Industrialised Building System Project
Transcript of Industrialised Building System Project
PROPOSED DESIGN, CONSTRUCTION AND COMPLETION
OF 548 UNITS GOVERNMENT APARTMENTS AT
PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA
PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target
Surau 1 Storey
LAYOUT PLAN
Block E
Block D
Block C
Block B
Dewan 2 Storey
Car Park 1
Car Park 3
Car Park 2
Block A
IBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTSIBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTS
Page 4
C 19 122
B 19 122
BLOCKS STOREYSUNITS
D 18 115E 16 74
TOTAL 548
Others: Car Parks 3 nos.(660 parking bays)
Substations 3 nos. Landscape Infrastructures
BLOCK A
BLOCK E
BLOCK D
BLOCK C
BLOCK B
DEWANSURAU
PERSPECTIVE
NA 18 115
IBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTSIBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTS
Page 5
PRECASTAPARTMENTS• 2nd Floor to 17th Floor• Structural precast walls• Precast hollowcore slab• Non-structural precast wall panels• Precast staircases• Blockwork infill wall
CAST-IN-SITUAMENITIES AND M&E ROOMS• Ground and first floor• Cast-in situ 250mm thk rc shear
wall • Blockwork infill• 2nd Floor• Cast-in situ slab
Precast
Cast-in Situ
IBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUTIBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUT
Page 6
Page 7
(Cont’d)IBS: IBS: TYPICAL UNITTYPICAL UNITIBS: IBS: TYPICAL UNITTYPICAL UNIT
Unit Size -9.0m X 14.4m (1,200 sqf) 3 Bedrooms• Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m)1 Kitchen (4.2m X 3.5m)1 Store (1.3m x 1.5m)2 BathroomsDry Yard
Page 8
IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)
Page 9
IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)
Page 10
(Cont’d)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)
Page 11
(Cont’d)IBS: IBS: DELIVERY SECTION DELIVERY SECTION IBS: IBS: DELIVERY SECTION DELIVERY SECTION
Page 12
(Cont’d)IBS: IBS: INSTALLATION SECTIONINSTALLATION SECTIONIBS: IBS: INSTALLATION SECTIONINSTALLATION SECTION
Page 13
(Cont’d)IBS: IBS: Construction of Joints and SupportConstruction of Joints and SupportIBS: IBS: Construction of Joints and SupportConstruction of Joints and Support
Overall progress on 28 June 2009
Block E on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block D on 28 June 2009
Block C on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block B on 28 June 2009
Block A on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Page 18
(Cont’d)IBS: IBS: MOCK-UP UNITMOCK-UP UNITIBS: IBS: MOCK-UP UNITMOCK-UP UNIT