Infrastructure Information Permits Department - dewa.gov.ae

4
Safety Precautions/Conditions to be Observed by the Consultants/Contractors Electricity Application Projects NOC Section, Tel. No. 043221615 Ext. 21615, Fax. No. 043072239 Infrastructure Information & Permits Department كھرباء ھيئة دبي ومياه.ب. ص564 دبي- ھاتف، المتحدة العربيةراتما ا44 44 324 04 فاكس، 11 81 324 04 كھرباء: برقيا، - : تلكس، دبي45838 إم إي كھرباءDubai Electricity & Water Authority PO Box 564 DubaiUAE,Tel 04 324 44 44,Fax 04 324 81 11 Cable KAHRABADubai,Tlx 45838 Kahraba EM [email protected],www.dewa.gov.ae Version: 5/2015 NOC Document Conditions 1. All works carried out under the ROW or DEWA reservation should be done as per DEWA standard. 2. The contractor should comply with precautions/conditions stated by DEWA on the drawings and GIS sheet. 3. NOC is valid for 6 months only, it must be revalidated within 2 weeks before expiry. 4. Completion certificate to be obtained from DEWA within 1 month from the date of work completion. 5. Original NOC with drawings should be available at site (all times). 6. The locations of DEWA(ED) services marked on the enclosed drawings are approximate. The contractor should excavate by hand to locate the existing services before undertaking construction activity in the vicinity of the cables. 7. DEWA reserves the right to stop work if necessary or all NOC conditions not fulfilled. 8. Any DEWA services located at the site, which is not marked in the NOC shall be notified to DEWA. These services will be also considered part of DEWA network and damage to them will be charged according to regulations. 9. As Built drawing, showing DEWA services should be submitted for DEWA approval. 10. Cables shutdown required for diversion work should be limited to low load period during 1 November to 31 March. 11. Any changes required on the approved NOC due to site conditions, revised drawings should be resubmitted to Infrastructure Information & Permits Department for approval. Coordination Conditions (Refer to the below mentioned table) 1. It is essential that the concerned contractor give a minimum of 3 working days in advance written intimation with exact location and area map, before starting any work near existing cables. 2. As massive amount of earth works are involved during drainage works, all backfilling works intimated one day in advance to enable us to check our services and give clearance for backfilling. 3. After exposing the cables, the contractor should contact DEWA(ED), necessary instructions for protection of DEWA(ED) cables to be given to him at site after checking their scope of works, which affects our cables. 4. If the contractor experience difficulty in locating DEWA(ED) services, he should contact DEWA(ED) for assistance. 5. The contractor /consultant are advised to liaise with any contractor/consultant who is/will be engaged with other project of DEWA within the area of subject project, and agree on a schedule to facilitate both contractors to work simultaneously. The contractor shall not object to DEWA’s contractor working within their area. Any delay in releasing the NOC certificate and schedule of work to DEWA will automatically lead to the withdrawal of this NOC. 6. Responsible Engineer/supervisor should be available at site while working close to DEWA (ED) services. 7. Access to be provided to DEWA staff or authorized contractor for cable laying works in the project area. If access is denied to carry out the works, the DEWA NOC will be withdrawn. 8. For working during the holidays, contractor should submit their work schedule to DEWA. 9. For any work below/close to OHL should be fulltime supervised by the competent safety inspector. 10. Any incident happened at site/unsafe situation of existing services, contractor should stop the work and inform the concerned department immediately. Permission and Supervision Conditions 1. All excavation in the vicinity of 33/11/6.6 KV cables should be done manually under DEWA’s supervision. 2. No existing cable joints are to be supported without DEWA(ED) supervision. 3. Excavation/Leveling work shall not be carried out in the vicinity of DEWA(ED) services without prior permission from DEWA. 4. Backfilling shall be carried out as per DEWA(ED) standard specifications and under the supervision of DEWA. 5. For any excavation in the vicinity of DEWA substation/structure/towers, the proposal must be referred to DEWA for approval in writing and all such works shall be done under supervision of DEWA. 6. The contractor shall locate DEWA(ED) services and obtain prior permissions from the consultant and DEWA for using Pickaxe, Steel Rod and Drilling Machine in the Vicinity of DEWA (ED) services. 7. DEWA(ED) services shall not be removed/relocated/shifted/sleeved without DEWA permission. 8. All the existing cables crossing or passing parallel the trenches must be properly protected; any protection for DEWA existing services should be approved by DEWA(ED) before starting the work Protection and Safety Conditions 1. No machine excavation shall be carried out in the vicinity of DEWA(ED) services. All such excavation should be done manually. 2. The cables should be adequately supported during excavation. 3. All exposed cable to be properly protected and barricaded with safety cones and mesh. 4. All the existing cables crossing or passing parallel the trenches must be properly protected. 5. Danger sign to be placed all along the cable route. 6. Proposed equipments/foundations should not be placed over the existing cables. 7. Tower earthing system at underground shall not be damaged. 8. Safety measures and precautions to be taken by contractor to safeguard cables at his own cost and will be liable for any damage. 9. While working high boom vehicles/equipments, specified safe clearance to be ascertained & maintained from OHL. 10. Crash barriers to be installed to protect the tower if the proximity is less than 25/40 meters to the secondary/main road edges. 11. Temporary height limit barriers to be installed, incase vehicles and equipments required to pass/approach the OHL. Site Conditions 1. Existing HV cables should not be kept under the proposed carriageway. 2. Foundation, porta cabin or any other materials dumping over HV cables routes and blocking access to DEWA substation entrance are not allowed. 3. Trial pits to be taken manually (Only hand shovel) under supervision of Distribution Maintenance and Transmission Maintenance staff only. 4. Contractor’s representative has to prepare trial pits details at site. Page: 1 of 4

Transcript of Infrastructure Information Permits Department - dewa.gov.ae

Page 1: Infrastructure Information Permits Department - dewa.gov.ae

    

Safety Precautions/Conditions to be Observed by the Consultants/Contractors 

 

Electricity Application ‐ Projects NOC Section, Tel. No. 04‐3221615 Ext. 21615, Fax. No. 04‐3072239

Infrastructure Information & Permits Department

كھرباء إي إم 45838دبي ، تلكس: -، برقيا :كھرباء 04 324 81 11، فاكس 04 324 44 44الإمارات العربية المتحدة ، ھاتف -دبي 564ص.ب. ومياه دبيھيئة كھرباء Dubai Electricity & Water Authority PO Box 564 Dubai‐UAE,Tel 04 324 44 44,Fax 04 324 81 11 Cable KAHRABA‐Dubai,Tlx 45838 Kahraba EM                                                                                                   [email protected],www.dewa.gov.ae Version: 5/2015 

   NOC Document Conditions 

1. All works carried out under the ROW or DEWA reservation should be done as per DEWA standard. 2. The contractor should comply with precautions/conditions stated by DEWA on the drawings and GIS 

sheet. 3. NOC is valid for 6 months only, it must be revalidated within 2 weeks before expiry. 4. Completion certificate to be obtained from DEWA within 1 month from the date of work completion. 5. Original NOC with drawings should be available at site (all times). 6. The locations of DEWA(ED) services marked on the enclosed drawings are approximate. The contractor 

should excavate by hand to locate the existing services before undertaking construction activity in the vicinity of the cables. 

7. DEWA reserves the right to stop work if necessary or all NOC conditions not fulfilled. 8. Any DEWA services  located at the site, which  is not marked  in the NOC shall be notified to DEWA. 

These services will be also considered part of DEWA network and damage to them will be charged according to regulations. 

9. As Built drawing, showing DEWA services should be submitted for DEWA approval. 10. Cables shutdown required for diversion work should be limited to low load period during 1 November 

to 31 March. 11. Any  changes  required  on  the  approved  NOC  due  to  site  conditions,  revised  drawings  should  be 

resubmitted to Infrastructure Information & Permits Department for approval. 

Coordination Conditions (Refer to the below mentioned table) 

1. It  is essential that the concerned contractor give a minimum of 3 working days  in advance written intimation with exact location and area map, before starting any work near existing cables. 

2. As massive amount of earth works are involved during drainage works, all backfilling works intimated one day in advance to enable us to check our services and give clearance for backfilling. 

3. After  exposing  the  cables,  the  contractor  should  contact  DEWA(ED),  necessary  instructions  for protection of DEWA(ED) cables to be given to him at site after checking their scope of works, which affects our cables. 

4. If the contractor experience difficulty in locating DEWA(ED) services, he should contact DEWA(ED) for assistance. 

5. The contractor /consultant are advised to liaise with any contractor/consultant who is/will be engaged with other project of DEWA within the area of subject project, and agree on a schedule to facilitate both  contractors  to  work  simultaneously.  The  contractor  shall  not  object  to  DEWA’s  contractor working within their area. Any delay in releasing the NOC certificate and schedule of work to DEWA will automatically lead to the withdrawal of this NOC. 

6. Responsible Engineer/supervisor should be available at site while working close to DEWA (ED) services. 7. Access to be provided to DEWA staff or authorized contractor for cable  laying works  in the project 

area. If access is denied to carry out the works, the DEWA NOC will be withdrawn. 8. For working during the holidays, contractor should submit their work schedule to DEWA. 9. For any work below/close to OHL should be fulltime supervised by the competent safety inspector. 10. Any incident happened at site/unsafe situation of existing services, contractor should stop the work 

and inform the concerned department immediately.  

 

  

Permission and Supervision Conditions  

1. All  excavation  in  the  vicinity  of  33/11/6.6  KV  cables  should  be  done  manually  under  DEWA’s supervision. 

2. No existing cable joints are to be supported without DEWA(ED) supervision. 3. Excavation/Leveling work shall not be carried out in the vicinity of DEWA(ED) services without prior 

permission from DEWA. 4. Backfilling shall be carried out as per DEWA(ED) standard specifications and under the supervision of 

DEWA. 5. For any excavation in the vicinity of DEWA substation/structure/towers, the proposal must be referred 

to DEWA for approval in writing and all such works shall be done under supervision of DEWA. 6. The contractor shall locate DEWA(ED) services and obtain prior permissions from the consultant and 

DEWA for using Pickaxe, Steel Rod and Drilling Machine in the Vicinity of DEWA (ED) services. 7. DEWA(ED) services shall not be removed/relocated/shifted/sleeved without DEWA permission. 8. All  the  existing  cables  crossing  or  passing  parallel  the  trenches must  be  properly  protected;  any 

protection for DEWA existing services should be approved by DEWA(ED) before starting the work 

Protection and Safety Conditions 

1. No machine excavation shall be carried out in the vicinity of DEWA(ED) services. All such excavation should be done manually. 

2. The cables should be adequately supported during excavation. 3. All exposed cable to be properly protected and barricaded with safety cones and mesh. 4. All the existing cables crossing or passing parallel the trenches must be properly protected. 5. Danger sign to be placed all along the cable route. 6. Proposed equipments/foundations should not be placed over the existing cables. 7. Tower earthing system at underground shall not be damaged. 8. Safety measures and precautions to be taken by contractor to safeguard cables at his own cost and 

will be liable for any damage. 9. While  working  high  boom  vehicles/equipments,  specified  safe  clearance  to  be  ascertained  & 

maintained from OHL. 10. Crash barriers to be  installed to protect the tower  if the proximity  is  less than 25/40 meters to the 

secondary/main road edges. 11. Temporary  height  limit  barriers  to  be  installed,  incase  vehicles  and  equipments  required  to 

pass/approach the OHL. 

Site Conditions 

1. Existing HV cables should not be kept under the proposed carriageway. 2. Foundation, porta cabin or any other materials dumping over HV cables routes and blocking access to 

DEWA substation entrance are not allowed. 3. Trial pits to be taken manually (Only hand shovel) under supervision of Distribution Maintenance and 

Transmission Maintenance staff only. 4. Contractor’s representative has to prepare trial pits details at site. 

 

 

Page:  1 of 4 

Page 2: Infrastructure Information Permits Department - dewa.gov.ae

    

Safety Precautions/Conditions to be Observed by the Consultants/Contractors 

 

Electricity Application ‐ Projects NOC Section, Tel. No. 04‐3221615 Ext. 21615, Fax. No. 04‐3072239

Infrastructure Information & Permits Department

كھرباء إي إم 45838دبي ، تلكس: -، برقيا :كھرباء 04 324 81 11، فاكس 04 324 44 44الإمارات العربية المتحدة ، ھاتف -دبي 564ص.ب. ومياه دبيھيئة كھرباء Dubai Electricity & Water Authority PO Box 564 Dubai‐UAE,Tel 04 324 44 44,Fax 04 324 81 11 Cable KAHRABA‐Dubai,Tlx 45838 Kahraba EM                                                                                                   [email protected],www.dewa.gov.ae Version: 5/2015 

 

5. Trial Pits checked/verified have to be backfilled within 24 hours for major roads and 48 hours for local roads. 

6. After backfilling of trial pits, sign board/route marker should be installed showing numbers, types & depth of the cable. 

7. Cable Detector should be available all  the  time during while working  in  the vicinity of DEWA  (ED) services. 

8. The reinstatement of existing cables shall be in accordance with DEWA’s procedures including use of back filling dune sand. 

9. DEWA(ED) reserves the right to open/excavate in the proposed area for any maintenance work or to lay new cables. 

10. DEWA will not be responsible for the reinstatement of special tiles, stones, marbles, bushes, plants, etc. Party can reinstate same as before at their own cost. DEWA can reinstate with normal available tiles only. 

11. Paving work in the proposed area should be done after completion of laying of the proposed cables shown on the NOC drawings. 

12. As far as possible contractor should restrict their excavation to their corridor. 13. The cover required for cables is 900mm from finished level. 14. Our existing underground cables are approximately 0.9 meter deep from the existing ground level. If 

the existing ground  level to be raised /lowered due to the proposed earth  filling/ramps/steps, the existing cable should be raised /lowered accordingly to maintain the standard depth of our cables, which is 0.9 meter from the finished level. 

15. Minimum clearance of other services such as cables, pipes, ducts etc. to be 1 meter away & 0.5 meter above or below. 

16. The access road shall not be disturbed or blocked. 17. Any poles/structures erected in the vicinity of OHL should have adequately falling distance and clear 

of OHL. 18. No plantation inside DEWA corridor. 19. Finished  road  level should have a minimum vertical clearance of 9 meters  from 33 KV  lines and 7 

meters from 11/6.6 KV lines. 20. DEWA access road along the line not to be used disturbed or damaged. 21. No excavation digging is allowed within 5 meters of tower legs and 3 meters from the pole. 22. NO F.O. cables or manhole shall be constructed in DEWA(ED) corridor, otherwise the F.O. cables or 

manhole have to be shifted on your cost. 23. Asphalt work within the Sikka is not permitted. 

Duct Conditions 

1. Existing ducts should not be damaged /blocked and should be left in perfect useable condition after completion of road construction. 

2. Any damages of DEWA(ED) ducts during the course of work, damaged ducts should be replaced by newly set of ducts. 

3. For buried DEWA HV & LV cables that affected by proposed road crossing, a spare duct and split duct shall be provided adjacent to the HV/LV cables. (Based on number of cables). 

4. Proposed ducts to be laid in two layers only. 5. Size of ducts should be 150mm diameter as per B.S. standard. 

    

  

6. Existing spare ducts to be extended to the proposed road widening /crossing area, if not possible new spare ducts (end to end) to be provided and maintain minimum 1.0 m. either side of the proposed road edge. 

7. Any work related to ducts should be carried out under DEWA supervision. 8. If existing empty DEWA HV ducts are affected, the same have to be extended and to be inspected by 

DEWA Engineer before backfilling. 9. The existing used ducts have to be extended with split ducts and concrete surround , spare ducts to 

be provided based on number of ducts affected in case the existing ducts are blocked due to extension of ducts.(without any financial cost to DEWA) the work should be inspected by DEWA engineer before backfilling. 

Diversion Conditions 

1. For diversion of the cables, minimum 150mm clearance to be maintained in between the cables. 2. All existing cables likely to come under the carriage way of new asphalt area have to be diverted in 

DEWA Corridor. The civil work  for exposing  the existing cable and  to provide a new  trench at  the proposed location of the cable shall be provided by the road’s contractor. 

400/132 KV Cable Conditions 

1. This N.O.C. is not a blanket permission to start the work. 2. Prior intimation to be given to DEWA at least 3 working days in advance by fax No. 04 3229095 and 

confirmed on telephone Nos. 04 3221547/3227929 3. Original/copy of the NOC drawings(s) approved by DEWA TLM Dept. must be available at the work site 

(within the vicinity of cable area) throughout,  including trial pit verified drawing (s) and method of statement. Sub‐contractor is not allowed to work in the vicinity of DEWA’s 132kV Power/FO/Pilot cable Route without prior approval from DEWA TLM. 

4. Responsible engineer/supervisor should be available at site while working close to DEWA ED services. 5. Safety measures & precaution to be taken by contractor to safe guard cables at his own cost and will 

be  liable  for any damage as per  local Act  .2/94, and action will be taken against contractor as per violation(s) /black point (s). 

6. Safety regulations pertaining to works in the vicinity of DEWA services to be complied with. 7. Trial holes to be taken by hand excavation in presence of DEWA personnel prior to commencement of 

the project to identify/confirm clearance of services marked in the approved NOC and the presence of any more  existing  cables  not marked, which  needs  to  be  identified/verified  by  TLMD  staff. After backfilling of trial pits temporary signboard should be installed showing numbers types and depth of cables. 

8. Existing 132Kv cable route within the vicinity of the proposed working area to be barricaded and fix danger signboard before starting the work at site. 

9. Any machinery, construction equipment / excavator / Vehicles Etc. not allowed to work / move or park over the cable route and use of heavy vibratory compaction is prohibited. If any particular locations are required to cross over the cables, that area to be protected and separate NOC to be obtained for the crossing area. 

10. Cable corridor should not be enclosed by fence and if the corridor is inside boundary of project area, then it should not be used as a storage, site offices Etc.     

Page:  2 of 4 

Page 3: Infrastructure Information Permits Department - dewa.gov.ae

    

Safety Precautions/Conditions to be Observed by the Consultants/Contractors 

 

Electricity Application ‐ Projects NOC Section, Tel. No. 04‐3221615 Ext. 21615, Fax. No. 04‐3072239

Infrastructure Information & Permits Department

كھرباء إي إم 45838دبي ، تلكس: -، برقيا :كھرباء 04 324 81 11، فاكس 04 324 44 44الإمارات العربية المتحدة ، ھاتف -دبي 564ص.ب. ومياه دبيھيئة كھرباء Dubai Electricity & Water Authority PO Box 564 Dubai‐UAE,Tel 04 324 44 44,Fax 04 324 81 11 Cable KAHRABA‐Dubai,Tlx 45838 Kahraba EM                                                                                                   [email protected],www.dewa.gov.ae Version: 5/2015 

   

11. No construction of road or services where joints & link boxes exit and joint bay access to be available at all times. If any activity within this area, separate NOC to be obtained. 

12. Any construction/structures  in DEWA corridor,  i.e. other utility services, manholes, gullies etc. are prohibited. 

13. Any streetlight poles, crash barriers, road signboards, excessive filling on cable corridor are prohibited. Only grass/shrubs allowed in cable corridor. Trees should be 5.0 m. away. 

14. Minimum clearances of services such as cables, pipes and ducts etc. to be 1 (one) Meter away and 500 mm above/below and no services lay on top of the troughs. 

15. DEWA reserves the right to excavate the garden/grass/tiled area and road without intimation in case of emergency. Owners for tiling/gardening/landscaping work etc. should give an undertaking before commencement of the work. NOC in this regard to be obtained. 

16. Protection, backfilling etc. as specified on NOC drawing /Method of statement/site instruction to be carried out under DEWA TLMD supervision. 

17. All crossings of 132 kV cable and passing parallel required separate cross section. Sections, protection & method of  statement  in  this  regard  to be approved by DEWA  in advance. No  crossing allowed over/under the cable joint /link box. 

18. Micro tunneling / Thrust boring / Directional drilling should have a minimum vertical clearance of 2.0m from  the bottom of  the  cable/trough and  the horizontal  clearance of 2.0m  from  the edge of  the cable/trough to the entry/exit pit. . Drilling profile to be approved by DEWA TLMD. 

19. Micro tunneling /Thrust boring / Directional drilling / Piling will be approved only after all the services and  clearances  have  been  identified  and  verified with  coordinates. Method  statement  and  shop drawing to be approved by DEWA before execution of the work. Drilling location to be ensured as per the  approved  profile  and  coordinates  before  starting  the  work  by  Transmission  Line  Patrolling supervisor. 

20. Shifting/slewing or exposing of cables will not be permitted without NOC explicit written permission. 21. Existing  cables  coming  under  the  proposed  roads  crossing  area  shall  be  provided  with  suitable 

protection  along with  spare  ducts  and  temporary  road  constructed  on  top  of  cables  have  to  be removed once use is over. 

22. Road shoulders should be marked with concrete blocks showing cable positions when  road works involved and tiled area to be provided with flush marker. 

23. Route markers should not be displaced / destroyed (will be charged) and to be replaced / reinstated in the same place/position after completion of the works with the pole or flush type & tiled area to be provided with the flush type marker. 

24. As built drawing showing cable positions, in relation to the permanent structures or land marks to be provided after finishing the project. 

25. All works to be carried out in presence of DEWA Personnel during normal DEWA working hours. Any deviation to be agreed in writing in advance. 

26. No high‐pressure pipe joint under/close to the cable. Surrounding Steel Sleeve to be extended both sides of the cable depending upon the diameter of the pipeline, which is to be approved by DEWA. 

27. The party who obtained the NOC from DEWA is only allowed to work at site. 28. Clearance from retaining wall/piling/pillar etc. to be 2.0m away from the cable/trough. The works to 

be carried out after identify the cable/trough with coordinates by TLMD cable staff. 29. Existing cables/Trough coming under / along the proposed road to be diverted and abandoned portion 

of the cable/trough to be removed. Steel protection barrier to be provided for Link boxes in the vicinity of Road. 

30. Existing spare ducts to be extended to the proposed road widening /crossing area, if not possible new spare ducts (end to end) to be provided and maintain minimum 1.0 m. either side of the proposed road edge.  

   

31. Any  deep  excavation  close  proximity  of  the  cable/trough  should  be  provided  with  steel  sheet piling/protection with de‐watering  arrangement  along  the  cable  route,  after providing method of statement. 

32. For proposed 400/132 kV cable installation/diversion/ loop in/out, Minimum 100m. Clearance to be required from the existing nearest cable joint location to the proposed cable joint location, if not the proposed cables to be connected to the nearest existing cable joint. 

33. If any cable circuits energized in the proposed working area before completion of the work and during the validity of the NOC, separate NOC to be obtained for completing the remaining work. 

34. After obtaining general NOC  for  the project,  separate NOC  to be obtained  for  the utility  services installation/diversions/plantations/tiling/piling/drilling/street lighting &signal foundation works etc., which are not shown on the project NOC drawings. 

35. Entrance to DEWA substation and access to DEWA corridor should not be blocked for the proposed project/work by any means temporary or permanently. 

36. Proposed  protection  for  the  cable/trough,  Pipelines,  sleeve  extensions,  new  spare  ducts,  Duct extensions to be confirmed and verified by TLMD cable staff during/completing the particular works (before  backfilling  the  area)  and  the  verified  details  to  be  submitted  along  with  the  As  built drawing/completion certificate 

37. The  working  personnel/site  agent  is  liable  to  receive  any  stop  work  notice  issued  by  DEWA representative  and  stop  the work  immediately.  Failure  to  do  so will  be  considered  as  a  serious violation. 

38. Contractor conveys to DEWA after completion of all works and clearance certificate is to be obtained accordingly in 45 days, which shall not to be issued if relevant conditions are not met. 

39. This NOC is valid for 6 months only, should be revalidated within 15 days before expiry. 40. DEWA reserves the right to stop the work, review/suspend/cancel the NOC in case of any violation of 

the above conditions or other violations noticed and any emergency arises. 

400/132 KV OHL Conditions 

1. This NOC is not a blanket permission to start work. 2. Prior intimation to be given to DEWA at least 3 working days in advance by Fax No. 04‐3229095 and to 

be confirmed by Telephone 04‐3221547/3227929. 3. Original/Copy of the NOC drawing(s) approved by DEWA TLMD must be made available at the work 

site. (Within the vicinity of the OHL area) including OHL clearance verified drawing (s) and method of statement. Sub‐contractor is not allowed to work without prior approval from DEWA TLM. 

4. Contractor should depute capable Engineer/supervisory staff at all times during the work near DEWA OHL services. Also full time supervision by a competent safety inspector from contractor to be ensured for any work below/close to OHL. 

5. Safety measures and precaution to be taken by contractor to safe guard the OHL network at their own cost and will be liable for any damages as per local act.2/94, and action will be taken against contractor as per violation(s) /black point (s). 

6. No  construction  activity  is  allowed within  the  reserved  corridor  of DEWA  (Road  crossings, Utility services crossing may be allowed with a valid NOC.) 

7. Any excavation / digging/drilling/tunneling are not allowed within 5 meters of tower legs. 8. Any heavy machinery, vehicle or other equipment are not allowed to park under/near the overhead 

line.    

Page:  3 of 4 

Page 4: Infrastructure Information Permits Department - dewa.gov.ae

    

Safety Precautions/Conditions to be Observed by the Consultants/Contractors 

 

Electricity Application ‐ Projects NOC Section, Tel. No. 04‐3221615 Ext. 21615, Fax. No. 04‐3072239

Infrastructure Information & Permits Department

كھرباء إي إم 45838دبي ، تلكس: -، برقيا :كھرباء 04 324 81 11، فاكس 04 324 44 44الإمارات العربية المتحدة ، ھاتف -دبي 564ص.ب. ومياه دبيھيئة كھرباء Dubai Electricity & Water Authority PO Box 564 Dubai‐UAE,Tel 04 324 44 44,Fax 04 324 81 11 Cable KAHRABA‐Dubai,Tlx 45838 Kahraba EM                                                                                                   [email protected],www.dewa.gov.ae Version: 5/2015  Page: 4 of 4 

   

9. Finished road level should have a minimum vertical clearance of 16.5/15 meters for 400/132KV lines respectively and the same clearances to be confirmed with TLP Personnel, before staring the work, during the construction and after completion of the work. 

10. The contractor should fully comply with the agreed protection measures for existing OHLs, method of statement, safety clearances and restriction/limitation if use of equipment. 

11. Any OHL located at the site, which is not marked in the NOC shall be notified to DEWA.  This OHL will also be considered a part of our network and damage to this OHL will be charged according to the regulation. 

12. Crash barriers to be  installed to protect the tower  if the proximity  is  less than 25/40 meters to the secondary / main road edges. 

13. DEWA access road along the line not to be disturbed or damaged. 14. Tower earthling system at underground shall not be damaged. 15. Any plantation/trees not allowed inside DEWA OHL corridor. 16. Temporary height limit gantry to be installed, incase vehicles and equipment require to pass/ approach 

the OHLs 17. As installed drawing showing OHL to be submitted for DEWA approval. 18. The party who obtained the NOC from DEWA only allowed to doing the work at site. 

       

   

 

    

  

19. If any new 400/132Kv OHL energized in the proposed working area before completion of the work or any changes on the approved NOC drawing during the validity of the original NOC, a separate NOC obtained for the affected area. Otherwise the work will be stopped. 

20. Any poles/structure erected  in  the vicinity of O/H  line should have minimum      falling clearance of 6.0/5.0 meters for 400/132KV lines respectively. 

21. All works to be carried out in presence of DEWA personnel during the day time only (Normal DEWA working hours) Any deviation to be agreed in writing in advance. No any activity allowed during the night. 

22. The working personnel/site agent must be  liable  to  receive any stop work notice  issued by DEWA representative and stop the work immediately. Failure to do so will be considered as a serious violation and DEWA will take a legal action against the violators. 

23. Contractor conveys to DEWA after completion of all works and clearance certificate is to be obtained accordingly in 45 days, which shall not to be issued if relevant conditions are not met. 

24. NOC valid for 6 months only, should be re‐validated within 15 days before expiry. 25. DEWA reserves the right to stop the work/ review / suspend / cancel NOC if any violations of the above 

conditions are noticed or due to arising OHL System emergency. 

 

 

 

 

 

 

 

 

 

No.  Department/Section  Purpose  Email Address  Telephone No.  Fax No. 1.  Transmission Line Maintenance  Supervision work for existing & diversion of 132KV & 400 KV cable & OHL  [email protected]  04-3221493/3221547  - 2.  Project Transmission  Laying 132KV & 400KV cable/substation  [email protected] 04-3221778 - 3.  Distribution Maintenance  Supervision work for protection of 6.6KV,11KV & 33KV cable & OHL  [email protected]  04-3227494/3227410 -

4. Project Execution ‐ Distribution Project Planning 

Supervision work for diversion of existing 6.6KV, 11KV & 33KV cable and DEWA‐ED duct.  [email protected]  04-3227956 - 

5.  NOC & GIS ‐ Connection Services  Low Voltage Cable  [email protected] 04-5066131 04-3229094

6. Projects Execution ‐ Distribution Projects Execution  Laying 6.6KV,11KV & 33KV cable  [email protected]  04-3227190 - 

During the course of works if damages are caused to DEWA services, the concerned contractor will be liable for action as per Law No. 6/2015 Government of Dubai concerning “Protection of the General Network of Electricity and Water Services”. The concerned contractor should take extreme care & ensure safety of  the  services  to  avoid any  consequential punitive action.  It  is obligatory  that  the  contractor  immediately  informs our Complaints  Section on Tel.No.991 of any damages, suspect or actual. 

For any further clarifications/queries, please contact our following officials: