Industrializing the Building Construction Process
Dr. Mohamed Al-HusseinEmail: [email protected]
1
A Real Solution
Residential Construction Material Waste Minimization
Wood, 24%
Drywall, 11%
Cardboard, 38%
Masonry, 1%
Metals, 4%
Other, 22%
(by volume)
EMISSIONS ANALYSIS: ON-SITE CONSTRUCTION CO2 EMISSIONStage Description co2 (kg)
1 Stake Out 232 Deep Services & Foundation Walls 22573 Backfill & Shallow Trenching 9264 Capping Shallow Services 10575 Framing Main & Second Joists 4826 Framing Second & Roof 7787 Roofing 5148 Siding & Rough-Ins 3819 Electrical RI & Slabs 34410 Insulation & Boarding 56211 Drywall Taping & Texture 42012 Stage 1 Finishing & Cabinets 16713 Railing & Painting 76314 Tile & Vinyl Flooring 32615 Hardwood & Stage 2 Finishing 27016 Carpet & Finals 32617 Touch-Ups & Pre-Occupancy 311
Total 9908
0 500 1000 1500 2000 2500
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
23%
4
CO2 Emissions from Transportation and Crew Trips
TasksDuration
(hr)Material Trips Crew Trips CO2 (kg)
Load Drywall 2 1 5t truck 46.4Drywall Boarding
32 5t picker 40.5 truck
54.4
Materialcu.yd/
1000 sq.ft.tonnes/
1000 sq.ft
Wood 6.0 0.73Gypsum 1.1 0.27Metal - -Concr./Asph. 0.04 0.05Cardboard 2.4 0.05Other 0.5 0.14
Total 10.04 1.24
Residential Low-rise
24kg of CO2 per kg of manufactured drywall1
8.64MJ/Kg of manufactured drywall2
0.76 kg CO2/sf of manufactured drywall3
5
The cost of weather protection & scaffolding
Building 4-times
Replacing 7-Studnet dorms bungalows
With 5- each is 3-story in one summer
The challenge is how to assemble on site these 5 3-story each in 10-working days
7
June 15
10
Other level of industrialization & its
Application
12
Today’s Technical Challenges
Drafting For Manufacturing (DFM)Lean Manufacturing
BIM ModelingBeyond BIM
Supporting Tools
13
Industrialization creates new requirements for designCurrent Drafting software Does NOT support the
manufacturing
14
ALGORITHM ANALYSIS: FRAMEX
• 3D Model
• Floor plan
45,000 + lines of Code
CUTEX: 2D-OPTIMIZATION
0
0minJj
j
0)'( mM
Tm ),,,,,( '1
11
01
23
1
23
1(%)
iii
ii
An
SW
Sheets Residual
Non-Guillotine cutting
Gilmore-Gomory
Cutting pattern
Possible cuts
Cutting pattern vector
Waste
Guillotine cutting
CUTEX: 2D-OPTIMIZATION (CON)
Waste : 2.4%
Beyond BIM: Lifting Scenario
19
Scenario 1Kullman Arrangement
one building @ a time(1-Building in 2- days)
-Background Color –one day of operation-Box – module number, sequence, Advance-Present-A, B, B1 – spots for module lifting-PB1 – place building 1
20
What is happening in Europe
21
22