Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST...
-
Upload
kaitlyn-ashby -
Category
Documents
-
view
217 -
download
0
Transcript of Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST...
![Page 1: Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.](https://reader036.fdocuments.net/reader036/viewer/2022062511/5513ed5555034674748b5a40/html5/thumbnails/1.jpg)
![Page 2: Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.](https://reader036.fdocuments.net/reader036/viewer/2022062511/5513ed5555034674748b5a40/html5/thumbnails/2.jpg)
Info Requirement Model
OPERATIONS PLANNINGDESIGNCONSTRUCTION
E S D A CE S D A C E S D A C E S D A C2
1 1 1
2 2
2
1 = MUST HAVEFOREWARD PASS
BACKWARD PASS= NICE TO HAVE
(If Low Impact Cost)
![Page 3: Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.](https://reader036.fdocuments.net/reader036/viewer/2022062511/5513ed5555034674748b5a40/html5/thumbnails/3.jpg)
CONSTRUCTIONESTIMATING SCHEDULING DOC MGMT ANALYSIS COORDINATION
Quantity Take-offs
ROM Estimating
Detailed Estimating
Constructability Reviews
Site Planning
4-D Scheduling3D Shop Drawing
ReviewQuantity Take-offs
4-D Project Phasing
4-D Tenant Phasing
4-D Construction Sequencing
COORDINATION
3D MEP Coordination
3D Design Coordination
Digital Fabrication
3D Laser Scanning
3D As-Built
Project Progress(% Complete)
Emergency Evacuation Plan
LEED Rating Analysis
3D As-Built
Energy / LightingAnalysis
Form Work Design
O & M Training
O & M Manuals
![Page 4: Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.](https://reader036.fdocuments.net/reader036/viewer/2022062511/5513ed5555034674748b5a40/html5/thumbnails/4.jpg)
CONSTRUCTIONESTIMATING SCHEDULING DOC MGMT ANALYSIS COORDINATION
Quantity Take-offs
ROM Estimating
Detailed Estimating
Constructability Reviews
Site Planning
4-D Scheduling3D Shop Drawing
ReviewQuantity Take-offs
4-D Project Phasing
4-D Tenant Phasing
4-D Construction Sequencing
COORDINATION
3D MEP Coordination
3D Design Coordination
Digital Fabrication
3D Laser Scanning
3D As-Built
Project Progress(% Complete)
Emergency Evacuation Plan
LEED Rating Analysis
3D As-Built
Energy / LightingAnalysis
Form Work Design
O & M Training
O & M Manuals
![Page 5: Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.](https://reader036.fdocuments.net/reader036/viewer/2022062511/5513ed5555034674748b5a40/html5/thumbnails/5.jpg)
Detailed Estimating
Models Required
Model Level of Detail
Competencies
Information