INDUSTRI 4 - · PDF fileIndustri 4.0 & Pasokan Energi Era wireless & digital telah...
date post
14-Mar-2019Category
Documents
view
216download
0
Embed Size (px)
Transcript of INDUSTRI 4 - · PDF fileIndustri 4.0 & Pasokan Energi Era wireless & digital telah...
INDUSTRI 4.0 PELUANG & TANTANGAN INDUSTRI ENERGI
Batu, 5 Oktober 2017
Industri 4.0 & Pasokan Energi
Era wireless & digital telah merubah pola kehidupan masyarakat: memperluas networking &
konektivitas yang membutuhkan supplay energi/listrik lebih banyak & berkelanjutan.
Pengetahuan
Baru
Cara Baru Objek Baru Teknologi
Baru
Penemuan
Baru
I N O V A S I
Lingkungan
Bisnis:
Internet of Thing
(IoT) yang makin
berkembang.
Era digitalisasi
Otomasi &
remote sensing
Rational
Impact
Cost effektif
Peningkatan
produksi
Perluasan
pasar
Resources
Operations
Financial
Production
Cash Flow Revenue Net Profit
Human Capital
Electric Power Consumption per Capita is Limited
978
Dengan installed capacity ~60.148 MW untuk
250 juta penduduk, maka konsumsi listrik
per kapita masih terbatas sebesar 978
kWh/kapita sehingga kurang mendukung
pertumbuhan pembangunan.
Sumber: Kementerian ESDM, 2017
Perlu terus memperluas jangkauan suplai
Primary Energy
Consumption
per capita
(Tonnes oil equivalent)
2014
Indonesia memiliki sumber daya energi yang melimpah (energy export country), akan tetapi
masih sangat tergantung pada minyak yg sebagiannya diperoleh dari import.
Indonesia
Energy
Production &
Consumption
(Million Tonnes
Oil Equivalent)
5
Primary Energy Consumption
2015 2016
64
45 5
237
Coal Petroleum Renewable Natural Gas
50 72
32
5 63
5
276
43
73
32
5
50
282
6
66
41
6
74
35
50
Production
(351)
Consumption
(159)
Production
(387)
Production
(395)
Consumption
(161)
Consumption
(164)
GEOTHERMAL ENERGY
Indonesia Berkomitmen Mengurangi 29% Emisi Karbon pada 2030
Government Priorities on National Energy Management
1. Maximazing the usage of New and Renewable Energy resources (current ~ 12%)
2. Optimizing the use of gas and coal for domestic.
3. Driving exploration for oil & gas to book more reserves.
4. Implementing energy conservation program as a national movement.
Energy Policy
Hydro ~75 GW 5,25 GW (7%)
Geothermal ~28 GW 1,44 GW (5%)
Solar ~75 GWp 0,07 GW (0,0137%)
Solar ~107 GW 0,00361 GW (0,0034%)
Biomass ~34 GW 1,74 GW (5,1%)
Rencana Umum Energi Nasional (RUEN) 2025
Inovasi dalam mendukung kemandirian energi
Untuk memanfaatkan sumber daya
energi yang beragam & melimpah
diperlukan inovasi untuk mewujudkan
ketersedian suplai energi yang handal
dan terjangkau oleh masyarakat
dengan mempertimbangkan
pembangunan yang berkelanjutan.
Ketersediaan
Suplai
Kehandalan
Suplai Harga
terjangkau
Kemandirian Energi
High
Low
Low High
Coal to chemical
Solar PV
Concentrated Panel - PV
Energi Angin
Hydro
Mini hydro
Ocean Energy
Biodiesel
Geothermal
Pengembangan Teknologi / R&D Prioritas Tinggi
Eco
no
mic
att
ract
iven
ess
Biomassa
Technology Maturity
Bioethanol
Bioavtur
Hydrogen
Fuel Cell
Coal to Fuels
Pengetahuan
Baru
Cara Baru Objek Baru Teknologi
Baru
Penemuan
Baru
I N O V A S I
Operation Excellent, Performance VS Cost
Development Cost 3 %
48 % 42-47%
2 %
Infrastruktur
Dev well & UjiProduksi
EPCC PLTP &SGS
General & Adm
5-10%
90-95%
Exploration Cost
I N O V A S I
PERTAMINA Geothermal Development
~ 2,742 MW by 2030
PAPUA
JAWA
1
5 8
7
4
6 2
3
Total New
developments
1,685
On-going
projects
existing
New developments
725 WKP Eksisting
960 New WKP
Existing assets
(1) Lahendong Units 1-6 120
(2) Kamojang Units 1-5 235
(4) Sibayak 12
(3) Ulubelu Units 1-4 220
Capacity,
MW
Capacity,
MW
(5) Lumut Balai Units 1-4 220
(6) Karaha Unit 1 30
On-going projects
Capacity,
MW
(7) Hululais Units 1&2 110
(8) Sungai Penuh Units 1&2 110
587
470
2,742
Exploration Development FEED EPCC
2-3 years 3-5 years
Notice Of Resource Confirmation Notice Of Intend to Develop
Development Exploration Production
~ 25 years
Ground Breaking
Production
Proses Lelang, HoA Negosiation on SSC / PPA
Permits: Land usage, IPPKH, IMB, SIPPA, AMDAL, etc
Land acquisitions Infrastructure Drill exploration wells
Permits: Land usage, IPPKH, IMB, SIPPA, AMDAL, etc (if any extension)
Land acquisitions & Infrastructure Drill development & Reinjection wells Construction of SGS & Power Plant IUPTL
Selection of WKP
1-2 years
Grass-root infrastructures Unsuccess Drilling Operation Fail to find permeable & High
temperature zone Under-capacity resources
Grass-root infrastructures Over-run on drilling cost Under capacity on production/injection wells Delay & overbudget on EPCC Prolonged on SSC / PPA negotiation
Under-rated power plant performance
High Declining rate Well problems (Scaling,
etc) High maintenance cost
COD
Natural Hazard, Environmental issues, Social issues
O&M Reservoir Management Drill make up wells
RISKS & CHALLENGES
Geothermal development takes ~ 5 - 7 years
Estimated solar irradiation map of Indonesia
(kWh/sqm/day) Solar insolation map Peak sun hours
January
July
4.75 4.90
4.90 5.25
5.25 7.50
Indonesia relatif memiliki eksposure sinar matahari yang intensif dengan level radiasia matahari tertinggi di
wilayah Jawa, Sulawesi and Nusa Tenggara
1
Solar Module Solar System Electricity Solar Cell Wafer Polysilicon
POTENSI PASIR KUARSA
PROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARATPROPINSI. NUSATENGGARA BARAT
PROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALOPROPINSI. GORONTALO
PROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTAPROPINSI DAERAH ISTIMEWA YOGYAKARTA
PROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTENPROPINSI. BANTEN
PROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARAPROPINSI. MALUKU UTARA
PROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKUPROPINSI. MALUKU
PROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATANPROPINSI. KALIMANTAN SELATAN
PROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARATPROPINSI. KALIMANTAN BARAT
PROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAHPROPINSI IRIAN JAYA TENGAH
PROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALIPROPINSI. BALI
PROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAHPROPINSI. SULAWESI TENGAH
PROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARAPROPINSI. SUMATERA UTARA
PROPINSI BANGKA BELITUNGPROPINSI BANGKA BELITUNGPROPINSI BANGKA BELITUNGPROPINSI BANGKA BELITUNGPROPINSI BANGKA BELITU