meeting: 6/18/2019 Date of Damage: 8/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
0,. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
James McWhorter Citizens Gas 19156 6/18/2019 9/21/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
~ Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
0 Dig Tickets □ Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
C:> 1 Respondent: ~Other Party:
Case Number: Date of Advisory Meeting: Date of Damage:
Frederick, Inc. Citizens Gas 19166 6/20/2019 9/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: INDOT Other Party: Case Number:
Northern Indiana Public Service Company 19274
Date of Advisory Meeting: 6/18/2019 Date of Damage: 9/18/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(out)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
. □ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _Y-"-'-', D.....,b:;;...0=-----------------□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
McCrite Milling & Construction Co., Inc. Vectren Energy Delivery
Case Number: 19333 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/3/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
1M Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of$1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Jeff Stone Vectren Energy Delivery 19458 6/18/2019 10/18/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
'5-.Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
D Dig Tickets D Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Holmes Complete Tree Care & Trash Removal LLC Vectren Energy Delivery
Case Number: 19460 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/19/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery M C Communication LLC 19462 6/18/2019 10/20/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D De:lllolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Schutte Excavating Inc. Vectren Energy Delivery 19463 6/18/2019 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
[\, Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Steve Reeves Vectren Energy Delivery 19464 6/18/2019 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
g W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
ft Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Bryan Wolfe Vectren Energy Delivery 19465 6/18/2019 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Cl Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
1i
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Branch Electric LLC 19466 6/18/2019 10/24/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
[R Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Scott Straw Vectren Energy Delivery 19467 6/18/2019 10/24/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
lB.. Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
?le-----
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
Direct Line Communications, Inc. 19468
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
rJ( Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana I Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
F T Kelley & Sons, Inc. Vectren Energy Delivery 19469 6/18/2019 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
!jg., Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery White Construction, Inc. 19470 6/18/2019 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Tom Cain Vectren Energy Delivery 19471 6/18/2019 10/27/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
[lX.._ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
it Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Poindexter Excavating Vectren Energy Delivery 19472 6/18/2019 10/27/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (flpecial instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
0 Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additi'onal civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Grassclips Inc. Vectren Energy Delivery 19473 6/18/2019 10/27/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
D Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
ii Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Leas Concrete Construction Co. LLC Vectren Energy Delivery
Case Number: 19474 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
1K Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Cox Recycling Company LLC Vectren Energy Delivery 19475
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Bowen Engineering Corp. Vectren Energy Delivery 19476 6/18/2019 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Sub-Surface of Indiana, Inc. Vectren Energy Delivery 19477 6/18/2019 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
liG. Civil penalty of$ _5_, _0_Ci)-=------------------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Joe Lundy Vectren Energy Delivery 19478 6/18/2019 10/10/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
True North Landscaping, LLC Vectren Energy Delivery 19479
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
==--
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Excel Services of Kentucky, Inc. Vectren Energy Delivery
Case Number: 19480 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (ppecial instructions:)
D Clearance Zone
D Dam.aging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
[ti(. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Linda Holmstrom Vectren Energy Delivery 19481 6/18/2019 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
g Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Ragle, Inc. Vectren Energy Delivery 19482 6/18/2019 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(other)
Qo(.o.)l\J The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Failure to Plan D Self-Repair D Clearance Zone
D Damaging Lines
D Dig Tickets
□ Potholing
□ Probing
D Using Stakes or Post Hole Diggers
□ White Lining
D Demolitions
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
and corrective
~ Civil penalty of$---=-=-----------------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 19483 6/18/2019 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
Ii. Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Miller
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Temple & Temple Excavating & Paving Midwest Natural Gas Corporation 19484
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
it Civil penalty of$ _3_.,~0_0_-_1C_1 __________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Robert Neises Construction Corp.
Case Number: 19485 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/15/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Lawnscape Site Development
Case Number: 19486 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/16/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Trim-A-Door Corp Other Party: Case Number:
Northern Indiana Public Service Company 19487
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/16/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
K Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: A-1 Services Other Party: Case Number:
Northern Indiana Public Service Company 19488
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/16/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company NIPSCO - Electric
Case Number: 19489 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/16/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Mill Construction Other Party: Case Number:
Northern Indiana Public Service Company 19490
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
5- Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hall Electrical Services LLC Other Party: Case Number:
Northern Indiana Public Service Company 19491
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
iX Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$-----~-----------------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Doolittle Electric, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19492
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
ilJ. Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Rothenberger Co., Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19493
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ __ ~_,_5_00 ________________ _ □ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Bore-It Corp. Other Party: Case Number:
Northern Indiana Public Service Company 19494
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
kl Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Quality Mobile Home Service, LLC Northern Indiana Public Service Company 19495
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: H I S Constructors, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19496
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/17/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
g_ Civil penalty of$ _L/.;..:.,...;;..()(D ________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Fort Wayne City Utilities
Case Number: 19497 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/18/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company C & E Excavating
Case Number: 19498 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/18/2018
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
fl Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company C & E Excavating
Case Number: 19499 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/18/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
R Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Crosby Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19502
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/19/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ __ S___,_1 ___________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Franz Nursery, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19503
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/19/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company B & D Sewer & Backhoe Service
Case Number: 19504 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/19/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
lil Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Sean Cron Other Party: Case Number:
Northern Indiana Public Service Company 19505
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
lSl_ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information: ------------------------
APPROVED: Ben Warren Chairman
ti---
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lawnscape Site Development Other Party: Case Number:
Northern Indiana Public Service Company 19506
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Crosby Excavating, Inc.
Case Number: 19507 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
0 Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
/8!. Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: C & E Excavating Other Party: Case Number:
Northern Indiana Public Service Company 19508
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _'1_1 O_u_U-='--. _______________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
3-D Structural Solutions, Inc . Respondent: . Other Party: Case Number:
Northern Indiana Public Service Company 19509
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
· The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
Ill Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
---::::----,,,, oc:::::::::
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Daniel Graber Other Party: Case Number:
Northern Indiana Public Service Company 19510
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/22/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Fence Masters Inc. DBA Best Security Fence Inc. Northern Indiana Public Service Company 19512
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
L i-k------Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: J L Milling Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19513
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$-----------------,--------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: J L Milling Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19514
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
IA Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Nova Basement Systems Other Party: Case Number:
Northern Indiana Public Service Company 19515
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
K Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
B.Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Cary Davis Other Party: Case Number:
Northern Indiana Public Service Company 19516
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
Kl, Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Gariup Construction Co., Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19517
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/23/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ _:_=>~1-~_~_·\.,,_,_) _________________ _ □ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company City of Garrett
Case Number: 19518 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/24/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
iii Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
zL ll __ c, ___
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Pulver Asphalt Paving, Inc.
Case Number: 19522 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
Kl_ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Cleary Construction Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19523
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Meade Electric Company, Inc.
Case Number: 19524 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Duke Energy Indiana Other Party: Case Number:
Northern Indiana Public Service Company 19526
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
!?.t Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Committee Recommendation to IURC
Respondent: Menno Eicher
Advisory
Other Party: Case Number:
Northern Indiana Public Service Company 19527
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/26/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
00 Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
-tf tJ.__ Ben Warren Chairman
I
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: R J Construction, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19529
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
Rf Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Under£round Plant Protection Advisory Committee Recommendation to IURC
Respondent: !Iliana Lawn Irrigation, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19530
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
l\ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company All Services Electric, Inc.
Case Number: 19531 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/29/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
li; Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Cleary Construction Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19532
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
iQ_ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Infonnation:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Specialties Co. LLC Other Party: Case Number:
Northern Indiana Public Service Company 19533
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
1K. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Justen Cable Construction Other Party: Case Number:
Northern Indiana Public Service Company 19534
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ --"~,::;...,L• Q .... -,.,,cs_1!!>,.·-·-_,,_) _________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Kokosing Construction Co., Inc.
Case Number: 19535 Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions: Selking
Additional Infonnation:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Perkins Septic & Drain Services Other Party: Case Number:
Northern Indiana Public Service Company 19536
Date of Advisory Meeting: 6/18/2019 Date of Damage: 10/30/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
& Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions: Selking
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
27~--
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Chad Brown Other Party: Case Number:
Indiana Natural Gas Corporation 19537
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/16/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ · White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
1,/~--
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery City of Rockport 19538 6/18/2019 10/25/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
.d__ j/__ Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Michael Gourley & Sons Concrete, LLC Vectren Energy Delivery
Case Number: 19542 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/4/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
jl_ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Dashiell Contracting Vectren Energy Delivery 19543 6/18/2019 11/5/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
M C F Construction, Inc. Vectren Energy Delivery 19545 6/18/2019 11/5/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Whalen Construction Co., Inc. Vectren Energy Delivery 19546
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 ciyil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
& Civil penalty of$ _3_, O_cQ ________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 19547 6/18/2019 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
i,. Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Miller
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
T & S Excavating Inc. Vectren Energy Delivery 19548 6/18/2019 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information: -----------------------
APPROVED: Ben Warren ~ Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 19549 6/18/2019 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
cg Civil penalty of$ _5_p_e_'D _______________ _ □ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Miller
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Pike Electric, LLC 19550 6/18/2019 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
ii Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Dutcher Trenching 19551 6/18/2019 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
'( Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Edward & Stephanie Kortman Vectren Energy Delivery 19552
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ CivHpenalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Lineal Contracting 19553 6/18/2019 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
City of Terre Haute Vectren Energy Delivery 19554 6/18/2019 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
A Sign-By-Design, Inc. Vectren Energy Delivery 19555 6/18/2019 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~.. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Telecom Placement, Inc. 19556 6/18/2019 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Infonnation:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
Howard's Home Improvement, Inc. 19557
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
dN-:::::::-----.... Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery E & B Paving, Inc. 19558 6/18/2019 11/10/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Ikes Sewer Service Vectren Energy Delivery 19559 6/18/2019 11/12/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
g Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1;-500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
B & B Plumbing Vectren Energy Delivery 19560 6/18/2019 11/12/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
D Clearance Zone bl Failure to Plan
D Damaging Lines D Potholing
~ Dig Tickets □ Probing
D Demolitions
/i Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery O'Risky Excavating 19561 6/18/2019 11/12/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
□ Training or $5,000 civil penalty if fail to complete training
Ill,. Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ----------------------------Abstentions:
Additional Information:
APPROVED:
------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 19562 6/18/2019 11/13/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Miller
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
B & S Plumbing & Heating Vectren Energy Delivery 19563 6/18/2019 11/14/2018
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
0 Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
EDKCompany Vectren Energy Delivery 19565 6/18/2019 11/14/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
R Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Campbell Excavating 19567 6/18/2019 11/14/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole D1ggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
il Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
L w~--Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Anthony S Campbell Other Party: Case Number:
Indiana Natural Gas Corporation 19571
Date of Advisory Meeting: 6/18/2019 Date of Damage: 12/4/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Kl Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Williams Concrete Citizens Gas 19573 6/18/2019 11/13/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
I( Warning letter (Special instructions:)
I( Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Wilson Water & Sewer Service, Inc. Citizens Gas 19574 6/18/2019 11/12/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(1)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
0.._ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Oak Creek Remodeling Citizens Gas 19575 6/18/2019 11/9/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(1)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
D Clearance Zone ~ Failure to Plan
D Damaging Lines D Potholing
D Dig Tickets D Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training ·
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
D C T Enterprises, Inc. Citizens Gas 19576 6/18/2019 11/9/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
H. Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
Additional Information: -----------------------
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Sub-Surface of Indiana, Inc. Citizens Gas 19577 6/18/2019 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _5_,_0_0_0 _______________ _ □ No ticket escalation - additional civil penalty of $1,000
□ Other --------''----------------------Abstentions: Warren
Additional Information: -----,----------------------
APPROVED:
Vice Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
IS F Signs Citizens Gas 19579 6/18/2019 11/5/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ W aming letter (ppecial instructions:)
~ Clearance Zone
0 Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED: Sc
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
York Brothers Water & Sewer Service Citizens Gas 19580 6/18/2019 11/4/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
\Zl Warning letter (Special instructions:)
Ill Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Oles Engineering Corp. Citizens Gas 19581 6/18/2019 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
R. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
___ , .. -
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Property Pros Land Management LLC Citizens Gas 19583 6/18/2019 11/1/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
(15(" Warning letter (Special instructions:)
e Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Warren
APPROVED:
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
C & HIM Excavating, Inc. Fountaintown-Gas Company, Inc 19584
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/26/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000 I
~ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions:
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Northwest Indiana Fence Co.
Case Number: 19585 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/1/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hipskind Concrete Other Party: Case Number:
Northern Indiana Public Service Company 19588
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ __ S_._00_0 _______________ _ □ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Meade Electric Company, Inc.
Case Number: 19589 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
M Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Bore-It Corp.
Case Number: 19590 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Jerome Conway Other Party: Case Number:
Northern Indiana Public Service Company 19591
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ________ ~--------------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hamstra Builders Other Party: Case Number:
Northern Indiana Public Service Company 19593
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/2/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
18 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
c& No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Cleary Construction Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19594
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/3/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(1)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
1K Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation- additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Mark's Septic Service LLC Other Party: Case Number:
Northern Indiana Public Service Company 19595
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/3/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
t/._
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Bryan Cygan Other Party: Case Number:
Northern Indiana Public Service Company 19596
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/3/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Dan Lonsberry Other Party: Case Number:
Northern Indiana Public Service Company 19597
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/4/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
B.Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Selge Construction Co., Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19598
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/5/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
& Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection · Advisory Committee Recommendation to IURC
Respondent: Hipskind Concrete Other Party: Case Number:
Northern Indiana Public Service Company 19599
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/5/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _5_,_0_0_0 ________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Cedar Rustic Fence Co.
Case Number: 19600 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
l!i Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lawnscape Site Development Other Party: Case Number:
Northern Indiana Public Service Company 19601
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)( eicp,rt:d)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penaity of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _3 ............ ,0 ........ 00=-=----------------
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
w------
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Justen Cable Construction Other Party: Case Number:
Northern Indiana Public Service Company 19603
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ ____,3__,_, -=seQ---""------------------
0 No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Northern Indiana Public Service Company Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
· Abes Plumbing, Inc. 19604 6/18/2019 11/6/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
I! Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
tL JJ __ Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Niblock Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19605
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(1)
The Advisory Committee recommends the following penalty:
D Warning letter (ppecial instructions:)
D Clearance Zone
D Damaging Lines
□ Dig Tickets
D Demolitions
D Failure to Plan
□ Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
!3- Civil penalty of$ _L/,..,.1 ..... D'-d::J _________________ _ □ No ticket escalation - additional civil penalty of $1,000
D Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Nature's Way Landscaping, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 19606
Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/7/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
~ Training or $5,000 civil penalty if fail to complete training
□ Civil penalty of $1,000
□ Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ _____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Sikma Plumbing, Inc.
Case Number: 19607 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
0 Potholing
□ Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
iil'I' Civil penalty of$1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training anc;I corrective action plan
□ Civil penalty of$ ____________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company MWM,Inc.
Case Number: 19608 Date of Advisory Meeting: 6/18/2019 Date of Damage: 11/8/2018
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
□ Probing
□ Self-Repair
D Using Stakes or Post Hole Diggers
□ White Lining
□ Training or $5,000 civil penalty if fail to complete training
il Civil penalty of $1,000
□ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
□ Civil penalty of$ ______________________ _
□ No ticket escalation - additional civil penalty of $1,000
□ Other ---------------------------Abstentions: Selking
Additional Information:
APPROVED:
-----------------------
Ben Warren Chairman