Indtryk fra International Applied Reliability Symposium
description
Transcript of Indtryk fra International Applied Reliability Symposium
Indtryk fra International Applied Reliability Symposium
28-30 Marts 2012
Warsaw, Polen
ARS 2012 CHS2
113 deltagere,heraf 4 fra Danmark
ARS 2012 CHS3
Challenges in Utilizing CMMS Data in Asset Performance Management by Adamantios Meltor
Succesful Physical Performance Management by Arkadiusz Burnos
ARS 2012 CHS4
•Root Cause Analysis
•Risk Assesment
•Response
ARS 2012 CHS5
“Dagens “historietime”
•Crow AMSAA) Model
Main Results: Growth rate; Demonstrated MTBF;Goodness-of-Fit Test; Confidence Intervals.
Benyttes i U.S. DoD military handbooks MIL-HDBK-189
•Crow Projection model
De kloge ord her:I test skal der skelnes mellem fejl der skyldes “arvede fejl” og fejl der skyldes ting der kan ændres
ARS 2012 CHS6
Split failure by country: Cars in
India do not have the same
mission profile as cars
in Europe.
ARS 2012 CHS7
• LCD TV Failure rate prediction for new designs is VITALLYIMPORTANT to understand if profit can be achieved from LowMargin, High Volume products.•In Europe average cost per failure including logistics cost > $150. (selling price ~ $300)
ARS 2012 CHS8
…fortsat
Ongoing Reliability Test
Accelerated Life TestingField Return Rate
Yield data
ARS 2012 CHS9
Spørgsmål?
?