Industrial risk: main issues(Scira Menoni, Politecnico di Milano)
![Page 2: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/2.jpg)
A relevant problem of planning is that everything has to be done so quickly .…
My experience is that the overall time of design and implementation is shorter if there is enough time to think to the entire project
(M. Andersson, Swedish Railway Adm.)
![Page 3: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/3.jpg)
Air pollution/toxic cloud
Groundwater contamination/toxic release
Accidents menacing people, houses, infrastructures
Contamination of neighborhoods, rural areas…
![Page 4: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/4.jpg)
Chemical riskChemical risk
Severe accident
* Sudden* Acute effects* Explosion/fires/release * Accident during hazmat transportation
Contamination
* Delayed* Long term effects* Chronic/degenerative effects
![Page 5: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/5.jpg)
![Page 6: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/6.jpg)
Contamination risk: Contamination risk: epidemiological studiesepidemiological studies
Hazard
* Toxic substances
* Context conditions must be considered: geological, metereological…
Exposure and vulnerability
* Exposure factors
* Individual susceptibility (cancerogenic markers)
![Page 7: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/7.jpg)
Reference legislation in the EUReference legislation in the EU
1. Seveso Directive II: 96/82/CEE
2. Seveso Directive III: 2003/105/EC
3. D.lgs 334/1999 eD.lgs 238/2005
4. DM 151, 9/5/2001
![Page 8: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/8.jpg)
Seveso Directive II: 96/82/CEE e DGL 334/1999;Seveso Directive II: 96/82/CEE e DGL 334/1999;Seveso Directive III: Seveso Directive III: 2003/105/EC 2003/105/EC e e Dlgs 238/2005Dlgs 238/2005
• Safety management and policy in the firm
• Control over land uses• Right to be informed• External emergency plan
![Page 9: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/9.jpg)
Classification of plantsClassification of plants
* Plants subject to safety report
* Plants subject to notification only
![Page 10: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/10.jpg)
Difference between probabilistic risk analysis and scenario approach
Probabilistic risk analysis R= H* V*E
Scenarios:choosing a specific event and its characteristics
1
D = f( y, V) d(y)
0
HAZARD INPUT
Hazard Vulnerabity
Risk
![Page 11: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/11.jpg)
P1 P2 P3
A way to bring scenario approaches closer to probabilistic risk assessment
(PRA)
HAZARD INPUT
HAZARD INPUT
HAZARD INPUT
![Page 12: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/12.jpg)
Hazard analysis:Hazard analysis:
- probability of each - probability of each scenario;scenario;
- Analysis of types of - Analysis of types of failures in the plantfailures in the plant
- Chain of failures- Chain of failures
![Page 13: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/13.jpg)
Vulnerability assessment:Vulnerability assessment:
-Other plants (domino effects);Other plants (domino effects);
- lifelines (domino effects);lifelines (domino effects);
- transportation networks;transportation networks;
![Page 14: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/14.jpg)
Vulnerability assessment:Vulnerability assessment:
- - Public buildings;Public buildings;
- Dwellings;- Dwellings;
- Population- Population
![Page 15: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/15.jpg)
Differences between Seveso I and IIDifferences between Seveso I and II
Seveso I• Need to make
hazardous installations safer (inspection, technical devices)
• Internal emergency plan
• Citizens’ right to Citizens’ right to knowknow
Seveso II Seveso 1 +• Safety policy in the
plant• Focus from inside to
outside:- Domino effects;- Land use planning- External
emergencyplants
![Page 16: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/16.jpg)
![Page 17: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/17.jpg)
and: hazmat transportation. A future directive?and: hazmat transportation. A future directive?
![Page 18: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/18.jpg)
![Page 19: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/19.jpg)
![Page 20: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/20.jpg)
![Page 21: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/21.jpg)
7.000450.000
8.000.000
60.000135.000
10.000
850.000
2.200
550.000
2,5
5.700.000
1.500.000
0
1.000.000
2.000.000
3.000.000
4.000.000
5.000.000
6.000.000
7.000.000
8.000.000
ADR 1 ADR 2 ADR 3 ADR4.1
ADR4.2
ADR4.3
ADR5.1
ADR5.2
ADR6.1
ADR6.2
ADR 8 ADR 9
Quantità (t/a) movimentate per Classe Adr
![Page 22: Industrial risk: main issues (Scira Menoni, Politecnico di Milano)](https://reader035.fdocuments.net/reader035/viewer/2022062719/5681316a550346895d97e1f5/html5/thumbnails/22.jpg)
And last but not least: brownfield cleaning And last but not least: brownfield cleaning up (DM 447/1999)up (DM 447/1999)