INGA ŠĪRANTE VIAA Zinātnes, pētniecības un inovāciju politikas atbalsta departamenta,...
-
Upload
evangeline-robbins -
Category
Documents
-
view
224 -
download
2
Transcript of INGA ŠĪRANTE VIAA Zinātnes, pētniecības un inovāciju politikas atbalsta departamenta,...
INGA ŠĪRANTEVIAA Zinātnes, pētniecības un inovāciju politikas
atbalsta departamenta,Pētniecības starptautisko
programmu nodaļasVecākā eksperte
Vaļņu iela 1, 3. stāvs (pa kreisi), Rīga, LV-1050, LATVIJATālr.: 67785463, fakss: 67814344
[email protected], www.viaa.gov.lv
Projektu veidi
1. Research & Innovation actionsEU funding rate – 100%Activities aiming to establish new knowledge or explore
the feasibility of a new technology, product, process, service or solution. For this purpose they may include basic and applied research, technology development and integration, testing and validation on a small-scale prototype in a laboratory or simulated environment.
Projektu veidi (1)
• 2.Innovation actionsEU funding rate – 70% (except non-profit, which
are still funded 100%)Activities directly aiming at producing plans and
arrangements or designs for new, altered or improved products, processes or services. For this purpose they may include prototyping, testing, demonstrating, piloting, large-scale product validation and market replication.
Projektu veidi (2)
• 3.Coordination & support actionsEU funding rate – 100%Accompanying measures such as
standardisation, dissemination, awareness-raising and communication, networking, coordination or support services, policy dialogues and mutual learning exercises and studies.
Projektu izmaksu kategorijas• A. direct personnel costs;• B. direct costs of subcontracting (including related duties, taxes and charges such
as non-deductible value added tax (VAT) paid by the beneficiary)• D. other direct costs;• Travel costs and related subsistence allowances• Depreciation costs of equipment, infrastructure or other assets• Costs of other goods and services (including related duties, taxes and charges such
as non-deductible value added tax (VAT) paid by the beneficiary.• E. indirect costs;• Indirect costs are eligible if they are declared on the basis of the flat-rate of 25%
of the• eligible direct costs from which are excluded:• (a) costs of subcontracting [and][;]• (b) costs of in-kind contributions provided by third parties which are not used on
the beneficiary’s premises.
Projektu finansu plūsma
• -one pre-financing payment (pre-financing payment to the coordinator within 30 days from the starting date of the action)
• - one or more interim payments, on the basis of the request(s) for interim payment (Limit to 90% of the maximum grant amount)
- one payment of the balance, on the basis of the request for payment of the balance
• ‘Guarantee Fund’-5%;
Projektu atskaites (elektroniski)
• Reporting period (1-18; 1-12; 1-24)• Coordinator must submit a periodic report
within 60 days following the end of each reporting period.
• final summary financial statement (EUR)• a ‘certificate on the financial statements’
total contribution of EUR 325 000 or more, as reimbursement of actual cost and unit costs calculated on the basis of its usual cost accounting practices.
TWINNING
CALL FOR TWINNINGH2020-TWINN-2015Opening Date: 02-07-2014Deadline Date: 07-05-2015 17:00:00 (Brussels
local time)Budget€65,270,000Informācija Interneta vietnē:
http://ec.europa.eu/research/participants/portal/desktop/en/opportunities/h2020/topics/6064-h2020-twinn-2015.html#tab1
Topic description• Specific challenge: The specific challenge is to
address networking gaps and deficiencies between the research institutions of the low performing Member States and regions and internationally-leading counterparts at EU level. Driven by the quest for excellence, research intensive institutions tend to collaborate increasingly in closed groups, producing a crowding-out effect for a large number of promising institutions. This is the challenge that a specific Twinning action will try to address.
Topic descriptionExpected impact: There will be a measurable and significant
improvement in the overall scientific and innovation capacity of the initiating institution in a particular field of research through linking with research intensive counterpart institutions in other Member States and thereby expect positive impacts on the overall research and innovation potential of the Member State or the region the initiating institution is located in. Such improvement could be measured through an increase of peer-reviewed publications, increased impact factors in terms of citations etc.
Impact indicators should reflect an increase in relative terms based on the situation before the project compared to the projected situation immediately after the project is completed, as well as within the foreseeable future after completion. These indicators are important for determining the potential regional and national impact, as well as long-term sustainability and viability of the beneficiary organisations.
CALL Documents
• Legal basis - Framework Programme H2020 en • Legal basis - Rules for Participation en • Legal basis - Specific Programme H2020 en • WP H2020 - 1. Introduction en • WP H2020 - 15. Spreading excellence and
widening participation en • WP H2020 - 19. General Annexes en • Frequently Asked Questions (FAQs) and info on
KPI Twinning 2015_updated version EN en
Noderīgākās atbildesWhat is the minimum, typical and maximum duration of each project?A Twinning project is foreseen to last for up to 3 years.
Category: Cost EligibilityFor general information and clarifications on cost eligibility in H2020,
potential applicants can check the Annotated Model Grant Agreement (MGA) that can be found on the participant portal in the link below: http://ec.europa.eu/research/participants/data/ref/h2020/grants_manual/amga/h2020-amga_en.pdf
What sort of costs could be charged to a project by an internationally-leading (advanced) partner?
Costs for exchanges of personnel, travel allowances and costs associated with the provision of expertise are some of the typical costs that could be claimed by internationally-leading (advanced) partners under a Twinning project.
Noderīgas atbildes• What is the expected duration of short-term staff
exchanges and/or expert visits? Are they limited to a few weeks? A few months?
• There is no pre-defined duration for short term staff exchanges or expert visits. They should however, add value to the project and they should last for a reasonable timeframe of a few weeks or a few months; more than 9 months would probably be considered as too long
Kādas valstis var pieteikt projektu konkursā
Based on the above threshold, applicant organisations from the following Member States24 will be eligible to submit proposals: Bulgaria, Croatia, Cyprus, Czech Republic,Estonia, Hungary, Latvia, Lithuania, Luxembourg, Malta, Poland, Portugal, Romania, Slovakia and Slovenia.
Projekta dalības nosacījumi
Twinning proposals must involve a minimum of three participants:
a. The applicant organisation must satisfy the condition set out in point 1 above, and must be the coordinator of the proposal.
b. At least two internationally-leading research intensive counterparts established in at least two different Member States other than that of the applicant organisation.
Plānojamās projekta aktivitātes • short term staff exchanges; • expert visits and short-term on-site or virtual
training;• workshops; • conference attendance; • organisation of joint summer school type activities; • dissemination and outreach activities;• MG- management.
Aktivitātes, kuras neplānot
• Twinning activities will provide no support to infrastructure and equipment;
(Costs for consumables as well as software related to the training and subscription fees to online services, may be eligible, however this does not apply to equipment (PCs, or laptops) or infrastructure. No consumables will be reimbursed for research activities.)
• no support for hiring new permanent research staff. • Costs for research activities are not eligible.
Projekta pieteikuma kopapjoms
• The Commission considers that proposals requesting a contribution from the EU of EUR 1 million, would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Projekta veids un EK finansējuma likme • Coordination and support actions • Funding rate: 100%
Laika plānojums
- Indicative timetable for evaluation and grant agreement: Information on the outcome of the evaluation (single stage) Indicative date for the signing of grant agreements H2020-TWINN-2015
Maximum 5 months from the final date for submission
Maximum3 months from the date of informing applicants
Projekta pieteikuma veidlapa• http://ec.europa.eu/research/participants/
data/ref/h2020/call_ptef/pt/h2020-call-pt-ria-ia-csa_en.pdf
Table 3.4b ‘Other direct cost’ items (travel, equipment, infrastructure, goods and services, large research infrastructure)
• Please complete the table below for each participant if the sum of the costs for’ travel’, ‘equipment’, and ‘goods and services’ exceeds 15% of the personnel costs for that participant (according to the budget table in section 3 of the proposal administrative forms).
H2020 H2020 for Subcontractorsfor SubcontractorsH2020 H2020 for Subcontractorsfor Subcontractors
European CommissionEuropean Commission
Co-ordinatorCo-ordinator
Partner 1Partner 1
Partner 2Partner 2
Partner 3Partner 3
Partner nPartner n
Con
sort
ium
Agr
eem
ent
Con
sort
ium
Agr
eem
ent
ContractContract
SubcontractSubcontract
PERT CHARTPERT CHART
WP1Co-ordination and Project Management
Workpackage Leader: 1Partners: All
WP1Co-ordination and Project Management
Workpackage Leader: 1Partners: All
WP6XXXXX
Workpackage Leader: 5Partners: All
WP6XXXXX
Workpackage Leader: 5Partners: All
WP2XXXXX
Workpackage Leader: 3Partners: 1,2,4
WP2XXXXX
Workpackage Leader: 3Partners: 1,2,4
WP3XXXXX
Workpackage Leader: 2Partners: 3,4,5
WP3XXXXX
Workpackage Leader: 2Partners: 3,4,5
WP4XXXXXX
Workpackage Leader: 1Partners: 2,3
WP4XXXXXX
Workpackage Leader: 1Partners: 2,3
WP5XXXXX
Workpackage Leader: 3Partners: 1,2,4
WP5XXXXX
Workpackage Leader: 3Partners: 1,2,4
Smart Specialisation platform• http://s3platform.jrc.ec.europa.eu/regions/LV
Smart Specialisation PlatformDescription Capabilities Target Markets EU Priorities
Smart Energy 1. Energy production & distribution
1. Energy production & distribution
1. Sustainable innovation2. Sustainable energy & renewables
Smart materials, technology and engineering.
1. Manufacturing & industry2. Other manufacturing
1. Services2. Architectural & engineering activities, technical testing & analysis
1. KETs2. Advanced materials
Biomedicine. medical technologies and biotechnology.
1. Manufacturing & industry2. Basic pharmaceutical products & pharmaceutical preparations
1. Manufacturing & industry2. Basic pharmaceutical products & pharmaceutical preparations
1. KETs2. Industrial biotechnology
Knowledge intensive bio-economy
1. Manufacturing & industry2. Biotechnology
1. Manufacturing & industry2. Biotechnology
1. KETs2. Industrial biotechnology
Advanced ICT 1. Information & communication technologies (ICT)
1. Information & communication technologies (ICT)
1. Digital Agenda
Noderīgas Interneta vietnes• http://ec.europa.eu/research/participants/
portal/desktop/en/funding/reference_docs.html#h2020-grants-manual-amga
• http://ec.europa.eu/research/participants/docs/h2020-funding-guide/grants/applying-for-funding/register-an-organisation/registration-of-organisation_en.htm
• PIC LATVIJAS UNIVERSITATE 999871830
• LATVIJAS UNIVERSITATE• RIGA, LV • VAT : LV90000076669 • VALIDATED • PIC999871830