INDUSTRIAL ENERGY EFFICIENCY PROJECT CASE...
Transcript of INDUSTRIAL ENERGY EFFICIENCY PROJECT CASE...
INDUSTRIAL ENERGY EFFICIENCY
PROJECT CASE STUDIES
SUSTAINABILITY CONFERENCE 2014
Faith Mkhacwa: Regional Project Manager B Eng., MBL, EnMS Expert (UNIDO)
UNIDO EnMS Programme Operational in 13 countries
on-going & planned activities in more than 30 countries
Operational
South Africa Moldova Russia Turkey Iran Malaysia
Thailand Vietnam Philippines Egypt Indonesia Ecuador
Total UNIDO Funds Total Co-Funding Total Project Funding
US$ 58M US$ 456M US$ 514M
Implementation Highlights
Company
kWh Savings Comments 2011/12 2012/13
ArcelorMittal Saldanha
81 325 527 92 676 882
No/low cost investments.
Toyota SA 4 484 533 11 131 462 73 Projects; Compressed Air, Lighting, Pumps, etc..
Gelvenor Textiles
996 670 996 670 3 projects; switched off generator & chillers and fitted VSD’s to 9 circulation fans.
Saint-Gobain Construction Products
917 916 917 916 Combustion efficiency improvement, lighting, compressed air, water gauge.
87 724 646 105 722 930
EnMS Implementation Outcomes
Company kWh Savings Energy Systems
Mercedes Benz 1 400 000 Compressed Air System
Kraft Foods 2 915 912 pF, Lighting, idle machines
PPC Cement PE 51 531 Axial sampling of grinding media
Tenneco Emission Control 301 564 Lighting
Tenneco Ride Control 1 181 844 Oven, Knives, Induction Geyser, VSD
Willard Batteries 2 817 649 Curing time, wet scrubbers, chargers
Distell – Adam Tas Winery 298 554 Lighting, Compressors
Sappi Cape Kraft 184 722 Peak clipping
Polyoak Packaging CT 194 400 Lighting retrofit
BMW 8 850 000 Paintshop ovens, driers
Consol Glass - Wadeville 2 084 392 Lighting, Compressor
ACSA Durban 393 148 Lighting
Feltex 1 305 804 Cooling, Comp , Lights, idle Mach
Richards Bay Minerals 3 919 687 Pumps, Compressed Air, Lighting
Total 25 899 207
Energy Management Standard
ISO 50001
• Purpose: Enable organizations to establish systems and processes necessary to
improve energy performance
• Applicable to all organizations
• Does NOT prescribe specific performance criteria with respect to energy
Source: SWEDAC
Other ISO Standards Different standards → All critical → One CANNOT replace the other
Energy
Management
ISO 50001
Environmental
Management
ISO 14000
Quality Management
ISO
9001
Other Management Systems
Tenneco Ride Control & Emission Control
ISO 50001 Certified!!!
Intervention Capital Cost
ZAR
Savings
ZAR
Energy saving
Compressed air systems
Compressed air optimisation
R 1 023 265.30 R 425 595 766 305 kWh
Lighting initiatives
Factory, Offices, Sensors, Daylight Harvesting
R 1 076 695.40 R 780 131.49 926 064 kWh
Paint shop burner submersion tube R 35 000 R 16 284 15 366 kWh
Automatic metering.
Electricity, LPG, Shielding gas weight
R 149 011 - Better energy
management.
New Chrome Planting oven R 750 000 R 634 508 829 444 kWh
Power Factor correction at Tenneco – Emission Control. To be
done at Tenneco - Ride Control
R 69 079 R 142 776 127 kVA
Procedures – Shutdown, SEU training - - Better energy
management.
TOTAL R 3 103 050.70 R 1 999 294.49 2 537 179 kWh
Energy Systems Optimisation
(ESO)
Component Approach Systems Approach
- Segregate components - Analyse performance of each in isolation
- Look at how the entire group functions together
- How will changing one impact the other?
May result from education by a specific technology sales engineer (e.g.: VSD or steam trap)
More knowledge of system and its interactions required
2-5% efficiency gains on the total energy consumption
10-50% average efficiency gains
Shifting FOCUS from Component optimization to systems
optimization!!!
ESO Implementation Victories
Company Energy System Savings Comments
Annualized
Rhodes Foods Group-Franchhoek
Steam R881 794 0.2 year payback (Not implemented)
Da Gama Textiles Steam R9 267 000 2.3 year payback (Implementation underway)
SAB Maltings Steam R6 603 028 1.0 year payback (Started system optimisation)
Arcelor Mittal-Saldanha Works
Pump R1 108 851 Cooling system Pump throttle settings changed.
Impala Platinum Pump R285 205 Switching off cooling system pump and fan.
Kraft Foods Electricity R223, 304 Switching off idle machines. Savings over shutdown.
R18 369 182
Techniplate- Silverton, Pretoria
Implementation Statistics Implementation Detail and Actions
Trigger: Plating tanks- temperature variations, excessive temp and excessive energy usage Energy Savings : • 19.3% or 421 344kWh/annum • 23.5% or R172 751/annum Investment Cost: R46 200 Payback Period: 4 months
* Better process control → Better products.
Background: Temperature was manually controlled on plating tanks • Average of 6°C higher than required=
4.4kWh
Optimisation Detail: Temperature controller & Energy Meter installed (42 tanks in total)
Measurement and Data Analysis: Manual vs Auto control resulted in • 4.7°C hotter tank temperature. • Higher variability • Higher energy consumption as per
temperature profile.
Precision Press - Cape Town
Energy Reduction Opportunity
Capital Cost (ZAR )
Savings per annum (ZAR )
Payback Months
Environmental Benefit per annum
Switching-off electrical equipment hydro-boils, lights & motors (presses) when not in use)
793.20
37,699
0.25
55,000 kWh
Compressed air (leak tagging, awareness & sustainable system)
0 28,566
- 62 100 kWh
TOTAL R 793.20
R 66,265
0.14 117 100 kWh
UNIDO Training
1 day Awareness Workshop
Target Group:
Process engineers, Energy consultants, Equipment vendors and Service providers.
Objective:
To buy into EnMS, ESO and the IEE project
2 day Users Training
Target Group:
Process engineers, Energy consultants, Equipment vendors and Service providers.
Objective:
To share in-depth technical information on undertaking system energy assessment
Experts Training
Target Group:
EE consultants, ESCO’s, Specialists and others
Objective:
Experts that deliver energy performance improvements and best practices that are sustainable
Elements, Target Groups and Objectives
Some of the participating companies